Input data
γ s 1= 27 ; γ s 2= 26.5
n1=33 % ; n2=36 %
ω1=10 % ; ω2=15 %
ф’1=25˚ ; ф’2=22˚
C’1=20 kPa ; C’2=25 kPa
N = 31 ; d = 4 m ; b = 1.5 m
q = 1.5 + 2.5*Gr. = 15.2 KPa
H1 = 3.5 + 0.1*Gr. + N*1/50 = 3.9 m
H2 = 2.9 + 0.1*Gr. + N*1/50 = 3.3 m
Predemensioning
m1 =1/tgψ 1 = 1,5 m
m1 * H1= 5.9 m
m2 ==1/tgψ 2 = 1,4 m
m2 * H2 = 4.6 m
ε1=25 ˚
ε2=35 ˚
Design approach 1 : A1 + M1
Combination 1:
1∗bi 2∗bi
∑ (1∗γ 1∗A 1∗cosαi∗tan ф1+c cos αi + 1∗γ 2∗A 2∗cosαi∗tan ф 2+ c cos αi ¿ ) A 1
Safety F1= ¿ = B1
∑ (1,35∗(¿ γ 1∗A 1+γ 2∗A 2)+1,5∗bi∗q)∗sin αi ¿
Combination 2:
SafetyF2=
1/1,25∗bi 2/1,25∗bi
∑ (1∗γ 1∗A 1∗cosαi∗tan ф1/1,25+c cos αi +1∗γ 2∗A 2∗cosαi∗tan ф 2 /1,25+ c cos αi
¿)
¿=
∑ (1∗( ¿ γ 1∗A 1+ γ 2∗A 2)+1,3∗bi∗q)∗sin αi ¿
A2
B2
10
8
Safety Factor
0
0 1000 2000 3000 4000 5000 6000
Fellenius line (cm)
f(x) = 0
Design Approach C2
14
12
10
Safety Factor
8
6
4
2
0
0 1000 2000 3000 4000 5000 6000
Fellenius line (cm)