PAGE 0
1 PURPOSE OF TESTS 2 X
2 REFERENCE DOCUMENT 2 X
3 SCOPE 2 X
4 TEST EQUIPMENT 2 X
5 PRE-REQUISTES 3 X
6 PROCEDURES 3 X
7 RECORD TEST SHEET 4 X
7.1 Sensitivity Test
7.2 Stability Test
Name Name
Date Date
Doc. No. REV-0 Page 1 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
1 PURPOSE OF TESTS
2 REFERENCE DOCUMENTS
DOCUMENT VERSION/
DOCUMENT REMARKS
REFERENCE DATE
Protection Line Diagram
Schematic Drawing
3 SCOPE
Substation Name :-
Busbar Name:
Scheme to be Checked Busbar Protection Sensitivity & Stability
3. Clip-on meter
4. Laptop NA
Name Name
Date Date
Doc. No. REV-0 Page 2 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
5. PRE - REQUISITES
PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)
All CT circuits are Through (Links are closed)
6. TEST PROCEDURES
With the help of Primary Injection test, connected through Earth switches on the GIS , ( with the full
coordination from GIS specialist ), and with controlling CBs Isolators, & Earth switches to change the
current path in all primary loops.
Consider the middle feeder as reference , the sensitivity test to be done in the reference feeder to check
BBP Supervision Function operation , and then Stability between reference feeder with other feeders (
diameters).
Name Name
Date Date
Doc. No. REV-0 Page 3 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y
2) Q01-Q03 STABILITY
BUSBAR NO. REFERENCE FEEDER Q01 TEST FEEDER Q03
RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y
Name Name
Date Date
Doc. No. REV-0 Page 4 of 5
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
3) Q01-Q04 STABILITY:
RELAY RELAY
INJECTED PRIMARY MEASURED MEASURED
MEASURMEN MEASURMEN
REF. INJECTED SECONDARY SECONDAR
PHASE T T
SIDE CURRENT CURRENT Y CURRENT
(DIFF ) (RESTRAIN )
(A) ( REF SIDE) (TEST SIDE)
IREF IREF
R-Y
Q01 Y-B
Y
REMARKS
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
END OF REPORT