GPCL-023 Project Risk Assessments Rev.0
GPCL-023 Project Risk Assessments Rev.0
GPCL-023 Project Risk Assessments Rev.0
Severity/Likelihood Matrix
Severity
Major Single
Slight
Minor/Serious Injury Lost Fatality/ Multiple
Injury
Injury Time > 3 Permanent Fatalities
First Aid
days Disability
Likelihood 1 2 3 4 5
Certain 5 5 10 15 20 25
Very
4 4 8 12 16 20
Likely
Likely 3 3 6 9 12 15
May
2 2 4 6 8 10
Happen
Unlikely 1 1 2 3 4 5
0–2 Trivial Risk - No further improvements necessary provided control measures are maintained.
3–6 Adequately Controlled Risk - Risk is tolerable when control measures identified are implemented.
work by - Injury 5 4 20 -Check the grinding disc and ensure that 1 4 4 Acceptable Risk
1 using - electrical there is no cracks
Grinding shock - Motor safe guard must be used
machine - fire - RPM for grinding machine shall be ≤
RPM for disk.
- All personal aware of grinding hazard
- Do not cut in wet or any area have
contain water
- Use equipment by competent personal
only
- All connections and cables to be
checked before use.
- Do not touch live electrical part without
glove.
-The area of work should be free from
any flammable material
- Fire extinguishers beside the hot work
- Good supervision.
- All labors should be aware of fire
hazard
- TBT before the work.
- Using suitable PPE
Using Hand - Injury 4 3 12 -All tools should be inspected prior to 1 3 3 Acceptable Risk
2 Tools use and kept good condition
- Use correct tools for the job
-Competent person
-provision of first aid kit
- wear suitable PPE
Welding -Fire 4 5 20 - Remove flammable material. 1 5 5 Acceptable Risk
3 works - Injuries - Use the cover shade if needed.
- Exposure to -Do not weld near flammable material,
ARC rays - Fire fighter man in the site
- Breathing - Fire extinguishers beside the hot work
welding - All personal aware of the hazard of
fumes welding
-Pre job safety meeting before start the
job( T.B.T)
-Avoid direct contact to exposure as
possible
-Provision of 1st aid kit
-Use welding helmet with correct shade
of filter
-Use wind shield
-Wear complete body protection
-Keep your head away from the fumes
- Do not breath the fumes
- Stay upwind during welding.
- Use PPE.
Lifting the -Wire failure 4 5 20 - The crane should be certified with valid 1 5 5 Acceptable Risk
7 Equipment during certificate.
during Lifting the - Inspection for the wire before starting
working at Equipment (visual test) and should be with valid
Plant from storage. certificate.
location. - Lifting plan should be prepared.
- Hit the load - Choosing the suitable slings to the load
to the - Caution tape surrounding the Area of
equipment work.
during lifting - Qualified sign man wears deferent color
jacket
- Bending the - Check that there is no other work in the
boom of work area
crane during - Using Tag line
loading - All non-essential personal keep away
from the area of work
- Injuries - All personal aware for the hazard of
Lifting
- Multiple - Competent person.
Fatality --Pre job safety meeting before start the
job (T.B.T).
- Exhaust - Wear suitable PPE ( Gloves, Helmet,
from Goggles, Safety Shoes)
crane during - Periodical maintenance for crane.
the work - All personal must be aware for hazard
of exhaust pollution.
- Shut down the crane if you don’t used it
10 Working - Injuries 4 4 16 1- The heat emissions from work should 1 4 4 Acceptable Risk
during heat be taken into account
stress hazards 2-Available good ventilation inside the
caravan
3-Any labor shows signs of heat stress
should drink a lot of liquid
4-Avoid monotonous work
5-Take many break between hard works.
3- Good supervision
Conclusion/Comments:
........................................................................................................................................................................................................................................................................
...............................................................................................................................................................................................................................................................
……………………………………………………………………………………………………………………………………………………………………
..