NM-51-4 1F-F1-001 Manual of writing an Task Handover Journal
Ocotober 1, 2008 (11)
Form-1
Fukushima Daiichi Nuclear Power Plant Unit 3 and 4
Shift Supervisor Task Handover Journal(1/3)
No. of
On duty
organizati Off duty 平野、志水 Support duty
8(operator)
on
- (instructor)
1 (trainee) 172 On proxy duty --- none
3. Periodic test
None
3. Periodic test
None
6. Others (Common)
None
NM-51-4 1F-F1-001 Manual of writing an Task Handover Journal
Ocotober 1, 2008 (11)
Form-1
Fukushima Daiichi Nuclear Power Plant Unit 3 and 4
March 11, 2011, Friday, Shift 2, Shift Supervisor Task Handover Journal(3/3)
Test Items Test Frequency Unit 3 Unit 4 Notes
Unit 4
all fuel were
3 Reactor lowest water level 1/ shift 1156 mm --- removed
at the time of
Reactor coolant maximum o
6 start-up and - C /hr - Co/hr
temperature change rate
shutdown
At the time of
pressure o
7 RPV lowest temperature -C - Co
resistance test of
RPV
Note: Test items #8 and #9 are only applicable to Unit 3&4. (Form for Unit 3&4)
(Unit change in the reporting paper is permissible.)
NM-51-4 1F-F1-001 Manual of writing an Task Handover Journal
Ocotober 1, 2008 (11)
Form-1
Fukushima Daiichi Nuclear Power Plant Unit 3 and 4
Shift Supervisor Task Handover Journal(1/3)
No. of
On duty
organizati Off duty 平野、志水 Support duty
8(operator)
on
- (instructor)
伊沢、鈴木(信)
1 (trainee) 172 On proxy duty Refer to attachment
March 11, 2011, Friday, Shift 1, Shift Supervisor Task Handeover Journal(2/3)
3. Periodic test
(1) M Tb safety facility test not executed
(2) Sealed oil system test not executed
(3) RFP-T oil pump automatic start up test not executed
(4) transmission system test not executed
3. Periodic test
None
6. Others (Common)
None
NM-51-4 1F-F1-001 Manual of writing an Task Handover Journal
Ocotober 1, 2008 (11)
Form-1
Fukushima Daiichi Nuclear Power Plant Unit 3 and 4
March 11, 2011, Friday, Shift 1, Shift Supervisor Task Handover Journal(3/3)
Test Items Test Frequency Unit 3 Unit 4 Notes
Unit 4
all fuel were
3 Reactor lowest water level 1/ shift 1156 mm --- removed
at the time of
Reactor coolant maximum o
6 start-up and - C /hr - Co/hr
temperature change rate
shutdown
At the time of
pressure o
7 RPV lowest temperature -C - Co
resistance test of
RPV
Note: Test items #8 and #9 are only applicable to Unit 3&4. (Form for Unit 3&4)
(Unit change in the reporting paper is permissible.)
Name of Predecessor
(Recorder) 小川 代務 (Team E)
Reactor Status In Operation Start up Hot shutdown Cold shutdown Fuel exchange
Operation Status
Reactor heat output 2378 MWt C/D pressure difference 200 KPa PLR−A PLR−B
Generator output 793.2 MWe HFFpressure difference 92 KPa Speed 88.3 % 88.3 %
Core flow rate 31170 T/H Core electro conductivity 0.06 μs/cm Top 28∼44 μm 24∼36 μm
Condenser vacuum rate 4.76 KPa・abs RCW temperature 18.3 ℃ X 43 μm 54 μm
D/W・HVH drain − L/min TCW temperature 16.9 ℃ Y 30 μm 59 μm
D/W pressure 5.31 KPa irculating water temperature 7.0 ℃
S/C level −0.1 cm CST level 66.1 % #REF!
None.
