Oral Questions Paper Surveyor Wise New - New

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 30

External venugopal questions refer image 1

Surveyor ...Mohan ..
FUNCTION 3:
1. Annex 3? Also tell me name of all annexes?
2. Annex 1
3. Oil record book? Entries?
4. latest ammendments in annex 5.
5. Container ship fixed and latest fire fighting ?
6. Latest Solas amendment for Container ship fire fighting on deck.
7. What describes the Hazardous cargo and details. How to identify the same on-board containers.
8. Scavenge fire and fire fighting measures for same?
9.
10. What is solas requirement for co2.
11. Co2 what checks
12. Co2 reg and pr testing
13. Explain the CO2 system.
14. Safeties in the CO2 system.
15. Lifeboat davit safety,
16. Windlass safety.
17. slipping clutch,
18. margin line and Uses
19. margin plate and function,
20. Damage stability,
21. Integrated stability.
22. Bilge discharge criteria for oil tankers.
23. Solid floors
24. Foam calculations
25. Dcp maintainnence
26. Seq preparation
27. Difference btwn coc and recommendation
28. Squatting ?
29. Explain the working procedure of water lance and water monitor.
30. Explain the Fire detection system and how to test it in container cargo space and the fixed fire fighting installation
system installed in detail.
31. what is Angle of List, Angle of heel, Angle of lol and how to correct it.
32. Explain the free surface effect and how to minimise it.
33. Discuss the preparation for Load Line Survey in detail.
34. ESP explain,
35. Enclosed survey program,
36. types of keel, duct keel, void space,
37. diff between void space and duct keel,
38. margin plate and function,
39. balanced rudder and compare with other rudder,
40. gunvel and purpose,
41. SFOC Calculation,
42. Conditions of assigning freeboard.
43. How loadline marked?
44. Margin line
45. What is bonjean curve
46. Intact stability and damage stability
47. Permisible length
48. Static and dynamic stability
49. If block coefficient is less, what will happen.
50. What all thing u carried in product carrier
51. what is cow requirements as per solas
52. what is ig regulations
53. what is voc in annex 6 say what all present as marpol
54. ship board incineration
55. mast fire extinguisher
56. what u ll do ship goes to polar water
57. what is esp ,what u do in close up survey in esp
58. What is LEL HFL value of hydrocarbons
59. What is dilution line in flammable diagram
60. Wake fraction, speed of advance, slip X qns
61. Marpol Annex 1,2,5 discharge criteria
62. Requirements of sounding pipe and air pipe
63. Types of keel and it's applications
64. Co2 five yearly maintenance
65. Aspect ratio of rudder
66. Solas chapter 11-1 explanation
67. annex 2 discharge
68. floodable length
69. solas requirements of emergency fire pump, hyper mist sysytem
70. windlass safety
71. ufl and lfl values of hydrocarbons
72. ship goin to and coming from Antarctica what will u do
73. fixed fire fighting sysytem
74. annex5 recent ammendments
75. esp
76. water integrity

External: Mr. Venugopal Function.3


1. Annex VI? marpol 6 substances ?
2. Annex 5 what r garbage. Latest amendments.
3. Chapter 9 objective
4. explain ism code?Ism applicable to what kind of ships? How many chapters in ism
5. marpol annex 3 explain with regulation.
6. Lifeboat brake working, how do to speed test for brake? life boat heveeing up explain procedure in detail , interval
carry out it. Lifeboat launching speed, how will u know whether o.6m/s has been comply nd met d regulation. How
will u check it. Type of lifeboat, lowering mechanism & hoisting mechanism.
7. Rudder construction? How rudder is fitt1ed? How rudder attaches to ship? Steering gear construction, how rudder
weight is taken care. Types of rudder?
8. Foam fire fighting system
9. Sea chest construction
10. CO2 released and u r in engine room, what actions to take? Co2 calculation with units ...what is free volume of
co2? CO2 periodical maintaince he want to know at how much pressure test carried out ask 15 yearly
maintenance. Function of fixed co2 system , what is meant by including / excluding casing.Safeties in co2 system
for fixed fire fighting. ? Fixed fire fighting system in engine room, CO2 calculation, CO2 room safeties and purpose
of relief valve in manifold. Co2 calculation ? Co2 calculation and foam system calculation(fixed fire fighting system
in detail)
11. What is mixture ratio?
12. Safeties for bulk carrier
13. About high density cargo loading
14. What are all the rules regarding triangle marking on bulkcarrier loading high density cargo...wheater applicable to
all types of bulk carrier loading high density cargo??...
15. Inclining experiment..why and how...where u will place ? Inclining experiment.... how it’s doing .... how the weight
is moving?
16. explain special survey.
17. explain stability curve & dynamic stability.
18. How boyancy intersecting M.
19. Foam criteria for deck. Quantity calculation.
20. Solas regulation for pump room safety. Pump Room Safeties?
21. Solas regulation for steering gear
22. Load line diagram.
23. Statutory certificates
24. Fixed fire fighting system other than co2 explain
25. Emergency fire pump suction location
26. Flare and camber purposes
27. In drydock which part they make first for ship building. Draw it.
28. Angle of vanishing explain
29. Operating of temp/ pr of safities- punture vv, relief vv,
30. How isps is comply onboard, who s authority . Wat u ll do as 2nd engg.
31. Annex-1 Discharge criteria for cargo residues
32. Slop tank capacity- requirement
33. Annex-1 Documents not certificates**
34. ORB Entries? ORB in details ? -Orb regulations and entries
35. What actions once orb is over(an entry has to be made somewhere, he was saying, not happy with Engine Log
Book.. Official log book maybe?? ) , entries regarding ows maintenance, etc and some more
36. IG-Regulation,Safeties,Composition
37. Muster List contents
38. What type of ship sailed with. LPG properties.
39. Cargo tank construction.
40. Integrity of tanks and how cargo tank pressure is maintained.
41. Cargo pumping arrangements.
42. LPG cargo compressor construction and working.
43. Type of fire fighting used on deck and it's working, capacity calculation.
44. What is stable and unstable ship.
45. What is metacentric height, is it a calculated point or what.
46. Anti-Rolling devices
47. Certificate carried on board ( gas carrier )
48. When and what is done in dock survey
49. When lifting weights from crane where is ur center of buoyancy
50. Annex 6 explain with certificate
51. Solas chapter 9, ISM code , wats the regulation number for DPA
52. Wat is solas chapter 11 , explain
53. Wats regulation 17 of marpol annexe 1 ? It's orb part 1 & relevant entries
54. Wat is metacentre ? Centre of bouyancy , centre of gravity & how all these varies as the ship is inclined ? Does
COG change with inclining ??
55. Requirements for number of portable extinguisher in machinery space
56. Asked about writtens results, why two attempts. Gave a smug answer.
57. what all you have prepared for what to ask? I said all, n can start with NA. He didn't ask me a single question from
NA.
58. Iapp, eiapp and NOx tech file. Just brief, Nothing elaborate.
59. what type of LB, breather, braking arrangements, speed requirements, how LB hoisted w/o rolling back.
60. Torsion box, why its needed, how strengthened
61. Docking survey, intervals(I told him about 7.5yrs extension, he was impressed 😂) , what all items come under it,
IWS, asked about extension requirements.
62. Tail shaft survey, how it's extended, what all requirements to be met.
63. type of vessel sailed.tanker pump room regulations as per SOLAS
64. Drills on board and the frequency.
65. ISM,DOC,SMC
66. B60&B100 type of vessels
67. Freeboard and how it is calculated
68. Explain marpol annex 4
69. Fixed co2 system installion in detail.. Certificates and safety.. Time delay units secs and where it is mentioned in
solas..
70. Purpose of time delay unit..
71. Annex 1 IOPP suevey preperation.. How u will prepare and wat are docs and certficates required.. He wants all
spares regarding ows.. Wat reg 17 says in annnex 1.
72. Angle of loll and how to correct.. Gone upto GZ curves calculations.
73. What ship u sailed
74. What is breast hook
75. How ll u identify sheer strake
76. How load from rudder transmitted to hull
77. How load line marking is marked Wat is the criteria
78. What r all the items not covered in CSM
79. what is SOLAS chapter 9 Wat r the certificate under this
80. Validity of DOC AND SMC what is intermediate survey in this
81. Difference b/w intermediate survery of DOC and SMC and other intermediate surveys
82. how ll u calculate the total required quantity of Co2 of ship
83. What is EPIRB LOCATION how it is activated. How its hru is different from the life raft HRU
84. Dynamical stability and statical stability GZ curve unit of dynamical stability
85. Structural difference between container and bulk carrier
86. How freeboard is assigned
87. Annex 4, discharge criteria, what is mean by “nearest land”-definition as per marpol, regarding pumping out or
retaining sewage in port where it is mentioning in marpol
88. Statical stability and dynamic stability, curves
89. Firefighting arrangement in cargo space, what are the latest regulations for container vessel
90. Latest amendments in solas and marpol
91. Sewage discharge criteria
92. Nearest land
93. Anniversary date
94. Ballast water management
95. harmonised survey .what r d certificates u will check.
96. what is csm? which equipment’s not comes under CSM.
97. stable and unstable ship.what is meta centric height .
98. why triangle is marked on bulk carrier .
99. tell about chapter 12.what r d contents .what is dere in damage stability .
100. Annex 4.discharge criteria .what is the discharge pressure of pump .
101. What is ism ? All elements of ISM code.,Documents under ISM code and validity of each document.
102. What is checked for doc renewal? Who issues it?
103. IOPP survey preparation. What all certificates u will show to surveyor?
104. Special survey interval. What checks done during special survey?
105. High expansion foam criteria for discharge?
106. Difference between foam solution and foam concentrate?
107. How foam is being produced in foam system? Foam calculation.
108. How is rudder fitted to ship
109. How it is made single plate or multiplate.
110. Annex 4. Sewage definition. Discharge criteria
111. Certificates and validity
112. Difference between doc and SMC
113. What is csr
114. gz curve
115. CO2 system maintenance full by monthly. Annually upto 10 years
116. CO2 system safeties
117. Marpol Annex 6 complete explain
118. Load line convention, what all it say about
119. Iopp renewal survey
120. How sea chest is attached to the hull of the ship,
121. Co2 calculation
122. How many bottles in ur ship

