SECTION 3 HYDRAULIC SYSTEM

Group 1 Hydraulic Circuit ------------------------------------------------------------------------------------------------- 3-1


Group 2 Main Circuit --------------------------------------------------------------------------------------------------------- 3-2
Group 3 Pilot Circuit ---------------------------------------------------------------------------------------------------------- 3-5
Group 4 Single Operation ------------------------------------------------------------------------------------------------- 3-13
Group 5 Combined Operation ------------------------------------------------------------------------------------------ 3-25
SECTION 3 HYDRAULIC SYSTEM
GROUP 1 HYDRAULIC CIRCUIT
53 51 50 T(dr2) E 10 11 8 9
3 dr5
Pi1 Pi2
(Pump) (Pump)
SH
30 30
54 54 56
Rs Pn2 Pn1
E
PG 2 V2 Pi1 PS
31 22
C6
Au
D6 Pc6 52 Pi1
T(dr3)
49
Dr
40 36 dr6 V2
35 37
OPT-C
(DOZER)
Pd6
B
37 Puo
B5
C
GB GA
C5 A5
1 Main pump
D5 Pc5
Pb5 2 Main control valve
B(CW) Mu A(CCW)
28 Pa5 3 Swing motor
Pd5
OPT-B BUCKET 4 Travel motor
DR5
P05
5 RCV lever(LH)
4 P04
6 RCV lever(RH)
RED RED
C4
T1
T2 T* D4 DR3
B4 7 RCV pedal
a3 a2 Pc41
Pb4 8 Boom cylinder(LH)
Pa4
Ps Pd40
9 Boom cylinder(RH)
Pc40
ARM 1 Pc42 10 Arm cylinder
V3
ARM REGEN
11 Bucket cylinder
Pc3 Pb3 12 Turning joint
DR2 42 13 Check valve
Pa21
BOOM 2 ARM 2 Pd41 14 Check valve
P2(BW) P1(FW) P1(FW) P2(BW) C2 27
B2
15 Hydraulic tank
D2 Pc2
Pd2 Pb21 A2 16 Oil cooler
C P D F
12 A Dr B E SWING DR1 17 Air breather
DR4
Pa20 18 Bypass valve
Pk
BOOM 1
P02 24 Pb20
19 Strainer
P03 Patt
PS
B1
20 Drain filter
C1
Pb1 A1
21 5 cartridge valve
D1 Pc1

Pd1
22 Pressure sensor
Pa1
24 Pressure sensor
41 PS 24 55 TRAVEL(R) TRAVEL(L)
25 Terminal block
26 34 32 T 26 A1 A2 P2 A3 A1 A2 DR0
P T P
P0 26 Last guard filter
24 PS Ai T1 28 Shuttle valve(option)
Pd0 P3 P2 P1 Pu 30 Boom safety valve(option)
(1) (2) (2) (1)
31 Arm safety valve(option)
Pd5 Pc5 Pc6 Pd6 P1 T P1 T 47
32 RCV dozer lever(option)
33 EPPR valve(option)
SWING P T
5 ARM BUCKET P T
6 BOOM 26 P T TRAVEL T B
34 Breaker pedal(option)
7 Psv P A
35 Accumulator(option)
A1 a4 A2
36 Accumulator(option)
a1 a2
(2) (1) (4) (3) 22 PS PS 22 1 37 Stop valve(option)
(1,a) (3,b) (2,d) (4,e) (3,f) (1,g) (2,h) (4,j)
Pa1 Pb1 Pd1 Pc1
14 13 40 Selector valve(option)
25 DR#,dr# 41 Solenoid valve(option)
a b d e f g h j 16 42 Selector valve(option)
c d1 h1 47 Quick clamp solenoid valve(option)
Pd2 Pc2 Pd40 Pa5 Pb5 PS
33 1 17 26 49 Pressure switch(option)
Pc3
(MCV)
PS 24 Pc40 Pa20 Pb20
2 26 26 Pi2
50 Adjust boom cylinder(option)
15 Pi1
(MCV, Pn1)
3 (MCV, Pn2) ENG 51 Adjust boom safety lock valve(option)
a3
P03(MCV) Pb4(MCV)
Pk
(T/Joint)
Pu
(MCV) 18 20 PS 24 52 Port relief valve(option)
A5 A4 A3 A2 A1 21 Dr B1 B3 A3
53 Dozer cylinder(option)
P4 19 54 Double pressure check(opt, dozer)
PG(S/Motor)
P3 P0(MCV) 55 Solenoid valve(option, dozer & adjust)
P2
56 Selector valve(option, dozer & adjust)
P1
T(dr1) 57 Line filter
57
1409SB3HC01

3-1