Professional Documents
Culture Documents
600-FKM (FYP1-PR-Rev.1) - FYP Progress Report
600-FKM (FYP1-PR-Rev.1) - FYP Progress Report
01)
PROJECT TITLE
A. PROPOSED PROJECT
1. PROJECT TITLE:
2. STUDENT NAME:
4. COURSE
3. STUDENT ID :
CODE :
SUPERVISOR NAME:
……………………………………………... ……………………………………………...
(Student’s Signature ) (Supervisor Signature & Cop)
Cut Here
ACKNOWLEDGEMENT SLIP
2
600-FKM (FYP1-PP-Rev.01)
PANEL COMMENTS
……………………………………………...
(Panel Signature & Cop)
Date: ……………………………....
3
600-FKM (FYP1-PP-Rev.01)
A. PROJECT ABSTRACT
(Abstract of the proposed project in not more than 200 words):
(20 MARKS)
B. PROJECT BACKGROUND
(Describe the background of your project)
(20 MARKS)
Briefly explain the keyword of your study. The keywords used should reflect your
study content.
4
600-FKM (FYP1-PP-Rev.01)
C. PROBLEM STATEMENT
(Please state clearly the problem of the proposed project)
(20 MARKS)
Why this topic is important to be studied? Highlight the problem or the aspects that
have not studied before. Highlight the new element or novelty of your study.
Objectives:
Suggested to be in point form, max. three for degree level.
Expected results:
Write down the expected results based on previous research finding, mathematic
model, and fundamental theory.
5
600-FKM (FYP1-PP-Rev.01)
E. SCOPE OF WORK
(Describe the scope of the project)
(20 MARKS)
Can be divided into different stages and discuss about each stage.
F. PROJECT METHODOLOGY
(Describe the procedures and methods to be used to achieve the project objectives)
(40 MARKS)
Discuss in details each design, fabrication and testing process. Experiment set up
and equipment used will be presented in figures.
6
600-FKM (FYP1-PP-Rev.01)
Literature review must be related and adequate. Use IEEE format to cite the
literatures.
H. PRELIMINARY OUTCOME
(Discuss the current status & expected outcomes of the project)
(80 MARKS)
It is not expected to have experiment output in FYP 1. Students shall report the
current status- confirm parameter of design, testing standard and procedure,
equipment venue, constraints of the study etc.
Expected outoutcomes is what you will do and what shall you gain in next FYP 2.
7
600-FKM (FYP1-PS-Rev.01)
I. PROJECT PLANNING
(List the main activities of the project. Indicate the length of time needed for each activity.)
201_ 201_
Project Activities
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18