Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Ras gahreb gas treatment plant

rev :01

date :15/4/2015
1 client Capital Gas equipment no 70-v-101 A/B/C
2 Service Propane QTY 3
3 Size 3790 ID X 52500 MM T/T Location Ras Ghareb -Red Sea -Egypt
4 Orientation /support Horizontal /Saddle Support
5
6 MECHANICAL DATA
7 Design Code ASME VIII DIV 1 &2
8 Content Propane
9 Design Pressure (Internal/External) bar (g) 21.6/FV
10 Design Temperature °C FROM -20 TO 150
11 Operating Pressure bar ( g) 18.0
12 Operating Temperature °C 55.0
13 Hydrotest Pressure bar (g) 28
14 Density kg /m3 510
15 Capacity m3 614
16 Corrosion Allowance mm 3.0
17 Min. Design Metal Temperature (MDMT) °C -20
18 Joint Efficiency (Shell I Head) 1.0
19 Radiography (Shell / Head) Full
20 Stress Relief as per code
21 PWHT NO
22 Insulation NO
23 Fireproofing YES (ON SADDLES)
24 Painting / Coating Refer note
25 Inspection By
26 Code stamp
27 Wind Data As per ASCE 7 - 10 wind speed 165km/h
28 Seismic Data as per code UBC 1997
29 WEIGHT
30 Empty Weight. tons ~ 160
31 Operating Weight tons ~ 325
32 Hydrotest Weight. (Full of Water) tons ~ 633
33 MATERIAL SPECIFICATION
34 Shell EN 10025-2-S355JR Internal attachments Carbon Steel
35 Dished End EN 10025-2-S355 JR (ladder,vortex, Dip pipe
36 Nozzle (SRN) ASTM A53/A106
37 Nozzle Flanges ASTM A53/A106
38 Support EN 10025-2-S355 JR External attachments EN 100025-2-S355 JR
39 Name Plate
40 Earthing Boss
32
33
34
35 * Indicative , Contractor to confirm and provide accordingly during detail engineering.
36
37
38
39

You might also like