Piping Work Contractor Bill-1
Piping Work Contractor Bill-1
683,236
Company Type of Work Area of Work Bill Date Unit Weigth/Sft Rate Amount Sub Total Grand Total Remarks
Khulna Fabrication & erection Main Pipe Rack 4-Mar-19 kg 13,263.30 20.00 265,266
Fabrication & erection Branch Pipe Rack 5-Mar-19 kg 15,176.00 20.00 303,520
Fabrication & erection Hand Railing Work Main 5-Mar-19 RM 280.00 290.00 81,200
Electric Support Main & Branch Pipe Rac 18-Mar-19 kg 3,058.00 20.00 61,160
Modification 5-Mar-19 8 nos 61,000 772,146
Piping Work Flare System 27-Mar-19 Ø inch 214.00 690.00 147,660
Piping Work Flare System 27-Mar-19 Ø inch 144.00 800.00 115,200
Painting Work Main Pipe Rack, Branch P 5-Mar-19 Sq. Mtr 11,757.21 12.50 146,965
Sand Blasting 27-Mar-19 Sq. Mtr 342.29 300.00 102,687 512,512
Sand Blasting 28-Apr-19 Sq. Mtr 462.45 300.00 138,735
Electric Support Work Utility Pipe Rack, Tank F 1-May-19 kg 7,773.80 24.00 186,571
Painting Work Utility Pipe Rack, Tank F 18-Apr-19 Sq. Mtr 557.68 12.50 6,971
Fabrication & erection Structure 29-Apr-19 kg 4,964.00 20.00 99,280
Piping Work Flare System & Caustic 17-Apr-19 Ø inch 296.75 690.00 204,758
Assembly & Erection Total Flare 1-May-19 kg 20,950.00 11.00 230,450
Fabrication & erection Monkey Ladder Safety Ri 1-May-19 pcs 40.00 125.00 5,000
Painting Work Flare System 29-Apr-19 Full Pkg 20,000
Worker Bill 29-Apr Person 34.00 700.00 23,800
Electrode 29-Apr 1,000
Shah Cement 29-Apr 14,500
Ladder Work Main Pipe Rack & Branch 17-Apr Kg 1,230.00 20.00 24,600
Stiffiner Plate 17-Apr pcs 4.00 750.00 3,000 958,665
Electric Support Work Utility Pipe Rack 14-May kg 1,820.93 24.00 43,702
Painting Work Utility Pipe Rack 14-May kg 138.16 12.50 1,727
Sand Blasting 18-May Sq. Mtr 709.77 300.00 212,931
Piping Work Meter Skid 18-May Ø inch 144.00 690.00 99,360
Structure Wok Meter Skid 18-May kg 781.00 24.00 18,744
Piping Work Flare System 19-May Ø inch 112.00 690.00 77,280
Piping Work CFP 19-May Ø inch 83.75 800.00 67,000
Piping Work Caustic Wash area 19-May Ø inch 223.00 690.00 153,870
Piping Work Underground Piping 19-May Ø inch 116.75 520.00 60,710 735,324
Piping Work Flare System 30-Jun Ø inch 25.25 690.00 17,423
Piping Work OSBL 30-Jun Ø inch 300.00 690.00 207,000
Piping Work SS Pipe 30-Jun Ø inch 18.50 800.00 14,800
Piping Work Caustic Wash area 30-Jun Ø inch 508.00 690.00 350,520
Piping Work Underground Piping 30-Jun Ø inch 653.00 520.00 339,560
Piping Work CRU Area 30-Jun Ø inch 251.00 690.00 173,190
Piping Work P 11 30-Jun Ø inch 96.00 690.00 66,240
Piping Work GI Piping 30-Jun Ø inch 60.25 690.00 41,573
Support Fabrication ErectiGI Piping 30-Jun Pcs 15.00 300.00 4,500
Erection Flare Equipment 30-Jun kg 1,124.00 11.00 12,364
Support Flare Equipment 30-Jun kg 133.00 25.00 3,325
Sand Blasting 28-Jun Sq. Mtr 192.80 300.00 57,840 1,288,334
Piping Work Flare System 27-Jul Ø inch 148.50 690.00 102,465
Piping Work Flare GI Line 27-Jul Ø inch 55.00 690.00 37,950
Piping Work Flare SS Pipe 27-Jul Ø inch 16.00 800.00 12,800
Piping Work Caustic Wash area 27-Jul Ø inch 16.00 690.00 11,040
Piping Work Underground Piping 27-Jul Ø inch 105.00 520.00 54,600
Piping Work CRU Area 27-Jul Ø inch 921.00 690.00 635,490
Piping Work OSBL 27-Jul Ø inch 210.00 690.00 144,900
Piping Work CFP Feed Pump 27-Jul Ø inch 270.25 690.00 186,473
Piping Work P 11 27-Jul Ø inch 168.00 690.00 115,920 1,301,638 80% Bill Paid 260,327.50
Sand Blasting 31-Jul Sq. Mtr 535.80 300.00 160,740
Piping Work Laboratory Water Line 25-Jul Ø inch 21.00 690.00 14,490
Jack Bolting Pump Allignment 25-Jul Pcs 40.00 200.00 8,000
Electric Support Fabricati 01 Area Pipe Rack 25-Jul Pcs 80.00 450.00 36,000
Worker Bill Electrical Dep 25-Jul 12,500
Pump Allignment 25-Jul Pcs 10.00 5,000.00 50,000
Pump Allignment 25-Jul holes 4.00 500.00 2,000 283,730
Piping Work Flare SS Pipe 5-Sep Ø inch 28.00 800.00 22,400
Piping Work CFP SS Pipe 5-Sep Ø inch 29.00 800.00 23,200
Piping Work Underground Piping 5-Sep Ø inch 495.00 520.00 257,400
Piping Work Caustic Wash area 5-Sep Ø inch 85.75 690.00 59,168
Piping Work CRU Structure Area 5-Sep Ø inch 66.50 690.00 45,885
Piping Work OSBL 5-Sep Ø inch 190.00 690.00 131,100 539,153 80% Bill Paid 107,830.50
Tube Piping Chemical Lab 4-Sep RM 75.00 200.00 15,000
Tube Support Chemical Lab 4-Sep pcs 20.00 300.00 6,000
Modification Flare System 3-Sep Ø inch 128.00 1,035.00 132,480
Modification Caustic Wash area 3-Sep Ø inch 18.00 1,035.00 18,630
Modification Flare System SS Pipe 3-Sep Ø inch 8.00 1,200.00 9,600
Tank Allignment Flare System 3-Sep Full Pkg 10,000
Erection Fitting Welding V-001 Platform 4-Sep kg 168.00 11.00 1,848
Sand Blasting 3-Sep Sq. Mtr 151.92 300.00 45,576 239,134
Filler Rod 7,500 7,500
Sand Blasting 22-Sep Sq. Mtr 1,286.20 300.00 385,860 385,860
Piping Work Caustic Wash area 3-Oct Ø inch 172.00 690.00 118,680
Piping Work Underground Piping 3-Oct Ø inch 257.00 520.00 133,640
Piping Work CRU Area 3-Oct Ø inch 252.50 690.00 174,225
Piping Work P 11 3-Oct Ø inch 340.00 690.00 234,600
Piping Work P 11 SS Pipe 3-Oct Ø inch 20.00 800.00 16,000
Piping Work CFP Structure area 3-Oct Ø inch 105.25 690.00 72,623
Piping Work MPR Area-1 (1200) 3-Oct Ø inch 28.00 690.00 19,320
Piping Work UPR & OSBL 3-Oct Ø inch 2,152.00 690.00 1,484,880 2,253,968 80% Bill Paid 450,793.50
Piping Work Caustic Wash area 28-Oct Ø inch 351.50 690.00 242,535
Piping Work P 11 area-04 28-Oct Ø inch 249.00 690.00 171,810
Piping Work CRU Structure Area 28-Oct Ø inch 464.00 690.00 320,160
Piping Work CFP Structure area 28-Oct Ø inch 36.25 690.00 25,013
Piping Work Main Pipe Rack 28-Oct Ø inch 110.00 690.00 75,900
Piping Work Utility & OSBL 28-Oct Ø inch 1,652.00 690.00 1,139,880 1,975,298 80% Bill Paid 395,059.50
Sand Blasting 3-Oct 359.34 300.00 107,802
Pump Allignment 3-Oct Pcs 48.00 6,500.00 312,000
Fabrication erection paintStructure shade 10,000 429,802
11,683,062
Company Type of Work Area of Work Bill Date Unit Weigth/Sft Rate Amount Sub Total Grand Total Remarks
Saleh
Engineering
