Professional Documents
Culture Documents
Section 3 Hydraulic System
Section 3 Hydraulic System
Section 3 Hydraulic System
Pd1
22 Pressure sensor
Pa1
24 Pressure sensor
41 PS 24 55 TRAVEL(R) TRAVEL(L)
25 Terminal block
26 34 32 T 26 A1 A2 P2 A3 A1 A2 DR0
P T P
P0 26 Last guard filter
24 PS Ai T1 28 Shuttle valve(option)
Pd0 P3 P2 P1 Pu 30 Boom safety valve(option)
(1) (2) (2) (1)
31 Arm safety valve(option)
Pd5 Pc5 Pc6 Pd6 P1 T P1 T 47
32 RCV dozer lever(option)
33 EPPR valve(option)
SWING P T
5 ARM BUCKET P T
6 BOOM 26 P T TRAVEL T B
34 Breaker pedal(option)
7 Psv P A
35 Accumulator(option)
A1 a4 A2
36 Accumulator(option)
a1 a2
(2) (1) (4) (3) 22 PS PS 22 1 37 Stop valve(option)
(1,a) (3,b) (2,d) (4,e) (3,f) (1,g) (2,h) (4,j)
Pa1 Pb1 Pd1 Pc1
14 13 40 Selector valve(option)
25 DR#,dr# 41 Solenoid valve(option)
a b d e f g h j 16 42 Selector valve(option)
c d1 h1 47 Quick clamp solenoid valve(option)
Pd2 Pc2 Pd40 Pa5 Pb5 PS
33 1 17 26 49 Pressure switch(option)
Pc3
(MCV)
PS 24 Pc40 Pa20 Pb20
2 26 26 Pi2
50 Adjust boom cylinder(option)
15 Pi1
(MCV, Pn1)
3 (MCV, Pn2) ENG 51 Adjust boom safety lock valve(option)
a3
P03(MCV) Pb4(MCV)
Pk
(T/Joint)
Pu
(MCV) 18 20 PS 24 52 Port relief valve(option)
A5 A4 A3 A2 A1 21 Dr B1 B3 A3
53 Dozer cylinder(option)
P4 19 54 Double pressure check(opt, dozer)
PG(S/Motor)
P3 P0(MCV) 55 Solenoid valve(option, dozer & adjust)
P2
56 Selector valve(option, dozer & adjust)
P1
T(dr1) 57 Line filter
57
1409SB3HC01
3-1