TSSR Technical Site Survey Report


For Microwave

Author Tony LECHEVALLIER


Owner Tony LECHEVALLIER
Organization NI SE (Network Implementation Site Engineering)
Approver Haral RUPP
Document ID D559792255
Document location https://sharenet-ims.int.net.nokia.com/Download/D559792255

Change History
Version Status Date Author Owner Reviewed by Reviewed date Approver Approval date Description of changes

1.0 Approved 11/23/2017 Tony LECHEVALLIER Tony LECHEVALLIER Massimo BRAMBILLA 11/23/2017 Haral RUPP 11/23/2017 Update History / Pre-requisite sheet / Remote access
2.0 Approved 11/30/2017 Tony LECHEVALLIER Tony LECHEVALLIER Massimo BRAMBILLA 11/30/2017 Haral RUPP 11/30/2017 Update of ID Number / Author / Apporver / Reviewer
SITE SURVEY DESCRIPTION

SERVICE SITE SURVEY SCOPE OF WORK DESCRIPTION


DESCRIPTION After the contract signature NOKIA will carry out a detailed site survey over the link(s)
of the system, in co-operation with the customer’s representative.
Information checked and/or collected during the Site survey :
Ø  Check of access condition :
q  Site address, Site location map, Site physical access,
q  Technical room location, Elevator/staircase availability,
q  Contact person,
Ø  Check of civil work; Internal, External, Tower,etc. (Under Customer Responsability)
Ø  Indoor Installation details:
q  Technical room configuration and location of equipment to be installed,
q  Check presence of Indoor grounding points,
q  Power supply configuration, Breakers availability,
q  Indoor cable ducts configuration, Wall/Roof feed-thru availability check, DDF configuration,
q  Air Conditioning, Fire alarms, safety system (if any)
Ø  Outdoor installation detail & Simple Visual Line of sight : (Only for new antenna)
q  Simple visual line of sight. (For links that do not require a Topographic Survey)
q  Description of aerial installation platform (pylon/roof type/water tower/others), including :
§  Tower Height, Available space on tower for new antenna positioning.
§  Necessary additional attachment to provision,
q  Check presence of outdoor grounding points,
q  Availability of outdoor cable tray
q  Estimation of global cables length (indoor and indoor-outdoor);
Elaboration of a detailed reporting with eventual blocking points and images relative to each checked points
PRE-CONDITIONS The following pre-conditions are under the customer responsibility :
Ø  The physical site must be accessible by road,
Ø  The customer must ensure that the surveying team is provided a full access to the site.
Ø  The customer must provide a site contact person.
Ø Description of co-located indoor / outdoor radio equipments or antennas must be available
(existing adjacent radio networks), with indication of the radio beam(s) direction and frequency,
Ø  The civil work, the grounding and the lighning, must be available by the customer.
Ø  The building, the power (Primary, secondary) and the tower, must be available by the customer.
Ø  For long haul application availability of a topographic survey report including at least :
q  Sites location on a map (scale 1/250), physical address, GPS coordinates,
q  Sites description (including indoor and outdoor images of the site),
q  Images of line of sight, with the potential position of the antenna(s),
q  MW equipments types and HW configuration.
APPLICATION q  Product Family : Short Haul / Long Haul,
EXCLUSIONS Ø  Topographic survey & Radio Network Design / Link budget
Ø  Site Engineering (supply of equipment installation documentation),
Ø  Site accessibility with non conventional means (Helicopter, …),
Ø  Tower load study, Static calculation, Structural calculation
Ø  Air cooling calculation
RESPONSIBILITY MATRIX
Task NOKIA Customer Comment
Site contact person X Site access & information.
Site access rights X Full access.
Preventive plan for risk X
Transport means X Limited to car. For specific means, the customer responsibility could
be shared with NOKIA (availability of helicopter for example)
Survey report Elaboration X
NOKIA
Microwave packet radio links
SITE SURVEY REPORT

OBJECT
This document is used during the site surveys phases and will be done and documented prior to any path surveys.
You need to pay close attention to details so we can collect information that would normally be gathered by those surveys.
Thanks to pay close attention to the responsability matrix and to adapt it to your Contract / Project

CUSTOMER INFORMATION

Customer name : MTN Customer order # : …


Project # : SUPER BOLO
Customer contact name 1 : … Contact phone # : …
Customer contact name 2 : … Contact phone # : …
JOB DETAIL / INFORMATION