Internal Sirish external new Function 3


1. Types of double bottoms ? Double bottom construction ?
2. What is fully balance rudder? What is rudder wash down? Balanced rudder and different types of rudder?
Balanced rudder?
3. How many docking plan ? Docking plan and no.of docking plan onboard. types of docking?
4. Stresses in ships
5. Shell expansion plan and its use.
6. Types of double hull construction.
7. torsion box.
8. purpose of telltale hole on dry powder type extinguisher.
9. types of container vessel
10. What is camber and all ship nomenclature?
11. What is aspect ratio?
12. Different collision bulk heads? And how many?Functions of bulk head ?Types of bulk head?
13. Purpose of roto cap?
14. Exhaust valve overhaul? Safety?
15. Coffr dam
16. Co2 release precautions
17. Line plane

External : Mr. suresh nair and Mr. selvaraju Function3


1. 2nd engineer how instincts new 4E
2. Life boat engine inspection for survey
3. Different between safety valve and relief vv
4. While shifting load what happened to gm..g...m
5. Marpol

Surveyor Krishnan Function 3


1. What is the purpose of torsional box
2. Difference between audit n survey
3. What is meant by Major non conformity give example
4. As a 2E preparation for drydock
5. Precautions before entering a db tank
6. What is breast hook and panting stinger
7. MLC 2006 details
8. EEDI AND EEOI and difference , EEOI Vs EEDI
9. Details of Nox technical file
10. Condition of freeboard
11. Relationship between freeboard and stability
12. Load line survey
13. TPC and it's application, Factors affecting TPC
14. Safeties in Ro Ro ship side shell door
15. Solas regulation for water leakage system for Ro Ro side shell doors.
16. Ballast water management & and when India ratified BWC?
17. Rest hours between mlc 2006 & STCW 2010
18. MLC 2006 Chapters and Minimum age criteria, objective
19. Ism code , objective and all chapters name
20. Periodic maintenance system and emergency maintenance system
21. Risk assessment process, explain where it is mentioned regulation number
22. What is bulkhead as per Solas? Types of bulkheads,purpose
23. What is bulk carrier as per Solas?
24. Permeability n cross qn
25. Latest amendments in all Marpol Annexes.
26. ISPS full chapter, Isps level 2
27. Marpol Annex 1 discharge criteria.
28. OWS inoperational.. In which code to enter in ORB
29. Marpol Annex 4 and 5 full.
30. Criteria for condition of assignment..
31. Differentiate Flag state inspection n port state inspection
32. SOLAS chapter 12 full
33. CO2 casing calculation with digram
34. CO2 room and CO2 system safeties
35. Hypermist system regulations and everything..
36. Smoke and heat detectors
37. Lumber hole in DB tks
38. How to train ur J/E regarding safety culture onboard?
39. Connection between reserve buoyancy and freeboard
40. panting stringer
41. water ingress alarm position inside cargo hold
42. marpol certificates
43. marpol annex 6,sox,nox, incinerator and BDN
44. MCT1
45. Factors deciding TPC
46. Bulk head definition as per SOLAS and Bulk carried safety mentioned in solas
47. why bulbous bow fitted to particular ships and its function
48. how to identify a ship is fast or slow speed ship
49. annex 6 certificate and validity and. About EEDI AND EEOI ,SEEMP
50. What is meaning of convention and code, Code Vs Convention
51. MLC convention and about young seafarer requirements to sail on ship
52. STCW Is a convention and y on stcw course certificate it is mentioned as as per stcw code
53. Types of Floors and what is transom floor
54. fixed co2 bottle calculation and free volume of co2 .56m3/kg where it is mentioned
55. Free surface effect on ship
56. Breast hook where and why
57. Fire pump regulation as per Solas
58. Convention and code, its difference. STCW code Or convention
59. Audit and inspection difference
60. Ism elements.. Regarding Master Review
61. EEDI AND EEOI difference
62. ISPS security level 2 explain - He is interested in entry log at Gangway
63. Explain the hypermist system in your ship.....pls tell about operating pressure also
64. Permiablity
65. Free surface effect
66. Lpg tank cons and fitting
67. Safeties of lpg tank
68. Free surface effect in lpg
69. material of tank
70. Marvs
71. Igc code cargo chapter 19 similarity ibc
72. Eedi eeoi who will decide everything in n out
73. Seemp full
74. Ism code certificate validity who will issue
75. Eiapp full who will issue pre certificate what it is full EIapp?
76. Cargo comp room pump room safeties
77. Eiapp pre certificate who will issue
78. EIAPP issued by maker to parent engine ..this is pre certification which h shows the limit of setting and
adjustment when engine is installed on board ..after engine installed during sea trial surveyor will ensure all
engines it's compling nox limit and certify with EIAPp certificate
79. Eiapp Certificate issued by classification society by Flag administration
80. Type of ship sailed
81. Wat is shell expansion plan
82. Wat is bonjion curve
83. Free surface effect, how to reduce
84. Slow ship and fast ship
85. What is cross curves of stability and types
86. Annexe to ur ship with names
87. Is IOPP is given to all ships
88. Pollutants of annex 6
89. Is CO2 is a pollutants under 6
90. Initial audit Vs Intermediate audit
91. Internal audit Vs External audit who carry out these audits
92. Audit Vs survey
93. DPA, why risk analysis .
94. CO2 calculation
95. Unit and value of volume of free gas of CO2 where it is mentioned
96. Explain fixed foam system and Foam system checks
97. Additional bulk carrier safety,asked about water ingress alarm.structural strength .
98. strengthening member for panting and pounding .
99. Fixed foam ratio.
100. High speed craft medium speed craft how you will identify.
101. Co2 mainteance as a second er how you will prepare.
102. Ows survey as a 2ER how you will prepare.
103. Bulbusbow function.
104. Solas chapter 12 detailed.
105. Pms under which chapter in ISM
106. Aft side strengthened arrangement
107. E/R safety equipment survey preparation
108. Intact stability..minimum GM same for all type of ship?
109. What is damage and dynamic stability??
110. New amendment in marpol 5
111. What is solas chapter 11 explain
112. Different between initial and intermediate survey
113. What are the conditions initial survey are subjected to
114. If major changes occurs survey will continue from initial survey or will continue as it is
115. What do mean administration
116. As a second engr how u will prepare for seq survey
117. Types of double bottom
118. How many docking plans you have???why so???
119. What is line plan
120. Shipboard incineration
External LSG FUNCTION 3
1. Types of ships sailed
2. How many containers you can carry on deck
3. What is mean by Protocol
4. What is mean by “Tacit Acceptance”
5. What is safety culture, As second engineer how you implement safety culture in ER
6. Why accidents happen on board, why we need to report, whom to report
7. UMS ship safeties
8. What all record you will keep inUMS vessel
9. Watertight door and weather tight door
10. Location of them in ER, maintenance on them
11. What is stress concentration
12. Diff between product and crude construction wise.
13. Wat is fitness certificate for product tanker. Fitness certificate for tanks?
14. Cargo hold fire detection system.
15. Define nearest land.
16. Regulation for overboard discharge from cargo tank.
17. Difference between ODME used for tank discharge and OWS
18. Can OSD used inside engine room ?
19. Ig regulation when came into force? Ig regulations.How O2 is controlled in IG. IG Gas constituents.
20. Fire line pr testing can it be carried out by ship staff? If yes when ? Where can u find that pr test was carried out?
21. Annexe 1 discharge req?
22. New ammendment in annexe v?
23. Deck fire fighting on system on ur ship?
24. Expansion ratio? What makes foam ?
25. Co2 calculation?
26. Freeboard of ur vessel?
27. Reserve buoyancy?
28. Floodable length?
29. Collision b/h reg?
30. What is annex 4
31. What are the machinery under annex 1.

