COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT

MONTHLY OPERATION REPORT


Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 1 of 10

MASS-QAIWAN WATER SUPPLY PROJECT

MONTHLY OPERATION REPORT

1 NOVEMBER - 30 NOVEMBER 2020


COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 2 of 10

EXECUTIVE SUMMARY

Water production and individual share for each Owner

Individual water shares for each Owner for the period between 1 and 30 November 2020
are summarized below:

Facility Qty. of water supplied (m3)


- Mass Power Plant 19,145
- Mass Steel Plant 64,024
- Mass Cement Plant 65,482
- Qaiwan Power Plant & Refinery 48,185
- Chamchamal City 247,924
Total 444,760

The following pie-chart shows the consumption percentages of Mass and Qaiwan between
1 and 30 November 2020. During that period, the consumptions measured were as follows:

• MASS Consumption: 148,651 m3 / 33 %


• QAIWAN Consumption: 48,185 m3 / 11 %
• CHAMCHAMAL Consumption: 247,924 m3 / 56 %
• Total Consumption: 444,760 m3
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 3 of 10

01.11.2020 –
Time Duration:
30.11.2020

148,651 m3 Total Consumption: 444,760 m3


33%
Mass Consumption: 148,651 m3
247,924 m3
56 % Qaiwan Consumption: 48,185 m3

48,185 m3 Chamchamal 247,924 m3


11 % Consumption

MASS
QAIWAN
CHAMCHAMAL + PIPE LEAK

The chart on the following page shows the cumulative water consumption amounts for Mass
and Qaiwan separately between 1 and 30 November 2020.

On the page following the chart, the daily water consumption values of Mass and Qaiwan
are also shown on table.

The relevant data on which the following chart and table are based are given on the
Attachment 1 of the Report.
Water Consumption (m3)

0
100,000
120,000
140,000
160,000

20,000
40,000
60,000
80,000
6,713
1,662
12,331
3,525
18,174
4,932
24,074
7,039
29,804
9,698
34,884
11,948
39,433
14,352
COMPANY

MASS

43,327
16,656
46,681
18,949
51,309
21,184
QAIWAN

53,188
22,689
59,741
24,395
65,344
25,576
68,179
OPERATOR

26,847
72,322
1 - 30 November 2020

28,165
NOKAN-TAKYAPI JV

78,517
28,985
84,458
30,145
87,693
31,191
92,985
32,094
99,431
33,212
Revision 00

105,110
34,406
Document Type Report

Page 4 of 10

109,900
35,224
Date 03/12/2020

114,371
36,468
Document No MQ_OP_MRPT_48

118,033
MONTHLY OPERATION REPORT

37,381
Cumulative Water Consumption

123,449
MASS-QAIWAN WATER SUPPLY PROJECT

39,114
129,543
40,998
133,764
42,701
138,182
44,422
143,018
45,916
148,651
48,185
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 5 of 10

WATER COMSUPTION OF FACILITIES – DAILY RECORDS


MASS POWER MASS STEEL MASS CEMENT QAIWAN POWER
TIME PLANT FACTORY FACTORY PLANT
QUANTITY TOTAL QUANTITY TOTAL QUANTITY TOTAL QUANTITY TOTAL
PER DAY FLOW PER DAY FLOW PER DAY FLOW PER DAY FLOW
(m3/day) (m3) (m3/day) (m3) (m3/day) (m3) (m3/day) (m3)
1761965 2164462 4477269 2778681
1/11/2020 0:00 1599 1763564 2358 2166820 2756 4480025 1662 2780343
2/11/2020 0:00 31 1763595 2616 2169436 2971 4482996 1863 2782206
3/11/2020 0:00 1283 1764878 2358 2171794 2202 4485198 1407 2783613
4/11/2020 0:00 1102 1765980 2020 2173814 2778 4487976 2107 2785720
5/11/2020 0:00 932 1766912 2040 2175854 2758 4490734 2659 2788379
6/11/2020 0:00 0 1766912 2371 2178225 2709 4493443 2250 2790629
7/11/2020 0:00 193 1767105 1740 2179965 2616 4496059 2404 2793033
8/11/2020 0:00 1206 1768311 1630 2181595 1058 4497117 2304 2795337
9/11/2020 0:00 636 1768947 1012 2182607 1706 4498823 2293 2797630
10/11/2020 0:00 0 1768947 1734 2184341 2894 4501717 2235 2799865
11/11/2020 0:00 110 1769057 235 2184576 1534 4503251 1505 2801370
12/11/2020 0:00 1288 1770345 2864 2187440 2401 4505652 1706 2803076
13/11/2020 0:00 0 1770345 2603 2190043 3000 4508652 1181 2804257
14/11/2020 0:00 0 1770345 1996 2192039 839 4509491 1271 2805528
15/11/2020 0:00 0 1770345 1920 2193959 2223 4511714 1318 2806846
16/11/2020 0:00 0 1770345 2903 2196862 3292 4515006 820 2807666
17/11/2020 0:00 1198 1771543 2385 2199247 2358 4517364 1160 2808826
18/11/2020 0:00 0 1771543 1817 2201064 1418 4518782 1046 2809872
19/11/2020 0:00 1217 1772760 2346 2203410 1729 4520511 903 2810775
20/11/2020 0:00 1259 1774019 2754 2206164 2433 4522944 1118 2811893
21/11/2020 0:00 1179 1775198 2052 2208216 2448 4525392 1194 2813087
22/11/2020 0:00 0 1775198 2367 2210583 2423 4527815 818 2813905
23/11/2020 0:00 1214 1776412 1815 2212398 1442 4529257 1244 2815149
24/11/2020 0:00 94 1776506 2947 2215345 621 4529878 913 2816062
25/11/2020 0:00 1854 1778360 2018 2217363 1544 4531422 1733 2817795
26/11/2020 0:00 0 1778360 2654 2220017 3440 4534862 1884 2819679
27/11/2020 0:00 0 1778360 2427 2222444 1794 4536656 1703 2821382
28/11/2020 0:00 1573 1779933 1973 2224417 872 4537528 1721 2823103
29/11/2020 0:00 0 1779933 2226 2226643 2610 4540138 1494 2824597
30/11/2020 0:00 1177 1781110 1843 2228486 2613 4542751 2269 2826866
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 6 of 10

Water quality

Regarding water quality, on a daily basis the turbidity and pH value are measured for raw
water and treated water, and the chlorine content is measured for treated water.

The average values measured were as follows:


• Turbidity: Raw water= 10.3 ppm / Treated water= 1.6 ppm
• pH value: Raw water= 7.9 / Treated water= 7.8
• Chlorine content of Treated water= 1.5 mg/l

The peak value of raw water turbidity measured during the report period was 17.0 ppm.

The data pertaining to water quality tests are given on Attachment 2 of this Report.
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 7 of 10

Turbidity Records of Raw and Treated Water


20.0

17.0

16.5

15.3
12.5

12.5

12.3
12.0
11.9
11.7
11.6

11.6
10.9
Turbidity (PPM)

10.6

10.5
10.5

10.5

10.3
9.9

9.9
9.5

10.0
8.9

8.8
8.5
8.3
7.9
7.7
7.1

7.1
6.4

2.5

2.3
2.1
2.0

2.0

2.0

2.0
1.9

1.9

1.9

1.9
1.8

1.7

1.7
1.6

1.6

1.6

1.6
1.5

1.5

1.5

1.5
1.4

1.4

1.4
1.3
1.2

1.2
1.1

1.1
1.0

0.0

Raw water Treated water


COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 8 of 10

Pumps operation records

The operation records of pumps showing the monthly operation times, total operation
times, out of operation durations together with their reasons are given on Attachment 3 of
this Report.

Once “Pump Operation Records” given in Attachment 3 is examined, it is observed that


pump stations operated for 1019 hours on the average in November 2020.

Detailed pump temperature vibration and current data are given in Attachment 8 of this
Report. It is seen that temperature, vibration and current of the operating pumps were
within the allowable limits.

Pipeline records

Attachment 4 of this report shows if any pipeline problems were recorded during report
period.

Equipment failures and maintenance

The Attachment 5 of this report shows the failure records of the equipment.

In addition to periodic maintenances, following activities are performed for the maintenance
of the equipment in November 2020:
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 9 of 10

Mechanical:

Summary Of Mechanical Activities – November 2020


# Date Stations Pumps Machine/Others Activities
14-Nov-20 BPS P#2 Recharging grease for both (Drive and
1
Non-Drive) End side Bearings.
14-Nov-20 BPS P#5 Recharging grease for both (Drive and
2
Non-Drive) End side Bearings.
17-Nov-20 IPS P#5 Changing both fixed side and free side
3
packing.
19-Nov-20 IPS P#2 Recharging grease for both (Drive and
4
Non-Drive) End side Bearings.
22-Nov-20 WTP P#4 Recharging grease for both (Drive and
5
Non-Drive) End side Bearings.
22-Nov-20 BPS P#3 Recharging grease for both (Drive and
6
Non-Drive) End side Bearings.
29-Nov-20 IPS P#1 Recharging grease for both (Drive and
7
Non-Drive) End side Bearings.
29-Nov-20 IPS P#4 Recharging grease for both (Drive and
8
Non-Drive) End side Bearings.
30-Nov-20 BPS P#1 Recharging grease for both (Drive and
9
Non-Drive) End side Bearings.

Electrical:

Summary Of Electrical Activities – November 2020


# Date Stations Pumps Machine/Others Activities

Periodic Maintenance Activities


Attachment 6 gives the maintenance schedules of the equipment for which maintenance is
performed this month.
COMPANY OPERATOR MASS-QAIWAN WATER SUPPLY PROJECT
MONTHLY OPERATION REPORT
Document No MQ_OP_MRPT_48
Document Type Report
NOKAN-TAKYAPI JV
Revision 00
Date 03/12/2020
Page 10 of 10

Facility Maintenance Activities


Following facility maintenance activities were performed during this month:

Summary Of Facility Activities – November 2020

Date Stations Machines/Others Activities


1/11/2020 BPS Compressor Air filter replaced.
11/11/2020 Mass Cement Pipe Line Mass cement gate valve replaced - DN 200, PN 16.
28/11/2020 WTP ELCB ELCB fixed for chlorine and chemical building at WTP.
29/11/2020 WTP photocell sensor New photocell sensor installed for transformer building at WTP.

Health and Safety (HS)


Weekly Tool Box Talks regarding health and safety have been given as Attachment 8.

Attachments
1. Water consumption of facilities – daily records
2. Water quality test records
3. Pump operation records
4. Pipeline failure records
5. Equipment failure records
6. Maintenance schedules
7. Pump operating data
8. Weekly toolbox
9. Attendance list