Service category : …
Job # : SURVEY…
Purchase order # : …
Subcontractor name : OMNIACOM
Field Technician name : KONE Maboualy
Service report author : …
Service report reviewed by : …
Service report approved by : …
Preferred start date : Preferred end date : …/ …/ …

Date of the field service : 24 10 2019 Date of the report : 24 10 2019


SITE INFORMATION

Region name : FRESCO


Cluster name : : FRESCO
Environment ✘
Greenfield Urban ✘
Sub Urband
Host site name : DOUGOUDOU SODEMI
Host site ID : : CI00775
Host site address : Site situé sur l'axe FRESCO -- GRD LAHOU
Host site latitude : 5°15'7"
Host site longitude : 5°21'51"
Host site altitude : 24.73
Deployment scope New site ✘
Extension Correction ✘
Updates
Number of links attached to this site : 1
SITE ACCESS INFORMATION LINK INFORMATION

Site gate access : VIGILE SUR SITE Link name : DOUGOUDOU SODEMIE -- ROUTE D
Room-Shelter-Cabinet access : Cabinet Access Link ID : Dir DOUGOUDOU SODEMIE -- ROU
Outdoor structure access : OUI Link configuration : 1+0
Access instructions : OT IHS Equipment name : NOKIA
Type of IDU : MSS
Type of ODU : NOKIA
SITE ACCESS INFORMATION LINK INFORMATION
Site gate access : Link name :

Room-Shelter-Cabinet access : Link ID :

Outdoor structure access : Link configuration :


Access instructions : Equipment name :

Type of IDU :

Type of ODU :
SITE ACCESS INFORMATION LINK INFORMATION

Site gate access : Link name :

Room-Shelter-Cabinet access : Link ID :

Outdoor structure access : Link configuration :


Access instructions : Equipment name :

Type of IDU :

Type of ODU :
SITE ACCESS INFORMATION LINK INFORMATION

Site gate access : Link name :

Room-Shelter-Cabinet access : Link ID :

Outdoor structure access : Link configuration :


Access instructions : Equipment name :

Type of IDU :

Type of ODU :
SITE ACCESS INFORMATION LINK INFORMATION

Site gate access : Link name :

Room-Shelter-Cabinet access : Link ID :

Outdoor structure access : Link configuration :


Access instructions : Equipment name :

Type of IDU :

Type of ODU :
Ref : Version : Date :
Name(s) Date : Signature(s)
NOKIA
KONE Maboualy 10/24/2019 48 98 98 56
Representative
CUSTOMER
Representative
pdates

ROUTE DOUGOUDOU
-- ROUTE DOUGOUDOU
8 98 56
SITE SURVEY REPORT

AERIAL SITE POSITION


Responsibility
✘ Check and confirm the GPS position of the site by copy / paste Aerial site position NOKIA Customer

X
SITE SURVEY REPORT

PREREQUISITE

TOOLS
Responsibility
NOKIA/
Customer
subco

Safety for personal (EPP) ✘ Available Not Available X

Digital Video camera ✘ Available Not Available X


Multimeter ✘ Available Not Available X
Digital Meter ✘ Available Not Available X
Laptop ✘ Available Not Available X
Binoculars (Field of View at 1000 Yards) Available Not Available X
GPS ✘ Available Not Available X
Clinometer (0° to 10°, resolution 0,1°, accuracy +/-0,1°) Available Not Available X
Compass (resolution 0,5°, accuracy +/-0,5°) ✘ Available Not Available X

DOCUMENTS
Responsibility
NOKIA Customer

Pre-Network Design / Link Budget ✘ Available To be provided X


Aerial picture locatrion of the site ✘ Available To be provided X
Indoor Layout Available ✘ To be provided X
Outdoor Layout Available ✘ To be provided X
Aircooling report Available ✘ To be provided X
Tower load calculation Available ✘ To be provided X

REMOTE ACCESS / MOBILE NETWORK

to use: speedtest.net in browser or ookla  speedtest app from Google Play/Apple Store for mobile device. Responsibility
NOKIA Customer

Mobile Network Operator available on this site MTN X


ORANGE

MOOV
Name of the Mobile Operator used to perform the speed test …… X
Up Link data speed on site using the existing mobile network …… X
Down Link data speed on site using the existing mobile network …… X
SITE SURVEY REPORT