Surveyor sivanaraya FUNCTION 3


1. Reg for incinerator
2. Condition for ship seaworthiness
3. Docking plan and how many is there
4. Shell expansion plan 2d or 3d
5. Mlc 2006
6. Stcw 2010
7. Types of db tanks
8. Safe manning certificate details and validity
9. Safe manning details what he was expecting? 3d ? Dont know I told min persons required for safe operation of
vessel and validity life time..depends upon that ship requires LSA FFA and accommodation facilities..he did not
replied anything
10. Transversely framed ,longitudinally framed and mixed frame db tanks
11. Types of stresses
12. Boiler safeties
13. Types of bulkheads and Function of bulkheads
14. Why oil tanker has less freeboard when compared to bulk carrier
15. What is corrugated bulkhead
16. Rudder checks in drydock.
17. Ship seaworthiness
18. Types of double bottom
19. sopep locker contents
20. Bollards pull
21. Lines plan, uses and draw
22. Shell expansion plan
23. Clear grounds
24. Rudder types and definition
25. GRT NRT calculation and calculation formula
26. Condition of class
27. Psc inspection what points to check.
28. Dispensation?!(didn't answer)
29. Marpol annex 6
30. Latest amendment
31. Ism code doc smc what is chapter and what is element..
32. Minimum safe Manning document
33. Types of ship u ve sailed. Container ship arrangement
34. If one of the crew member dont understand the language of the command given to him n hes doin somethin
else, does tat mean the ship is unseaworthy?
35. Why tankers have less freeboard? Questions abt stability.
36. All 2018 amendments, regulations
37. Orb entries- wat all to enter.
38. Bwm convention, is bwm convention entered into force
39. inclining experiment and purpose
40. before marpol enter into force incinerator used onboard or not
41. Without shell expansion plan how to find shell plating thickness
42. Safeties in ro ro ship
43. Flag state surveys & certifications
44. Ballast water convention
45. Freeing port
46. Psc inspection
47. 2018 ..New amendments
48. List survey items
49. Solas chapter Xl explain?
50. Solas training manual?
51. GZ curve

Surveyor ...Mohan .. FUNCTION 4


1. Explain vit and draw fuel pump and show me how is vit integrated to the fuel pump? how’s the VIT working?
2. How will u do Engine tuning ?
3. U r opening a unit of ME . What all checks?
4. Explain nitriding?
5. Liner calibrations and wear limit?
6. Fuel quality setting?
7. How will u know the fuel quality?
8. What all checks in piston?
9. which surface in the piston ring groove is the most important?
10. Explain FQS (Fuel Quantity Piston) with a sketch
11. What are the properties of Cylinder Lub. Oil.
12. Explain the principle of fuel metering in ur engine.
13. Back pr vv
14. Vapour pr and evaporation difference
15. Lay up m/e checks
16. Type of boiler u worked
17. Difference between safety vv and relief
18. Difference between ship side and ovbd vv
19. Explain the starting air system in RT-flex Engine in detail.
20. Define cold corrosion and hot corrosion and causes of it.
21. What is the 2nd order vibration of the IC engine and how it is countered.
22. What is shroud in turbo charger?
23. Purpose of shroude ring I. Turbocharger and sealing arrangement between suction and exhaust side.
24. Nox criteria and problems faced in operator point of using the LSFO fuel in non compliant engine.
25. Stroke to bore ratio?
26. What/why is G in ultra long stroke ?
27. Reasons for liner wear and tell about cold corrosion?
28. Air cooler water mist catcher fouled, what are the effects?
29. Liquid came to compressor side of Reefer system , what safeties given to prevent same ?
30. Engine latest development for 2020
31. Y screw pp y not gear pp for sludge discharge
32. material selection for pipe,
33. manufacturing methods of pipe,
34. what is meant by schedule,
35. Accom AC - how do u remove air from system?
36. while advancing the fuel injection, exhaust temperature will increase or decrease, how and why...?
37. disadvantages of using LSFO and what methods to overcome ..?
38. what is the derating of the engine , how and why it is done...?
39. what is the allowance for free length of the spring in the safety valve...
40. what is LDCL and draw the line diagram...
41. How Auto tuning done in ME engine ?
42. Cold corrosion details, causes and remedies
43. Variable Exhaust closing in main engine
44. Follow up and non follow up in steering gear
45. Hunting gear and cross questions
46. Refrigeration back pressure valve
47. Rudder drop , causes and maximum limit
48. Multistage turbocharger
49. Exhaust gas bypass system
50. How u show to surveyor ur engine is in NOx limits
51. LDCC?
52. Vit?
53. Fqs? Where u will adjust?
54. Challenges in lsfo with cylinder lubrication?
55. Reason for exhaust valve burning?
56. What is load based cooling water system of main engine?
57. How will you correct the timing of engine after chain adjustment?
58. Difference Between high lift and improved high lift safety valve
59. Fuel quality adjustment
60. What is critical rpm and why it is happening?
61. CCAI - limit
62. Safety valve lift pressure and clearance
63. How will u balance ur engine
64. Particular unit show less power how will u improve
65. What is swell and shrink of boiler.
66. New development in turbocharger
67. What type of bearing in turbocharger
68. Fqs, vit
69. Man b&w
70. 6G70ME-C 9 II
71. What stands for G..
72. Green. Ultra long strong
73. Green it reduces 7% of CO2 emission
74. What is auto tuning?
75. Continuously monitoring and adjusting p Pmax and P comp. .
76. What is VEC? Benifit?
In order to optimise the exhaust valve operation over the normal load range, the closing point of the exhaust valve is
changed over 70-85% x MCR. During VEC operation the exhaust valve is closed EARLIER which means that the
compression stroke of the piston is increased. This will lead to higher compression pressures and temperatures.
For instance if the normal closage of the exhaust valve is 130oBTDC, and this gives a compression ratio of 10.6, then
by closing the valve 10o earlier, the compression ratio will increase to 11.2, and the compression pressure will rise by
4 bar, for the same scavenge air/load setting.The unit achieves this by leaking some of the oil contained in the high
pressure pipe .
This will cause the valve to slightly close, but will mean that the exhaust valve will be  Hence the piston can start to
pressurise the cylinder contents earlier. The amount the valve closes is dependant on the position of the VEC shaft
and eccentric mounted on the side of the exhaust valve actuator.
77. What is internal and external of TEV in ref.system?
There are two main types of thermal expansion valves: internally or externally equalized. The difference between
externally and internally equalized valves is how the evaporator pressure affects the position of the needle. In
internally equalized valves, the evaporator pressure against the diaphragm is the pressure at the inlet of the
evaporator, whereas in externally equalized valves, the evaporator pressure against the diaphragm is the pressure at
the outlet of the evaporator.
Externally equalized thermostatic expansion valves compensate for any pressure drop through the evaporator.
Internally equalized valves can be used on single circuit evaporator coils having low pressure drop.
Externally equalized valves must be used on multi-circuited evaporators with refrigerant distributors. Externally
equalized TXVs can be used on all applications; however, an externally equalized TXV cannot be replaced with an
internally equalized TXV.[4] A type of internally equalized thermal expansion valve, known as the block type valve,
which features an internal sensing bulb, located inside the suction line connection and in constant contact with the
refrigerant flow, is nowadays often used on automotive evaporators that don't require externally equalized TXVs
78. Type of boiler.. whats swell and shrinkage in boiler and to overcome this problem?
https://www.brighthubengineering.com/marine-engines-machinery/46144-what-are-swell-and-shrinkage-effects-in-a-
boiler/

79. what is back pressure valve in ref. System?