Note
Form -2
NM-51-4 1F-F1-001 Manual of Writing an Task Handover Journal
Fukushima Daiichi Nuclear Power Station Unit 3 October 1, 2008 (11)
March 11, 2011 Friday ( Shift 2 ) Operator Task Handover Journal (2/3)
Time Context Classification
< Regular tasks >
21:05∼21:06 Main Control RoomANNTest R
6:52 RWMain Control RoomANNTest(incl. 25 - 17, 25 - 160) R
22:36∼22:48 TCW Hx(A)(C) back wash R
23:09∼23:25 RCW Hx(A)(C) back wash R
4:01∼4:53 Condenser back wash R
21:59 Shared boiler sump pump A → B (piped up, fine) * sharedM/C(A) preparation to halt. O
6:46∼7:00 Each building, sump piped up * sump operation recording inspection preparation Others
7:18∼7:28 CRD suction filter switch to the bypass side (pressure difference: 35 kPa ↓ 0kPa) O
7:30∼7:39 CRD suction filter ISOL blow O
M: MRF issued N: Non compliant report R: Regular Test/ Switching O: Operation
Notes on classification
P: PTW RW: R/W related Mon: Monitoring Others: Others
NM-51-4 1F-F1-001 Manual of Writing an Task Handover Journal
October 1, 2008 (11)
Form-2
Fukushima Daiichi Nuclear Power Station Unit 3
March 11, 2011 Friday ( Shift 2 ) Operator Task Handover Journal (3/3)
Context Classification
1. Under monitoring
・T/D RFP mechanical seal amount: (A) 1d/10s (B) 1d/15s Mon
・HPCP(A) Main body anti-CP side mechanical leak 1d/15s HPCP(B) (C) Main body anti-CP side mechanical leak Leakage Mon
・C/D Recirculation pump mechanical leak Leakage Mon
・IBP(A) mechanical leak status CP side: 1d/3s Anti-CP side: 1d/ 5s (in operation) Mon
・IBP(B) mechanical leak status CP side: Leakage Anti-CP side: 1d/ 15s (shutdown) Mon
・Bawser Filter Pump Gland Leak 1d/17s (Bawser level 550mm Subsidiary oil pump under operation) Mon
・Fire pump for adjustment anti-cup side plug for oil drainage No oil leakage found. Mon
・D/G3B Engine Main body cover Not yet wiped (Tray No dripping confirmed.) Mon
・Stator cooling pump (A) mechanical leak Leakage Mon
・D/G3B Shimizu priming pump Gland tray Water drainage: fine. Gland leak 1d/7s Mon
・Condensate storage tank LCV-52-20 ground bleeding. Wiped. Mon
・R/B the north of HCU FP pipe leakage No dripping confirmed. Mon
・HCU 06-35: 7.4 MPa Mon
2. PLR (B) the 2nd stage seal cavity pressure 3.51MPa (7:00) Others
Confirmed by Processing Control CRT: Minimum Pressure 3.50 Mpa Maximum Pressure 3.51MPa Fluctuation range 0.01 MPa
3. The following shows the power receipt status of Common M/C (A) before power receipt switching. Others
・Common boiler MCC(C) receives power from MCC(A) side now.
・Power control panel for common boiler air conditioning selects B-system use-side now.
・Direct current power source does not locate in common boiler building, but in 1.2U switch yard. The name is DC125V charger panel.
Here receives power from switch yard MCC side now.
M: MRF issued N: Non compliant report R: Regular Test/ Switching O: Operation
Notes on classification
P: PTW RW: R/W related Mon: Monitoring Others: Others
NM-51-4 1F-F1-001 Manual of Writing an Task Handover Journal
October 1, 2008 (1)
Form-2
Fukushima Daiichi Nuclear Power Station Unit 3
Name of
predecessor 高宮 (Group A)
(Recorder)
Reactor Status In Operation ・ Start up ・ Hot shutdown ・ Cold shutdown ・ Fuel exchange
Operation Status
Reactor heat output 2378 MWt C/D differencial pressure 200 KPa PLR−A PLR−B
Generator output 793.2 MWe HFF differencial pressure 92 KPa Velocity 88.3 % 88.3 %
Core flow rate 31170 T/H Reactor water conductivity 0.06 μs/cm Top 28∼44 μm 24∼36 μm
Condenser vacuum 4.76 KPa・abs RCW temperature 18.3 ℃ X 43 μm 54 μm
D/W・HVH drain − L/min TCW temperature 16.9 ℃ Y 30 μm 59 μm
D/W pressure 5.31 KPa Circulating water temperature
7.0 ℃
S/C level −0.1 cm CST level 66.1 % #REF!
