OGC-FIC-004-I-Cable Insulation Resistance-Field Installation Checklist
OGC-FIC-004-I-Cable Insulation Resistance-Field Installation Checklist
Core 11 12 13 14 15 16 17 18 19 20
(A)
(B)
Core 21 22 23 24 25 26 27 28 29 30
(A)
(B)
Core 31 32 33 34 35 36 37 38 39 40
(A)
(B)
Remarks:
Field Installation Checklist
INSTRUMENT CABLE INSULATION RESISTANCE
AND CONTINUITY TEST RECORD AFTER INSTALLATION (MULTIPAIR)
COMPLETED
I hereby confirm the work has been completed in accordance with Contract specified drawings, technical specifications & standards.
CONTRACTOR REPRESENTATIVE
Signature: Date:
Name: Position:
ACCEPTED
Signature: Date:
Name: Position: