WBS Task Name Start

MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA


1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.7 CIVIL WORKS 7/30/2020
1.8 ROAD FURNITURE 11/11/2021
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.1 PROVISIONAL SUM 11/24/2020
1.11 FINAL SITE INSPECTION 9/10/2021
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/17/2023
3/10/2023
2/14/2023
3/9/2023
3/17/2023
4/1/2023
WBS Task Name Start
MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA
1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.2.1 INITIAL 12/17/2019
1.2.2 SURVEY WORK 3/3/2020
1.2.3 FINAL 3/10/2020
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.3.1 INITIAL 2/4/2020
1.3.2 RECURRING WORK 1/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.4.1 NON PHYSICAL WORKS 7/10/2020
1.4.2 PHYSICAL WORKS 8/18/2020
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.5.1 INITIAL 7/27/2020
1.5.2 RECURRING WORK 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.6.1 INITIAL 7/29/2020
1.6.2 RECURRING WORK 3/2/2020
1.7 CIVIL WORKS 7/30/2020
1.7.1 CH 0 - CH 1025 7/30/2020
1.7.2 CH 1025 - CH 2075 11/11/2020
1.7.3 CH 2075 - CH 3025 3/5/2021
1.7.4 CH 3025 - CH 4156 6/30/2021
1.8 ROAD FURNITURE 11/11/2021
1.8.1 TRAFFIC BARRIER 11/11/2021
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.9.1 STRUCTURE WORK - SUNGAI BENG: CH425 - CH525 2/18/2021
1.9.2 STRUCTURE WORK - ALOR 1: CH2625 - CH2750 5/10/2021
1.9.3 STRUCTURE WORK - SUNGAI DURAU: CH2800 - CH2900 7/22/2021
1.9.4 STRUCTURE WORK - ALOR 2: CH3075 - CH3200 9/15/2021
1.1 PROVISIONAL SUM 11/24/2020
1.10.1 RELOCATION AND PROTECTION OF UTILITY SERVICES 4/23/2021
1.10.2 SOIL INVESTIGATION WORKS 11/24/2020
1.10.3 SLOPE STABILIZATION AND GEOLOGICAL MAPPING 3/3/2023
1.10.4 G1 TEMPORARY RD FURNITURE 2/23/2023
1.10.5 G2 SIGNBOARD 3/6/2023
1.10.6 ROAD SAFETY AUDIT STAGE 4 3/9/2023
1.10.7 PRIME COST SUM 3/8/2023
1.11 FINAL SITE INSPECTION 9/10/2021
1.11.1 PRELIMINARIES COMPLETION 9/10/2021
1.11.2 CUT & FILL 11/3/2022
1.11.3 GEOTECHNICAL WORKS FINAL INSPECTION 1/31/2023
1.11.4 DRAINAGE WORK FINAL INSPECTION 12/9/2022
1.11.5 ROADWORKS FINAL INSPECTION 3/17/2023
1.11.6 ROAD FURNITURE FINAL INSPECTION 3/10/2023
1.11.7 BRIDGE FINISHES 2/14/2023
1.11.8 PROVISIONAL SUM COMPLETION 3/9/2023
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
11/17/2022
4/1/2023
3/20/2023
7/20/2020
3/20/2023
3/20/2023
3/20/2023
9/10/2021
3/20/2023
8/10/2020
3/20/2023
3/20/2023
9/21/2020
3/20/2023
3/17/2023
8/2/2022
8/12/2022
12/2/2022
3/17/2023
3/10/2023
3/10/2023
2/14/2023
6/28/2022
10/19/2022
1/9/2023
2/14/2023
3/9/2023
8/24/2021
6/2/2021
3/3/2023
2/23/2023
3/6/2023
3/9/2023
3/8/2023
3/17/2023
9/10/2021
11/3/2022
1/31/2023
12/9/2022
3/17/2023
3/10/2023
2/14/2023
3/9/2023
4/1/2023
WBS Task Name Start
MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA
1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.2.1 INITIAL 12/17/2019
1.2.1.1 A100 CONTRACTUAL REQUIREMENT 12/17/2019
1.2.1.2 A200 SO/PD'S REQUIREMENT 3/10/2020
1.2.1.3 A500 CONTRACTOR'S REQUIREMENT 1/20/2020
1.2.2 SURVEY WORK 3/3/2020
1.2.2.1 STAGE 1 3/3/2020
1.2.2.2 STAGE 2 7/24/2020
1.2.2.3 STAGE 3 7/8/2021
1.2.3 FINAL 3/10/2020
1.2.3.1 PLANT & MACHINERY MOBILIZATION 3/10/2020
1.2.3.2 PLANT & MACHINERY DEMOBILIZATION 3/17/2023
1.2.3.3 CLEARING AFTER COMPLETION 3/20/2023
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.3.1 INITIAL 2/4/2020
1.3.1.1 PREPARATION OF SAFETY PLAN,HIRARC 2/4/2020
1.3.1.2 SUBMISSION OF SAFETY PLAN 2/17/2020
1.3.1.3 TEAM PREPARATION 2/28/2020
1.3.2 RECURRING WORK 1/20/2020
1.3.2.1 SHO, PROTECTIVE EQUIPMENT 1/20/2020
1.3.2.2 SAFETY REPORT PREPARATION 7/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.4.1 NON PHYSICAL WORKS 7/10/2020
1.4.1.1 EMP. REQUIREMENT 7/10/2020
1.4.2 PHYSICAL WORKS 8/18/2020
1.4.2.1 Washing Facilities 9/3/2020
1.4.2.2 SEDIMENT CONTROL 8/18/2020
1.4.2.3 SILT FENCE LAYING WORK 9/2/2020
1.4.2.4 SAND BAG INSTALLATION WORK 9/17/2020
1.4.2.5 SILT CURTAIN INSTALLATION WORKS 10/15/2020
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.5.1 INITIAL 7/27/2020
1.5.1.1 PREPARATION OF TMP 7/27/2020
1.5.1.2 PRESENTATION OF TMP 8/10/2020
1.5.1.3 SUBMISSION OF TMP 8/10/2020
1.5.2 RECURRING WORK 7/20/2020
1.5.2.1 Traffic Management Team Maintenance 7/20/2020
1.5.2.2 Traffic Report 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.6.1 INITIAL 7/29/2020
1.6.1.1 PREPARATION OF SCHEDULE MAINTENANCE 7/29/2020
1.6.1.2 PRESENTATION OF SCHEDULE 8/12/2020
1.6.1.3 SUBMISSION OF SCHEDULE 8/19/2020
1.6.1.4 TEAM PREPARATION 9/7/2020
1.6.2 RECURRING WORK 3/2/2020
Road Lighting,Grass Cutting,Litter collection,Maintenance Bridge
1.6.2.1 3/2/2020
and Culvert,Maintenance Drainage
1.6.2.2 Grass Cutting & Litter Collection 7/10/2020
1.6.2.3 Settlement Plate Report & Analysis 2/22/2021
1.7 CIVIL WORKS 7/30/2020
1.7.1 CH 0 - CH 1025 7/30/2020
1.7.1.1 GENERAL CLEARANCE 7/30/2020
1.7.1.2 DEMOLITION WORKS 9/1/2020
1.7.1.3 TEMPORARY ACCESS 9/23/2020
1.7.1.4 TEMPORARY CROSSING 10/19/2020
1.7.1.5 STRIPPING OF TOPSOIL 9/28/2020
1.7.1.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/19/2020
1.7.1.7 EXCAVATE TO SUITABLE MATERIAL 10/21/2020
1.7.1.8 EXCAVATE TO UNSUITABLE MATERIAL 2/18/2021
1.7.1.9 INSTRUMENTATION - SETTLEMENT PLATE 3/18/2021
1.7.1.10 PC CULVERT INSTALLATION 4/15/2021
1.7.1.11 FILLING WORKS & COMPACTION 3/25/2021
1.7.1.12 TESTING (FDT) 4/27/2021
1.7.1.13 SURFACE DRAIN 12/18/2020
1.7.1.14 LANDSCAPING 4/27/2021
1.7.1.15 RUBBLE RETAINING WALL 6/1/2021
1.7.1.16 NEW PAVEMENT 5/25/2021
1.7.1.17 JUNCTION 6/24/2021
1.7.1.18 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 7/30/2021
1.7.1.19 BRICK SUMP (TYPE SF1) 8/30/2021
1.7.1.20 WEARING COURSE LAYING - 50MM 9/21/2021
1.7.1.21 UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND 9/24/2021
COMPACTION WORK
1.7.1.22 TREATMENT WORK (EXISTING WORK) 10/1/2021
1.7.2 CH 1025 - CH 2075 11/11/2020
1.7.2.1 GENERAL CLEARANCE 11/11/2020
1.7.2.2 DEMOLITION WORKS 12/2/2020
1.7.2.3 TEMPORARY ACCESS 12/23/2020
1.7.2.4 TEMPORARY CROSSING 11/11/2020
1.7.2.5 STRIPPING OF TOPSOIL 12/29/2020
1.7.2.6 EXCAVATION OF TEMPORARY EARTH DRAIN 1/20/2021
1.7.2.7 EXCAVATE TO SUITABLE MATERIAL 1/26/2021
1.7.2.8 EXCAVATE TO UNSUITABLE MATERIAL 5/25/2021
1.7.2.9 EXCAVATION TO HARD MATERIAL (LEUCOGRANITE) 8/27/2021
1.7.2.10 EXCAVATION TO ROCK (LEUCOGRANITE) 9/28/2021
1.7.2.11 LAYING GEOTEXTILE LAYER 10/27/2021
1.7.2.12 SAND FILLING WORKS & COMPACTION 10/29/2021
1.7.2.13 SAND DRAINAGE BLANKET & ROCK FILL BUND 7/23/2021
1.7.2.14 PC CULVERT INSTALLATION 7/23/2021
1.7.2.15 IN-SITU RC BOX CULVERT 1/20/2021
1.7.2.16 FILLING WORKS & COMPACTION 8/5/2021
1.7.2.17 TESTING (FDT) 9/9/2021
1.7.2.18 DIVERSION CHANNEL 7/14/2021
1.7.2.19 SURFACE DRAIN 3/4/2021
1.7.2.20 LANDSCAPING 9/9/2021
1.7.2.21 NEW PAVEMENT 11/19/2021
1.7.2.22 JUNCTION 12/17/2021
1.7.2.23 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 1/24/2022
1.7.2.24 BRICK SUMP (TYPE SF1) 2/23/2022
1.7.2.25 WEARING COURSE LAYING - 50MM 3/15/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.2.26 3/18/2022
COMPACTION WORK
1.7.3 CH 2075 - CH 3025 3/5/2021
1.7.3.1 GENERAL CLEARANCE 3/5/2021
1.7.3.2 DEMOLITION WORKS 3/26/2021
1.7.3.3 TEMPORARY ACCESS 4/16/2021
1.7.3.4 TEMPORARY CROSSING 3/5/2021
1.7.3.5 STRIPPING OF TOPSOIL 4/21/2021
1.7.3.6 EXCAVATION OF TEMPORARY EARTH DRAIN 5/17/2021
1.7.3.7 EXCAVATE TO SUITABLE MATERIAL 5/19/2021
1.7.3.8 EXCAVATE FOR SAND REPLACEMENT 7/16/2021
1.7.3.9 EXCAVATE TO HARD MATERIAL 6/18/2021
1.7.3.10 EXCAVATE TO ROCK 7/16/2021
1.7.3.11 ROCK FACE PROTECTION 8/17/2021
1.7.3.12 BOULDER PROTECTION 9/15/2021
1.7.3.13 ROCK BOLT 9/15/2021
1.7.3.14 HORIZONTAL DRAIN 9/27/2021
1.7.3.15 EXCAVATE TO UNSUITABLE MATERIAL 12/17/2021
1.7.3.16 LAYING GEOTEXTILE LAYER 8/17/2021
1.7.3.17 SAND FILLING WORKS & COMPACTION 8/19/2021
1.7.3.18 IN-SITU RC BOX CULVERT 5/17/2021
1.7.3.19 FILLING WORKS & COMPACTION 1/31/2022
1.7.3.20 TESTING (FDT) 3/7/2022
1.7.3.21 DIVERSION CHANNEL 2/23/2022
1.7.3.22 SURFACE DRAIN 6/18/2021
1.7.3.23 LANDSCAPING 3/14/2022
1.7.3.24 NEW PAVEMENT 4/8/2022
1.7.3.25 JUNCTION 6/9/2022
1.7.3.26 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 6/16/2022
1.7.3.27 BRICK SUMP (TYPE SF1) 7/14/2022
1.7.3.28 WEARING COURSE LAYING - 50MM 8/8/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.3.29 8/15/2022
COMPACTION WORK
1.7.4 CH 3025 - CH 4156 6/30/2021
1.7.4.1 GENERAL CLEARANCE 6/30/2021
1.7.4.2 DEMOLITION WORKS 7/22/2021
1.7.4.3 TEMPORARY ACCESS 8/13/2021
1.7.4.4 TEMPORARY CROSSING 8/18/2021
1.7.4.5 STRIPPING OF TOPSOIL 8/18/2021
1.7.4.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/1/2021
1.7.4.7 EXCAVATE TO SUITABLE MATERIAL 10/5/2021
1.7.4.8 EXCAVATE FOR SAND REPLACEMENT 1/31/2022
1.7.4.9 EXCAVATE TO HARD MATERIAL 11/3/2021
1.7.4.10 EXCAVATE TO ROCK 12/3/2021
1.7.4.11 ROCK FACE PROTECTION 3/16/2022
1.7.4.12 BOULDER PROTECTION 4/13/2022
1.7.4.13 ROCK BOLT 4/13/2022
1.7.4.14 HORIZONTAL DRAIN 12/14/2021
1.7.4.15 EXCAVATE TO UNSUITABLE MATERIAL 3/30/2022
1.7.4.16 LAYING GEOTEXTILE LAYER 3/2/2022
1.7.4.17 SAND FILLING WORKS & COMPACTION 3/4/2022
1.7.4.18 SAND DRAINAGE BLANKET & ROCK FILL BUND 5/31/2022
1.7.4.19 PC CULVERT INSTALLATION 5/31/2022
1.7.4.20 IN-SITU RC BOX CULVERT 10/1/2021
1.7.4.21 FILLING WORKS & COMPACTION 12/17/2021
1.7.4.22 TESTING (FDT) 5/31/2022
1.7.4.23 DIVERSION CHANNEL 6/24/2022
1.7.4.24 SURFACE DRAIN 12/31/2021
1.7.4.25 LANDSCAPING 5/31/2022
1.7.4.26 NEW PAVEMENT 7/26/2022
1.7.4.27 JUNCTION 11/30/2022
1.7.4.28 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 9/29/2022
1.7.4.29 BRICK SUMP (TYPE SF1) 10/28/2022
1.7.4.30 WEARING COURSE LAYING - 50MM 2/9/2023
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.4.31 2/14/2023
COMPACTION WORK
1.8 ROAD FURNITURE 11/11/2021
1.8.1 TRAFFIC BARRIER 11/11/2021
1.8.1.1 GUARD RAIL INSTALLATION WORK 11/11/2021
1.8.1.2 PC NEW JERSEY BARRIER (NJB) 1/18/2023
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.9.1 STRUCTURE WORK - SUNGAI BENG: CH425 - CH525 2/18/2021
1.9.1.1 CAISSON PILING WORKS 2/18/2021
1.9.1.2 ABUTMENT 2/24/2021
1.9.1.3 PIER CASTING/ERECTION WORKS 7/6/2021
1.9.1.4 TWIN SPINE BEAM 10/12/2021
1.9.1.5 IN-SITU PARAPET 3/29/2022
1.9.1.6 MISCELLANEOUS/SUNDRIES WORKS 4/29/2022
1.9.2 STRUCTURE WORK - ALOR 1: CH2625 - CH2750 5/10/2021
1.9.2.1 CAISSON PILING WORKS 5/10/2021
1.9.2.2 ABUTMENT 5/12/2021
1.9.2.3 PIER CASTING/ERECTION WORKS 8/20/2021
1.9.2.4 TWIN SPINE BEAM 10/26/2021
1.9.2.5 BRIDGE BEARING INSTALLATION 1/31/2022
1.9.2.6 IN-SITU PARAPET 7/22/2022
1.9.2.7 MISCELLANEOUS/SUNDRIES WORKS 9/5/2022
1.9.3 STRUCTURE WORK - SUNGAI DURAU: CH2800 - CH2900 7/22/2021
1.9.3.1 CAISSON PILING WORKS 7/22/2021
1.9.3.2 ABUTMENT 7/26/2021
1.9.3.3 PIER CASTING/ERECTION WORKS 12/21/2021
1.9.3.4 TWIN SPINE BEAM 2/22/2022
1.9.3.5 BRIDGE BEARING INSTALLATION 5/9/2022
1.9.3.6 IN-SITU PARAPET 10/12/2022
1.9.3.7 MISCELLANEOUS/SUNDRIES WORKS 11/15/2022
1.9.4 STRUCTURE WORK - ALOR 2: CH3075 - CH3200 9/15/2021
1.9.4.1 CAISSON PILING WORKS 9/15/2021
1.9.4.2 ABUTMENT 9/20/2021
1.9.4.3 PIER CASTING/ERECTION WORKS 1/28/2022
1.9.4.4 TWIN SPINE BEAM 3/31/2022
1.9.4.5 BRIDGE BEARING INSTALLATION 7/22/2022
1.9.4.6 IN-SITU PARAPET 10/11/2022
1.9.4.7 MISCELLANEOUS/SUNDRIES WORKS 1/10/2023
1.1 PROVISIONAL SUM 11/24/2020
1.10.1 RELOCATION AND PROTECTION OF UTILITY SERVICES 4/23/2021
1.10.1.1 TNB UTILITY (CH 2400 - CH 3600) 4/23/2021
1.10.1.2 WATER UTILITY (CH 2400 - CH 3600) 5/27/2021
1.10.2 SOIL INVESTIGATION WORKS 11/24/2020
1.10.2.1 IN-SITU TESTING & REPORT 11/24/2020
1.10.3 SLOPE STABILIZATION AND GEOLOGICAL MAPPING 3/3/2023
1.10.4 G1 TEMPORARY RD FURNITURE 2/23/2023
1.10.5 G2 SIGNBOARD 3/6/2023
1.10.6 ROAD SAFETY AUDIT STAGE 4 3/9/2023
1.10.7 PRIME COST SUM 3/8/2023
1.10.7.1 ROAD LIGHT AND TRAFFIC LIGHT 3/8/2023
1.11 FINAL SITE INSPECTION 9/10/2021
1.11.1 PRELIMINARIES COMPLETION 9/10/2021
1.11.2 CUT & FILL 11/3/2022
