Comparison With Conventional Floor VS Fibermesh Floor
Comparison With Conventional Floor VS Fibermesh Floor
Comparison With Conventional Floor VS Fibermesh Floor
1 Reinforcment Laying 200-250 Kg per day with 2 One/Two person at the batching Saving in time and labour gives early
and tying Bar benders 2 Helpers ( 10 plant or at the mixer. Cutting bags handover and cost saving
hrs) for lesser diameter and dosing
else varies
4 Conecrete pouring Truck mixer or bag mixer Mixer can go to pouring site as Saving in lead time as distance
has to be loacted beyond there is no reinforcement between mixer and actual site is
the flooring area reduced