Perhitungan Profil Melintang Spillway Embung Jatisari
Perhitungan Profil Melintang Spillway Embung Jatisari
Perhitungan Profil Melintang Spillway Embung Jatisari
X
0.175 Hd
X1.85=2Hd0.85Y X
Elev. Crest = 105.32
Hd = 2.140 m R1 = 0.5 Hd
R1 = 1.10 m R2 = 0.2 Hd
R2 = 0.50 m
0.175 Hd = 0.40 m
0.282Hd = 0.70 m
2.50 1.000
1.500
2.000
2.500
3.000
3.500
4.000
DESIGN OF SILT SECTION AT KERTOSARI POND
X2=4m2hY
Y m= 4.386
X Y Elevasi
0.00 0.00 15.30
0.10 0.00 15.30 0.877193
0.20 0.01 15.29
0.30 0.01 15.29
0.40 0.02 15.28
0.50 0.03 15.27
0.60 0.05 15.25
0.70 0.06 15.24
0.88 0.10 15.20
0.80 0.08 15.22
PERHITUNGAN ALIRAN DEBIT DAN KOEFISIEN PADA PELIMPAH
BENDUNG GELANG
El. Crest Tanggul = 107.32
Fb = -0.071 m
El. Crest = 105.320 m 107.391
Flood Discharge (Q100) = 193.776 m /sec
3
Correlation H dan Q at
Gelang Spillway
2.5
2.0
Water Dept (H) m
1.5
1.0
0.5
0.0
0 20 40 60
Flood 80 100(Q) m3/sec
Discharge 120 140 160 180 200
PERHITUNGAN ALIRAN DEBIT DAN KOEFISIEN PADA PELIMPAH
BENDUNG GELANG
El. Crest Tanggul = 107.32
Fb = 0.428 m
El. Crest = 105.320 m 106.892
Flood Discharge (Q100) = 193.776 m /sec
3
Correlation H dan Q at
Gelang Spillway
1.8
1.6
1.4
Water Dept (H) m
1.2
1.0
0.8
0.6
0.4
0.2
0.0
0 20 40 60
Flood 80 100(Q) m3/sec
Discharge 120 140 160 180 200
PERHITUNGAN ALIRAN DEBIT DAN KOEFISIEN PADA PELIMPAH
BENDUNG PAINGAN
El. Crest Tanggul = 91.706
Fb = 0.646 m
El. Crest = 89.007 m 91.060
Flood Discharge (Q100) = 193.776 m /sec
3
Correlation H dan Q at
Paingan Spillway
2.5
2.0
Water Dept (H) m
1.5
1.0
0.5
0.0
0 20 40 60
Flood 80 100 (Q) 120
Discharge m3/sec140 160 180 200
PERHITUNGAN ALIRAN DEBIT DAN KOEFISIEN PADA PELIMPAH
BENDUNG SUMBERGAYAM
El. Crest Tanggul = 88.001
Fb = 0.529 m
El. Crest = 85.083 m 87.472
Flood Discharge (Q100) = 193.968 m /sec
3
Correlation H dan Q at
Sumbergayam Spillway
2.5
2.0
Water Dept (H) m
1.5
1.0
0.5
0.0
0 20 40 60
Flood 80 100(Q) m3/sec
Discharge 120 140 160 180 200