Quality Conformance Awareness Training

Quality Conformance
Awareness Training

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Establish Quality standard


And work methodology.
Keep defective works
Do it right the first time and wastages to the minimum
and every time. in order to improve
performance.

YOU

Our quality objective


is to meet client Never repeat the same mistake.
expectations and Never give up quality improvement
requirements It is the competitive edge
for survival.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Pre-planning and preparatory work (Architecture )


1 Check and study construction drawing and window
schedule details thoroughly and note down any
discrepancies.

2 Prepare shop drawing for architect approval.

3 Submit material sample for approval.

4 Request for latest programmed so as to match


resources ( manpower and material )to schedule
and progress.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Pre- mobilization to project site

1 Pay a site visit to decide the suitable date of


commencement of work.

2 Find out what problems have hindered your progress and


liaise with the PIC.

3 Fabrication of sub-frame at factory.

4 Arrange to transport sub-frame & or outer frame to


site.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Installation of window at project site.

1 Level pegs must be provided by plasterer.


2 Ensure window opening position, size and level of
lintel position are correct.
3 Installed sub- frame and/or outer frame with
adequate brackets and plumb true verticality.
4 Plastering can proceed after installation of sub-
frame.
5 Main frame and glazing shall follow after
painting work has completed.

Prepare by : Eddy Ong


Quality Conformance Awareness Training
To achieve a Good Quality of window work with 10 Factor
window opening dimension
1 for sub-frame
(40mm to 50mm both sides)

Correct level of opening


2 position. (Lintel level)

CRITICAL Level pegs provision and


3 verticality control.
SUCCESS
FACTORS
4 Adequate provision of
sub-frame brackets & Plugs.

Correct dimension of window


5 frame and leaf.

6 Skilled of fabricator and


installer.
Prepare by : Eddy Ong
Quality Conformance Awareness Training

To achieve a Good Quality of window work

Good selection of window


7
accessories.

Good protection of finished


CRITICAL 8 product.
SUCCESS
FACTORS
9 Good and neat plastered work.

proper clean up before


10 hand over

Prepare by : Eddy Ong


Quality Conformance Awareness Training
KPI = Qlassic Assessment Criteria & standard

Correct dimension Skill of the


Adequate provision
Of Window frame fabricator
Level Peg/setting out Of brackets
and leaf. and installer
Verticality control 1
1 1,2,3,4 and 5
Assessment
Standards.
criteria

1) Evenness and alignment -Window leaf and frame corner maintain at right angle – 4mm/300mm.
- window frame to be plumb and square.
-Parallel with wall opening.
2) Joints and gaps - Consistent gap between window leaf and frame.-5mm
- No visible gaps between window frame and wall.
- Neat joint between window frame and wall internally & externally.
3) Material and damages -No stain mark & visible damage and defect.
-Glazing clean and evenly sealed with putty or gasket for aluminium windo
- No sign of corrosion.
- good paintwork.
4) Functionality – Ease of opening and closing.
- No squeaky sound during opening & closing.
5) Accessories Defects – Lock sets with good fit and aligned.
- No sign of corrosion
Proper clean up - No missing or defective accessories.

before hand over Good protection of


Good selection of Good and neat
3 & 5 finished product
window accessories plastered work 3
Prepare by : Eddy Ong 4 & 5 1 & 2
Quality Conformance Awareness Training

Window: 1) Joints and Gap


Silicon to
Skilled & visible gaps.
6 experienced 1
plasterer (1 & 5)
Leave 2 to 3mm
for skim coat Pre-informed
the gaps
requirement 2
• 1) No visible gap between window frame and wall.

• 2) Consistent gap between window leaf and frame and not Skilled aluminum
more than 5mm (timber window only). measurement
taker and
• 3) No visible gaps within window leaf and frame. fabricator 2,3
&4
• 4) No visible gaps between window leaf and frame.

• 5) Neat joints between window and wall internally and


externally.

• 6)byConsistence
Prepare : Eddy Ong and no visible gaps at MITRE joints.
Quality Conformance Awareness Training

Window: 1)Joints and Gap

Gap between
Door frame &
wall. Gaps

Two different gap


20mm & 3mm to 5mm
Prepare by : Eddy Ong
Quality Conformance Awareness Training

Window : 2)Alignment And Evenness

• 1) Alignment and level with wall opening.

• 2) Window leaf and frame corners


maintained at right angles.

Level peg
installation Check with Level
1. Set square control
Prepare by : Eddy Ong 2. 1.
Quality Conformance Awareness Training

Window: 3) Material and damages

Damage
Rusty
frame.

1
2

• 1) No stain marks and any visible damage /


defects. Alignment

• 2) Louvre windows with glass panels of


correct lengths.

• 3) Glazing clean, evenly sealed with putty


or gasket for aluminum windows.

3
Prepare by : Eddy Ong
Quality Conformance Awareness Training

Window: 4) Functionality

1
2
• 1) Ease in opening ,closing and locking.

• 2) No sign of rainwater leakage.

• 3) No squeaky sound during swinging of


leaf.

Good selection of material


Prepare by : Eddy Ong
Quality Conformance Awareness Training

Window: 5) Accessories Defects

1,2,4

• 1) Lock sets with good fit and aligned.


• 2) No sign of corrosion.
• 3) No missing or defective accessories. Good selection
of
• 4) Countersunk screws leveled and flushed. No Ironmongeries
over tightened screws.
• 5) Stainless steel screw at hinges for swing
window.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper Equipment Use


Laser Equipment & Or
spirit level is used to
control level

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of sub frame

Install sub-
frames and check
verticality

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of sub frame

Installation of Sub frame


using wall brackets and plugs

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of main frame


Preparation for
installation of outer
frame
Checking the verticality
of outer frame

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of main frame


Protective adhesive tape can only
be removed after painting work is
completed.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Good & Bad practice of installation

Good practice Bad Practice


Adequate floor thickness Inadequate floor thickness
for floor screed for floor screed.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Bad practice of installation


Bad Practice
Too thick mortar for
sub-frame plastered.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of sub frame

With level peg


use by
Aluminums sub
con to install sub
frame.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Proper installation of sub frame

With level peg use by Aluminums sub


con to install sub frame.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Good practice of installation


Good Practice ( tempered glass panel at
Pergola )
Good trimming of silicon at 12mm joints.
And at groove between wall and glazing.

Prepare by : Eddy Ong


Quality Conformance Awareness Training

Bad practice of installation


Bad Practice
Inadequate fall and water
back flow and seep
through

Prepare by : Eddy Ong


Quality Conformance Awareness Training

END