Emergency seal oil pump automatic start up test Success・rejected Fine・caution・in progress・cancelled
Operation Status of Regular tests・Regular switching
OLR receiving device & suppression pilot lamp tests Success・rejected Fine・caution・in progress・cancelled
None
Note
NM-51-4 1F-F1-001 Manual of Writing an Task Handover Journal
October 1, 2008 (1)
Form-2
Fukushima Daiichi Nuclear Power Station Unit 3
9:23/12:02 Switchyard COMP(A/B) Power "OFF" / "ON" Receiver pressure 1.45/1.45 Mpa P
9:28/11:56 Switchyard MCC "Stop" / "Power receiving" P
9:40/11:54 Switchyard MCC Receiving circuit breaker P/C 3SB-5B Circuit breaker "DC off & R.O" / "R.I & DC on" P
9:10∼ Fire close operation 3-1019 T/B carry-in gate for large stuff P
9:10∼ Fire close operation 3-1020 R/B airlock P
10:03∼10:46 Feed water control device C system in FTV circuit AOC platform replacement P
10:46 ANN 「Light malfunction of feed water flow rate control device」 clear (ANN backside reset) Others
12:20 D/W device drain sampling pump(A) Manual start-up (Operation check of sump operation record) O
14:05∼14:18 T/B HVCW T/B HVCW Chemical feeding tank "KURIREX" 1kg Injection (HOUKA G Instruction) P
T/B HVCW Chemical feeding recycle O
Form-2
Fukushima Daiichi Nuclear Power Station Unit 3
Context Classification
3. CUW Information that F/D differential pressure is increasing was shared with Mr. X, HOUKA G. Mon
F/D (A/B) 14/15KPa (No change with nightshift)
4. Regarding alarm occurrence of "Light malfunction of feed water flow rate control device", replacement of AOC platform in FTV P
circuit of feed water control device C system was implemented. At the present moment, conclusive cause has not verified
because the platform will be brought to a factory for investigation. (Mr. X, KEISOU G)
6. According to the DS tank lining repair completion, all of the isolation were restored. We are planning to conduct sampling and
RW
check
availability of DS tank treatment after tomorrow.
7. We have finished repair of the fire monitoring system. (Mr. X, KEISOU G)
Form-2
Fukushima Daiichi Nuclear Power Station Unit 3
14:10/14:41 Unit 3-4 SA Tie valve "Fully close" / "fully open" (Unit 4 SA Comp (A) T/R but failure occurred.) P
R/B air-cooled chiller ACH3-4 Compressor A/B Blower A/B Temprary power source "OFF"
(MCC replacement temporary → permanent installation)
R/B air-cooled chiller ACH3-6 Compressor A/B Blower B permanent power source "ON"
(Blower A There was a trouble with space heater)
Time of Operation/Event
15:56 L- 8
15:26 STr3A 3 Points at the Bottom Confirmed *Points of Leakage Not Detected
15:38 SBO
15:42 Report under Article 10 (from Emergency Measures Office)
16:03 RCIC"Activate" R*Water Level: -500mm S/C Level: 150mm (Rise due to mini-flow valve open)
RCIC mini-flow valve "Open"
16:13 HPCI, RCIC Water Source Switching Prevention Lift
16:16 RCIC Injection Start R*Water Level: -900mm
16:45 Stack 3cps R*Water Level: -450mm Reactor Pressure: 7.3MPa RCIC: 19L/s
16:55 R*Water Level: -150mm Reactor Pressure: 7.25MPa
Operation ・ Time of Event
17:30 Process Computer Room Emergency Lights "Off" (Removed the fluorescent lights)
18:45 Main Control - Fuel Change TEL⑧, Jack ⑦ "Off"
19:08-19:11 Process Computer Power "Off"
19:15 Power "Off"
20:30 2nd Main Control EHC, T/D Panel Power "Off"
21:11 CRD Panel 9-27, 28 Power "Off"
21:27 Main Control Temporary lighting equipment, Main Control DC Lights "Off"
11:13 RCIC MO−18、19、41 NFB「OFF」
Operation ・ Time of Event
12:35 Reactor Water Level L-2 Reactor Water Level: -1220mm (W)
HPCI Automatically Activated
12:40 FP No.2-3 Tie Valve (301, 22) "Close" (AM Panel Flow Rate Hunching Observed)