80. Power balancing with cross qns
81. Turbocharger surging, surge line graph explanation
82. VGTurbocharger
83. Certificates under ism?
84. Certificates under marpol anex6?
85. Tpc? Why it required?
86. How sea chest fitted?
87. Miller's cycle
88. Shore analysis lub oil(too much cross qu?)
89. New amendment in annex 6
90. Draw Internsically safe circuit
91. Scr?(deeply)
92. Synchonous motor how installed in ship?
93. Function of brazing
94. How mechanical brazing work
95. 2020 LSFO CONTROL
96. TYPES OF BURNERS
97. HOW FUEL GET ATOMISE
98. TBN 70 stand's

External: Mr. Venugopal Function.4b


1. Purpose of back pr valve in veg room.
2. Cylinder liner and piston rings material and heat treatment carried on it.
3. Difference between synthetic and mineral oil and where it is used
4. Ibhp calculation and spring constant wr u will get.
5. Main air compressor details, construction & PV diagram.Draw Air compr PV diagram for multistage comp
6. Cross head lubrication.? hows cross head bearing different from other bearings. He was asking abt it's
construction. Cross head clearance.
7. Hoop stress in boiler
8. Telescopic pipe sealing arrangement . Piston cooling flow and telescopic pipe sealing.
9. Boiler salinity increased
10. Wat is ph mean. Value .Wat will happen ph increase and decrease
11. Viscotherm working principle.
12. Piston rings material.
13. CPR purpose
14. Case hardening?
15. ME lubrication to crosshead and turbocharger. Working of labyrinth seal in turbocharger. labyrinth seals in
turbocharger.working? M/E turbocharger details and what type of bearing used it. Types of turbocharger
16. How is vibration is reduced in turbocharger?How T/C vibrations are minimized.
17. Chain drive vibration
18. Main engine vibration? Which types of vibrations in ME , how to minimise it.
19. types of boiler safety valve and differences
20. Which type of bearing , why not bush or sleeve brng,
21. Position of detuners nd compensators, how and why both r provided differently.
22. VIT- funtions, advantage,
23. During operation movement of plunger and barrel,
24. Explanation about break point , how it is acheived, whether can be done for all engine or not
25. How's ME different from MC
26. various components of ME engine
27. miller cycle in detail
28. Complete explanation of ME engine
29. Alpha lubricator working? how quantity controlled. How cyl. Oil metering is done in alpha lubricator
30. Power calculation using power card
31. axial vibration damper location with reason
32. Thrust bearing location with reason
33. How reversing takes place in man b&w engines and it's sequence.
34. Stuffing box clearance & checks ?
35. Indicated horse power
36. Planimeter ,
37. K valve and where u will find
38. Centrifugal pump casing working. Type of Centrifugal pump used as me lo pump. Volute casing and centrifugal
pump working
39. Why overlap is provided in timing
40. Relation between speed and mcr and cross questions
41. Venturi effect and its principle
42. How many tie rods in ur ME , how it is calculated.
43. Purpose of tie rod and difference in single and twin tie rod construction and why twin tie rod is preferred
44. at Wat rpm ur ship moves
45. wat r all the factors affecting the power of the engine
46. relation between speed and power
47. how ll u calculate power
48. wat will u get from a/l from the calculations
49. Unit of spring const
50. where cyl. L. O is injected in a unit
51. injection pr.
52. fuel timing without opening camcase
53. wat info u ll get from draw card
54. Engine specifications, draw card and wat all information u wil get from that
55. CLO metering and how do u adjust the cylinder lube oil feed rate.alpha lubrication system and cross questions
56. M/E turbocharger..diffuser..inducer..explain their purpose
57. ridge formation on liners.how it is formed..how it can be removed
58. CPR...purpose..depth and it’s importance
59. Type of cylinder lubrication .i said Alfa .den how does it measure the quantity .how u will increase or
decrease .wanted to listen each minute details .
60. why frequency of generator crankshaft damage is more compared to main engine .
61. turbocharger function of inducer ,diffuser .how does diffuser converts to pressure energy from velocity .lot f
cross questions on this .how area affects n all.
62. boiler started from cold starting .as 2nd engineer what all things u check ,I said will check for leakage .he said
that’s Oiler job .he said think from construction point of view.how boiler is fitted to ship .draw card .what r d
information u will get .show on diagram .wher is point of injection .what s dis side what is dat side.if your
indicator chord length is more how will b d diagram .
63. Forces on crankshaft.
64. Stresses in crankshaft.
65. What force it exerts on bed plate? How?
66. Why Jacking bolts in Sulzer engine provided?
67. Types impeller? Why wear ring provided? Why does wear ring wear down?
68. By just looking at crankshaft web reading how will u know whether it’s right?
69. Thermostatic expansion valve purpose?
70. How is cylinder lub oil quantity controlled
71. Wt u answer?? How is cylinder lube oil quantity controlled
72. Have to check the scavenge drain oil for iron and tbn and increase the cylinder lub oil according ly
73. Sweep test for 24 hour period
74. What are tests u carry onboard
75. Whether you have done it how to do
76. What other lub oil tests u do onboard
77. Boiler safety valve accumulation pressure test. When all u will do
78. What is the lift between full lift and improved high lift safety valve
79. What is relation between safety valve pressure and accumulation pressure
80. Type of engine sailed
81. VIT explanation, purpose, advantage, how adjustments made in depth with many cross questions
82. Auxiliary engine turbocharging system type?
83. Lambda controller explain and cross questions in that
84. Variable exhaust closing why and how achieved
85. Boiler accumulation pr test?why done
86. Why 7mins and 15mins time diff for smoke tube nd water tube
87. Safety valve pressure setting
88. Alpha lubricator explain, how optimisation done, how metering done, values feed in hmi panel,
89. Sweep test
90. Type of engines u sailed . Man b&w 6s50mc single acting, vertical , crosshead type, uniflow scavenging ,
constant pressure turbocharged disel engine. With Mcr n Ncr ratings , ended with sfoc of my engine. (Its better
to say this much as soon as he ask type of engine).
91. Surging - Strated with practical definition of reversal of flow of air due to restrictions in air/gas passage etc., he
was not convinced. Then said the definition which is on devan aranha book with pressure ration n mass flow..
still he wants more. I stated abt surgine line graph. But still he wants me to tell more abt what is surging. (Dono
what he expects)
92. Components of air side in t/c. Strtd with filter, silencer, inducer, impeller , diffuser.. stopped and asked. Inducer
n diffuser function. (Inducer to guide the air to the impeller to avoid entry loss. Diffuser to convert velocity to
pressure energy. He wants how it s done on diffuser, said abt bernouli principle.
93. How vibrations are minimised in t/c? Binding wire in blades, in ball bearing type damping springs provides on
top n sides of bearing. In sleeve type hydro dynamic lubrication itself dampens it, but he want more in sleeve
type. I couldn tell.
(Later found a notes that air is given at the backside of the turbine blade from the comp side )
94. How botton end bearing lubricated ? Said from tels pipe, xhead, con rod then comes to bottom half of the shell.
He wanted exact location of entry (it is through side holes in upper shell. Wants to know ant tangential run n
bore relief in the shell)
95. Back pressure valve in reefer. Strtd with , it ll be in veg room to maintain more pressure in the evaporator line
of the veg room coz bef room doesnt need tht much low refrigerant like meat room, so y increasing the back
pressure, refrigerant is made to stay longer in the evaporator. Then he asked what expansion vlv is dng? Said
it jus maintains the superheat condition at evaporator outlet not the pressure.
96. What pressure u set the blr safety valve? Said 103% of working pressure. He asked abt design pressure.
Expected Factor of safety. Said it is uts/working stress. Convinced him that safety vlv is not set according to
design pressure . Then He said “ u need to tell maximum working pressure” . He expects that word “maximum”
(Cross questions he s asking is jus to know how me we know, sometimes it ll be confusing us, but we should be
confident with our answers and tell all the things we know related to that question

