Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A

8
IIi' SUPPn

~rJ ,.. J-((T-1.2


~"-'iF
FROM INLET SEPARATOR
VA-020001 ·. I

c
NOTE 2! ru
Nl A-L

HC-020001
NOTE 2,17

N2 A-L

~1 NOTE 2 ru B" -VH-043 - 0030-1 SA


TO HP FLARE HEADER
JBOO-B-PPOC- 043 -0001
0
RS
NOTE 10

TO GLYCOL CONTACTOR VB-024001


1~. -PG-020-0003-:!:6~0A~_.:~::::::::::::~-~NO:!_!J~E~3'---:-_::~IJJ~BOO~-~B-~P~PD
~CBa~24E-]o~oo~
l)
020- XS - 012 TO 015

TO FIELD COMPRESSION TRAIN 2


NOTE 14
NOTE 8 E

14"x10" TO FIELD COMPRESSION TRAIN 1


14 "-PG-020-0003-6DA NOTE 14

TO 024-TDIC-011 F
I JBOO- B- PPOC-OU- 0010 >

NOTE (CONI ) ~
6. DELETED.
7. DELE1ED {
ill
B. FI\NS~D 10 HAVE AUTO VARIABLE PITCH FI\N. TAG NO. HC-02000 I
9. DELETED
SERVICE PRODUCTION GAS COOLER
10. PROVIDE A TIE-IN CONNECTION AT THE FLARE HEADER.

G
11. INSTRUMENT TAG NUMBERS FOR FI\N MOTORS A,B,C AND D ARE 008, 009, 010 AND 011 RESPECTIVELY
3 SIGNALS PER MOTOR A: RUNNING/STOPPED; B: FAULT/TRIPPED; C: AVAILABLE
12. THIS DRAWING WAS PREVIOUSLY ISSUED AS 6643-B-1-GLBA-DCH-BDP-020-00002.
DUTY 8443 KW
TAG NO.

SERVICE
KE-02000\A-0
PRODUCTION GAS
COOLER FANS
...........--..
In Salah Gas
G
13. FOR GENERAL NOTES AND SYMBOLS REFER TO P&ID LEGEND SHEET (UUOO-B-PPDC-000-0001) SIZE (mm) 9400 L X 14060 w
14. ALLOW SPACE FOR FUTURE ACOUSTIC INSULATION REQUIREMENT (PHASE Ill) ABSORBED/ 27 5/ 37kW EACH
15. VIBRATION SWITCHES WIRED DIRECTLY TO THE EMERGENCY STOP. DESIGN RATED POWER
16. VIBRATION SWITCH TAG NUMBERS FOR FAN MOTORS A,B,C,O ARE 001, 002, OQ3, 004 RESPECTIVELY. CONDITIONS 91.0 borg 0 126 & -25"C
l ..:_;,jijSl)t.:(:A_fii$Ji~.Qj0J\!Oijm:fu.Jill~~~· POSITION. OPERATION UNDER LOW AJMBIENT CONDITIONS
J· HYDRATES (LOUVRES UNLOCKED AND PARTIALLY CLOSED).
IN SALAH PROJECT
EPC
PIPING AND INSTRUMENT DIAGRAIM
PREFIX FOR EACH ITEM AND LINE IS ASSET REFERENCE FOR KRECHBA FIELD :
2 CONNECTION TO FIN-FAN COOLER IS SHOWN SYMBOLICALLY. FOR ACTUAL CONFIGURATION OF UNIT AND
KRECHBA CPF
SUGGESTED PIPING ARRANGEMENT FOR EQUAL FLOW, SEE DETAIL 'A' • PRODUCTION GAS COOLER
3 FREE DRAINING PIPEWORK WITH NO POCKETS
4. SPOOL TO BE REPLACED IN FUTURE WITH TIE-IN AND TIE-OUT FOR PHASE 3 FACILITIES (flcLID
COMPRESSION). AT THAT TIME A CHECK VALVE IS TO BE INSTALLED IN LINE No. 14-- PG-02{) -
5. DELETED.