12:55 RCIC Vac Pump Trip (Cooling Water Valve MO-23-132 Close)
D/D FP Pump Fuel Supply (Reception Valve Open, Supply only for the line) 172↑195L Inhaling
14:00
Pressure: 0.02MPa
D/D FP Pump Inlet Pressure: 0.02MPa Discharge Pressure: 0.35MPa
16:35 Water Level Rise Operation +400mm (W) Reactor Pressure: 2.86MPa
17:35-17:50 No.2 Light-Oil Tank D/D FP Pump Transfer Line Structure (Integrator, Pump Bypass)
20:00 D/D FP Pump Fuel Tank 130L
Saturday, March 12, 2011-
1/
Contents
20:27 AM Panel D/W Pressure, S/C Pressure, S/C Water Level Indicator No Power Supply
20:35 Reactor Water Level Indicator No Power Supply Final Data Wide Range A System: 1350mm, Fuel R
3/13
1:45 D/D FP Pump Light Oil Supply 70↑110L Inlet Pressure: 0MPa Discharge Pressure: 0.42MPa
3:05 D/D FP Pump Injection into Reactor MO-10-27B 15% Open Probable Flowing Sound at 7%
Inlet Pressure: 0↑0.14MPa Discharge: 0.4↑0.61MPa
4:52 D/W Ventilation Valve AO-205 Temporary Outlet ON Valve: Fully Open Cylinder Pressure: 0
5:08 RCIC Manually Activated/Stop Valve Close RCIC Stop Valve Did Not Move
Water Supply All Lost, article 15, Act on Special Measures Concerning Nuclear Emergency
5:10
Preparedness
9:57 Boric Acid Injected (from Fire Engine, Via FP line) Confirmed
Operation ・ Time of Event
11:04-11:05 Full Water Operation Started HPCI, RCIC Steam Isolation Valve "Close" (MSIV, CUW Closed)
13:10 Sea Water Injection into Reactor Started (from Fire Engine via Backwash Valve Pit-FP line)
Water Level Indicator Wide Range A -1700mm Fuel Range B -2200mm
1:15 Sea Water Injection into Reactor Stopped (from Fire Engine via Backwash Valve Pit-FP line)
Pump Exchanged & Backwash Pit Sea Water Stored
3:20 Sea Water Injection into Reactor Started (from Fire Engine via Backwash Valve Pit-FP line)
Name of predecessor
渡部(正) (Group E)
(Recorder)
Cold
Reactor Status In Operation Start up Hot shutdown fuel exchange
shutdown
RHR(B) [Emergency heat load mode] Fuel pool gate ( Open Close ) LR2-3-103 (water-feed) 1220 cm
RHR pump ( A B C D ) RHRS Pump ( A B C D ) Core water temp. – ℃
Operation Status
<Scheduled switching>
N/A OK NG Fine・caution・in progress・cancelled
OK NG Fine・caution・in progress・cancelled
・
OK NG Fine・caution・in progress・cancelled
OK NG Fine・caution・in progress・cancelled
OK NG Fine・caution・in progress・cancelled
OK NG Fine・caution・in progress・cancelled
OK NG Fine・caution・in progress・cancelled
N/A
Note
NM-51-4 1F-F1-001 Manual of writing a Task Handover Journal
Ocotober 1, 2008 (11)
Form-2
March 11, 2011 Friday ( Shift 2 ) Operator Task Handover Journal( 2/2 )
【T/B RT operation】T2020T0023
Operation
content Classification
site StatusComments to pass on
Name of predecessor
忠地 (Group A)
(Recorder)
Cold
Reactor Status In Operation Start up Hot shutdown fuel exchange
shutdown
RHR(B) [Emergency heat load mode] Fuel pool gate ( Open Close ) LR2-3-103 (water-feed) 1220 cm
RHR pump ( A B C D ) RHRS Pump ( A B C D ) Core water temp. – ℃
Operation Status
<Scheduled test>
10:55 – 11:05 R/B, T/B, R/W Each building sump pump OK NG Fine・caution・in progress・cancelled
switching ( B→A ) OK NG Fine・caution・in progress・cancelled
・
March 11, 2011 Friday ( Shift 1 ) Operator Task Handover Journal( 2/3 )
<Scheduled operations>
10:38-11:10 TCW Hx (B) B/W O
10:24-11:05 RCW Hx (C) B/W O
Ferrous sulfate injection R
R
March 11, 2011 Friday ( Shift 1 ) Operator Task Handover Journal( 3/3 )
content Classification
2. T/R of SA compressor was started, but cancelled due to the noise for cylinder. P
The communication valve of Unit 3-4 was opened, and the compressor was
Isolated again.
site StatusComments to pass on
2. FPC (B) pump was activated, and, F/D (A), water obtained. Others