"Ls Xxiv & Part Bill": Bill Measurement P. Upto Since Date Last
"Ls Xxiv & Part Bill": Bill Measurement P. Upto Since Date Last
Name of Work : Construction of Bridge across Uppanar in Vedaranyam Municipal Area in the Following Location
.(i) Between Manianthievu and (ii) At km 1/2 of Sannathi street (iii) At km 1/6 of Thopputhurai -
A.cattuthurai road (iv) Between Arukkattuthurai and Ayyanar Kovil Vasal at km 2/8 of Arukkattuthurai
road (v) Between Arukkattuthurai and Kollithevu at 3/4 of Aruttuthurai road .
1297.74 M3 0.00 M3
as per Vide Page 30/9545 4900.00 M3 6358926.00 0.00
10
44.00 M3 0.00 M3
as per Vide Page 150.00 M3 6600.00 0.00
11
45.231 M3 M3
as per Vide Page 42/9250 6800.00 M3 307570.80 0.00
12
Providing and fixing PVC expansion joints
including cost and conveyance of expansion joints,
shalimar pad an joint sealants and fixing them in
position etc., complete.
10.00 nos 2.00 Nos as per Vide Page 59/9250 3800.00 M3 38000.00 7600.00
13
44.01 M3 14.67 M3
as per Vide Page 86/9230 6200.00 M3 272862.00 90954.00
18 vibrated cement concrete M15 (Nominal mix
1:2:4) using 40mm ISS size hard broken granite
metal including cost and conveyance of all
materials to site, cost and labour charges for
formwork centering, labour charges for laying,
compacting curing, all incidental charges etc
complete for base course below approach slab.
591.60 M3 169.20 M3
as per Vide Page 77/9230 300.00 M3 177480.00 50760.00
20 Vibrated reinforced cement concrete M30
(Design mix) using crusher ISS, HBG graded
metal of 20mm and below including cost and
conveyance of all materials to site but
excluding cost and fabrication of steel but
including cost and labour charges for
formwork centering, labour charges for laying
compacting curing, including all incidental
charges etc., complete for APPROACH SLAB.