1. TITLE
Localization of Bearings for PNR Trains
Phase I: Characterization of Existing Traction Support Bearing
2. CLIENT INFORMATION
3. OBJECTIVES
c. Preparing terminal report and other pertinent documents for the completion of the
project.
a. Providing all the necessary information of the product as required by the project team;
c. Communicating with the project team if there are changes in any aspect of the design
of the parts.
4.3. Others:
DOST-MIRDC shall conduct the activities stated in Item 4.1 as may be accomplished during
the project duration. Advance activities not yet covered by the official project duration may
be conducted to meet the requirements of Philippine National Railways(PNR).
5. PROJECT DURATION
The maximum project duration is six (6) months after which all activities will cease and the
extent of accomplishment during the period will constitute that of the project. The project will
start upon signing of the Contract Research Agreement.
7. SUCCESS CRITERIA
8. QUALITY ASSESSMENT
The project and the allied activities are free from accidents and that the objectives are achieved
during the project duration.
9. RISK ASSESSMENT
The success of the project will be dependent on the faithful accomplishment of the
responsibilities of both parties.
PNR REPRESENTATIVE
Date :
Approved by:
ROBERT O. DIZON
Executive Director