1.11.3 GEOTECHNICAL WORKS FINAL INSPECTION 1/31/2023
1.11.4 DRAINAGE WORK FINAL INSPECTION 12/9/2022
1.11.5 ROADWORKS FINAL INSPECTION 3/17/2023
1.11.6 ROAD FURNITURE FINAL INSPECTION 3/10/2023
1.11.7 BRIDGE FINISHES 2/14/2023
1.11.8 PROVISIONAL SUM COMPLETION 3/9/2023
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
1/17/2020
3/20/2023
3/20/2023
11/17/2022
8/7/2020
9/4/2020
11/17/2022
4/1/2023
7/29/2020
3/17/2023
4/1/2023
3/20/2023
7/20/2020
2/17/2020
2/17/2020
7/20/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/10/2021
9/17/2020
8/19/2021
8/12/2021
8/26/2021
9/10/2021
3/20/2023
8/10/2020
8/10/2020
8/10/2020
8/10/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/21/2020
8/5/2020
8/12/2020
8/19/2020
9/21/2020
3/20/2023
3/6/2023
3/20/2023
9/20/2022
3/17/2023
8/2/2022
10/13/2020
11/4/2020
11/10/2020
10/21/2020
12/1/2020
11/4/2020
2/17/2021
5/17/2021
4/21/2021
5/11/2021
6/23/2021
7/7/2021
9/6/2021
7/22/2021
8/26/2021
11/18/2021
11/12/2021
10/27/2021
10/29/2021
8/2/2022
11/30/2021
10/27/2021
8/12/2022
2/5/2021
3/1/2021
3/4/2021
2/24/2021
3/25/2021
4/2/2021
5/24/2021
10/20/2021
9/27/2021
10/26/2021
11/30/2021
11/29/2021
11/18/2021
8/18/2021
11/25/2021
2/25/2022
2/11/2022
1/13/2022
4/8/2022
3/25/2022
6/22/2022
3/8/2022
6/2/2022
6/6/2022
8/5/2022
8/12/2022
12/2/2022
6/2/2021
6/24/2021
6/29/2021
5/4/2021
7/21/2021
7/27/2021
12/16/2021
8/16/2021
1/13/2022
2/15/2022
6/8/2022
7/13/2022
1/6/2022
1/27/2022
2/15/2022
9/20/2021
9/17/2021
2/22/2022
3/29/2022
4/22/2022
5/30/2022
8/4/2022
5/30/2022
8/30/2022
8/24/2022
8/10/2022
8/12/2022
11/25/2022
12/2/2022
3/17/2023
10/18/2021
11/11/2021
11/16/2021
10/27/2021
12/7/2021
12/13/2021
3/29/2022
3/1/2022
4/27/2022
5/30/2022
11/18/2022
1/3/2023
9/27/2022
8/12/2022
8/22/2022
4/1/2022
3/31/2022
7/22/2022
6/23/2022
5/31/2022
9/21/2022
10/14/2022
12/9/2022
12/2/2022
11/3/2022
2/20/2023
2/14/2023
1/31/2023
2/2/2023
2/23/2023
3/17/2023
3/10/2023
3/10/2023
3/10/2023
1/24/2023
2/14/2023
6/28/2022
9/13/2021
6/2/2021
11/18/2021
3/28/2022
6/28/2022
5/20/2022
10/19/2022
1/14/2022
7/19/2021
3/31/2022
7/21/2022
9/12/2022
10/19/2022
10/11/2022
1/9/2023
6/1/2022
1/4/2022
8/4/2022
10/11/2022
12/8/2022
1/9/2023
12/19/2022
2/14/2023
3/17/2022
3/2/2022
5/27/2022
10/7/2022
11/24/2022
1/9/2023
2/14/2023
3/9/2023
8/24/2021
7/26/2021
8/24/2021
6/2/2021
6/2/2021
3/3/2023
2/23/2023
3/6/2023
3/9/2023
3/8/2023
3/8/2023
3/17/2023
9/10/2021
11/3/2022
1/31/2023
12/9/2022
3/17/2023
3/10/2023
2/14/2023
3/9/2023
4/1/2023
WBS Task Name Start
MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA
1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.2.1 INITIAL 12/17/2019
1.2.1.1 A100 CONTRACTUAL REQUIREMENT 12/17/2019
1.2.1.1.1 PERFORMANCE BOND 12/17/2019
1.2.1.1.2 INSURANCE 12/27/2019
1.2.1.1.3 SOCSO 1/8/2020
1.2.1.1.4 CIDB LEVI 1/17/2020
1.2.1.2 A200 SO/PD'S REQUIREMENT 3/10/2020
1.2.1.2.1 S.O./PD SITE OFFICE 3/10/2020
1.2.1.2.2 LABORATORIES 7/10/2020
1.2.1.2.3 TRANSPORT SERVICE 7/10/2020
1.2.1.3 A500 CONTRACTOR'S REQUIREMENT 1/20/2020
1.2.1.3.1 SITE OFFICE 1/20/2020
1.2.1.3.2 SITE STORE 2/4/2020
1.2.1.3.3 WORKSHOP 2/11/2020
1.2.1.3.4 WORKERS ACCOMODATION 2/18/2020
1.2.1.3.5 CONTRACTORS'S SUPERINTENDANCE 2/4/2020
1.2.1.3.6 HOARDING 3/3/2020
1.2.1.3.7 PROJECT SIGNBOARD 1/20/2020
1.2.2 SURVEY WORK 3/3/2020
1.2.2.1 STAGE 1 3/3/2020
1.2.2.1.1 ROW SURVEY WORK 3/3/2020
1.2.2.1.2 OGL 3/12/2020
1.2.2.1.3 DRAWING PREPARATION 7/24/2020
1.2.2.1.4 SUBMISSION OGL DRAWING 8/7/2020
1.2.2.2 STAGE 2 7/24/2020
1.2.2.2.1 SETTING OUT 7/24/2020
1.2.2.3 STAGE 3 7/8/2021
1.2.2.3.1 AS-BUILT (FORMATION LEVEL) 7/8/2021
1.2.3 FINAL 3/10/2020
1.2.3.1 PLANT & MACHINERY MOBILIZATION 3/10/2020
1.2.3.2 PLANT & MACHINERY DEMOBILIZATION 3/17/2023
1.2.3.3 CLEARING AFTER COMPLETION 3/20/2023
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.3.1 INITIAL 2/4/2020
1.3.1.1 PREPARATION OF SAFETY PLAN,HIRARC 2/4/2020
1.3.1.2 SUBMISSION OF SAFETY PLAN 2/17/2020
1.3.1.3 TEAM PREPARATION 2/28/2020
1.3.2 RECURRING WORK 1/20/2020
1.3.2.1 SHO, PROTECTIVE EQUIPMENT 1/20/2020
1.3.2.2 SAFETY REPORT PREPARATION 7/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.4.1 NON PHYSICAL WORKS 7/10/2020
1.4.1.1 EMP. REQUIREMENT 7/10/2020
1.4.1.1.1 INITIAL 7/10/2020
1.4.2 PHYSICAL WORKS 8/18/2020
1.4.2.1 Washing Facilities 9/3/2020
1.4.2.1.1 Wash Trough 9/3/2020
1.4.2.2 SEDIMENT CONTROL 8/18/2020
1.4.2.2.1 SILT TRAP EXCAVATION & INSTALLATION 8/18/2020
1.4.2.2.2 SEDIMENT BASIN EXCAVATION & INSTALLATION 9/3/2020
1.4.2.3 SILT FENCE LAYING WORK 9/2/2020
1.4.2.3.1 CH 0 - CH 1025 9/2/2020
1.4.2.3.2 CH 1025 - CH 2075 11/25/2020
1.4.2.3.3 CH 2075 - CH 3025 3/19/2021
1.4.2.3.4 CH 3025 - CH 4157 7/14/2021
1.4.2.4 SAND BAG INSTALLATION WORK 9/17/2020
1.4.2.4.1 CH 0 - CH 1025 9/17/2020
1.4.2.4.2 CH 1025 - CH 2075 12/9/2020
1.4.2.4.3 CH 2075 - CH 3025 4/2/2021
1.4.2.4.4 CH 3025 - CH 4157 7/29/2021
1.4.2.5 SILT CURTAIN INSTALLATION WORKS 10/15/2020
1.4.2.5.1 CH 450 - CH 500 10/15/2020
1.4.2.5.2 CH 1150 - CH 1200 10/22/2020
1.4.2.5.3 CH 1750 - CH 1800 1/8/2021
1.4.2.5.4 CH 2175 - CH 2200 1/15/2021
1.4.2.5.5 CH 2675 - CH 2700 5/3/2021
1.4.2.5.6 CH 2850 - CH 2875 5/10/2021
1.4.2.5.7 CH 3125 - CH 3175 8/27/2021
1.4.2.5.8 CH 4025 - CH 4075 9/6/2021
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.5.1 INITIAL 7/27/2020
1.5.1.1 PREPARATION OF TMP 7/27/2020
1.5.1.2 PRESENTATION OF TMP 8/10/2020
1.5.1.3 SUBMISSION OF TMP 8/10/2020
1.5.2 RECURRING WORK 7/20/2020
1.5.2.1 Traffic Management Team Maintenance 7/20/2020
1.5.2.2 Traffic Report 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.6.1 INITIAL 7/29/2020
1.6.1.1 PREPARATION OF SCHEDULE MAINTENANCE 7/29/2020
1.6.1.2 PRESENTATION OF SCHEDULE 8/12/2020
1.6.1.3 SUBMISSION OF SCHEDULE 8/19/2020
1.6.1.4 TEAM PREPARATION 9/7/2020
1.6.2 RECURRING WORK 3/2/2020
Road Lighting,Grass Cutting,Litter collection,Maintenance Bridge
1.6.2.1 3/2/2020
and Culvert,Maintenance Drainage
1.6.2.2 Grass Cutting & Litter Collection 7/10/2020
1.6.2.3 Settlement Plate Report & Analysis 2/22/2021
1.7 CIVIL WORKS 7/30/2020
1.7.1 CH 0 - CH 1025 7/30/2020
1.7.1.1 GENERAL CLEARANCE 7/30/2020
1.7.1.1.1 CH 0 to CH 250 (EXISTING ROADWAY) 7/30/2020
1.7.1.1.2 CH 250 to CH 500 8/7/2020
1.7.1.1.3 CH 500 to CH 750 9/1/2020
1.7.1.1.4 CH 750 to CH 1025 9/23/2020
1.7.1.2 DEMOLITION WORKS 9/1/2020
1.7.1.2.1 CH 250 to CH 500 9/1/2020
1.7.1.2.2 CH 500 to CH 750 9/23/2020
1.7.1.2.3 CH 750 to CH 1025 10/14/2020
1.7.1.3 TEMPORARY ACCESS 9/23/2020
1.7.1.3.1 CH 250 to CH 500 9/23/2020
1.7.1.3.2 CH 500 to CH 750 10/14/2020
1.7.1.3.3 CH 750 to CH 1025 11/5/2020
1.7.1.4 TEMPORARY CROSSING 10/19/2020
1.7.1.4.1 C1 - CH 850 10/19/2020
1.7.1.5 STRIPPING OF TOPSOIL 9/28/2020
1.7.1.5.1 CH 250 to CH 500 9/28/2020
1.7.1.5.2 CH 500 to CH 750 10/19/2020
1.7.1.5.3 CH 750 to CH 1025 11/11/2020
1.7.1.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/19/2020
1.7.1.6.1 CH 225 - CH 300 10/19/2020
1.7.1.6.2 CH 300 - CH 375 10/21/2020
1.7.1.6.3 CH 400 - CH 440 10/23/2020
1.7.1.6.4 CH 510 - CH 675 10/27/2020
1.7.1.6.5 CH 700 - CH 825 10/30/2020
1.7.1.6.6 CH 850 - CH 1025 11/3/2020
1.7.1.7 EXCAVATE TO SUITABLE MATERIAL 10/21/2020
1.7.1.7.1 CH 225 - CH 300 10/21/2020
1.7.1.7.2 CH 300 - CH 375 11/20/2020
1.7.1.7.3 CH 700 - CH 825 12/18/2020
1.7.1.7.4 CH 825 - CH 1025 1/19/2021
1.7.1.8 EXCAVATE TO UNSUITABLE MATERIAL 2/18/2021
1.7.1.8.1 CH 400 - CH 440 2/18/2021
1.7.1.8.2 CH 510 - CH 675 3/18/2021
1.7.1.8.3 CH 825 - CH 875 4/15/2021
1.7.1.9 INSTRUMENTATION - SETTLEMENT PLATE 3/18/2021
1.7.1.9.1 CH 400 - CH 450 3/18/2021
1.7.1.9.2 CH 515 - CH 675 4/15/2021
1.7.1.10 PC CULVERT INSTALLATION 4/15/2021
1.7.1.10.1 EXCAVATION WORK 4/15/2021
1.7.1.10.2 LAYING OF GEOTEXTILE WORK 4/22/2021
1.7.1.10.3 FOUNDATION (TYPE B) 4/23/2021
1.7.1.10.4 PC CULVERT LAYING 5/3/2021
1.7.1.11 FILLING WORKS & COMPACTION 3/25/2021
1.7.1.11.1 CH 400 - CH 440 3/25/2021
1.7.1.11.2 CH 510 - CH 675 4/22/2021
1.7.1.11.3 CH 825 - CH 875 5/25/2021
1.7.1.12 TESTING (FDT) 4/27/2021
1.7.1.12.1 CH 250 to CH 500 4/27/2021
1.7.1.12.2 CH 500 to CH 750 5/31/2021
1.7.1.12.3 CH 750 to CH 1025 6/29/2021
1.7.1.13 SURFACE DRAIN 12/18/2020
1.7.1.13.1 INTERCEPTOR DRAIN (TYPE 2) 12/18/2020
1.7.1.13.2 STONE PITCHED SUMP (TYPE SC1) 1/5/2021
1.7.1.13.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/5/2021
1.7.1.13.4 STONE PITCH SUMP (TYPE SC2) 1/19/2021
1.7.1.13.5 BRICK SUMP (TYPE SF2) 1/21/2021
1.7.1.13.6 EMBANKMENT TOE DRAINS (TYPE 1) 1/19/2021
1.7.1.13.7 BRICK SUMP (TYPE SF3) 2/3/2021
1.7.1.13.8 ROADSIDE DRAIN (TYPE RSD 1) 3/4/2021
1.7.1.13.9 STONE PITCH SUMP (TYPE SC3) 3/18/2021
1.7.1.13.10 CASCADE DRAIN 5/7/2021
1.7.1.14 LANDSCAPING 4/27/2021
1.7.1.14.1 GROUND SURFACE PREPARATION 4/27/2021
1.7.1.14.2 CLOSE TURFING 5/7/2021
1.7.1.15 RUBBLE RETAINING WALL 6/1/2021
1.7.1.15.1 EXCAVATION & SURFACE PREPARATION 6/1/2021
1.7.1.15.2 RUBBLE PITCHING ERECTION 6/30/2021
1.7.1.16 NEW PAVEMENT 5/25/2021
1.7.1.16.1 SUBGRADE PREPARATION - 300MM 5/25/2021
1.7.1.16.2 SUB-BASE - 100MM 7/1/2021
1.7.1.16.3 ROADBASE - 300MM 8/6/2021
1.7.1.16.4 PRIME COATING WORK 9/14/2021
1.7.1.16.5 TACK COATING WORK 9/17/2021
1.7.1.17 JUNCTION 6/24/2021
1.7.1.17.1 STRIPPING TOP SOIL 6/24/2021
1.7.1.17.2 CUT AND FILL WORK 7/1/2021
1.7.1.17.3 CUT AND DISPOSE WORK 7/15/2021
1.7.1.17.4 TESTING (FDT) 7/30/2021
1.7.1.17.5 LANDSCAPING 8/4/2021
1.7.1.17.6 SUBGRADE PREPARATION - 300MM 8/19/2021
1.7.1.17.7 SUB-BASE - 100MM 8/26/2021
1.7.1.17.8 ROADBASE - 300MM 9/3/2021
1.7.1.17.9 PRIME COATING WORK 9/10/2021
1.7.1.17.10 TACK COATING WORK 9/13/2021
1.7.1.18 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 7/30/2021
1.7.1.18.1 CH 250 to CH 500 7/30/2021
1.7.1.18.2 CH 500 to CH 1025 9/29/2021
1.7.1.19 BRICK SUMP (TYPE SF1) 8/30/2021
1.7.1.19.1 CH 250 to CH 500 8/30/2021
1.7.1.19.2 CH 500 to CH 1025 10/28/2021
1.7.1.20 WEARING COURSE LAYING - 50MM 9/21/2021
1.7.1.20.1 CH 250 to CH 500 9/21/2021
1.7.1.20.2 CH 425 to CH 525 (BRIDGE) 7/29/2022
1.7.1.20.3 CH 500 to CH 1025 11/19/2021
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.1.21 9/24/2021
COMPACTION WORK
1.7.1.21.1 CH 250 to CH 500 9/24/2021
1.7.1.21.2 CH 500 to CH 1025 11/24/2021
1.7.1.22 TREATMENT WORK (EXISTING WORK) 10/1/2021
1.7.1.22.1 ROAD SURFACE PREPARATION 10/1/2021
1.7.1.22.2 LAYING TACK COAT 10/25/2021
1.7.1.22.3 LAYING WEARING COURSE 10/26/2021
1.7.2 CH 1025 - CH 2075 11/11/2020
1.7.2.1 GENERAL CLEARANCE 11/11/2020
1.7.2.1.1 CH 1025 to CH 1250 11/11/2020
1.7.2.1.2 CH 1250 to CH 1500 12/2/2020
1.7.2.1.3 CH 1500 to CH 1750 12/23/2020
1.7.2.1.4 CH 1750 to CH 2075 1/15/2021
1.7.2.2 DEMOLITION WORKS 12/2/2020
1.7.2.2.1 CH 1025 to CH 1250 12/2/2020
1.7.2.2.2 CH 1250 to CH 1500 12/23/2020
1.7.2.2.3 CH 1500 to CH 1750 1/15/2021
1.7.2.2.4 CH 1750 to CH 2075 2/8/2021
1.7.2.3 TEMPORARY ACCESS 12/23/2020
1.7.2.3.1 CH 1025 to CH 1250 12/23/2020
1.7.2.3.2 CH 1250 to CH 1500 1/15/2021
1.7.2.3.3 CH 1500 to CH 1750 2/8/2021
1.7.2.3.4 CH 1750 to CH 2075 3/2/2021
1.7.2.4 TEMPORARY CROSSING 11/11/2020
1.7.2.4.1 C2 - CH 1135 11/11/2020
1.7.2.4.2 C3 - CH 1225 12/29/2020
1.7.2.4.3 C4 - CH 1475 1/4/2021
1.7.2.4.4 C5 - CH 1535 1/20/2021
1.7.2.4.5 C6 - CH 1615 1/25/2021
1.7.2.4.6 C7 - CH 1758 2/11/2021
1.7.2.4.7 C8 - CH 1925 2/17/2021
1.7.2.4.8 C9 - CH 2040 2/22/2021
1.7.2.5 STRIPPING OF TOPSOIL 12/29/2020
1.7.2.5.1 CH 1025 to CH 1250 12/29/2020
1.7.2.5.2 CH 1250 to CH 1500 1/20/2021
1.7.2.5.3 CH 1500 to CH 1750 2/11/2021
1.7.2.5.4 CH 1750 to CH 2075 3/5/2021
1.7.2.6 EXCAVATION OF TEMPORARY EARTH DRAIN 1/20/2021
1.7.2.6.1 CH 1025 - CH 1350 1/20/2021
1.7.2.6.2 CH 1375 - CH 1475 1/22/2021
1.7.2.6.3 CH 1555 - CH 1600 2/11/2021
1.7.2.6.4 CH 1650 - CH 1725 3/5/2021
1.7.2.6.5 CH 1750 - CH 1810 3/26/2021
1.7.2.6.6 CH 1825 - CH 1900 3/30/2021
1.7.2.6.7 CH 1900 - CH 2075 4/1/2021
1.7.2.7 EXCAVATE TO SUITABLE MATERIAL 1/26/2021
1.7.2.7.1 CH 1375 - CH 1475 1/26/2021
1.7.2.7.2 CH 1555 - CH 1600 2/25/2021
1.7.2.7.3 CH 1650 - CH 1725 3/25/2021
1.7.2.7.4 CH 1825 - CH 1900 4/22/2021
1.7.2.8 EXCAVATE TO UNSUITABLE MATERIAL 5/25/2021
1.7.2.8.1 CH 1025 - CH 1350 5/25/2021
1.7.2.8.2 CH 1475 - CH 1525 6/24/2021
1.7.2.8.3 CH 1600 - CH 1650 7/23/2021
1.7.2.8.4 CH 1750 - CH 1810 8/23/2021
1.7.2.8.5 CH 1900 - CH 2075 9/22/2021
1.7.2.9 EXCAVATION TO HARD MATERIAL (LEUCOGRANITE) 8/27/2021
1.7.2.9.1 CH 1650 - CH 1725 8/27/2021
1.7.2.10 EXCAVATION TO ROCK (LEUCOGRANITE) 9/28/2021
1.7.2.10.1 CH 1650 - CH 1725 9/28/2021
1.7.2.11 LAYING GEOTEXTILE LAYER 10/27/2021
1.7.2.11.1 CH 1650 - CH 1725 BOTTOM 10/27/2021
1.7.2.11.2 CH 1650 - CH 1725 TOP 11/30/2021
1.7.2.12 SAND FILLING WORKS & COMPACTION 10/29/2021
1.7.2.12.1 CH 1650 - CH 1725 10/29/2021
1.7.2.13 SAND DRAINAGE BLANKET & ROCK FILL BUND 7/23/2021
1.7.2.13.1 SAND DRAINAGE BLANKET 7/23/2021
1.7.2.13.2 ROCK FILL BUND 8/11/2021
1.7.2.14 PC CULVERT INSTALLATION 7/23/2021
1.7.2.14.1 EXCAVATION WORK 7/23/2021
1.7.2.14.2 LAYING OF GEOTEXTILE WORK 7/30/2021
1.7.2.14.3 FOUNDATION (TYPE B) 8/2/2021
1.7.2.14.4 PC CULVERT LAYING 8/9/2021
1.7.2.15 IN-SITU RC BOX CULVERT 1/20/2021
1.7.2.15.1 EXCAVATION WORK 1/20/2021
1.7.2.15.2 LAYING OF GEOTEXTILE WORK 1/27/2021
1.7.2.15.3 FOUNDATION (TYPE B) 2/1/2021
1.7.2.15.4 LEAN-CON 2/8/2021
1.7.2.15.5 BASE SLAB 2/10/2021
1.7.2.15.6 SIDEWALL, WINGWALL 4/9/2021
1.7.2.15.7 TOP COVER 6/14/2021
1.7.2.15.8 SUBSURFACE INSTALLATION & FILLINGS 6/14/2021
1.7.2.15.9 BACKFILLING WORKS 7/7/2021
1.7.2.16 FILLING WORKS & COMPACTION 8/5/2021
1.7.2.16.1 CH 1025 - CH 1350 8/5/2021
1.7.2.16.2 CH 1475 - CH 1525 9/21/2021
1.7.2.16.3 CH 1600 - CH 1650 10/20/2021
1.7.2.16.4 CH 1650 - CH 1725 12/1/2021
1.7.2.16.5 CH 1750 - CH 1810 12/29/2021
1.7.2.16.6 CH 1900 - CH 2075 1/27/2022
1.7.2.17 TESTING (FDT) 9/9/2021
1.7.2.17.1 CH 1025 to CH 1250 9/9/2021
1.7.2.17.2 CH 1250 to CH 1500 10/25/2021
1.7.2.17.3 CH 1500 to CH 1750 11/24/2021
1.7.2.17.4 CH 1750 to CH 2075 2/3/2022
1.7.2.18 DIVERSION CHANNEL 7/14/2021
1.7.2.18.1 EARTH CHANNEL EXCAVATION 7/14/2021
1.7.2.18.2 GABION WALL ERECTION WORKS 8/13/2021
1.7.2.18.3 GEOTEXTILE LAYING 9/13/2021
1.7.2.18.4 BACKFILLING WORKS 9/14/2021
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.2.18.5 9/17/2021
WEEPHOLE
1.7.2.18.6 SLOPE PROTECTION STONE PITCHING 8/13/2021
1.7.2.18.7 SLOPE PROTECTION GABION CAGE 9/13/2021
1.7.2.18.8 SLOPE PROTECTION GEOTEXTILE LAYING 10/12/2021
1.7.2.18.9 SLOPE BACKFILLING 10/15/2021
1.7.2.19 SURFACE DRAIN 3/4/2021
1.7.2.19.1 INTERCEPTOR DRAIN (TYPE 2) 3/4/2021
1.7.2.19.2 STONE PITCHED SUMP (TYPE SC1) 3/18/2021
1.7.2.19.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 3/4/2021
1.7.2.19.4 STONE PITCHED SUMP (TYPE SC2) 3/18/2021
1.7.2.19.5 BRICK SUMP (TYPE SF2) 3/22/2021
1.7.2.19.6 EMBANKMENT TOE DRAINS (TYPE 1) 9/6/2021
1.7.2.19.7 BRICK SUMP (TYPE SF3) 9/21/2021
1.7.2.19.8 ROADSIDE DRAIN (TYPE RSD 1) 4/1/2021
1.7.2.19.9 STONE PITCH SUMP (TYPE SC3) 4/15/2021
1.7.2.19.10 CASCADE DRAIN 9/21/2021
1.7.2.20 LANDSCAPING 9/9/2021
1.7.2.20.1 GROUND SURFACE PREPARATION 9/9/2021
1.7.2.20.2 CLOSE TURFING 9/21/2021
1.7.2.21 NEW PAVEMENT 11/19/2021
1.7.2.21.1 SUBGRADE PREPARATION - 300MM 11/19/2021
1.7.2.21.2 SUB-BASE - 100MM 12/24/2021
1.7.2.21.3 ROADBASE - 300MM 1/31/2022
1.7.2.21.4 PRIME COATING WORK 3/9/2022
1.7.2.21.5 TACK COATING WORK 3/11/2022
1.7.2.22 JUNCTION 12/17/2021
1.7.2.22.1 STRIPPING TOP SOIL 12/17/2021
1.7.2.22.2 CUT AND FILL WORK 12/24/2021
1.7.2.22.3 CUT AND DISPOSE WORK 1/7/2022
1.7.2.22.4 TESTING (FDT) 1/24/2022
1.7.2.22.5 LANDSCAPING 1/27/2022
1.7.2.22.6 SUBGRADE PREPARATION - 300MM 2/14/2022
1.7.2.22.7 SUB-BASE - 100MM 2/21/2022
1.7.2.22.8 ROADBASE - 300MM 2/28/2022
1.7.2.22.9 PRIME COATING WORK 3/7/2022
1.7.2.22.10 TACK COATING WORK 3/8/2022
1.7.2.23 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 1/24/2022
1.7.2.23.1 CH 1025 to CH 1500 1/24/2022
1.7.2.23.2 CH 1500 to CH 2075 5/5/2022
1.7.2.24 BRICK SUMP (TYPE SF1) 2/23/2022
1.7.2.24.1 CH 1025 to CH 1500 2/23/2022
1.7.2.24.2 CH 1500 to CH 2075 6/3/2022
1.7.2.25 WEARING COURSE LAYING - 50MM 3/15/2022
1.7.2.25.1 CH 1025 to CH 1500 3/15/2022
1.7.2.25.2 CH 1500 to CH 2075 8/3/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.2.26 3/18/2022
COMPACTION WORK
1.7.2.26.1 CH 1025 to CH 1500 3/18/2022
1.7.2.26.2 CH 1500 to CH 2075 8/8/2022
1.7.3 CH 2075 - CH 3025 3/5/2021
1.7.3.1 GENERAL CLEARANCE 3/5/2021
1.7.3.1.1 CH 2075 to CH 2250 3/5/2021
1.7.3.1.2 CH 2250 to CH 2500 3/26/2021
1.7.3.1.3 CH 2500 to CH 2750 4/16/2021
1.7.3.1.4 CH 2750 to CH 3025 5/10/2021
1.7.3.2 DEMOLITION WORKS 3/26/2021
1.7.3.2.1 CH 2075 to CH 2250 3/26/2021
1.7.3.2.2 CH 2250 to CH 2500 4/16/2021
1.7.3.2.3 CH 2500 to CH 2750 5/10/2021
1.7.3.2.4 CH 2750 to CH 3025 6/3/2021
1.7.3.3 TEMPORARY ACCESS 4/16/2021
1.7.3.3.1 CH 2075 to CH 2250 4/16/2021
1.7.3.3.2 CH 2250 to CH 2500 5/10/2021
1.7.3.3.3 CH 2500 to CH 2750 6/3/2021
1.7.3.3.4 CH 2750 to CH 3025 6/25/2021
1.7.3.4 TEMPORARY CROSSING 3/5/2021
1.7.3.4.1 C10 - CH 2160 3/5/2021
1.7.3.4.2 C11 - CH 2250 4/21/2021
1.7.3.4.3 C12 - CH 2285 4/26/2021
1.7.3.4.4 C13 - CH 2430 4/30/2021
1.7.3.5 STRIPPING OF TOPSOIL 4/21/2021
1.7.3.5.1 CH 2075 to CH 2250 4/21/2021
1.7.3.5.2 CH 2250 to CH 2500 5/17/2021
1.7.3.5.3 CH 2500 to CH 2750 6/9/2021
1.7.3.5.4 CH 2750 to CH 3025 6/30/2021
1.7.3.6 EXCAVATION OF TEMPORARY EARTH DRAIN 5/17/2021
1.7.3.6.1 CH 2075 to CH 2150 5/17/2021
1.7.3.6.2 CH 2150 to CH 2350 6/9/2021
1.7.3.6.3 CH 2350 to CH 2425 6/11/2021
1.7.3.6.4 CH 2550 to CH 2640 6/30/2021
1.7.3.6.5 CH 2745 to CH 2790 7/22/2021
1.7.3.6.6 CH 2910 to CH 3025 7/26/2021
1.7.3.7 EXCAVATE TO SUITABLE MATERIAL 5/19/2021
1.7.3.7.1 CH 2075 to CH 2150 5/19/2021
1.7.3.7.2 CH 2330 to CH 2425 6/18/2021
1.7.3.7.3 CH 2550 to CH 2640 8/17/2021
1.7.3.7.4 CH 2745 to CH 2790 10/20/2021
1.7.3.7.5 CH 2910 to CH 3025 11/19/2021
1.7.3.8 EXCAVATE FOR SAND REPLACEMENT 7/16/2021
1.7.3.8.1 CH 2425 - CH 2525 (2.0M) 7/16/2021
1.7.3.9 EXCAVATE TO HARD MATERIAL 6/18/2021
1.7.3.9.1 CH 2075 to CH 2150 6/18/2021
1.7.3.9.2 CH 2910 to CH 3025 12/17/2021
1.7.3.10 EXCAVATE TO ROCK 7/16/2021
1.7.3.10.1 CH 2075 to CH 2150 7/16/2021
1.7.3.10.2 CH 2910 to CH 3025 1/14/2022
1.7.3.11 ROCK FACE PROTECTION 8/17/2021
1.7.3.11.1 PLANT MOBILIZATION & WORK PLATFORM 8/17/2021
1.7.3.11.2 DRILLING AND INSTALL ANCHORING 9/15/2021
1.7.3.11.3 INSTALLATION STEEL NETTING 11/25/2021
1.7.3.12 BOULDER PROTECTION 9/15/2021
1.7.3.12.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 9/20/2021
1.7.3.12.3 DRILL AND INSTALL DOWEL BAR 10/18/2021
1.7.3.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 12/16/2021
1.7.3.12.5 CONCRETE WORK 12/30/2021
1.7.3.12.6 FINISH WORK 1/12/2022
1.7.3.13 ROCK BOLT 9/15/2021
1.7.3.13.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.13.2 DRILLING WORK AND INSTALLATION WORKS 9/27/2021
1.7.3.13.3 GUNITING WORK 10/15/2021
1.7.3.13.4 PULL OUT TEST 12/15/2021
1.7.3.14 HORIZONTAL DRAIN 9/27/2021
1.7.3.14.1 MARKING OF DRAIN POINT 9/27/2021
1.7.3.14.2 INSTALLATION OF PIPE DRAIN 9/29/2021
1.7.3.15 EXCAVATE TO UNSUITABLE MATERIAL 12/17/2021
1.7.3.15.1 CH 2150 - CH 2350 12/17/2021
1.7.3.15.2 CH 2425 - CH 2550 1/14/2022
1.7.3.16 LAYING GEOTEXTILE LAYER 8/17/2021
1.7.3.16.1 CH 2425 - CH 2525 (2.0M) BOTTOM 8/17/2021
1.7.3.16.2 CH 2425 - CH 2525 (2.0M) TOP 9/20/2021
1.7.3.17 SAND FILLING WORKS & COMPACTION 8/19/2021
1.7.3.17.1 CH 2425 - CH 2525 (2.0M) 8/19/2021
1.7.3.18 IN-SITU RC BOX CULVERT 5/17/2021
1.7.3.18.1 EXCAVATION WORK 5/17/2021
1.7.3.18.2 LAYING OF GEOTEXTILE WORK 5/24/2021
1.7.3.18.3 FOUNDATION (TYPE B) 5/27/2021
1.7.3.18.4 LEAN-CON 6/3/2021
1.7.3.18.5 BASE SLAB 6/8/2021
1.7.3.18.6 SIDEWALL, WINGWALL 9/15/2021
1.7.3.18.7 TOP COVER 11/17/2021
1.7.3.18.8 SUBSURFACE INSTALLATION & FILLINGS 11/17/2021
1.7.3.18.9 BACKFILLING WORKS 12/10/2021
1.7.3.19 FILLING WORKS & COMPACTION 1/31/2022
1.7.3.19.1 CH 2150 - CH 2350 1/31/2022
1.7.3.19.2 CH 2425 - CH 2550 3/2/2022
1.7.3.20 TESTING (FDT) 3/7/2022
1.7.3.20.1 CH 2075 to CH 2250 3/7/2022
1.7.3.20.2 CH 2250 to CH 2500 3/16/2022
1.7.3.20.3 CH 2500 to CH 2750 4/4/2022
1.7.3.20.4 CH 2750 to CH 3025 4/13/2022
1.7.3.21 DIVERSION CHANNEL 2/23/2022
1.7.3.21.1 EARTH CHANNEL EXCAVATION 2/23/2022
1.7.3.21.2 GABION WALL ERECTION WORKS 3/23/2022
1.7.3.21.3 GEOTEXTILE LAYING 4/21/2022
1.7.3.21.4 BACKFILLING WORKS 4/22/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.3.21.5 4/26/2022
WEEPHOLE
1.7.3.21.6 SLOPE PROTECTION STONE PITCHING 3/23/2022
1.7.3.21.7 SLOPE PROTECTION GABION CAGE 4/21/2022
1.7.3.21.8 SLOPE PROTECTION GEOTEXTILE LAYING 5/24/2022
1.7.3.21.9 SLOPE BACKFILLING 5/27/2022
1.7.3.22 SURFACE DRAIN 6/18/2021
1.7.3.22.1 INTERCEPTOR DRAIN (TYPE 2) 6/18/2021
1.7.3.22.2 STONE PITCHED SUMP (TYPE SC1) 7/2/2021
1.7.3.22.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 7/2/2021
1.7.3.22.4 STONE PITCHED SUMP (TYPE SC2) 7/16/2021
1.7.3.22.5 BRICK SUMP (TYPE SF2) 7/21/2021
1.7.3.22.6 EMBANKMENT TOE DRAINS (TYPE 1) 3/14/2022
1.7.3.22.7 BRICK SUMP (TYPE SF3) 3/28/2022
1.7.3.22.8 ROADSIDE DRAIN (TYPE RSD 1) 9/1/2021
1.7.3.22.9 STONE PITCH SUMP (TYPE SC3) 9/15/2021
1.7.3.22.10 CASCADE DRAIN 4/11/2022
1.7.3.23 LANDSCAPING 3/14/2022
1.7.3.23.1 GROUND SURFACE PREPARATION 3/14/2022
1.7.3.23.2 CLOSE TURFING 3/28/2022
1.7.3.24 NEW PAVEMENT 4/8/2022
1.7.3.24.1 SUBGRADE PREPARATION - 300MM 4/8/2022
1.7.3.24.2 SUB-BASE - 100MM 5/19/2022
1.7.3.24.3 ROADBASE - 300MM 6/23/2022
1.7.3.24.4 PRIME COATING WORK 7/28/2022
1.7.3.24.5 TACK COATING WORK 8/1/2022
1.7.3.25 JUNCTION 6/9/2022
1.7.3.25.1 STRIPPING TOP SOIL 6/9/2022
1.7.3.25.2 CUT AND FILL WORK 6/16/2022
1.7.3.25.3 CUT AND DISPOSE WORK 6/30/2022
1.7.3.25.4 TESTING (FDT) 7/14/2022
1.7.3.25.5 LANDSCAPING 7/19/2022
1.7.3.25.6 SUBGRADE PREPARATION - 300MM 8/2/2022
1.7.3.25.7 SUB-BASE - 100MM 8/9/2022
1.7.3.25.8 ROADBASE - 300MM 8/16/2022
1.7.3.25.9 PRIME COATING WORK 8/23/2022
1.7.3.25.10 TACK COATING WORK 8/24/2022
1.7.3.26 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 6/16/2022
1.7.3.26.1 CH 2075 to CH 2500 6/16/2022
1.7.3.26.2 CH 2500 to CH 3025 7/14/2022
1.7.3.27 BRICK SUMP (TYPE SF1) 7/14/2022
1.7.3.27.1 CH 2075 to CH 2500 7/14/2022
1.7.3.27.2 CH 2500 to CH 3025 8/11/2022
1.7.3.28 WEARING COURSE LAYING - 50MM 8/8/2022
1.7.3.28.1 CH 2075 to CH 2500 8/8/2022
1.7.3.28.2 CH 2500 to CH 3025 11/23/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.3.29 8/15/2022
COMPACTION WORK
1.7.3.29.1 CH 2075 to CH 2500 8/15/2022
1.7.3.29.2 CH 2500 to CH 3025 11/28/2022
1.7.4 CH 3025 - CH 4156 6/30/2021
1.7.4.1 GENERAL CLEARANCE 6/30/2021
1.7.4.1.1 CH 3025 to CH 3250 6/30/2021
1.7.4.1.2 CH 3250 to CH 3500 7/22/2021
1.7.4.1.3 CH 3500 to CH 3750 8/13/2021
1.7.4.1.4 CH 3750 to CH 4000 9/6/2021
1.7.4.1.5 CH 4000 to CH 4156.876 9/28/2021
1.7.4.2 DEMOLITION WORKS 7/22/2021
1.7.4.2.1 CH 3025 to CH 3250 7/22/2021
1.7.4.2.2 CH 3250 to CH 3500 8/13/2021
1.7.4.2.3 CH 3500 to CH 3750 9/6/2021
1.7.4.2.4 CH 3750 to CH 4000 9/28/2021
1.7.4.2.5 CH 4000 to CH 4156.876 10/20/2021
1.7.4.3 TEMPORARY ACCESS 8/13/2021
1.7.4.3.1 CH 3025 to CH 3250 8/13/2021
1.7.4.3.2 CH 3250 to CH 3500 9/6/2021
1.7.4.3.3 CH 3500 to CH 3750 9/28/2021
1.7.4.3.4 CH 3750 to CH 4000 10/20/2021
1.7.4.3.5 CH 4000 to CH 4156.876 11/12/2021
1.7.4.4 TEMPORARY CROSSING 8/18/2021
1.7.4.4.1 C14 - CH 3410 8/18/2021
1.7.4.4.2 C15 - CH 3575 9/9/2021
1.7.4.4.3 C16 - CH 3735 9/14/2021
1.7.4.4.4 C17 - CH 3950 10/1/2021
1.7.4.4.5 C18 - CH 4025 10/25/2021
1.7.4.5 STRIPPING OF TOPSOIL 8/18/2021
1.7.4.5.1 CH 3025 to CH 3250 8/18/2021
1.7.4.5.2 CH 3250 to CH 3500 9/9/2021
1.7.4.5.3 CH 3500 to CH 3750 10/1/2021
1.7.4.5.4 CH 3750 to CH 4000 10/25/2021
1.7.4.5.5 CH 4000 to CH 4156.876 11/17/2021
1.7.4.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/1/2021
1.7.4.6.1 CH 3200 to CH 3375 10/1/2021
1.7.4.6.2 CH 3375 to CH 3450 10/5/2021
1.7.4.6.3 CH 3450 to CH 3550 10/7/2021
1.7.4.6.4 CH 3550 to CH 3775 10/25/2021
1.7.4.6.5 CH 3775 to CH 3925 11/17/2021
1.7.4.6.6 CH 3925 to CH 4075 12/8/2021
1.7.4.6.7 CH 4075 to CH 4156.876 12/10/2021
1.7.4.7 EXCAVATE TO SUITABLE MATERIAL 10/5/2021
1.7.4.7.1 CH 3200 to CH 3375 10/5/2021
1.7.4.7.2 CH 3450 to CH 3550 11/3/2021
1.7.4.7.3 CH 3650 to CH 3750 12/3/2021
1.7.4.7.4 CH 3775 to CH 3925 12/31/2021
1.7.4.7.5 CH 4075 to CH 4156.876 3/2/2022
1.7.4.8 EXCAVATE FOR SAND REPLACEMENT 1/31/2022
1.7.4.8.1 CH 3975 - CH 4075 (1.5M) 1/31/2022
1.7.4.9 EXCAVATE TO HARD MATERIAL 11/3/2021
1.7.4.9.1 CH 3200 to CH 3375 11/3/2021
1.7.4.9.2 CH 3825 to CH 3875 1/31/2022
1.7.4.9.3 CH 4075 to CH 4156.876 3/30/2022
1.7.4.10 EXCAVATE TO ROCK 12/3/2021
1.7.4.10.1 CH 3200 to CH 3375 12/3/2021
1.7.4.10.2 CH 3825 to CH 3875 3/2/2022
1.7.4.10.3 CH 4075 to CH 4156.876 4/28/2022
1.7.4.11 ROCK FACE PROTECTION 3/16/2022
1.7.4.11.1 PLANT MOBILIZATION & WORK PLATFORM 3/16/2022
1.7.4.11.2 DRILLING AND INSTALL ANCHORING 5/17/2022
1.7.4.11.3 INSTALLATION STEEL NETTING 7/12/2022
1.7.4.12 BOULDER PROTECTION 4/13/2022
1.7.4.12.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 4/15/2022
1.7.4.12.3 DRILL AND INSTALL DOWEL BAR 6/16/2022
1.7.4.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 8/11/2022
1.7.4.12.5 CONCRETE WORK 8/25/2022
1.7.4.12.6 FINISH WORK 9/8/2022
1.7.4.13 ROCK BOLT 4/13/2022
1.7.4.13.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.13.2 DRILLING WORK AND INSTALLATION WORKS 4/25/2022
1.7.4.13.3 GUNITING WORK 5/18/2022
1.7.4.13.4 PULL OUT TEST 7/13/2022
1.7.4.14 HORIZONTAL DRAIN 12/14/2021
1.7.4.14.1 MARKING OF DRAIN POINT 12/14/2021
1.7.4.14.2 INSTALLATION OF PIPE DRAIN 12/16/2021
1.7.4.15 EXCAVATE TO UNSUITABLE MATERIAL 3/30/2022
1.7.4.15.1 CH 3300 - CH 3350 3/30/2022
1.7.4.15.2 CH 3375 - CH 3475 4/28/2022
1.7.4.15.3 CH 3525 - CH 3650 5/31/2022
1.7.4.15.4 CH 3700 - CH 3825 6/28/2022
1.7.4.15.5 CH 3875 - CH 4075 7/26/2022
1.7.4.16 LAYING GEOTEXTILE LAYER 3/2/2022
1.7.4.16.1 CH 3975 - CH 4075 (1.5M) BOTTOM 3/2/2022
1.7.4.16.2 CH 3975 - CH 4075 (1.5M) TOP 4/1/2022
1.7.4.17 SAND FILLING WORKS & COMPACTION 3/4/2022
1.7.4.17.1 CH 3975 - CH 4075 (1.5M) 3/4/2022
1.7.4.18 SAND DRAINAGE BLANKET & ROCK FILL BUND 5/31/2022
1.7.4.18.1 SAND DRAINAGE BLANKET 5/31/2022
1.7.4.18.2 ROCK FILL BUND 6/16/2022
1.7.4.19 PC CULVERT INSTALLATION 5/31/2022
1.7.4.19.1 EXCAVATION WORK 5/31/2022
1.7.4.19.2 LAYING OF GEOTEXTILE WORK 6/7/2022
1.7.4.19.3 FOUNDATION (TYPE B) 6/8/2022
1.7.4.19.4 PC CULVERT LAYING 6/15/2022
1.7.4.20 IN-SITU RC BOX CULVERT 10/1/2021
1.7.4.20.1 EXCAVATION WORK 10/1/2021
1.7.4.20.2 LAYING OF GEOTEXTILE WORK 10/8/2021
1.7.4.20.3 FOUNDATION (TYPE B) 10/12/2021
1.7.4.20.4 LEAN-CON 10/20/2021
1.7.4.20.5 BASE SLAB 10/22/2021
1.7.4.20.6 SIDEWALL, WINGWALL 12/22/2021
1.7.4.20.7 TOP COVER 2/22/2022
1.7.4.20.8 SUBSURFACE INSTALLATION & FILLINGS 2/22/2022
1.7.4.20.9 BACKFILLING WORKS 3/17/2022
1.7.4.21 FILLING WORKS & COMPACTION 12/17/2021
1.7.4.21.1 CH 3050 - CH 3075 12/17/2021
1.7.4.21.2 CH 3300 - CH 3350 4/28/2022
1.7.4.21.3 CH 3375 - CH 3475 5/31/2022
1.7.4.21.4 CH 3525 - CH 3650 6/28/2022
1.7.4.21.5 CH 3700 - CH 3825 7/26/2022
1.7.4.21.6 CH 3875 - CH 4075 8/23/2022
1.7.4.22 TESTING (FDT) 5/31/2022
1.7.4.22.1 CH 3025 to CH 3250 5/31/2022
1.7.4.22.2 CH 3250 to CH 3500 7/1/2022
1.7.4.22.3 CH 3500 to CH 3750 8/23/2022
1.7.4.22.4 CH 3750 to CH 4000 9/27/2022
1.7.4.22.5 CH 4000 to CH 4156.876 10/6/2022
1.7.4.23 DIVERSION CHANNEL 6/24/2022
1.7.4.23.1 EARTH CHANNEL EXCAVATION 6/24/2022
1.7.4.23.2 GABION WALL ERECTION WORKS 7/22/2022
1.7.4.23.3 GEOTEXTILE LAYING 8/19/2022
1.7.4.23.4 BACKFILLING WORKS 8/22/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.4.23.5 8/24/2022
WEEPHOLE
1.7.4.23.6 SLOPE PROTECTION STONE PITCHING 7/22/2022
1.7.4.23.7 SLOPE PROTECTION GABION CAGE 8/19/2022
1.7.4.23.8 SLOPE PROTECTION GEOTEXTILE LAYING 9/20/2022
1.7.4.23.9 SLOPE BACKFILLING 9/23/2022
1.7.4.24 SURFACE DRAIN 12/31/2021
1.7.4.24.1 INTERCEPTOR DRAIN (TYPE 2) 12/31/2021
1.7.4.24.2 STONE PITCHED SUMP (TYPE SC1) 1/14/2022
1.7.4.24.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/14/2022
1.7.4.24.4 STONE PITCHED SUMP (TYPE SC2) 1/31/2022
1.7.4.24.5 BRICK SUMP (TYPE SF2) 2/4/2022
1.7.4.24.6 EMBANKMENT TOE DRAINS (TYPE 1) 4/26/2022
1.7.4.24.7 BRICK SUMP (TYPE SF3) 5/12/2022
1.7.4.24.8 ROADSIDE DRAIN (TYPE RSD 1) 4/28/2022
1.7.4.24.9 STONE PITCH SUMP (TYPE SC3) 5/17/2022
1.7.4.24.10 CASCADE DRAIN 8/5/2022
1.7.4.25 LANDSCAPING 5/31/2022
1.7.4.25.1 GROUND SURFACE PREPARATION 5/31/2022
1.7.4.25.2 CLOSE TURFING 6/9/2022
1.7.4.26 NEW PAVEMENT 7/26/2022
1.7.4.26.1 SUBGRADE PREPARATION - 300MM 7/26/2022
1.7.4.26.2 SUB-BASE - 100MM 8/30/2022
1.7.4.26.3 ROADBASE - 300MM 10/6/2022
1.7.4.26.4 PRIME COATING WORK 11/14/2022
1.7.4.26.5 TACK COATING WORK 11/16/2022
1.7.4.27 JUNCTION 11/30/2022
1.7.4.27.1 STRIPPING TOP SOIL 11/30/2022
1.7.4.27.2 CUT AND FILL WORK 12/7/2022
1.7.4.27.3 CUT AND DISPOSE WORK 12/21/2022
1.7.4.27.4 TESTING (FDT) 1/4/2023
1.7.4.27.5 LANDSCAPING 1/9/2023
1.7.4.27.6 SUBGRADE PREPARATION - 300MM 1/23/2023
1.7.4.27.7 SUB-BASE - 100MM 1/30/2023
1.7.4.27.8 ROADBASE - 300MM 2/6/2023
1.7.4.27.9 PRIME COATING WORK 2/13/2023
1.7.4.27.10 TACK COATING WORK 2/14/2023
1.7.4.28 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 9/29/2022
1.7.4.28.1 CH 3025 to CH 3500 9/29/2022
1.7.4.28.2 CH 3500 to CH 4156.876 1/4/2023
1.7.4.29 BRICK SUMP (TYPE SF1) 10/28/2022
1.7.4.29.1 CH 3025 to CH 3500 10/28/2022
1.7.4.29.2 CH 3500 to CH 4156.876 2/1/2023
1.7.4.30 WEARING COURSE LAYING - 50MM 2/9/2023
1.7.4.30.1 CH 3025 to CH 3500 2/9/2023
1.7.4.30.2 CH 3500 to CH 4156.876 2/21/2023
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.4.31 2/14/2023
COMPACTION WORK
1.7.4.31.1 CH 3025 to CH 3500 2/14/2023
1.7.4.31.2 CH 3500 to CH 4156.876 3/2/2023
1.8 ROAD FURNITURE 11/11/2021
1.8.1 TRAFFIC BARRIER 11/11/2021
1.8.1.1 GUARD RAIL INSTALLATION WORK 11/11/2021
1.8.1.1.1 CH 0 to CH 1025 11/11/2021
1.8.1.1.2 CH 1025 to CH 2075 6/15/2022
1.8.1.1.3 CH 2075 to CH 3025 8/23/2022
1.8.1.1.4 CH 3025 to CH 4156.876 2/13/2023