SITE ACCESS
Responsibility
NOKIA Customer

Means of transport ✘ Car ✘ 4-while (4x4) Truck Boat Plane


Other : …………………….
Site gate access ✘ Keys Badge Digicode Lockbox X
Room / Shelter / cabinet access ✘ Keys Badge Digicode Lockbox X
Outdoor structure access ✘ Keys Badge Digicode Lockbox X
Comments
VIGILE SUR SITE

SITE ENVIRONMENT & STORAGE INFORMATIONS


Responsibility
NOKIA Customer

Type of outdoor infrastructure ✘ Greenfield Rooftop Water tower Other X


Type of indoor infrastructure Equipment Room Shelter Outdoor cabinet X
Exposure to ✘ Wind ✘ Sunshine Ice ✘ Dust X
Protection against Available To be provided ✘ NA X
Wind / Sunshine / Ice / Dust
Number of Floor in case of building NA X
Estimated height of the NA … Unit ( e.g. meter ) X
( building / rooftop / water tower )
Material storage facility ✘ Yes No X
Storage under shelter Yes ✘ No X
Storage safety ✘ Yes No X
Space for storage Yes Unit ( e.g. square meter ) X
Comments
Espace disponible sur le site pour le stockage du matériel

HEALTH & SAFETY


Responsibility
NOKIA Customer

Ladder ✘ Yes No X
Caged of ladder Yes ✘ No X
Cable ✘ Yes No X
Safety rail ✘ Yes No X
Type X
Safety equipment to be installed X
Health & Safety issues X
Comments

MATERIAL LIFTING
Responsibility
NOKIA Customer

Conformity with H&S ✘ Yes No


Lifting required Yes No
Lifting means Pulley X
Crane Helicopter X
Comments
SITE AU SOL PAS BESOIN DE LEVAGE POUR DEPOSER LE MATERIEL
SITE SURVEY REPORT

INDOOR INFORMATION
Responsibility
NOKIA Customer

False-floor Available To be provided ✘ N/A X


False-ceiling Available To be provided ✘ N/A X
Cable tray (Place for new cable) ✘ Available To be provided N/A X
Cable tray Horizontal Length 10 m Unit ( e.g. meter ) X
Cable tray Vertical Length 55 m Unit ( e.g. meter ) pour la liaison vers ROUTE DOUGOUDOU X
Cable tray Vertical Length Unit ( e.g. meter ) X
Cable tray Vertical Length Unit ( e.g. meter ) X
Cable tray Vertical Length Unit ( e.g. meter ) X
Cable tray Vertical Length Unit ( e.g. meter ) X
Equipment room height … Unit ( e.g. meter ) X
Temperature in the room … … Unit ( e.g. °C ) X
Air Cooling System Available ✘ Not available X
Air Cooling System report Available ✘ Not available X
Comments Installer un support FH a 54m

POWER SUPPLY ( Main )


Responsibility
NOKIA Customer

AC Power Source ✘ Available To be provided N/A X


DC Power Source ✘ Available To be provided N/A X
Power Distribution Box to the equipment ✘ Available To be provided N/A X
Power cable length to equipment rack 8m … Unit ( e.g. meter )
Quantity of power termination point 7 Nb of points available X

Power A Location Floor :OUI Room : PDB : Position #


Power B Location Floor : OUI Room : PDB : Position #

Comments
3DPN DE 63A + 2DPN DE 50A DISPONIBLE DANS LA BAIE IHS

GROUNDING
Responsibility
NOKIA Customer

Main ground plate Available ✘ To be provided N/A X


Earth cable length to the equipment 1m Unit ( e.g. meter )
Comments
BARETTE DE TERRE DISPONIBLE

RACK
Responsibility
NOKIA Customer

Rack required ✘ Available To be provided N/A


Type of rack SIEMENS ou HUAWEI BTS3900

Wall mounting required Available To be provided ✘ N/A
Rack position DALLE OUTDOOR MTN
Available space to install new rack Heigth Unit ( e.g. mm )
Width Unit ( e.g. mm )
Depth Unit ( e.g. mm )
Comments

Il est préférable d'installer le MSS dans la BTS HUAWEI pour faciliter son alimentation

SITE SURVEY REPORT

INDOOR UNIT
Responsibility
NOKIA Customer

Type of IDU to be installed MSS-1c MSS-1 MSS-4 MSS-8


IDU postion INSIDE CABINET
Existing IDU relocation required Yes ✘ No
Available space to install new shelf YES
Heigth Unit ( e.g. mm )
Width Unit ( e.g. mm )
Depth Unit ( e.g. mm )
Comments
Il est préférable d'installer le MSS dans la BTS HUAWEI pour faciliter son alimentation

TOP RACK UNIT


Responsibility
NOKIA Customer

TRU Required ✘ Available To be provided N/A


Comments
DCDU EXISTENT AVEC 5 POINTS DE CONNECTIONS

BREAKERS / FUSES
Responsibility
NOKIA Customer

Type of protection Breaker ✘ Fuse X


Breakers / Fuses Size(A)
2A 4A 6A 8A 10A 30A 50A 63A

Power A Location Qty Available … … … … 5


Power A Location Qty to be provided … … … … … …

Power B Location Qty Available … … … … … …


Power B Location Qty to be provided … … … … … …

Comments
5 POINTS DE CONETIONS DISPONIBLE DANS LE RACK TMC DE HUAWEI

PRESSURIZATION
Responsibility
NOKIA Customer

Pressurization required Available To be provided ✘ N/A
Type of dehydrator …
AC power supply required Available To be provided ✘ N/A
DC power supply required Available To be provided ✘ N/A
Number of manifold, gauge air access … Qty available / needed
Distance between dehydrator and
Waveguide …. … Unit ( e.g. meter )
Requirement for dehydrator install Wall mounted Rack available Rack to be provided
Dehydrator position …
Dehydrator status ( If Existing ) Operationnel Out of Service In alarm X
Comments …………………………………………………………………………………………………………

SITE SURVEY REPORT

DIGITAL DISTRIBUTION FRAME


Responsibility
NOKIA Customer

Internal DDF in the equipment rack Yes ✘ No


External DDF required ✘ Yes No
Frame for external DDF Available ✘ To be provided N/A
Distance from equip rack to internal DDF Unit ( e.g. meter )
Distance from equip rack to external DDF … Unit ( e.g. meter )
Type of interfaces E1/T1 E3/T3 STM-1 Ethernet
Terminal Block Position … … …
75 Ohms interface … Qty … Qty … Qty … Qty
120 Ohms interface Qty … Qty … Qty … Qty
1.6/5.6 type of connector … Qty … Qty … Qty … Qty
1.0/2.3 type of connector … Qty … Qty … Qty … Qty
BNC type of connector … Qty … Qty … Qty … Qty
RJ45 type of connector … Qty … Qty … Qty Qty

Connections Detail
Source Destination Type # Connections Connector T Lenght (M) Label
NA NA 2 NA

Comments

OPTICAL DISTRIBUTION FRAME


Responsibility
NOKIA Customer

Internal ODF in the equipment rack Yes ✘ No X


External ODF required Yes ✘ No X
Rack for external ODF Available To be provided ✘ N/A X
Type pf rack …
Rack position …
Available space to install new rack
Heigth … … Unit ( e.g. mm )
Width … … Unit ( e.g. mm )
Depth … … Unit ( e.g. mm )
Optical module position in the rack …
Distance from equip to internal ODF … … Unit ( e.g. meter ) X
Distance from equip to external ODF … … Unit ( e.g. meter ) X
Type of interfaces Single Mode Multi-Mode
Terminal Block Position … …
LC-LC … Qty … Qty
LC-FC … Qty … Qty
LC-SC … Qty … Qty
FC-SC … Qty … Qty
SC-SC … Qty … Qty

Comments Pas de rack FO DISPONIBLE

SITE SURVEY REPORT

AUXILIARY
Responsibility
NOKIA Customer

Housekeeping cabling Available To be provided N/A


Cable Length from
Alarms cabling Available To be provided N/A
Status No Alarms No Urgent Urgent
Synchronization cabling Available To be provided N/A
Type :
Distance between Network Managment and FH racks:
Supervision cabling Available To be provided N/A
Type :
Distance between Synchronization source and FH racks:
Comments …………………………………………………………………………………………………

LABELING
Responsibility
NOKIA Customer

Type of label for power cable to TRU


Type of label for power cable to Shelf
Type of label for IDU-ODU cable
Type of label for E1/T1 cable
Type of label for E3/T3 cable
Type of label for STM-1 cable
Type of label for Ethernet cable
Type of label for Optical cable
Type of label for housekeeping cable
Type of label for alarms cable
Type of label for synchronization cable
Type of label for supervision cable
Comments …………………………………………………………………………………………………
Responsibility
Customer

Installer un support FH a 54m

Responsibility
Customer

N DE 63A + 2DPN DE 50A DISPONIBLE DANS LA BAIE IHS

Responsibility
Customer

BARETTE DE TERRE DISPONIBLE

Responsibility
Customer
le d'installer le MSS dans la BTS HUAWEI pour faciliter son alimentation

Responsibility
Customer

nstaller le MSS dans la BTS HUAWEI pour faciliter son alimentation

Responsibility
Customer

DCDU EXISTENT AVEC 5 POINTS DE CONNECTIONS

Responsibility
Customer

DE CONETIONS DISPONIBLE DANS LE RACK TMC DE HUAWEI

Responsibility
Customer
Responsibility
Customer

Responsibility
Customer
Responsibility
Customer

Responsibility
Customer
SITE SURVEY REPORT

TOWER / STRUCTURE
Responsibility
NOKIA Customer

Tower / Pole / Wall ✘ Available To be provided N/A X


Type of Structure Tower Type Self-support ✘ Guyed mast Concrete tower X
Pole Type Pole Gravity support X
Wall Type Wall X
Type of metal profil ✘ Corner Tubular Other X
Tower / Pole Height 72 m Unit ( e.g. meter ) X
Number of platforms: 0 X
Outdoor Temperature Unit ( e.g. °C ) X
Height(s) of platforms 1 Unit ( e.g. meter ) X
Height(s) of platforms 2 Unit ( e.g. meter ) X
Height(s) of platforms 3 Unit ( e.g. meter ) X
Comments

PYLONE HAUBANNE 72 m

OUTDOOR INFORMATION
Responsibility
NOKIA Customer

Indoor Cable entry point Wall Roof Ground ✘ N/A


Cable feed-thru Available To be provided ✘ N/A
Type of material to create penetration NA
Distance entry point outdoor structure 10m Unit ( e.g. meter )
Outdoor cable tray (Free place available) ✘ Available To be provided N/A
Type of cable tray HORIZONTAL: ECHELLE / VERTICAL : ECHELLE
Horizontal Length 12 m Unit ( e.g. meter )
Vertical Length 54 m Unit ( e.g. meter ) Pour la liaison vers ROUTE DOUGOUDOU
Vertical Length Unit ( e.g. meter )
Vertical Length Unit ( e.g. meter )
Vertical Length Unit ( e.g. meter )
Vertical Length Unit ( e.g. meter )
Outdoor cable tray cover ✘ Available To be provided N/A
Type of cable tray cover HORIZONTAL: CAPOT / VERTICAL : NA
Horizontal Length 10 Unit ( e.g. meter )
Vertical Length NA Unit ( e.g. meter )
Structure Grounding Building / Tower / Etc. Available ✘ To be provided N/A
Grounding continuity test … … Unit ( Ohms ) ✘ N/A
It is a continuity test not a ground validation by a grounding mesureament
The disponibility of the ground is from Customer Responsability
Comments CDCV vers ROUTE DOUGOUDOU: 54m
sibility
Customer

sibility
Customer
SITE SURVEY REPORT

ANTENNA & ODU MOUNTING


ANTENNA
Responsibility
NOKIA Customer

Link Name Dir DOUGOUDOU SODEMI -- ROUTE DOUGOUDOU


Space diversity Yes ✘ No
Antenna Available ✘ To be provided N/A
Type of antenna NOKIA
Antenna size A DEFINIR Unit ( e.g. Cm )
Non - integrated antenna ✘ Yes No
FlexTwist Available To be provided ✘ N/A
Azimuth 47.05 Unit ( e.g. Degres )
Minimum antenna height 55m Unit ( e.g. meter )
Proposed antenna height 54m Unit ( e.g. meter )
Comments

INSTALLER LE SUPPORT SUR LA FACE AB A 54m

✘ ✘ ✘

Link Name
Space diversity Yes No
Antenna Available To be provided N/A
Type of antenna
Antenna size Unit ( e.g. Cm )
Non - integrated antenna Yes No
FlexTwist Available To be provided N/A
Azimuth Unit ( e.g. Degres )
Minimum antenna height Unit ( e.g. meter )
Proposed antenna height Unit ( e.g. meter )
Comments