External LSG Function 4


1. Engine type and power in bhp.
2. Effects of early and late ignition and how will
3. you find.
4. Questions regarding catfines.
5. Surging . What documents you will keep ready if a service technician comes to inspect T/C .
6. FWG efficiency, how will you decide and adjust.
7. Sterliser operation and how will you check if it is operating properly.
8. Type of turbo charger and make? Parts of turbocharger? Use of nozzle ring and inducer? With out handover
how will u come to know the nozzle ring of that tc is changed. He was expecting from nox tech file.
9. Lubricator working. Cylinder lubrication ?
10. How load dependent is incorporated in it
11. Conditions for standby for main eng
12. Wat u ll do if master reports hez not able to start me from bridge
13. Aux eng make
14. Testing overspeed of gen( wants to hear simulation test)
15. Bunker 8217 spec.? How u ll know receiving bunker oil is suitable? Cappuchino effect.wat instructions u ll give
to 4th engg while taking sounding?
16. Bhp formula? BHP calculation?
17. Unit cut off procedure?
18. Chain tightening procedure
19. Sfoc calculation
20. PID controller
21. Purifier optimisation
22. Crosshead brg removal
23. Guide shoe forces
Surveyor Krishnan Function4
1. Chain tightening procedure
2. Sfoc calculation
3. BHP calculation
4. PID controller
5. Purifier optimisation
6. Crosshead brg removal
7. Guide shoe forces
8. Type of engine, how to say it is superlong stroke? Advantages and disadvantages of Super long stroke
9. Draw card showing ignition lag
10. ME interlocks - cross qns
11. T/C everything regarding construction, bearing type, lubrication, safeties, clearances, why header tank is
provided? What is d interlock provided there for engine starting?
12. Vibration full... Explain Moment compensator cross qns
13. Axial vibration full with many cross qns
14. Top bracing.. What all circumstances to check?
15. Chain tightening checks and procedure
16. Moment compensator
17. Axial damper
18. Main bearing survey
19. AE con rod checks
20. puncture valve function ,when it ll get activated if one unit puncture valve not getting activated then how u stop
the engine
21. cross head bearing survey
22. types of vibration and damping arrangements
23. why silicon is used in torsional vibration damper
24. Fuel pump timings setting
25. Fuel pump lead
26. Thrust block purpose and clearance measurements and value
27. Draw 2stroke timing cycle with all angles
28. What is braking air in crash astern
29. What is barred range and where you will find
30. What is zero sac and normal sac draw and explain
31. Explain main bearing removal procedure will you loose the tie rod
32. Explain what is the importance and what is the problem happen in holding down bolts
33. What is Ignition delay and Injection delay
34. During cross head bottom end bearing removal what precaution youll take on crosshead
35. Cross head precautions? After lifting the pin we have to lock crosshead slipper with the tool
36. What is overlap in airstarting valve
37. Type of ship
38. Sulzer development from RND to RTA
39. Explain vit and fqt? How it s done in sulzer
40. What is name of instrument used to take powerd card and indicator card?
41. Do u know any other engine other then Man?
42. Draw sulzer fuel pump?
43. Where ecentric cam connected?
44. Draw power card and draw card for broken piston rings
45. What is immobilization?
46. What is propeller clearance

External : Mr. suresh nair and Mr. selvaraju Function 4b


1. ae no indicator cock how will u check liner leaking from which unit
2. ae post decarb check
3. boiler and cooling water analysis abt chemical used, chemistry of it, effect , uses pros and cons
4. tbn analysis pro cons
5. new regulations from jan 2019
6. Fwg.operation. Salinometer ?
7. How vaccum attains? Principle?

Internal Sirish external new Function 4


1. Omd zero caliberation
2. Under what condition liner have to change
3. Before undocking wat check have to made
4. Wat instruction have to give junior before entering to co2 room
5. Pump room safeties
6. Decarb report
7. Types of engine worked , told rta and bw mc
8. Type of fuel pump in rta , draw?Type of pump in b&w? How it differs from rta? Difference between rta and mc
engines?
9. Reversing of B&w
10. Sulzer cylinder head how many pieces
11. Told one piece casting, he asked there is any inserts? I told no.?Then asked how about b&w. I told some
12. Engines provided with hydraulic ring for opening cylinder head bolts otherwise single casting only
13. Fuel pump reversing and action of non function during manoeuvre.
14. boiler safety valve floating.
15. indicator diagram for broken piston rod.
16. bubbles in ME expansion tank and reasons,how to come to know about liner crack and immediate action.
17. Advantage of full bore safety valve than high lift safety valve..easing gear purpose..how many safety valves on
boiler and its settings and reasons
18. What is mc and mcc?
19. Rt flex fuel pump diagram and working?
20. Man b&w fuel pump fuel pump and reversing?
21. If your engine is not reversing while pilot on board what is ur immediate action?
22. Viscosity damper in main engine?
23. Engine holding down bolts which which will get fritted away first main engine (two stroke) or four stroke engine?
Holding down bolts which engine have more prone to break?why?
24. Stuffing box construction and where it is fitted in engine he want exact area?
25. Manovering diagram?And some more questions?
26. Cylinder lubrication,types of cylinder lubrication
27. Omd check during rounds Ae cc inspection
28. Power card draw card for injector dripping
29. Late injection
30. Early injection
31. Roto cap purpose
32. ME crank shaft deflections and its purpose.
33. Why bhp relate to rpm.
34. FWG type and purpose of vaccum

Surveyor ...Janaka.. FUNCTION 4


1. How u calculate power output of engine
2. How u decide Ur turbocharge type for Ur engine
3. Safeties of ME
4. Boiler safety valve setting , accumulation pressure test
5. How thrust transmit to ship hul, construction,
6. Main bearing survey
7. Crosshead lubrication
8. Generator thrust how transmit

Surveyor ...Sivanarayana.. FUNCTION 4

1. type engine sailed man b& w


2. type of problem u faced in me say me and explain what action u done
3. crosshead survey procedure say me from clearances to inspection of bearing
4. t/c how ll u isolate
5. Say me for two type t/c
6. Power card, draw card
7. How to find out any survey is pending
8. type of engine and fuel pump
9. major problems faced in main engine action taken
10. liner wear and conditions for liner removal
11. scavenge space inspection
12. what documents gives u the list of upcoming survey due
13. constructional diffwrence between Sulzer and man bw cylinder cover
14. indicator cards types and interpretation from the same
15. type of cylinder lubrication in Sulzer and man bw
16. Indicator diagram faults.
17. Blue code.
blue code is csm item...is it correct
I think it's BLU code.. international code for safe loading and unloading of bull carriers.*bulk Thats how its sounded
like. He actually asked me whats blue book. I asked to repeat the question and he said the same thing again. Then
the guys outside told me its blue code( BLU).

18. Main bearing survey.


19. Heat exchanger no of plates determining formula.

Oh OK bro.. Heat exchanger plate determining formula?


floating vlv... answer plz Its the same as setting of safety valve.Floating of safety valve means, setting the lifting
pressure of boiler safety valve before commissioning the boilerheat exhan...is it plate type
What is beem knee? different types of double bottom construction, where it is used, what is bulwark, what is strakes,
what is keel strakes, what is lines plane, what is balances rudder, what is free board, free board marking, marpol
annex, incinerator comes under which annex, incinerator regulation? Can we burn plastic? Annex 6 explain, incline
experiment?
Can u answer for seaworthiness,hw to find survey pending
For seaworthiness i explained abt loadline survey he was not satisfied, expected some more. For the other one,
quarterly listing document from classification society. Seaworthniness -roughly if say.minum equipment mech required
readly run safe operation of ship.like if we had 2compressor one out order u dont had enough spare parts.if some
thing happened other compressor u cant sail.like this its examples. Because this one had from oneship i takeover
vessel from layoff
20. Advantages of V type engine
21. M/E clearance during unit overhaul
22. Boiler gauge glass blow through procedure... How will u train J/E
23. Clearances in T/c
24. Reasons for reefer compressor undercharged..
25. M/E main bearing survey
26. Type of ME and generator
27. 3.Explain man bw fuel pump
28. How will you cut off one unit
29. Draw card and power card
30. how will you find the leaky fuel injector by draw card and power card
31. what are the faults you can find with the help of indicator diagram
32. engine turns on air but not run on fuel reason?
33. omd checks
34. fuel pump cut-off procedure
35. linear cracked action
36. linear wear rate? What is the unit? When u ll change the linear?
37. liner wear down rate ? Liner calibration report? How to calculate the wear down?
38. types of lubricator?
39. scavenge fire indication and action to take?
40. what r all situation u ll cutoff fuel pump?
41. new development in cross head bearing?
42. main engine and aux engines sailed with type and maker ?
43. main engine decarb all clearence ?
44. Exhaust gas economiser tube leaking symptoms ? How to identify the which tube is leaking? And repair to
arrest the leaks?

