EXECUTIVE SUMMARY
Individual water shares for each Owner for the period between 1 and 30 November 2020
are summarized below:
The following pie-chart shows the consumption percentages of Mass and Qaiwan between
1 and 30 November 2020. During that period, the consumptions measured were as follows:
01.11.2020 –
Time Duration:
30.11.2020
MASS
QAIWAN
CHAMCHAMAL + PIPE LEAK
The chart on the following page shows the cumulative water consumption amounts for Mass
and Qaiwan separately between 1 and 30 November 2020.
On the page following the chart, the daily water consumption values of Mass and Qaiwan
are also shown on table.
The relevant data on which the following chart and table are based are given on the
Attachment 1 of the Report.
Water Consumption (m3)
0
100,000
120,000
140,000
160,000
20,000
40,000
60,000
80,000
6,713
1,662
12,331
3,525
18,174
4,932
24,074
7,039
29,804
9,698
34,884
11,948
39,433
14,352
COMPANY
MASS
43,327
16,656
46,681
18,949
51,309
21,184
QAIWAN
53,188
22,689
59,741
24,395
65,344
25,576
68,179
OPERATOR
26,847
72,322
1 - 30 November 2020
28,165
NOKAN-TAKYAPI JV
78,517
28,985
84,458
30,145
87,693
31,191
92,985
32,094
99,431
33,212
Revision 00
105,110
34,406
Document Type Report
Page 4 of 10
109,900
35,224
Date 03/12/2020
114,371
36,468
Document No MQ_OP_MRPT_48
118,033
MONTHLY OPERATION REPORT
37,381
Cumulative Water Consumption
123,449
MASS-QAIWAN WATER SUPPLY PROJECT
39,114
129,543
40,998
133,764
42,701
138,182
44,422
143,018
45,916
148,651
48,185
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 5 of 10
Water quality
Regarding water quality, on a daily basis the turbidity and pH value are measured for raw
water and treated water, and the chlorine content is measured for treated water.
The peak value of raw water turbidity measured during the report period was 17.0 ppm.
The data pertaining to water quality tests are given on Attachment 2 of this Report.
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 7 of 10
17.0
16.5
15.3
12.5
12.5
12.3
12.0
11.9
11.7
11.6
11.6
10.9
Turbidity (PPM)
10.6
10.5
10.5
10.5
10.3
9.9
9.9
9.5
10.0
8.9
8.8
8.5
8.3
7.9
7.7
7.1
7.1
6.4
2.5
2.3
2.1
2.0
2.0
2.0
2.0
1.9
1.9
1.9
1.9
1.8
1.7
1.7
1.6
1.6
1.6
1.6
1.5
1.5
1.5
1.5
1.4
1.4
1.4
1.3
1.2
1.2
1.1
1.1
1.0
0.0
The operation records of pumps showing the monthly operation times, total operation
times, out of operation durations together with their reasons are given on Attachment 3 of
this Report.
Detailed pump temperature vibration and current data are given in Attachment 8 of this
Report. It is seen that temperature, vibration and current of the operating pumps were
within the allowable limits.
Pipeline records
Attachment 4 of this report shows if any pipeline problems were recorded during report
period.
The Attachment 5 of this report shows the failure records of the equipment.
In addition to periodic maintenances, following activities are performed for the maintenance
of the equipment in November 2020:
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 9 of 10
Mechanical:
Electrical:
Attachments
1. Water consumption of facilities – daily records
2. Water quality test records
3. Pump operation records
4. Pipeline failure records
5. Equipment failure records
6. Maintenance schedules
7. Pump operating data
8. Weekly toolbox
9. Attendance list
10. Service Invoices