Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

Gulf Cooperation Council

Interconnection Authority
GCCIA

Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
Busbar Low Impedance P740 Busbar Protection BB Ref: BB
Sensitivity & Satability Test Substation: SALWA

REVISION
SUMMARY
PAGE 0
1 PURPOSE OF TESTS 2 X
2 REFERENCE DOCUMENT 2 X
3 SCOPE 2 X
4 TEST EQUIPMENT 2 X
5 PRE-REQUISTES 3 X
6 PROCEDURES 3 X
7 RECORD TEST SHEET 4 X
7.1 Sensitivity Test
7.2 Stability Test

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV-0 Page 1 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA

Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
Busbar Low Impedance P740 Busbar Protection BB Ref: BB
Sensitivity & Satability Test Substation: SALWA

1 PURPOSE OF TESTS

- check stability of the Busbar under normal operation condition

2 REFERENCE DOCUMENTS
DOCUMENT VERSION/
DOCUMENT REMARKS
REFERENCE DATE
Protection Line Diagram
Schematic Drawing

3 SCOPE
Substation Name :-
Busbar Name:
Scheme to be Checked Busbar Protection Sensitivity & Stability

4 TEST EQUIPMENT USED

Equipment Calibration Calibration due


Sl No Description Make
Sl No. date date
1. Primary
Injection Kit
2 Multimeter

3. Clip-on meter

4. Laptop NA

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV-0 Page 2 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA

Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
Busbar Low Impedance P740 Busbar Protection BB Ref: BB
Sensitivity & Satability Test Substation: SALWA

5. PRE - REQUISITES

PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)
All CT circuits are Through (Links are closed)

6. TEST PROCEDURES

With the help of Primary Injection test, connected through Earth switches on the GIS , ( with the full
coordination from GIS specialist ), and with controlling CBs Isolators, & Earth switches to change the
current path in all primary loops.
Consider the middle feeder as reference , the sensitivity test to be done in the reference feeder to check
BBP Supervision Function operation , and then Stability between reference feeder with other feeders (
diameters).

6.1 SENSITIVITY TEST


* Check the Supervision Function operation :
- inject primary current in phase R-Y and increase the injected current until the supervision relay
operate
- record the operating primary and secondary current .
- repeat same procedure above for phase Y-B and Y.
6.2- SATABILITY TEST
- Inject primary current in phase R in both feeders, reference feeder and test feeder
- Increase injected current up to a value more than Supervision Function operating value of the
differential relay.
- Check no operation of the differential relay.
- Record the value of the primary and secondary currents.
- Repeat same procedure above for phase Y and B.

7. SENSITIVITY & STABILITY TESTS:


AREVA T&D GCCIA / SNCL
Signature Signature

Name Name
Date Date
Doc. No. REV-0 Page 3 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA

Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
Busbar Low Impedance P740 Busbar Protection BB Ref: BB
Sensitivity & Satability Test Substation: SALWA

7.1 SENSITIVITY TEST


1) Supervision Function operation( CU P741 ) :
INJECTED PRIMARY MEASURED RELAY
RELAY
REF. INJECTED SECONDARY MEASURMENT
PHASE MEASURMENT
FEEDER CURRENT CURRENT (DIFF )
(RESTRAIN ) IREF
(A) ( mA) IREF
R-Y
Q01 Y-B
Y

7.2 STABILITY TEST:


1) Q01-Q02 STABILITY
BUSBAR NO. REFERENCE FEEDER Q01 TEST FEEDER Q02

RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y

2) Q01-Q03 STABILITY
BUSBAR NO. REFERENCE FEEDER Q01 TEST FEEDER Q03

RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV-0 Page 4 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA

Engineer

GCC Interconnection Project - Phase I


TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report
Busbar Low Impedance P740 Busbar Protection BB Ref: BB
Sensitivity & Satability Test Substation: SALWA

3) Q01-Q04 STABILITY:

BUSBAR NO. REFERENCE FEEDER Q01 TEST FEEDER Q04

RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y

REMARKS
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………

END OF REPORT

AREVA T&D GCCIA / SNCL


Signature Signature

Name Name
Date Date
Doc. No. REV-0 Page 5 of 5

You might also like