Surveyor ...Sivanarayana .. FUNCTION 4b & 5


1. Boiler flame failure reason how to rectify
2. Late injection and early injection draw card
3. Sulzer engine cross head lubrication.
4. Sequential star.and why
5. How u order motor.
6. High voltage advantages.
7. Iccp
8. Explosive meter woking principl
Surveyor ...Mohan .. FUNCTION .5
Types of AVR
What are all things u prepare for electrical survey.
How ll u check alternator insulation
How load sharing done bw two generators
Types governor, what S speed droop, characterisation of speed droop,
Y motor over heating
What is insulated neutral system
How to convert an induction motor to synchronos motor
Steering gear motor safeties
What is dielectric strength
What is zener diode and uses
Reverse power trip working
navigation lamp regulations
Contunity how will u check for gen
Working of brushless alternator
Exciter working
Power factor. How to improve.
Synchronous motor working
What happens if motor is supplied with 50hz.
6. How to excite alternator of not developing voltage.
1.AVR with too many cross questions....what actually happens while increasing and decreasing the DC current in the
exciting system...
2. What all you check on emergency battery and how...capacity ..?
3.reverse power trip with too many cross questions....
5.how many windings in alternator and purpose of each...?
What is allowance for lip clearance in boiler safety valve ...?
answer for 1,3,4
1. Actually question was not how, but wat all things happen when we press auto tune button.
Pmax, p comp, fuel index all gets optimised as per the performance curve for best fuel economy.
3. Variable Exhaust closing .. early closing of exhaust valve. U can find more about this on net
4. Load dependent Cylinder liner cooling system. It keeps cylinder liner at higher temperature than the cylinder cover
and jacket , also temp varies as per load.
Isolated or insulated (check) neutral earth system and earth neutral system
How will u test insulation for rotor of alternator
How ll u improve power factor
What power factor does actually
How u ll find capacity of battery
What is navigation al safeties of light
What precautions u do in alternator while taking insulation test say precautions in alternator
What is soft starter
What is brush less alternator What is current transformer

External: Mr. Venugopal Function .5


1. AVR working? Avr- detailed explanation and function ? Working Principle of AVR , wat will happen if one of the
rectifying diodes mounted on the shaft get damaged ?? Avr types and working how its controlling voltage.. What
exactly happens wen u start a motor.. Wat avr is doing.. Voltage dip primary and secondary.. Went deep enough..
2. Voltage dip
3. What is filter, types of starters , where is auto transformer starter is used. PI CONTROLLERS , where it is used in
ship??, transistor, thyristor explain purposes and where it used.
4.
5. Earth fault ... Earth fault , methods to find ?how will u know an earth fault occurs...how earth fault indicators
working(both meter and lamp working) Shaft earthing...why...how.....? Y 1 lamp glow dark and other 2 are bright
6. Insulated neutral and neutral earth system
7. Preferential trip setting ?How to try out preferential trip?Preferential trip why how it works...if overload still exist
what will happen...how various time delays are achvied ? Preferential tripping- how it happens( needs circuit
explanations and order of functioning), in which sequence, ? If non essential services donot cut off wat will happen
further. Preferential trip ,what load activated ? Over load ? overload relay in detail along with preferential trip
settings and mechanism..
8. Black out what will u do..how emergency generator starts...how battery came in to operation in transom period?
Black out sequential procedures. What exactly sequnce will happen after black out step by step.. Till sequential
starting of pumps and how is that happening..
9. Paralleling of alternator?Synchronoscope working procedure?Syncroscope- how AE syncronising is done. ?
Position of syncroscope. ?Wat all factors to be checked ?Why done bw 11-o clck position . Paralleling of two
alternators- condition and procedure
10. Solas Steering motor regulation
11. Transformer working principle and explanation about current transformer?Voltage transformer n current
transformer ?Transformer working and details.. Step up and step down.. How voltage induced.. Wat abt voltage
current and power at primary with respect to secondary.. Realtion between them..
12. how battery is charged on board my ship
13. How to you identify electronic components in circuit diagram……? I think he expects those symbol to draw and
explain.
14. Intrinsically safe equipment & line circuit, mention about zener diode & working Principle
15. Wat is power factor ?
16. O/p of welding transformer
17. wat r all the transformer in ur ship
18. voltage in control circuit
19. Voltages in ur ship
20. What is power factor .why in ac not in DC .how will u improve it .i said capacitor.what capacitor does.
21. Thermal image
22. why u clean the contactors often .
23. how reverse power trip works .what is d range of reverse power .
24. 3 core wire .u checked current by clamp meter .what result u will get .i said 0.he asked why .i said for 3 core net
flux is 0.den why net flux is 0.
25. how u will order a new battery when all d data from old battery is vanished
26. Specifications of your supply system?
27. What’s a cycle?
28. What happens in positive cycle and negative cycle? How it’s exactly happening?
29. Apparent and active power?
30. What does reactive power do in circuit?
31. How does AVR work? How’s the error signal being generated?
32. What is diode? How p and n junction behave in diode?
33. What is the need for reactive power
34. For Venugopal 5 sir. For synchroscope use. Say. It is used to check whether both incoming and main bus bar
voltage are inphase. Don't say phase sequence. He is expecting only the word inphase
35. For reactive power he is excepting us to say. Generally ac circuits has inductance and to overcome this
inductance only reactive power is used.

External LSG FUNCTION 5


1. Type of alternator
2. Maintenance on alternator
3. Wat is insulation and questions about IR?how to test insulation resistance of motor ?Under what condition you will
check
4. High voltage safeties ?Precautions before doing maintenance in high voltage
5. Navigation lights, why they are failing often?What preventive measures you will do?How will you replace
navigation light? Navigation lighting (voltages) and light position?
6. Annual survey of UMS vessel, what all we have to prepare on electrical side
7. If you use an electronic megger, what is the first thing you have to check?Reason for answer.
8. Diff between DOL starter and reduced voltage starter.
9. Power factor. And other cross questions. Values in your ship. What is power factor and what happens if it is unity
lagging and leading? What is the power factor in your last ship.?
10. Wat is Energy audit.
11. You have to order a new alternater what all you have to consider while ordering it.?
12. Cable duct and how many openings.
13. Third engineer called up and telling you that after parelling the frequency is going up and down. How you go about
it.
14. Msb safety. And what is msb.

Surveyor Krishnan Function5


1. IGBT, uses and how IGBT differs from SCR and it's advantages. working? Construction details. Applications
2. Safeties of alternators in alternator side
3. How to show reverse power to surveyorTrip for single generator running
4. CT working and applications of CT in ship circuit
5. Auto transformer working and it's application in ship
6. PID controller working and it's application in ships
7. Generator started and voltage not developed reasons
8. What is residual magnetism and ways of recovering it.
9. Brushless alternator full explanation with drawing
10. Alternator maintenance.. How to do diode test?
11. Purpose of airgap? How much clearance? Cross qns
12. Busbar material? Thickness.. Safety provided from alternator cables to busbar?
13. Soft starter full with diagram
14. Autotransformer principle.. Auto transformer starter diagram explain, application
15. Variable speed drive? Frequency? Applications
16. Electric propulsion
17. Battery onboard, it's regulations, battery supply items difference in cargo ships and passenger ships.. Everything
about both Lead acid and nickel cadmium batteries and their maintenance
18. Alternator specification
19. what if motor with 50hz frequency is put in place of 60hz
20. circuit breaker specification
21. eletrical system survey
22. battery room safety
23. diodes
24. battery testing
25. Brushless alternator maintenance and working
26. difference between synchronous and induction motor
27. synchronous motor , speed control of synchronous motor
28. Zener diode and zener barrier and what is avalanche breakdown why in zenor after breakdown voltage voltage is
not increasing what happen inside the diode
29. Current transfer purpose
30. Why alternator rated in KVA and name plate details of alternator
31. Insulation classes
32. how to check diode using multimeter
33. Draw Avr ciruit
34. Difference between vaccum and Air circuit
35. breaker....He wants to know arcing temperature
36. Working Principle of synchronous motor.... proper definition
37. Kirchoff's law explain
38. Voltages in ship
39. Electronic measuring instrument u know
40. What r all Document u show to surveyor during electrical survey?
41. When 2 generator running in parallel one generator showing less kW compared to other one.. reason??
42. What IP 28??
43. What IP value for deck and engine room motor in ur ship?
44. AC motor speed control..
45. Alternator speed control method
46. Igbt, mostet, bjt
47. Types of starter
48. How ll yu train your junior for paralleling two alternators
49. While dry docking earthing is required or not???
50. What Ll yu check while getting shore power
51. Steering gear motor safeties and safeties in electrical part
52. Difference between Ums class and non ums class vessel with respect to boiler alarms and trips
53. Incinerator alarms and trips
54. Function of transformer
55. Where yu re using single phase in ship

External : Mr. suresh nair and Mr. selvaraju Function 5


1. airgap value, why it is needed and what if increase and decrease
2. What excitation voltage
3. How u will order a cable
4. Motor came from shore after rewinding what are all checks u will do.
5. Types of starter explain about soft starter and whr it is used.
6. What is difference bt circuit breaker and switch
7. What is Exi and Exe.. What values of voltage and current for Exi
8. Why earth lamp indicator are different for 440 and 220 in msb
9. type of motor starting
10. Avr flash
11. Diodes function
12. main switchboard safeties , explain in detail

Internal Sirish external new Function 5


1. In electrolyte acid added to water or water added to acid y reason
2. Dry dock grounding? How you will connect the earth in drydock
3. wat protection available on deck motors for maintaining insulation.
4. Precautions for shore supply

Surveyor sivanaraya Internal choudry FUNCTION 5


1. How ship is earthed
2. How low insulation checked
3. Use of HV
4. Electric steering gear principle and how it works
5. Onboard wer the single phase motor is used.
6. Electro hydraulic steering gear principle and regulation
7. Safety instrumentation and checks in incinerator, boiler, reefer container(have never done container ship in life)
8. Battery checks and capacity
9. Electrohydraulic steerin gear safeties
10. What if junior doesn’t know English and don’t understand command given by you? I said its still worthy, cos
official language is onboard is English, he didnt agree, den i said wen i give a command if he didn’t understand n
if he was abt to do a mistake, i ll myself will do the task n later will explain him i said,
11. what is ward leonard system
12. Types of steering gear
13. Safeties in electrical cables lay up in steering gear room?
14. carrying reefer container on weather deck what r all checks u ll do?
15. Drydock how u ll do earthing?

