Outline of Building Survey For SE - ASE - TOT Myanmar 1108 PDF
Outline of Building Survey For SE - ASE - TOT Myanmar 1108 PDF
11 November 2020
“Project for
Dissemination and Implementation
of Simple Seismic Evaluation Method
for Existing Buildings in Myanmar
(DISEM)”
Contents
1
2020/11/8
Resistant
Need MNBC
Screening
Retrofit
Detail
- Construction
evaluation
& Rebuild
Demolish
Vulnerable New
Safer
Vulnerable Buildings
Weak
Actual situation is the Initial Key for future solution. 4
2
2020/11/8
Simplify
F undam ental Perio d
Si te inv es tigati o n
Sei sm i c A rea
A ppro xim ate
SE ASE
Cal c ulated
H i ght( m )
Project
Fl oor
W /ΣA CF c
Year
IMS0
No
Year T Sd Total Total
Hoop
1 6 2010 18.91 0.92 2.278 ☓ Yangon 0.40 1.00 1.00 0.196 0.10 1.70 0.10 4.91 SC DA III 0.15 1.00 0.716 200 NO 200 10 0.15 SC DA III
2016-17
2 8 2010 30.00 1.39 2.652 ☓ Yangon 0.26 1.00 1.00 0.239 0.08 1.00 0.08 5.98 SC DA III 0.17 1.00 0.989 350 NO 100 6 0.17 SB DA II
3 4 1974 14.80 0.75 - 〇 Yangon 0.50 1.00 1.00 0.219 0.17 1.70 0.29 2.95 SB DA II 0.17 1.70 0.508 350 YES 150 10 0.29 SB DA II
4 5 1991 22.10 1.06 - 〇 Yangon 0.35 1.00 1.00 0.270 0.11 1.00 0.11 4.59 SC DA III - - - - - - - - - -
5 6 1995 18.30 0.89 - 〇 Yangon 0.41 1.00 1.00 0.224 0.13 1.00 0.13 3.81 SC DA III - - - - - - - - - -
2018
6 6 1997 17.30 0.85 - 〇 Yangon 0.43 1.00 1.00 0.258 0.11 1.00 0.11 4.38 SC DA III - - - - - - - - - -
7 5 1995 16.60 0.82 - 〇 Yangon 0.45 1.00 1.00 0.266 0.11 1.00 0.11 4.53 SC DA III - - - - - - - - - -
8 10 1995 31.70 1.46 - 〇 Yangon 0.25 1.00 1.00 0.431 0.08 1.00 0.08 7.32 SC DA III - - - - - - - - - -
9 4 1998 11.58 0.59 - ☓ Yangon 0.61 1.00 1.00 0.204 0.15 1.00 0.14 3.46 SC DA III 0.15 1.00 0.530 225 YES 150 6 0.15 SC DA III
10 3 1998 8.84 0.46 - ☓ Yangon 0.61 1.00 1.00 0.151 0.20 1.00 0.19 2.57 SC DA III 0.21 1.00 0.525 225 YES 150 6 0.20 SC DA III
11 5 1998 14.33 0.72 - ☓ Yangon 0.51 1.00 1.00 0.265 0.11 1.00 0.11 4.51 SC DA III 0.11 1.00 0.512 225 YES 150 6 0.11 SC DA III
12 5 1998 14.33 0.72 - ☓ Yangon 0.51 1.00 1.00 0.246 0.12 1.00 0.12 4.18 SC DA III 0.13 1.00 0.596 225 YES 150 6 0.13 SC DA III
2019 13 3 2008 11.00 0.56 - ☓ Yangon 0.61 1.00 1.00 0.160 0.18 1.00 0.18 3.19 SC DA III 0.27 1.00 0.765 200 NO 200 6 0.27 SC DA III
14 6 2014 18.91 0.92 - 〇 Yangon 0.40 1.00 1.00 0.160 0.11 1.70 0.19 4.40 SC DA III 0.29 1.70 1.277 350 YES 100 10 0.49 SA DA I
15 6 2019 18.91 0.92 - 〇 Yangon 0.40 1.00 1.00 0.154 0.11 1.70 0.18 4.62 SC DA III 0.25 1.70 1.144 350 YES 100 10 0.42 SA DA I
19 3 1991 11.00 0.56 - ☓ Yangon 0.61 1.00 1.00 0.140 0.24 1.70 0.41 2.37 SB DA II 0.41 1.70 0.884 450 YES 150 9 0.70 SA DA I
20 4 1995 14.64 0.73 - ☓ Yangon 0.50 1.00 1.00 0.158 0.22 1.70 0.37 2.68 SB DA II 0.26 1.70 0.634 400 YES 150 9 0.44 SB DA II
3
2020/11/8
4
2020/11/8
C1 corner column
C2 side column
C3 middle column
10
5
2020/11/8
3.0m GF RC Slab
GF (office) Total Building weight Σwi 9,824 kN
11
b(mm) D(mm)
C1: 300 300
b= 300
12
12
6
2020/11/8
13
13
‘DA’ means
gravity load
is quite OK
Judgment for service load
IMD02 <IMD : Remarkably lower than gravity load capacity demand (Rank DC)
IMD01 ≦IMD≦ IMD02 : Lower than gravity load capacity demand ((Rank DB)
IMD<IMD01 : Higher than gravity load capacity demand (Rank DA)
14
14
7
2020/11/8
Hoop & tie information is necessary, but this time not available,
therefore judgment of structural type should be necessary.
15
15
16
16
8
2020/11/8
17
17
18
9
2020/11/8
Floor height
19
19
where, (O) is Outside Survey, (H) is Hearing/Interview, and (I) I Inside Survey 20
20
10
2020/11/8
21
A
B
C
22
22
11
2020/11/8
23
23
24
24
12
2020/11/8
17.4 kN/mm2
25
26
13
2020/11/8
Myanmar has
sometimes F
low strength
concrete
Nakajima (average: 2017)
Japan Materials Inst.(1958).
Kato (light: 1975)
Nakajima’s Nakajima
equation* Nakajima
will be more
suitable
rather than
those of
Japan
Materials R:
Institute’s**
or Kato’s *Nakajima’s equation is based on data from Bangladesh
equation for (Y. Nakajima et al., AIJ (2017)) (F(MPa) = 0.9369*R-19.573-sigma(2.8))
light concrete. **Japan Materials Institute’s equation (1958) is basically using data
of Japan. (F(MPa) = 1.27*R-18) 27
27
28
28
14
2020/11/8
The arrangement of rebar between the site survey and design are sometimes different
To make sure, to go to top roof to confirm it is recommended. (see Next Slide) 29
29
30
30
15
2020/11/8
Evidence is inevitable
31
32
16