Works Labor Charge Workshop,Worker Sheed 31-Mar-19 525,000
Pipe Line Fabrication Maachine,Tools 31-Mar-19 475,000 1,000,000 Advance Payment
1,089,903.50
1,148,762.13
706,663.13
705,704.13
Company Type of Work Area of Work Bill Date Unit Weigth/Sft Rate Amount Sub Total Grand TotaRemarks Outstanding
Ideas It
Ltd Fabriccation & Erection Internal Floating Roof 9/26/2018 SFT 19,300.00 95.00 1,833,500
Testing by Water Internal Floating Roof 9/26/2018 Lot 1.00 100,000.00 100,000 1,933,500 433,520
Installation, Construction Fire Hydrant 11/11/2018 3,300,000 3,300,000.00 90% Bill Paid 330,000.00
Internal Floating Roof Tank#1,2,4,7 8-Nov-18 SFT 10,000.00 95.00 950,000 950,000.00
Internal Floating Roof Stilling Wall 5-Dec-18 Pcs 13.00 3,500.00 45,500
Internal Floating Roof Pantoon Size 5-Dec-18 Pcs 6.00 19,200.00 115,200 160,700 Discount 30,700.00
Internal Floating Roof Connection Work 5-Dec-18 Pcs 60.00 400.00 24,000
Internal Floating Roof Metal Sheet 5-Dec-18 Meter 58.00 310.00 17,980 41,980
Internal Floating Roof Tank# 3,5,6,10 15-Dec-18 SFT 7,965.87 95.00 756,758
756,757 50% Bill Paid 5/6/2019
Installation Work Boiler Chimney,Duct 5-Dec-18 220,800
Installation Work Utility Air Compressor 5-Dec-18 382,860
Modificaation Work Diesel Tank 5-Dec-18 120,000
Installation Work Nitrogen Generator 5-Dec-18 172,800 896,460 696,460.00
Fabriccation & Erection Utility Pipe Rack 18-Dec Ton 140.00 27,000.00 3,780,000
Fabriccation & Erection Big Compressor 18-Dec Ton 13.00 27,000.00 351,000
Piping Work CS,Alloy,SS Pipe 18-Dec Ø inch 10,000.00 690.00 6,900,000
11,031,000 10,231,000.00
Structure Fabrication Utility Pipe Rack 21-Jan KG 27,887.90 27.00 752,973 750,000
Installation & Pipe Line Boller duct,Chimny 4-Apr Lot 1.00 1.00 67,500
Installation & Pipe Line Pipe Joint Weld 4-Apr Ø inch 405.00 450.00 182,250
Installation & Pipe Line Pipe Joint Thred 4-Apr Joint 20.00 200.00 4,000
Installation & Pipe Line Pipe Joint Thred 4-Apr Joint 27.00 200.00 5,400
Installation & Pipe Line Nitrogen Plaant 4-Apr Job 1.00 100,000.00 100,000
Installation & Pipe Line Pipe Joint Thred 4/4/2019 Ø inch 69.00 450.00 31,050
Installation & Pipe Line Materials Pcs 405,790 795,990
Testing & Commissioning IFR for Tank 5/6/2019 Pack 1.00 100,000.00 100,000
Internal Floating Roof Tank# 3,5,6,10 5/6/2019 Pack 1.00 378,378.00 378,378 Previous Due
Structure Fabrication SS-04 5/6/2019 Lot 1.00 670,000.00 670,000
Stair Hndrailing SS-04 5/6/2019 Lot 1.00 40,000.00 40,000
Installation C-1002 5/6/2019 KG 2,660.00 10.00 26,600 1,214,978
Utility Pipe Rack Near Compressor Room 7/27/2019 KG 1,936.18 27.00 52276.74822
Utility Pipe Rack Near Tank 10 7/27/2019 KG 2,841.77 27.00 76,728
Utility Pipe Rack Near Truck Loaading 7/27/2019 KG 1,822.56 27.00 49,209
Utility Pipe Rack Near Tank 8 7/27/2019 KG 2,353.30 27.00 63,539
Utility Pipe Rack Near SS-01 7/27/2019 KG 4,029.74 27.00 108,803
Utility Pipe Rack Near ETP 7/27/2019 KG 2,628.42 27.00 70,967
Utility Pipe Rack MPR to Flare Connection 7/27/2019 KG 12,050.65 27.00 325,368 735,730
OSBL 80-P-00213 7/27/2019 Ø inch 87.00 690.00 60,030
OSBL 50-P-00214 7/27/2019 Ø inch 98.00 690.00 67,620
OSBL 50-P-00215 7/27/2019 Ø inch 100.00 690.00 69,000 196,650 70% Bill Paid 58,995
Steel Railing Installation SS-01 7/28/2019 Nos 68.00 51600 51,600
LT-
Radar LT Housing Assembly 10301,10601,106021,201
01,20401,30802,31301,31
302,31502,32101,32901,4
1601 7/27/2019 Ø inch 310.00 690.00 213,900 192,510 90% Bill Paid 21,390
OSBL Utility Piping 7/27/2019 Ø inch 521.00 690.00 359,490 251,643 70% Bill Paid 107,847
InSaaf
Engineeri
ng Works Welding, Tank Area 31-Mar-19 Ø inch 568.00 350.00 198,800
Reducer,Concentric
Reducer Tank Area 31-Mar-19 Ø inch 227.50 250.00 56,875
Cleaning Tank Area 31-Mar-19 SFT 356.00 15.00 5,340
Cleaning & Wrapping Tank Area 31-Mar-19 RM 6.50 400.00 2,600
Fabrication & Erection Tank Area 31-Mar-19 KG 171.40 25.00 4,285 267,900
Welding Tank Fram Area 4-Aug-19 Ø inch 518.75 520.00 269,750 90% Bill Paid 26,975
Thread Joint WTP 4-Aug-19 Ø inch 54.00 200.00 10,800
Equipment WTP 4-Aug-19 KG 300.00 11.00 3,300
Ladder Support 4-Aug-19 KG 270.00 25.00 6,750 290,600 263,625
Pipe Line WTP to boilar,cooling tower 12-Sep-19 Ø inch 94.00 520.00 48,880
Railing ETP,Heater 12-Sep-19 140,658 189,538
Piping Work Main Pipe Rack-1200 26-Nov Ø inch 11.75 685.00 8,049
Piping Work 50-P-31701 26-Nov Ø inch 20.00 685.00 13,700
Piping Work Area-6 26-Nov Ø inch 186.50 685.00 127,753
Piping Work 50-P-41702 26-Nov Ø inch 20.00 685.00 13,700
Piping Work Electric 26-Nov Ø inch 207.25 685.00 141,966
Piping Work H-2 Line 26-Nov Ø inch 27.25 685.00 18,666
Piping Work Nash 26-Nov Ø inch 34.00 685.00 23,290
Piping Work I/A Compressor 26-Nov Ø inch 11.25 685.00 7,706
Piping Work NG-30301 26-Nov Ø inch 5.25 685.00 3,596
Piping Work Cooler PG 26-Nov Ø inch 42.00 685.00 28,770
Piping Work ETP 26-Nov Ø inch 48.00 520.00 24,960
Piping Work WTP 26-Nov Ø inch 16.00 520.00 8,320
Piping Work Tank Fram 26-Nov Ø inch 111.00 520.00 57,720
Piping Work Modification 26-Nov Ø inch 9.00 1,027.50 9,248 487,444 487,444
M/S
Chittagon
g
Engineeri
ng Works Procurement of Machinery 02.10.2018 1,000,000
CFP,Main Pipe
Fabrication & Erection Rack,Flare 22-Dec-19 800,000 800,000
Full Paid-1,897,000
Pipe Welding CS & LTCS 28-Apr Ø inch 1,300.00 690.00 897,000 897,000 Full Paid-1,897,000
Pipe Welding CS & LTCS Area-06 28-Aug Ø inch 2,471.20 690.00 1,705,128
Rework SS-02,03 & Colum 22-Aug 242,660
Febrition & Installation Structure-002,03 16-Aug KG 24,773.00 25.00 619,325
Send Blsting Area-01-1200 5-Sep Sq. Mtr 590.00 300.00 177,000
Febrition & Installation Hand Railing,Ladder 15-Sep RSM 588.50 290.00 170,665
Send Blsting Area-01-1200 16-Sep Sq. Mtr 925.22 300.00 277,565
Fitup & Welding Area-06 18-Sep Ø inch 813.00 690.00 560,970
Modification CFP,CRU,MPR 15-Sep Ø inch 452.25 1,035.00 468,079
Febrition & Installation SS-04, Area-6 30-Sep KG 100,000.00 13.00 1,300,000 5,521,392 Payment- Tk.5,668,802
Pipe Welding CFP,MPR 22-Oct Ø inch 3,281.40 690.00 2,264,166 2,264,166 Full Paid