Surveyor ...Janaka.. FUNCTION 5


1. Alternator working
2. Induction and synchronous motor working
3. Insulation resistance
4. Battery room safety
5. Emergency Battery supply
6. Difference of engine starting battery to emergency battery
7. Insulated system
8. Bus bar distance and thickness
9. Contact breaker and main circuit breaker
10. How to decide turbocharge for engine?
11. I said about constant and pulse type
12. Generator thrust how transmit?
Surveyor ...Mohan .. Function 6:
1. Explain the Boiler burner of ur ship.
2. Define the Turn Down ratio of the boiler burner.
3. Explain what you shall do if you find Oil in the boiler gauge glass in your watch.
4. Explain the purpose of Air Register and what to do if the O2 in exhaust gas is high.
5. Explain the Inert Gas Generator system.
6. One Turbocharger got damaged.. Hw Ll u run the engine
7. Checks in centrifugal pp during overhauling
8. How u protect ball bearings in store
9. How u protect ur m/e during long layup
10. purifier speed not achieved reason,
11. how to reuse worn-out clutch,
12. annealing, nitriding and normalising,purpose of annealing,
13. What position u will place poker gauge
14. Why propeller drop clearence checked
15. What is trammel gauge
16. What place u check rudder drop clearence. How much is the clearence
17. What is eldoper coupling
18. What is muff coupling
19. What is nominal diameter
20. What is schedule of pipe
21. It’s LDCL used in ME-B engines
22. Load depedent cylinder liners ? Is it correct
23. Purpose of ldcl??
24. Ldcl cooling water system
To avoid cold corrosion on cylinder liners they using this new
Technically to keep the temperature of atmosphere inside the liners above the due point of air
Yes...but how I Dont know
So no condensation no sulphuric acid formation no corrosion on liners bro just now I found out
He wants how it works also
Anyone knows how it’s working plz share
Recirculating jacket water to keep the temperature high to prevent condensation
Some modifications done in liners and cooling water system
Jcw is kept at elevated temperature by by passing cooler.
So at low load also jcw temp won't fall

External: Mr. Venugopal Function.6


1. Main bearing survey?What are the things to check after assembling the main bearing. Crankpin bearing survey?
main bearing bottom half removal. Checks u do on main bearing....
2. Top bearing in main bearing is removed. How will you proceed with bottom half.
3. - asked me procedure for replacing c/pin brg top half. I went the whole yard, made a mistake in position of
conrod when extracting bearing(see Img attd).
4. Bottom end bearing removal procedure? bottom end bearing survey. ?
5. How to check timing of camshaft? cam timings and regarding pin gauge ? cam adjustment procedure. ?
6. rudder pressure testing.
7. How will you check double bottom plug in drydock
8. Winch load test
9. propeller removal? Propellor removing procedure.? Poker gauge measurement, points to take care.? How
propeller drop is taken?
10. exhaust valve complete overhaul. Mainly he's asking abt templates for valve seat and spindle
11. How the exhaust valve of ME is
12. locked in open and closed position?
13. Checks and clearances in me exhaust valve
14. Stuffing box overhaul without removing piston? What are clearances taken in stuffing box?
15. Centrifugal pump checks? Centrifugal pump construction.?
16. Which type of pump for lub oil supply to main engine. ( clarify - its centrifugal radial/ axial flow type)
17. Wat is difference in radial nd axial flow type pumps.
18. Chain tightening procedure?
19. fuel pump timing adjustments.
20. cylinder liner calibration with inside micrometer zero error , ovality percentage in liner.
21. which are materials in ME subjected to case harding
22. x- head clearance. x head bearing clearance where to take
23. action to be taken if blr wtr contained oil.
24. Piston removal - wat all checks ? Piston ring and stuffing box, what clearances to check.
25. Before using hydraulic jack what and all points to check and its operational procedure.
26. Scavenge fire action by .wat u instruct ur junior. Wat indication of scavenge fire.action u do
27. blackout procedure. Asked which unit sense the main bus power not having power n tell emergency generator to
start.
28. Economiser safety vlv setting.
29. Engines you have worked on, what all maintenance you have done.
30. -Welding of two plates with different thickness, angle for edge prep, distance, how you will choose welding rod.
Methods of NDT.
31. - Methods for improving Propeller efficiency. He expected a lot I think. Define Skew and rake, draw. (not sure if
it's fn3/fn6)
32. - Boiler survey, safety valve setting(I started with safety valve requirements as per SOLAS) , what test after
safety valve setting. He said u need to do accumulation pressure test after everytime safety valve is overhauled
like lapping or lip clearance adjustment(strange!) I argued saying, books mention that it needs to be done only
when boiler major repairs or when safety valve is checked. He asked me to read quality books.
33. Accumulation Pressure test, why its done and procedure.
34. Nitriding? Explain process, why its done and to which parts of m/c?
35. Indications of liner crack,,,,,,,,,
36. How u ll fit the propeller
37. how u ll find out the push up
38. bottom end bearing clearance position
39. c/s deflection of one unit Hw ll u confirm ur reading is correct
40. if u press the deflection gauge Wat valuy it shows positive or negative
41. propeller drop
42. how rope guard is attached to ship
43. piston crown burn away were u ll measure..
44. what is d essential item u will keep in ur store .not agreed on anything .
45. how will you charge your refrigerator compressor .while opening bottle which cap u will open .there is 2cap on
bottle .
46. exhaust valve repair .what r the things to take in to account .
47. fresh water generator consumption less.what r d checks .how u will knw heat exchanger is dirty or not .confused
me completely .
48. Stuffing box overhaul?
49. Clearances and value? How spring measured as per manual?
50. how will carry out load test on bearing?
51. Jack up test procedure.
52. Piston clearance complete along with values
53. Crosshead bearing clearance
54. Thrust bearing clearance
55. How will u test preferential trip infront of psc
56. What are the values for preferential and overload trip
57. double bottom plug pr testing
58. in drydock tanks pressure test
External LSG Function 6
1. How will you select new safety valve for boiler.
2. Easing gear in boiler?
3. Why centrifugal pump used mostly in engine room. Centrifugal vertical pump allignment.
4. Positive displacement pump? Where used on board?
5. Which type of pump is largely used ( generaly)
6. Reciprocating pump defects and function of accumulator.
7. Plate type heat exchanger maintenance.
8. Sea water salinity ppm?
9. Steering gear emg operation how to carry out? Procedures for above where to be found? .
10. Welding defects. Or you as a second engineer how do u certify a welder that he is good for the job.
11. Ows maintanace and alarms. How many relay's in ows.
12. How do u deal with person in engine room who is in depression.

Surveyor Krishnan Function 6


1. How u pressure test an AE cylinder head
2. How will u find out AE lube oil is contaminated reasons
3. What instructions u will give to ur juniors while handling a mechanical seal
4. NDT explain everything
5. Boiler everything regarding construction details, diff in hydraulic test and accumulation pressure test? When to
do accumulation pressure test?
6. Interlocks provided for cpp
7. Controller in boiler? Why PID preferred over PI controller .. Everything about controller and boiler automation ,
Boiler combustion chamber controller about PID
8. Purifier maintenance.. How to accommodate vertical shaft thrust? Cross qns
9. How to assemble bearing in p/p shaft? What is stamped on it? Bearing nomenclature everything. Is both
electrical side and p/p side same? If no y?
10. Metal locking procedure
11. Turbocharger washing turbine and blower side
12. Wear ring clearance in centrifugal pump
13. How to measure backlash in gear pumps
14. Ibattery onboard it’s regulation battery supply items difference in cargo and passenger ship
15. T/C vibrations
16. Engine room safety in heavy weather conditions
17. Exhaust valve overhaul and checks
18. Boiler type
19. Heat exchangers
20. Plate and shell & tube advantage and disadvantages
21. boiler water treatment and testing ,how to do chloride test
22. A.E crankpin ovality checking
23. TEV ice formation what is the reason
24. capacity control of A/C compressor
25. Caustic embrittlment and what temperature it occurs
26. Dry dock preparation
27. Buker preparation
28. Gauge glass blow down train junior
29. Purifier auto desludge not taking place reasons?
30. Forumala for tighting plate type cooler
31. Safety valve floating?

External : Mr. suresh nair and Mr. selvaraju Function6


What is hag in boiler
1. Why tramel gauge L Shape
2. Gen high temperature check
3. Aux engine not start what u do

Internal Sirish external new Function 6


1. Air starting Vlv leak test , overhaul steps
2. Checks before undocking ( expecting removal of shore earthing)
3. What all precautions / checks you will take before taking shore supply in drydock
4. When going for engine rounds what will you check in OMD.
5. During manoeuvring you are in ECR and 5/e in cyl head plat. How will you know if one air starting valve is
leaking.
6. I told I’ll ask him to feel all the line. He said what if he didn’t give attention and missed, then what will happen?
7. I told if the temp raises the paint will peel off and line will discolor.
8. While removing AE piston how will you make sure liner is not disturbing
9. I told about the locking tool.
10. How will you train your 5/E for charging refrigeration gas
11. Cross head bearing survey preparations..
12. boiler gauge glass blowdown training for JE..? after blowdown,water not coming to gauge glass...gauge glass
broken and it is not spilled out-protection method.......
13. purpose of conductivity test.
14. ME fuel valve test

Surveyor sivanaraya Internal choudry FUNCTION 6


1. what is function 6
2. what is operatinal level and management level.. Total how many levels?
3. How do u train ur 5E for boiler gauge glass blow through.
4. co2 room inspection as second engineer and safeties of co2 room and maintenace intervals..
5. centrifugal pump can start with dich shut if yes wat will happen and what abt receprocating p/p. How centrifugal
pp takes suction..
6. Types of lathe and onboard lathe type..
7. what is milling machine and purpose..
8. what is shaping machine and purpose.
9. what is knurling how to do and purpose..
10. condensor efficiency is low what action u ll take
11. what documents ll say u survey is due ? - Quarterly listing document form classification society
12. Classification society will send this documents?
13. plate type heat exchanger what ll u do before opening and formula
14. type of lathe, milling knurling on board
15. Boiler safety valve floating?
16. Air starting valve overhaul.
17. Training ur junior engineer to enter co2 room n inspection?
18. Boiler scum blow down-why and how.
19. What is clear grounds
20. M/E Lo test report analysis
21. How will you do crank case inspection
22. How will you charge reefer system
23. Main engine decarbonisation report what are the clearance recorded
24. when will you Change the liner
25. what is the linear wear rate
26. Boiler water level low action
27. Only one Turbocharger isolate
28. reefer compressor under charged what r all effects?
29. fire in engine room action?
30. He is reporting to you after opening the water cock with drain cock closed water level not rising ! What is your
actions?
31. Refer compressor over charged what are the systems?
32. how to you remove excess gas from the system?
33. any major brake down have you faced so far?
34. centrifugal pump survey? Shaft trueness?how to do balancing of impeller?

Surveyor venugopal
Fun 4b and 6
1. Type of engine
2. Type of cylinder lubrication
3. Alpha lubricator metering
4. Piston checks...how and were u measure clearance in piston crown using template...near circumference of
piston crown? Or near centre? Or near taper crown? Where u put feeler gauge? Did u gone through manual???
5. Connecting rod bolt checks? Special design of conrod bolt? advantages of thin shell bearing?
6. Type of tc in ur vessel
7. Constant pressure tubocharching advantages?
8. Lamda controller working?
9. Why multistage in compressor?
10. What is nitriding?
11. Con rod ovality? How much is the maximum value?
12. Vit? How u adjust break point?
Internal Sirish external new 4B & 6—
engine specifications, main bearing removal procedure, spill type pump draw and exaplin, liner calibrations pistin
calibrations, main beairng and bottom end bearing clearances, main bearing removal procedure in RTA, indicator
power formula and explain, decarb clearances, crankshaft deflection, air bottle survey, plate type cooler is leaking
action, condensor Collin not effective , sea water leaks in AE , indicator diagram, air compressor discharge valve leak,
1. How to Measure AE Big end bearing clearance without removing Conrod....?
2. how welding transformer works?
3. Y gauge glass in different height?
4. where can we find the spring constant value for power calculations
5. Indicator card instrument box or stamped on spring hope so
6. What is the measuring instrument used to find the S/Box spring tension
7. How to measure rudder pintle clearance????
8. Hw v can access pintle bearing???
9. Is it with a feeler gauge or by some special means????
10. What did u say lifeboat lowering speed question?
11. 36m per mins to be converted to m/secs..
12. I said i will mark a reference point on wire wen its on just after the pulley.. I will lower the boat for a period of
10secs or greater.. Then mark the second point at the same place after pulley and measure the length of the wire
and calculate..
13. But he said this is ok.. Simple way is to mark the reference point on side shell plating, lower it mark the second
point and measure.. Same 10 to secs..
14. But for mathews sir.. it wont suit.. He u will go how will u mark and all..for venugopal sir u can say this answer.
15. Angle of loll how to correct it what u said bro?
16. For angle of loll start up with a unstable ship with negative metacentric height.. Main point for angle of loll.

Internal Sirish 3
full name of chapter 11,what is solas training manual ,difference between the lifeboat and rescue boat ,how to prevent
free surface effect .

Internal Sirish 4B & 5


1. Clover leafing.
2. Thrust bearing clearance.
3. Preferential trip
4. If motor submerged in sea water wat u do how u bring back to operation
5. Zener diode characteristics where it is used

Internal Sirish 4B
1. Types of engine sailed
2. Said both mc and rta
3. Cross head lub differences in both
4. Latest developments in cross head and cross head bearing
5. Articulate arm purpose and functions
6. Super vit and vit difference...how break point varied
7. What is the latest development in crosshead?
Internal Surveyor Mr. Sirish
Deciding Questions
1. Explain G-Z curve.
2. Explain Marpol Annex 3.
3. what is nitriding
4. Megger, synchroscope working
5. Electrical Tachometer working
6. Deciding question was by shirish.. Which I included on top (what is nitriding)? Couldn't answer and he said come
next time 😐
7. shirish decider preferential trip and soft starter
8. what is moment compensator ,what is 1 St moment and second moment
9. what inspection u ll do in scavenge manifold not in under piston space
10. what u ll look in flap
11. What happen if it stacks
12. Wat is wear rate? Liner calibration.
13. Wat is critical rpm? Apart from manual wer u ll find out critical rpm?
14. Vapour compression cycle
15. What type ship u sailed
16. What is solas training manual
17. What is 5 year routine in life boat
18. What is solas chapter 11 explain what all the things present in it

Unknown
Fun:3
1. Ism chapters
2. Doc&smc interrelation
3. Marpol annex 6 in detail
4. Angle of lol
5. Ship fwd and aft strengthening
6. Freeing ports
7. Isps
8. Freesurface effect
9. Co2 qty calculation
Fun 3
1. Bdn
2. Anexe 1 and 6
3. Strengthening member of fwd of ship
4. Breast hook
5. Anexe 2 and 3
6. Co2 calculation
7. Fun 5
8. Avr
9. Brushless alternator
10. Synchronous motor
11. Igbt
12. Diode
13. Zener diode application
14. Pid
15. Tats all I remember
16. Co2quantity calculation answer
17. No of cylinder including ER casing = ER gross volume to the top casing+ vol of air receiver/ specific vol of co2*
co2 content of a bottle
18. *.35
4b. What type of engine, power calculation, mcr, egb tubes leaking what will you do, boiler safety valve setting,
control air requirements and why, airbottle surveys, 2nd stage relief valve lifting why, valve plates broken why, diff
bwt hypermist and high fog, crankshaft deflection when taken and why, and how, stern tube survey preparation, tubes
leaking in shell and tube heat exchanger what will you do hw many tubes can be plug, marpol latest regulation IN
annex 4,5,6, connecting rod checking, crankshaft failure why and hw will you know, during running coupling bolts
sheeroff what will you do hw will you bring vessel safely to port,

You might also like