UPPER TENSION (-WPS Office

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

UPPER TENSION ( DISC SPRING AND DIAL )

 Remove outer bolt , tension dial , discs and

disc spring.

 Lay each part in your front table following its

disassembling for easier assembling.

 Brush dust and wipe with absorbent cloth with oil.

 Assemble by following the laid parts in your table.

LOWER MECHANISM ( ROTARY OSCILLATING HOOK )

 Remove bobbin case.

 Fasten sides of oscillating hook.

 Remove dust with lint brush.

 Put a little amount of machine oil on moving parts.

 Return spare parts in place.


OTHER MINOR PARTS

 Remove entangled threads between head and balance wheel.

 Brush accumulated dust in the treadle joints connecting the band wheel.

 Clean gummy dust on the band wheel.

 After all parts were dusted, lubricate all joints and oil slots with good quality oil.

 Wipe off all surplus oil then put a piece of absorbent cloth under the presser foot for

dripping oil.

Note : When the machine has thoroughly cleaned and oiled, run it slowly for

several minutes to allow the oil to work on its moving parts. Place a scrap of fabric

under the presser foot and lower the needle to absorb excess oil.

You might also like