MECHANICAL LIST OF DRAWINGS a  ma

a  ma
7/ /2020

1 M-WS-000 COVER PAGE - WATER SUPPLY SYSTEM 18/06/2020 N.T.S A2

2 M-WS-001 SITE PLAN - WATER SUPPLY SYSTEM 18/06/2020 1:200 A2

3 M-WS-002 GROUND FLOOR PLAN - WATER SUPPLY SYSTEM 18/06/2020 1:100 A2

4 M-WS-003 FIRST FLOOR PLAN - WATER SUPPLY SYSTEM 18/06/2020 1:100 A2

5 M-WS-004 ROOF FLOOR PLAN - WATER SUPPLY SYSTEM 18/06/2020 1:100 A2

6 M-WS-005 STANDARD DETAILS -01 -WATER SUPPLY SYSTEM 18/06/2020 N.T.S A2

7 M-WS-006 STANDARD DETAILS -02 -WATER SUPPLY SYSTEM 18/06/2020 N.T.S A2

8 M-D-000 COVER PAGE - DRAINAGE SYSTEM 18/06/2020 N.T.S A2


9 M-D-001 SITE PLAN - DRAINAGE SYSTEM 18/06/2020 1:200 A2
10 M-D-002 GROUND FLOOR PLAN - DRAINAGE SYSTEM 18/06/2020 1:100 A2
11 M-D-003 FIRST FLOOR PLAN - DRAINAGE SYSTEM 18/06/2020 1:100 A2
12 M-D-004 ROOF FLOOR PLAN - DRAINAGE SYSTEM 18/06/2020 1:100 A2

13 M-D-005 TOP OF ROOF FLOOR PLAN - DRAINAGE SYSTEM 18/06/2020 1:100 A2

14 M-D-006 STANDARD DETAILS -01- DRAINAGE SYSTEM 18/06/2020 N.T.S A2

15 M-D-007 STANDARD DETAILS -02- DRAINAGE SYSTEM 18/06/2020 N.T.S A2

16 M-D-008 STANDARD DETAILS -03- DRAINAGE SYSTEM 18/06/2020 N.T.S A2

17 M-F-000 COVER PAGE - FIRE FIGHTING SYSTEM 18/06/2020 N.T.S A2

18 M-F-001 GROUND FLOOR PLAN - FIRE FIGHTING SYSTEM 18/06/2020 1:100 A2

19 M-F-002 FIRST FLOOR PLAN - FIRE FIGHTING SYSTEM 18/06/2020 1:100 A2

20 M-F-003 ROOF FLOOR PLAN - FIRE FIGHTING SYSTEM 18/06/2020 1:100 A2

21 M-H-000 COVER PAGE - HVAC SYSTEM 18/06/2020 N.T.S A2

22 M-H-001 GROUND FLOOR PLAN - HVAC SYSTEM 18/06/2020 1:100 A2

23 M-H-002 FIRST FLOOR PLAN - HVAC SYSTEM 18/06/2020 1:100 A2

24 M-H-003 ROOF FLOOR PLAN - HVAC SYSTEM 18/06/2020 1:100 A2

25 M-H-004 STANDARD DETAILS -01 - HVAC SYSTEM 18/06/2020 N.T.S A2

26 M-H-005 STANDARD DETAILS -02 - HVAC SYSTEM 18/06/2020 N.T.S A2

27 M-H-006 STANDARD DETAILS -03 - HVAC SYSTEM 18/06/2020 N.T.S A2

28 M-G-000 GROUND & ROOF FLOOR PLANS - GUARD BUILDING 18/06/2020 1:100 A2

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

HB Ø25 CWS HDPE U/G HB HB Ø25 CWS HDPE U/G

SEPTIC TANK
EFF.VOLUME=82m3

Ø25 CWS HDPE U/G


Ø25 CWS HDPE U/G HB
P.V.C 4"
R.W.P

19.30

4.70

Ø25 CWS HDPE U/G


10.90

9.10

HB P.V.C 4"
R.W.P
17.90

3.70
Ø50 CWS HDPE PIPE FILLING THE TANKS
6.15

Ø25 CWS HDPE U/G P.V.C 2"


