1 Scope of Work
2 References
3 Project Organization
4 Pre-requisite
5 Activity Description
6 Work Methodology
7 Testing
8 In process and Final Inspection and Testing
9 Records
10 List of attachments
1.0 SCOPE OF WORK
This method statement describes the method of Welding process specification at DIAL,
Phase-3 project.
2.0 REFERENCES
Project Engineer :
Site Supervisor:
He is prime responsible for ensuring the implementation of this method statement
assuring EHS and quality management at site.
Ensures that tools and equipment used by construction sub contractor are in safe and
workable condition.
Conduct frequently activity supervision regarding the workers activities and ensuring
work as per approved working drawings & method statement and initiate corrective
action if any deviation observed from system requirement.
Works in close coordination with site safety officer & takes all necessary measures to
comply and correct all practices and condition which are deemed to be unsafe.
To conduct Tool Box Talk.
Safety Officer :
Coordinate the safety activities between the customer, contractor (BSL) and sub-
contractor.
Coordinating safety, Health & Environment implementation.
Conduct regular safety checks to ensure that the established safety procedures are
implemented in proper manner.
Record & report all reportable incidents to EHS head Manager.
Report and investigate all near misses, incidents and accidents.
Organizes and conducts safety trainings of Subcontractors at site.
Organize the monthly Safety committee meeting at site.
Ensures use of Personal Protective Equipment (PPE).
Ensures that safety equipment (incl. Fire-fighting equipment) is always ready for use,
monitors expiry dates and inspection requirements.
Ensure that all Safety related documents like instructions, procedures, inspection
forms and emergency plans are kept updated with the latest information.
Assist in conducting tool box talk to workers along with site supervisor.
Inspection of tools, tackles, lifting machines & inform the Project Engineer if any
deviations observed.
Promoting safety consciousness at site.
Monitoring of welfare measures for workers & staff at work site.
EHS management system shall be followed as per approved Project EHS plan.
4. Pre-requisite :
Clearance of site from civil agency where installation activity to be commenced.
Availability of approved working drawings
Availability of required tools and tackles with safety tag ‘ safe for use’
Availability of all material required to conduct the welding activity.
5. Activity description :
Item Description
1. Safety Helmet ( Mandatory)
2 Safety Shoes ( Mandatory)
3. Safety Jacket ( Mandatory)
4. Hand gloves- (as per activity)
PHASE-3A DEVELOPMENT AT
INDIRA GANDHI INTERNATIONAL
AIRPORT
SS PIPE WELDING PROCEDURE
SPECIFICATION
JOINT (QW-402)
Backing: No
POSITION (QW-405)
Position: 6G
Position of Groove: All position
Welding Progression: Up Hill
Temperature: NA
Time: NA
PHASE-3A DEVELOPMENT AT
INDIRA GANDHI INTERNATIONAL
AIRPORT
SS PIPE WELDING PROCEDURE
SPECIFICATION
Other: NA
GAS (QW-408)
Current AC or DC: DC
Amps ( Range) : 65-90 ampere
Polarity: DCEN
Volt (Range): 10-15 volts
TECHNIQUE (QW-410)
WELDING PROCEDURE: