PROJECT 599 DAVID ST , PALM BAY

ITEM ACTIVITY INCLUDES LABOR TOTAL


INSTALATION OF TILE FLOORING ( living
TILE INSTALL $ 3.750 $ 3.750
room, kitchen, 3 bedrooms, closets, and
OUTDOOR (3 colors), INDOOR (2 COLORs) ,
PAINT GENERAL PAINT Includes Roof, does not include Garage $ 3.500 $ 3.500
interior
BASEBOARDS INSTALL COST PER FEET, APROX 500 LINEAR $ 900 $ 900

FIX FLOORS, WALLS, INSTALL TILE, DUROCK


MASTER BATH LABOR VANITY, MIRROR, TOILET, FIXTURES, LAMP, $ 3.500 $ 3.500
CONNECT SINK AND PLUMBING

FIX FLOORS, WALLS, INSTALL TILE, DUROCK


SECOND BATH LABOR VANITY, MIRROR, TOILET, FIXTURES, LAMP, $ 2.500 $ 2.500
CONNECT SINK AND PLUMBING

UNISTALL OLD KITCHEN, INSTALL NEW


KITCHEN, WALL DEMOLITION, NEW ELECTRIC
KITCHEN LABOR $ 5.000 $ 5.000
FOR DISHWASHER , NEW PLUMBING FOR
DISHWASHER, EXTEND ISLAND WALL
ESTIMATED COMPLETION TIME: 21 BUSINESS DAYS
$ 19.150

PAYMENT CONDITIONS

25% IN ADVANCE $ 4.788


75% AT ACTIVITY COMPLETION
$ 14.363
(PER ACTIVITY)