Link Name
Space diversity Yes No
Antenna Available To be provided N/A
Type of antenna
Antenna size Unit ( e.g. Cm )
Non - integrated antenna Yes No
FlexTwist Available To be provided N/A
Azimuth Unit ( e.g. Degres )
Minimum antenna height Unit ( e.g. meter )
Proposed antenna height Unit ( e.g. meter )
Comments

ANTENNA SUPPORT
Responsibility
NOKIA Customer

Space in the Tower for the ant support Available To be provided N/A X
Antenna support Available To be provided N/A X
Type of antenna support INSTALLER UN SUPPORT FH A 54m X
Size of antenna support Unit ( e.g. mm ) X
Structure for antenna support mounting Available ✘ To be provided N/A X
Type of Structure for antenna support Corner ✘ Tubular ✘ Other X
Size of structure profile for ant support 84 Unit ( e.g. meter ) X

Comments

INSTALLER UN SUPPORT FH A 54m sur la face AB

SWAY BAR
Responsibility
NOKIA Customer

Quantity of sway bar A DEFINIR


Type of sway bar A DEFINIR
Structure for sway bar mounting Available ✘ To be provided N/A X
Type of Structure for Sway bar mounting ✘ Corner Tubular Other X
Size of structure profile for sway bar … … Unit ( e.g. meter ) X
Comments

ODU
Responsibility
NOKIA Customer

Quantity of ODU A DEFINIR


Type of ODU A DEFINIR
Structure for ODU mounting Available ✘ To be provided N/A X
Type of Structure for ODU mounting Corner Tubular Other X
Size of structure profile for ODU N/A… … Unit ( e.g. meter ) X
Comments
LES CARACTERISTIQUES ODU SONT SELON LES ORIENTATIONS DU BILAN DE LIAISON

SITE SURVEY REPORT


ANTENNA & ODU MOUNTING
IDU - ODU Cable Dir LEBRE--DAHIRA2
Responsibility
NOKIA Customer

Coaxial Available ✘ To be provided N/A


Feeder / Waveguide Available ✘ To be provided N/A
Optical Fiber Available ✘ To be provided N/A
CAT5 Eth Available ✘ To be provided N/A
Horizontal length 10 m Unit ( e.g. meter )
Vertical length 54 m Unit ( e.g. meter )
Type of label for IDU - ODU cable
Comments

LE TYPE DE CABLE IDU-ODU EST A DEFINIR SELON LE BILAN DE LIAISON


OUTDOOR GROUNDING SYSTEM ✘

(0) Antenna / ODU ground

(4) Ground
of the Building
(1)(2)(3) Example
of grounding plate

Responsibility
NOKIA Customer

Structure Level Available plates Plates to be provided Free connection points


Level 0 - Main ✘ Yes ✘ No Yes ✘ No … X
Grouding for Antennas & ODU
Level 0 - Space Diversity
Yes ✘ No Yes ✘ No … X
Grounding for Diversity Antennas & ODU
Level 1 ( At the top) (IDU - ODU cable) ✘ Yes No Yes ✘ No … X
Level 2 ( Intermediate)
(if D > 50m) X
Grounding for IDU - ODU cable Yes ✘ No ✘ Yes No … X
Grounding for IDU - ODU cable Yes No Yes No … X
Level 3 ( At the bottom ) ✘ Yes No Yes No … X

Level 4 ( At building entry )


Yes No Yes No … X

Comments
sibility
Customer

sibility
Customer
sibility
Customer

sibility
Customer

E LIAISON

sibility
Customer

SON
sibility
Customer
SITE SURVEY REPORT

LINK OF SIGHT CHECK


LINK
Responsibility
NOKIA Customer

Link Name Dir DOUGOUDOU SODEMI -- ROUTE DOUGOUDOU


Space diversity Yes ✘ No
Azimuth 47.05 Unit ( e.g. Degres )
Minimum antenna height 55m Unit ( e.g. meter )
Proposed antenna height 54m Unit ( e.g. meter )

Comments
INSTALLER UN SUPPORT FH A 54m sur la FACE AB

Link Name
Space diversity Yes ✘ No
Azimuth Unit ( e.g. Degres )
Minimum antenna height Unit ( e.g. meter )
Proposed antenna height Unit ( e.g. meter )

Comments

VISIBILITY
Responsibility
NOKIA Customer

Compass serial number : …


Binocular serial number : …
Visibility ✘ Naked eye With binocular
Obstacle Yes ✘ No
Comments

TYPE OF OBSTACLE
Responsibility
NOKIA Customer

Building Yes ✘ No X
Chimney Yes ✘ No X
Airport Yes ✘ No X
High voltage electricity tower and cable Yes ✘ No X
Tree Yes ✘ No X
Other Yes ✘ No … X
Comments
SITE SURVEY REPORT

OUTDOOR LAYER

✘ Yes

Site dimensions (m): L= W= H=

L 1 2 3 4 5
W

6
7

OUTDOOR LAYER

✘ Yes

Site dimensions (m): L= W= H=

L 1 2 3 4 5
W

5
6

7
SITE SURVEY REPORT

DIGITAL PHOTO RECORDS – Exterior and Interior (Check List of Photos Recorded / Available)

AERIAL SITE POSITION


Aerial site position available ✘

SITE ACCESS
Site gate access view ✘

Room / Shelter / cabinet access view ✘

Outdoor structure access view ( Tower / polle / Etc.) ✘

SITE ENVIRONMENT & STORAGE INFORMATIONS


Outdoor infrastructure view ✘

Indoor infrastructure view


View if there is wall protection / structure portection for Wind / Sunshine / Ice / Dust ✘

View if there is a storage place Storage under shelter Storage safety Space for storage ✘

HEALTH & SAFETY


Ladder & caged of ladder view ✘

Cable & safety rail view


Safety equipment installed view Health & Safety issues
MATERIAL LIFTING
Lifting required view
INDOOR INFORMATION
False-floor False-ceiling view
View of the place available in the Cable tray (Place for new cable)
View of the Cable tray Horizontal Length
View of the Cable tray Vertical Length
POWER SUPPLY ( Main )
AC Power Source view
DC Power Source view ✘

GROUNDING
Main ground plate view ✘

RACK
Rack or a new subrack position view Available space to install new rack
INDOOR UNIT
IDU postion view Available space to install new shelf ✘

TOP RACK UNIT BREAKERS / FUSES


View of the TRU with the breaker position to use ✘

IF PRESSURIZATION
Dehydrator position view Dehydrator status ( If Existing ) Type of dehydrator
AC / DC power supply view
manifold, gauge air access view available
If existing Waveguide connection view
DIGITAL DISTRIBUTION FRAME
Internal DDF position view in the equipment rack with the type of interface ✘

External DDF rack / DDF position view with the type of interface ✘

OPTICAL DISTRIBUTION FRAME


Internal ODF position view in the equipment rack with the type of interface
External ODF rack / ODF position view with the type of interface
TOWER / STRUCTURE

Overall tower / pole / wall view Type of Structure Type of metal profil ✘

Tower top half detail view ✘

Tower bottom half detail view ✘

Platform/Rooftop view

SITE SURVEY REPORT

OUTDOOR INFORMATION
Feed-through entry - Outdoor view ✘

View of the place available in the Cable tray (Place for new cable) ✘

View of the Cable tray Horizontal Length ✘

View of the Cable tray Vertical Length ✘

ANTENNA & ODU MOUNTING


ANTENNA ANTENNA SUPPORT
Antenna pole mounting view Structure / Type of Structure for antenna support mounting ✘

FlexTwist attachment to the bar ✘

SWAY BAR
Sway bar mounting to the structure
ODU
ODU pole mounting view ✘

IDU - ODU Cable

OUTDOOR GROUNDING SYSTEM


Structure
Level 0 - Main Ground bar in the structure for the antenna and ODU grounding
Level 0 - Space Diversity
Grounding for Diversity Antennas & ODU
Level 1 ( At the top)
Grounding for IDU - ODU cable ✘

Level 2 ( Intermediate)
Grounding for IDU - ODU cable ✘

Level 3 ( At the bottom )


Grounding for IDU - ODU cable
Level 4 ( At building entry )
Grounding for IDU - ODU cable
LINK OF SIGHT CHECK
Visibility Obstacle Type of obstacle on the Azimuth direction of the antenna ✘

IMAGES DOUGOUDOU

VUE GENERALE DU SITE


IMAGE 1 IMAGE 2

NEW SITE