2.75

12.00
4.30 R.W.P
Ø32 CWS HDPE U/G

9.90
4.80

Ø 25 HDPE CWS U/G

6.20

6.20
8.75
TWP-01 FLOATING
1.00 6.75 1.00
4.80

Ø40 CWS CPVC FOR VALVE


CONTINUATION REFER TO GROUND FLOOR 2.50 Ø50 CWS HDPE PIPE FILLING THE TANKS
3.25

7.65 15.15 2.75 Ø25 CWS HDPE U/G


9.70
P.V.C 4"

HB
R.W.P

11.30
2.90

2.90
Ø25 CWS HDPE U/G Ø32 CWS HDPE U/G
HB

Ø 50 HDPE CWS U/G


+00.10

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪GROUND FLOOR PLAN‬‬


‫‪SCALE‬‬ ‫‪1:100‬‬
‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪FIRST FLOOR PLAN‬‬


‫‪SCALE‬‬ ‫‪1:100‬‬ ‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

P.V.C 4"
R.W.P

WATER IV (NC)
TANK
2000L
BWP-01 PV

WATER
TANK
2000L

FIRE
FIGHTING
TANK
2000L

FIRE P.V.C 2"


FIGHTING R.W.P
TANK
2000L
P.V.C
R.W.P

P.V.C 2"
R.W.P

P.V.C 4"
R.W.P
3 ‫اﻟﺣﺳﺑﺎن‬

ROOF FLOOR PLAN ‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬


SCALE 1:100

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪300‬‬
‫‪200‬‬ ‫‪150‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

200 600 200


15mmØ

1000
PW SUPPLY LINE

HOSE UNION
BALL BIBCOCK
ECONOMIC TYPE
WITH LEVER PIPE CHASE
HANDLE

200 600 200


1000

600
FINISHED FLOOR

VARIES
VARIES
200
50
3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

3.0 m x 0.3m x0.3m (LxWxD) DRAIN


TRENCH

Ø110 VP T/A

3.0 m x 0.3m x0.3m (LxWxD) DRAIN


SEPTIC TANK TRENCH
EFF.VOLUME=82m3

P.V.C 4"
R.W.P

19.30

4.70
3.0 m x 0.3m x0.3m (LxWxD) DRAIN
TRENCH

3.0 m x 0.3m x0.3m (LxWxD) DRAIN


10.90

9.10 TRENCH
Ø110 UPVC RWP F/A
P.V.C 4"
R.W.P
17.90

3.70
6.15

P.V.C 2"
2.75

12.00
4.30 R.W.P

9.90
4.80
Ø110 VP T/A Ø110 VP T/A

6.20

6.20
8.75
1.00 6.75 1.00
4.80

2.50
3.25

7.65 15.15 2.75


9.70
P.V.C 4"
R.W.P

11.30

2.90

2.90
Ø110 DP FOR
+00.10
CONTINUATION REFER TO SITE PLAN

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

Ø110 UPVC RWP F/A

COND.PIPE AFC
25mm

Ø110 VP T/A
COND.PIPE AFC Ø110 DP F/A TO U/G
40mm Ø110 VP T/A

COND.PIPE AFC Ø110 UPVC RWP F/A


50mm

COND.PIPE D/D
50mm

Ø110 VP T/A

Ø110 UPVC RWP F/A

GROUND FLOOR PLAN


SCALE 1:100

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

Ø110 UPVC RWP F/A T/B

COND.PIPE AFC
25mm
COND.PIPE D/D
32mm
COND.PIPE AFC
50mm

COND.PIPE AFC
50mm
COND.PIPE D/D
50mm

Ø110 DP T/B & VP T/A

3 ‫اﻟﺣﺳﺑﺎن‬

FIRST FLOOR PLAN ‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬


SCALE 1:100

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

P.V.C 4"
R.W.P

Ø110 RWO

Ø110 UPVC RWP T/B

Ø110 VP F/B

Ø50 UPVC RWP F/A P.V.C 2"


R.W.P

P.V.C 4"
Ø110 RWO R.W.P

Ø110 UPVC RWP T/B

Ø110 VP F/B Ø50 UPVC RWP F/A P.V.C 2"


