Scheduling

Tab
On the
“Scheduling”
tab, pay
particular
attention to
these fields:
 Capacity
Category—
This should
be set, in
most cases,
to indicate
“Labor, ”
usually 002.
 Other
formula—
This should
be set to
SAP004
(unless the
formulas
have been
reconfigure
d in the
Implementa
tion Guide).
 Work
dimension—
This is
normally set
to “TIME, ”
which
indicates
the unit of
measure
dimension
that
includes the
time based
units of
measure.
 Work unit—
This should
be set to the
normal unit
of measure
on which
this work
center’s
time will be
scheduled,
often H or
HR for
hours
(again,
determine
whether to
use H or HR
and try to
always use
that unit).
Costing Tab
On the
“Costing” tab,
the following
fields are
important:
 Cost
Center—This
field should
contain the
cost center,
usually
defined by a
person
responsible
for
maintaining
the CO
(Controlling)
module, that
reflects this
work
center’s
activities.
 Act Type In
t.Proc.—The
Activity
Type
Internal
Processing
field should
contain the
activity type,
also defined
by a person
responsible
for
maintaining
the CO
(Controlling)
module. An
activity rate,
which
determines
the rate at
which the
work center
is “charged”
to a work
order
operation, is
assigned to
the activity
type. By
specifying
more than
one activity
type to a
cost center,
and then
assigning
that cost
center to a
work center,
the work
center can
be
“charged” at
different
rates to
reflect
regular time,
overtime,
holiday
time, etc. if
desired. In
many cases,
however, a
“standard
rate” is
determined
and
assigned to
a single
activity type,
which is
then
assigned to
all work
performed
by the work
center,
regardless
of the
amounts of
regular time,
overtime,
etc.
Standard
rates can be
easier to set
up and
manage,
especially
initially, but
are often a
rough
estimate
and must be
reviewed on
a regular
basis to
ensure their
relative
accuracy. A
combinatio
n of
standard
rates and
actual rates
is quite
difficult to
manage and
should only
be
considered
after
serious
discussions
with those
responsible
for the CO
(Controlling)
module.
 Unlabeled
field to the
right of the
previous
field
(Formula
key for
costing)—
This field
should
contain
SAP008
(unless the
formulas
have been
reconfigure
d in the
Implementa
tion Guide).
If any
additional
tabs appear
on the work
center screen,
ignore them
for Plant
Maintenance
purposes.
Depending on
how work
center
configuration
has been
defined, there
may be a
required field
on such a tab
(for other
purposes,
such as
Production
Planning). If
there is no
valid value to
provide for
the required
field, it will be
difficult/impo
ssible to save
the values
entered on
the previous
tabs.Tabs on
the work
center
screens are
controlled in
the
Implementati
on Guide in
the
configuration
step
“Configure
Screen
Sequence for
Work Center.”
« Next
Previous Topic
Topics s»
 End Of  The
Configura Work
tion Order
 Informati Proce
on ss
Systems  The
For Plant Preve
Maintena ntive
nce And Maint
Customer enan
Service ce
 The Work Proce
Order ss
Cycle  Repo
rting
SAP PM Related
Tutorials
SAP QM SAP
Tutorial MM
Tutorial
SAP PI SAP PS
Tutorial Tutorial
SAP PP SAP
Tutorial Scripts
Tutorial
SAP PM Related
Interview
Questions
SAP QM SAP
Interview PM
Question Intervi
SAP PM Related
Interview
Questions
s ew
Quest
ions
SAP PM Related
Interview
Questions
SAP MM SAP
Interview PI
Question Intervi
SAP PM Related
Interview
Questions
s ew
Quest
ions
SAP PM Related
Interview
Questions
SAP SAP
Business Asset
Objects Accou
SAP PM Related
Interview
Questions
Cloud nting
Interview Intervi
Question ew
SAP PM Related
Interview
Questions
s Quest
ions
SAP PS SAP
SAP PM Related
Interview
Questions
Interview ASAP
Question Intervi
s ew
SAP PM Related
Interview
Questions
Quest
ions
SAP PP SAP
SAP PM Related
Interview
Questions
Interview Script
Question s
s Intervi
SAP PM Related
Interview
Questions
ew
Quest
ions
SAP PM Related
Interview
Questions
Sap Mm SAP
Cin Produ
Interview ct
SAP PM Related
Interview
Questions
Question Costi
s ng
Intervi
SAP PM Related
Interview
Questions
ew
Quest
ions
SAP PM Related
Interview
Questions
Sap
Hana Sql
Script
SAP PM Related
Interview
Questions
Interview
Question
s
SAP PM Related
Interview
Questions
SAP PM Related
Practice Tests
SAP QM SAP
SAP PM Related
Interview
Questions
Practice PM
Tests Practi
ce
SAP PM Related
Interview
Questions
Tests
SAP MM SAP
Practice PI
SAP PM Related
Interview
Questions
Tests Practi
ce
Tests
SAP PM Related
Interview
Questions
SAP PS
Practice
Tests
Sap Pm
Tutorial

Sap Pm
Interview
Questions
Sap Pm
Practice
Tests

You might also like