TO HP FLARE HEADER
JBOO-B-PPOC ~ 04J-000 1
TO GIS/GIS
16"-PG-024-0006-SCA EXCHANGER HA-025001
JB00- 8- PPOC- 025 - 0001

8 8
TO PB-024001A/B

024-BL-ocl02 ·~
c c

A~l 1I~~ 11-


- J-Ccr- 1.1 ~it
T~
_ . -J-((1- I.}
D D
__. -"J·(CT"
- - -J .(Cf~ s.z.
·4·1
<£9--------
,... -:J-aT·€·5
-, -J .u:r- 9.)
TO RICH GLYCOL HEADER
3" -CG-024- 0012-6CB
JBOO- B-PPOC-024-0006

E E
FROM KRECHBA PRODUCTION ~ 20
GAS COOLER HC-020001 14._PG-020-0003-60A I ., 5 14"x16" - 024-BL-0036
I J800- B- PPOC-Q20-0002 )>-~C2.~===~-,-:-::=-:-r--111f-l_:,::
NO:::.
TE:..::.- ..::::=--IC]1----------Ir--r-1....__ _j
NOTE 4 : NOTE 2
I NOTE 25
J024-GL- 0062 NOTE 26
FROM FIELD COMPRESSOR :
~00~~~2--. 10" I
[
(MURE)- ------~
~--------------- 1 I
FROM FIELD COMPRESSOR
10 14
.' "y ~900# F
F ~~~~N_!__..... 10• I 6001
[<MlTREi---- - --~ ~ --- - -- -------- -j
EL MIN
NOTES (CQNJ l
12. RANGE AND ElEVATION OF LEVEL TRANSMITTERS TO BE IDENTICAL
13. COMBINED rN OF 024-LV-013 AND SP-29-009 NOT TO EXCEED 5.5. TO CONDENSATE STABIUSER
14. DELETED. FEED DRUM VL-022001
15. fOR GENERAL NOTES AND s.ntBOLS REFER TO P&:ID LEGEND SHEETS 2" -W0-02<b 001 4-60A
(UUOO-B-PPDL-000-0001/2). JBOO- B- PPOC - 022-0001
16. CONTROLLER OUTPliT TO BE DRIVEN TO MINIMUM AND SWITCHED TO MANUAL
17. SAMPLE PROBE WITH DOUBLE VALVE ISOLATION SUPPUED BY ANALYSER VENDOR.
18. COMBINED rN OF 024-LV-008 AND SP-29-008 NOT TO EXCEED 15. TAG NO. W-024001
G 19. SP-29-020 rN NOT TO EXCEED 6. ~ G
KRECHBA FIELD GIS
20.
~&
ALLOW SP-\CE FOR FliTURE ACOUSTIC INSULATION REQUIREMENT (PHASE 3).
SERVICE GLYCOL CONTACTOR
I
6DA, ,6LA
In Salah Gas
~RESSURr DROP, ANCHOR SECURELY.
2"x1" 1"x2" ~
23. FLOW TOTAUZATION IS PERFORMED AND INDICATED USING THE "sUM" PARAMETER
ON THE CONTROL SYSTEM.
24. INSULATION. MOC-0058-U.
25. IMPULSE UNE ARMAFLEX WRAPPED. - MOC-0058-U.
SIZE (mm)
DESIGN
CONDmONS
2300 ID x 11000 T/T

91.0 borg 0 85"C &: -25"C


J038-GL-0055
111611 ~
Kellogg Brown & Root
A Halbu!bl Company

26. CHANGE TAG - P1-0044J NOTE 26 IN SALAH PROJECT


EPC
NOTES CUENT 5 DAlE Tl11£ PIPING AND INSTRUMENT DIAGRAM
SIGNED
N'PRfNN.. ~
1. PREFIX FOR EACH ITEM AND UNE No. IS ASSET REFERENCE FOR KRECHBA FIELD : J. KRECH8A CPF
H 2. REDUCER TO BE LOCATED 10 PIPE DIAMETERS MINIMUM STRAIGHT LENGTH FROM NOZZLE N1 {D=161. ~· REV. DAlE ~~~~~~~+~+--:!~~~~~~~'!c.---------1 ORIGIN
BY llKP 12/6/00
3. DELETED. FIELD GAS
I DRAWN
4. CONNECTION SPOOL FOR TIE-IN AND TIE-Ollf OF PHASE J FACIUTIES. 0 BY KL 12/6/00 GLYCOL CONTACTOR
5. FREE DRAINING PIPEWORK WITH NO POCKETS. f CHK"D SCAlf Rev.
6. ALARM ONLY ON HIGH HIGH LEVEL BY OJW/.rll 12/6/00
E
7. SELF DRAINING TAPPINGS REQUIRED. 0 N'P"D OJW/Rf'
8. DRAINS TO BE LOCATED WITH ADEQUATE CLEARANCE TO ALLOW COLLECTION OF GLYCOL ORAliiiiC Ho BY nE 12/6/00 NONE 5