R.W.P

Ø110 VP F/B

Ø110 UPVC RWP T/B

P.V.C 4" Ø110 RWO


R.W.P

ROOF FLOOR PLAN


SCALE 1:100

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

P.V.C 4"
R.W.P

P.V.C 4"
Ø50 RWO R.W.P
Ø50 UPVC RWP T/B

P.V.C 2"
R.W.P

Ø50 RWO

Ø50 UPVC RWP T/B

P.V.C 4"
R.W.P

3 ‫اﻟﺣﺳﺑﺎن‬
TOP OF ROOF FLOOR PLAN
SCALE 1:100
‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
100 a  ma
7/ /2020

200 150

3 ‫اﻟﺣﺳﺑﺎن‬
PRE-FORMED INSULATION VAPOR SEAL
COATED W/ POLYTHELENE COAT
PIPE STEEL CLAMP W/ LINER

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬


Ø8mm LOCKING NUT
WITH WRINKLE WASHER
50X50X4mm.
C-CHANNEL SUPPORT
Ø10mm CONTINUOUS TREADED ROD
‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬
400
400

100X100X6mm. WELDED BASEPLATE ANCHORED TO Ø10mm. EXPANSION BOLT

N. T. S
‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪B‬‬ ‫‪F‬‬
‫‪A‬‬

‫‪A‬‬

‫‪L‬‬
‫‪.10‬‬ ‫‪.10‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬

‫‪0.3 m‬‬
‫‪0.3 m‬‬

‫‪0.3 m‬‬

‫‪3.0 m‬‬

‫‪0.1 m‬‬ ‫‪0.1 m‬‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪Ø 80 TO MANHOLE‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪ELECTRICAL PUMP‬‬
‫) ‪( 1 L/S , 3bar‬‬
‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫“‬
‫”‬

‫“‬ ‫”‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪Ø40 FP F/A‬‬

‫‪GROUND FLOOR PLAN‬‬


‫‪SCALE‬‬ ‫‪1:100‬‬
‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪Ø50 FP F/A‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫‪FIRST FLOOR PLAN‬‬


‫‪SCALE‬‬ ‫‪1:100‬‬ ‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 2‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫‪Ø50 FP T/B‬‬

‫"‪P.V.C 2‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫‪ROOF FLOOR PLAN‬‬


‫اﻟﺣﺳﺑﺎن ‪3‬‬
‫‪SCALE‬‬ ‫‪1:100‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


OUTDOOR UNIT SCHEDULE (GROUND & 1ST FLOORS)
a  ma ELECT. DATA
Total Calculated Total Selection Total Selection
MARK
a  ma Coil Load (kW) Coil Load (kW) Coil Load (kW) KW QUANTITY
For Each Unit For Each Unit VOLT PH HZ
7/ /2020
OU-GR-01 49.5 74.8 78.5 35 380 3 50 1
OU-1ST-01 39.9 47.6 50.4 21 380 3 50 1

SPLIT UNIT HEAT PUMP SCHEDULE

FRESH FAN SCHEDULE

IU-CASS-GR-01 & 02 ACTIVITIES HALL MEDIUM 8.2 7.5 5.6 22.0 240 1 50 274 2

IU-CASS-GR-03 & 04 PHYSICAL THERAPY MEDIUM 7.5 6.7 5.6 22.0 240 1 50 274 2

IU-CASS-GR-05 SKILLS REHABILITION MEDIUM 5.0 5.0 5.6 22.0 240 1 50 380 1

IU-CASS-GR-06 CLASS-04 MEDIUM 2.5 2.5 3.6 22.0 240 1 50 224 1

IU-CASS-GR-07 CLASS-03 MEDIUM 2.2 2.2 3.6 22.0 240 1 50 224 1


IU-CASS-GR-08 CLASS-02 MEDIUM 2.2 2.2 3.6 22.0 240 1 50 224 1
EXHAUST FAN SCHEDULE
IU-CASS-GR-09 CLASS-01 MEDIUM 2.2 2.2 3.6 22.0 240 1 50 224 1
IU-CASS-GR-10 NURSE MEDIUM 2.1 2.0 3.6 22.0 240 1 50 224 1
IU-CASS-GR-11 OCCUPATION THERAPY MEDIUM 2.4 2.4 3.6 22.0 240 1 50 224 1
IU-CASS-GR-12 PSYCHOLOGIST MEDIUM 1.8 1.8 3.6 22.0 240 1 50 224 1
IU-CASS-GR-13 SOCIAL WORKER MEDIUM 2.0 1.9 3.6 22.0 240 1 50 224 1
IU-CASS-GR-14 CLASS-08 MEDIUM 2.5 2.5 3.6 22.0 240 1 50 224 1
IU-CASS-GR-15 CLASS-07 MEDIUM 2.5 2.5 3.6 22.0 240 1 50 224 1
IU-CASS-GR-16 CLASS-06 MEDIUM 2.5 2.5 3.6 22.0 240 1 50 224 1
IU-CASS-GR-17 CLASS-05 MEDIUM 2.4 2.3 3.6 22.0 240 1 50 224 1
IU-SU-GR-18 CONTROL ROOM MEDIUM 1.5 1.3 3.6 22.0 240 1 50 224 1

3 ‫اﻟﺣﺳﺑﺎن‬
IU-CASS-1ST-19 & 20 MEETING ROOM MEDIUM 6.5 6.1 3.6 22.0 240 1 50 224 2

IU-CASS-1ST-21 DIWAN & PRINTING MEDIUM 3.3 3.0 3.6 22.0 240 1 50 224 1
‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬
IU-CASS-1ST-22 ACCOUNT & SUPPLIER MEDIUM 3.0 2.8 3.6 22.0 240 1 50 224 1

IU-CASS-1ST-23 & 24 COMPUTER LAB MEDIUM 9.8 9.5 5.6 22.0 240 1 50 274 2
IU-CASS-1ST-25 TEACHERS BREAK RM MEDIUM 3.4 3.2 3.6 22.0 240 1 50 224 1 ‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬
IU-CASS-1ST-26 P.TREAT MEDIUM 3.0 2.9 3.6 22.0 240 1 50 224 1
IU-CASS-1ST-27 E.INTERVENTION-01 MEDIUM 3.7 3.5 5.6 22.0 240 1 50 274 1
IU-CASS-1ST-28 E.INTERVENTION-02 MEDIUM 3.5 3.3 3.6 22.0 240 1 50 224 1
IU-CASS-1ST-29 MANAGER OFFICE MEDIUM 3.7 3.5 5.6 22.0 240 1 50 274 1
‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫‪GROUND FLOOR PLAN‬‬


‫‪SCALE‬‬ ‫‪1:100‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 2‬‬
‫‪R.W.P‬‬

‫"‪P.V.C 4‬‬
‫‪R.W.P‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬
‫‪FIRST FLOOR PLAN‬‬
‫‪SCALE‬‬ ‫‪1:100‬‬
‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

P.V.C 4"
R.W.P

P.V.C 2"
R.W.P

P.V.C 4"
R.W.P

P.V.C 2"
R.W.P

OU-GR-01

OU-1ST-01

P.V.C 4"
R.W.P

ROOF FLOOR PLAN 3 ‫اﻟﺣﺳﺑﺎن‬


SCALE 1:100

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


‫‪a  ma‬‬
‫‪a  ma‬‬
‫‪7/‬‬ ‫‪/2020‬‬

‫اﻟﺣﺳﺑﺎن ‪3‬‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬

‫‪SCALE‬‬ ‫‪NTS‬‬
a  ma
FIGURE-B SUGGESTED SIZING a  ma
7/ /2020

FIGURE-C SUGGESTED SIZING

Support Angle Size


ROD SUPPORT
DUCT WIDTH (mm) SUPPORT DUCT WIDTH ( mm) ANGLE SIZE
SIZE SPACING
UP to 600 8mm STEEL ANGLE EVERY 2.5m UP TO 600 25 x 25 x 3 mm
601 to 1000 10mm EVERY 1.8m 600 to 2100 30 x 30 x 3mm
" "
1001 to 1500 12mm EVERY 1.8m
" "
1501 to 2500 12mm EVERY 1.2m
" "

DETAIL-B

3 ‫اﻟﺣﺳﺑﺎن‬

‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


Construction Type: Internal Floor Construction Type: Exposed Walls (BLOCK WALL)
Thickness K R Density Thickness K R Density a  ma
Layer type Layer type
(mm) W/m °C m² °C/ W Kg / m³ (mm) W/m °C m² °C/ W Kg / m³ a  ma
7/ /2020
Inside Film 0.100 Outside Film 0.060
Tiles 20 1.1 0.018 2450 Cement Plaster 25 1.1 0.036 2250
Cement Mortar 15 1.4 0.010 2000 Hollow Concrete Block (Walls) 150 0.9 0.1667 2300
Polystyrene Board Insulation 25 0.03 0.833 600 Polystyrene Board Insulation 50 0.034 1.470 25
Concrete 300 1.75 0.171 37 Hollow Concrete Block (Walls) 100 0.9 0.111 1400
Cement Plaster 15 1.2 0.0125 0 Cement Plaster 25 1.1 0.023 2000
Inside Film 0.100 Inside Film 0.120

Totals 375 1.25 Totals 350 1.99


U-Value = 0.8 W / m².C U-Value = 0.503 W / m².C
Construction Type: Floors on Grade
Thickness K R Density
Layer type
(mm) W/m °C m² °C/ W Kg / m³

Gravel Pavement 50 1.5 0.033 2000 Construction Type: Roof


Blinding 50 0.16 0.313 2300 Thickness K R Density
Layer type
Polystyrene Board Insulation 20 0.03 0.667 700 (mm) W/m °C m² °C/ W Kg / m³
Concrete 200 1.75 0.114 2300
Cement Mortar 20 1.4 0.0143 2000 Outside Film 0.040
Tiles 20 1.6 0.013 2450 Water Proof Membrane 30 0.18 0.1666 1100
Inside Film 0.150 Screed 20 1.2 0.016 2000
Polystyrene Board Insulation 40 0.03 1.333 700
Totals 360 1.304 Concrete 300 1.75 0.171 2300
Cement Plaster 20 1.2 0.016 2000
U-Value = 0.77 W / m².C
Inside Film 0.100

Totals 410 1.843


U-Value = 0.542 W / m².C

o 2 o SUMMARY OF (U) VALUES


WALL MATERIAL K (W/m C) THICKNESS (m) R (m .C/W)
AREA U
2 o
OUTSIDE AIR FILM 0.050 m2 W/m .c
DOORS 0 3.5
PLASTER 1.20 0.025 0.021
GLASS(DG) 150 3.5
BRICK 0.9 0.200 0.22
METAL DOORS 18 5
PLASTER 1.20 0.025 0.021 NET WALL 1200 0.503
INNER SURFACE X 0.12 TOTAL WALL 1368 ??
RcTOTAL= 0.434 & Uc = 2.30 U - total = A W UW+ A G UG + AD U D / A T
U - total =((150x 3.5) + (18x 5)+(1200*0.503)) / 1368
U - total = 0.891< 1.6 WATER PROOFING ASPHALT
ROLLS MEMBRANE

FOAM CONCRETE AND


SLOPED SCREED (TO DRAIN)

3 ‫اﻟﺣﺳﺑﺎن‬
BITUMEN COAT LAYER
BLINDING 5CM
‫ﻣرﻛز اﻟﺑوﺗﺎس ﻟذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬

‫وزارة اﻻﺷﻐﺎل اﻟﻌﺎﻣﺔ واﻻﺳﻛﺎن‬


a  ma
a  ma
7/ /2020

P.V.C 4"
P.V.C 4"
R.W.P R.W.P

PV
BWP-02

IV (NC)

Ø110 DP FOR
CONTINUATION REFER TO SITE PLAN

Ø110 VP T/A Ø110 VP F/B

P.V.C 4"
P.V.C 4"
R.W.P Ø110 RWO R.W.P

Ø110 UPVC RWP F/A Ø110 UPVC RWP T/B

P.V.C 4"
P.V.C 4"
R.W.P R.W.P