DNIP-ESC-0003-C3 -BAR BENDING SCHEDULE

LEGEND
Type A Type B Type C Type D
a
c
a c b b a

b a b b
DIA a b c TOTAL UNIT WT TOTAL
DESCRIPTION MARK TYPE NOS
mm mm mm mm L -meter kg/m WEIGHT
PEDESTAL-P-2no's
Main reinforcement 1 D 24 16 335 0 0.34 1.58 12.703
Ties 2 B 18 8 220 220 100 0.98 0.39 6.880
WEIGHT(kg): 19.583
5%WAST
AGE 0.979
TOTAL WEIGHT(kg): 20.562
CONCRETE DETAILS
QUANT
L B H
DESCRIPTION NOS ITY cu
m m m
m
PEDESTAL-2no's 6 0.3 0.3 0.30 0.162
TOTAL QUANTITY: 0.162
ODBTS BAR BENDING SCHEDULE
LEGEND
Type A Type B Type C Type D
a
c
a c b b a

b a b b
DIA a b c TOTAL UNIT WT TOTAL
DESCRIPTION MARK TYPE NOS
mm mm mm mm L -meter kg/m WEIGHT
ODBTS SLAB-1no.(1.2X1.05X0.15M)
Along Shorter span 1 A 14 10 110 1150 110 1.37 0.62 11.892
Along Longer span 2 A 16 10 110 1000 110 1.22 0.62 12.102
WEIGHT(kg): 23.994
5%WAST
AGE 1.200
TOTAL WEIGHT(kg): 25.194
CONCRETE VOLUMES
QUANT
L B H
DESCRIPTION NOS ITY cu
m m m
m
ODBTS SLAB-1no.(1.2X1.05X0.15M 1 1.2 1.05 0.15 0.189
TOTAL QUANTITY: 0.189