1.8.1.2 PC NEW JERSEY BARRIER (NJB) 1/18/2023
1.8.1.2.1 CH 4156.876 1/18/2023
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.9.1 STRUCTURE WORK - SUNGAI BENG: CH425 - CH525 2/18/2021
1.9.1.1 CAISSON PILING WORKS 2/18/2021
1.9.1.1.1 POINT 1 & 2 2/18/2021
1.9.1.1.2 POINT 2 & 3 5/3/2021
1.9.1.2 ABUTMENT 2/24/2021
1.9.1.2.1 ABUTMENT A 2/24/2021
1.9.1.2.2 ABUTMENT B 3/22/2021
1.9.1.2.3 PERMEABLE LAYER WORKS 3/18/2021
1.9.1.3 PIER CASTING/ERECTION WORKS 7/6/2021
1.9.1.3.1 PIER 1 & 2 7/6/2021
1.9.1.3.2 PIER 3 & 4 9/14/2021
1.9.1.4 TWIN SPINE BEAM 10/12/2021
1.9.1.4.1 SCAFFOLDING ERECTION WORKS 10/12/2021
1.9.1.4.2 FORMWORK 11/12/2021
1.9.1.4.3 REBAR WORK 11/26/2021
1.9.1.4.4 CONCRETING WORKS 12/10/2021
1.9.1.4.5 BRIDGE BEARING 3/1/2022
1.9.1.5 IN-SITU PARAPET 3/29/2022
1.9.1.5.1 FORMWORK ERECTION WORK 3/29/2022
1.9.1.5.2 REBAR PLACEMENT 4/12/2022
1.9.1.5.3 CONCRETING WORKS 4/27/2022
1.9.1.6 MISCELLANEOUS/SUNDRIES WORKS 4/29/2022
1.9.1.6.1 GI handrail 4/29/2022
1.9.1.6.2 uPVC rain water downpipe 5/9/2022
1.9.1.6.3 Expansion joints 5/12/2022
1.9.1.6.4 Protective coatings 5/19/2022
1.9.2 STRUCTURE WORK - ALOR 1: CH2625 - CH2750 5/10/2021
1.9.2.1 CAISSON PILING WORKS 5/10/2021
1.9.2.1.1 POINT 1 & 2 5/10/2021
1.9.2.1.2 POINT 3 & 4 7/19/2021
1.9.2.1.3 POINT 5 & 6 9/24/2021
1.9.2.2 ABUTMENT 5/12/2021
1.9.2.2.1 ABUTMENT A 5/12/2021
1.9.2.2.2 ABUTMENT B 6/2/2021
1.9.2.2.3 PERMEABLE LAYER WORKS 6/8/2021
1.9.2.3 PIER CASTING/ERECTION WORKS 8/20/2021
1.9.2.3.1 PIER 1 & 2 8/20/2021
1.9.2.3.2 PIER 3 & 4 11/25/2021
1.9.2.3.3 PIER 5 & 6 1/27/2022
1.9.2.4 TWIN SPINE BEAM 10/26/2021
1.9.2.4.1 SCAFFOLDING ERECTION WORKS 10/26/2021
1.9.2.4.2 FORMWORK ERECTION WORK 11/29/2021
1.9.2.4.3 REBAR PLACEMENT 12/13/2021
1.9.2.4.4 CONCRETING WORK 12/27/2021
1.9.2.5 BRIDGE BEARING INSTALLATION 1/31/2022
1.9.2.5.1 Span 1 1/31/2022
1.9.2.5.2 Span 2 5/6/2022
1.9.2.5.3 Span 3 6/6/2022
1.9.2.5.4 Span 4 8/9/2022
1.9.2.5.5 Span 5 8/25/2022
1.9.2.6 IN-SITU PARAPET 7/22/2022
1.9.2.6.1 FORMWORK ERECTION WORK 7/22/2022
1.9.2.6.2 REBAR PLACEMENT WORK 8/5/2022
1.9.2.6.3 CONCRETING WORK 9/13/2022
1.9.2.7 MISCELLANEOUS/SUNDRIES WORKS 9/5/2022
1.9.2.7.1 GI handrail 9/5/2022
1.9.2.7.2 uPVC rain water downpipe 9/15/2022
1.9.2.7.3 Expansion joints 9/28/2022
1.9.2.7.4 Protective coatings 10/5/2022
1.9.3 STRUCTURE WORK - SUNGAI DURAU: CH2800 - CH2900 7/22/2021
1.9.3.1 CAISSON PILING WORKS 7/22/2021
1.9.3.1.1 POINT 1 & 2 7/22/2021
1.9.3.1.2 POINT 3 & 4 10/18/2021
1.9.3.1.3 POINT 5 & 6 1/12/2022
1.9.3.2 ABUTMENT 7/26/2021
1.9.3.2.1 ABUTMENT A 7/26/2021
1.9.3.2.2 ABUTMENT B 9/3/2021
1.9.3.2.3 PERMEABLE LAYER WORKS 10/26/2021
1.9.3.3 PIER CASTING/ERECTION WORKS 12/21/2021
1.9.3.3.1 PIER 1 & 2 12/21/2021
1.9.3.3.2 PIER 3 & 4 3/24/2022
1.9.3.3.3 PIER 5 & 6 6/9/2022
1.9.3.4 TWIN SPINE BEAM 2/22/2022
1.9.3.4.1 SCAFFOLDING ERECTION WORKS 2/22/2022
1.9.3.4.2 FORMWORK ERECTION WORK 3/24/2022
1.9.3.4.3 REBAR PLACEMENT 3/17/2022
1.9.3.4.4 CONCRETING WORKS 3/31/2022
1.9.3.5 BRIDGE BEARING INSTALLATION 5/9/2022
1.9.3.5.1 Span 1 5/9/2022
1.9.3.5.2 Span 2 5/25/2022
1.9.3.5.3 Span 3 6/8/2022
1.9.3.5.4 Span 4 11/11/2022
1.9.3.5.5 Span 5 11/25/2022
1.9.3.6 IN-SITU PARAPET 10/12/2022
1.9.3.6.1 FORMWORK ERECTION WORK 10/12/2022
1.9.3.6.2 REBAR PLACEMENT 10/27/2022
1.9.3.6.3 CONCRETING WORKS 11/11/2022
1.9.3.7 MISCELLANEOUS/SUNDRIES WORKS 11/15/2022
1.9.3.7.1 GI handrail 11/15/2022
1.9.3.7.2 uPVC rain water downpipe 11/25/2022
1.9.3.7.3 Expansion joints 12/6/2022
1.9.3.7.4 Protective coatings 12/13/2022
1.9.4 STRUCTURE WORK - ALOR 2: CH3075 - CH3200 9/15/2021
1.9.4.1 CAISSON PILING WORKS 9/15/2021
1.9.4.1.1 POINT 1 & 2 9/15/2021
1.9.4.1.2 POINT 3 & 4 10/18/2021
1.9.4.1.3 POINT 5 & 6 11/22/2021
1.9.4.2 ABUTMENT 9/20/2021
1.9.4.2.1 ABUTMENT A 9/20/2021
1.9.4.2.2 ABUTMENT B 10/28/2021
1.9.4.2.3 PERMEABLE LAYER WORKS 12/20/2021
1.9.4.3 PIER CASTING/ERECTION WORKS 1/28/2022
1.9.4.3.1 PIER 1 & 2 1/28/2022
1.9.4.3.2 PIER 3 & 4 2/23/2022
1.9.4.3.3 PIER 5 & 6 3/25/2022
1.9.4.4 TWIN SPINE BEAM 3/31/2022
1.9.4.4.1 SCAFFOLDING ERECTION WORKS 3/31/2022
1.9.4.4.2 FORMWORK ERECTION WORK 5/5/2022
1.9.4.4.3 REBAR PLACEMENT WORK 5/20/2022
1.9.4.4.4 CONCRETING WORKS 6/20/2022
1.9.4.5 BRIDGE BEARING INSTALLATION 7/22/2022
1.9.4.5.1 Span 1 7/22/2022
1.9.4.5.2 Span 2 8/5/2022
1.9.4.5.3 Span 3 8/19/2022
1.9.4.5.4 Span 4 10/27/2022
1.9.4.5.5 Span 5 11/11/2022
1.9.4.6 IN-SITU PARAPET 10/11/2022
1.9.4.6.1 FORMWORK ERECTION WORK 10/11/2022
1.9.4.6.2 REBAR PLACEMENT WORK 10/26/2022
1.9.4.6.3 CONCRETING WORK 11/10/2022
1.9.4.7 MISCELLANEOUS/SUNDRIES WORKS 1/10/2023
1.9.4.7.1 GI handrail 1/10/2023
1.9.4.7.2 uPVC rain water downpipe 1/20/2023
1.9.4.7.3 Expansion joints 2/1/2023
1.9.4.7.4 Protective coatings 2/8/2023
1.1 PROVISIONAL SUM 11/24/2020
1.10.1 RELOCATION AND PROTECTION OF UTILITY SERVICES 4/23/2021
1.10.1.1 TNB UTILITY (CH 2400 - CH 3600) 4/23/2021
1.10.1.1.1 CH 2250 to CH 2500 4/23/2021
1.10.1.1.2 CH 2500 to CH 3000 5/27/2021
1.10.1.1.3 CH 3000 to CH 3500 6/25/2021
1.10.1.1.4 CH 3500 to CH 3750 7/26/2021
1.10.1.2 WATER UTILITY (CH 2400 - CH 3600) 5/27/2021
1.10.1.2.1 CH 2250 to CH 2500 5/27/2021
1.10.1.2.2 CH 2500 to CH 3000 6/25/2021
1.10.1.2.3 CH 3000 to CH 3500 7/26/2021
1.10.1.2.4 CH 3500 to CH 3750 8/24/2021
1.10.2 SOIL INVESTIGATION WORKS 11/24/2020
1.10.2.1 IN-SITU TESTING & REPORT 11/24/2020
1.10.2.1.1 CH 0 - CH 1025 11/24/2020
1.10.2.1.2 CH 1025 - CH 2075 1/7/2021
1.10.2.1.3 CH 2075 - CH 3025 4/30/2021
1.10.2.1.4 CH 3025 - CH 4157 6/2/2021
1.10.3 SLOPE STABILIZATION AND GEOLOGICAL MAPPING 3/3/2023
1.10.4 G1 TEMPORARY RD FURNITURE 2/23/2023
1.10.5 G2 SIGNBOARD 3/6/2023
1.10.6 ROAD SAFETY AUDIT STAGE 4 3/9/2023
1.10.7 PRIME COST SUM 3/8/2023
1.10.7.1 ROAD LIGHT AND TRAFFIC LIGHT 3/8/2023
1.11 FINAL SITE INSPECTION 9/10/2021
1.11.1 PRELIMINARIES COMPLETION 9/10/2021
1.11.2 CUT & FILL 11/3/2022
1.11.3 GEOTECHNICAL WORKS FINAL INSPECTION 1/31/2023
1.11.4 DRAINAGE WORK FINAL INSPECTION 12/9/2022
1.11.5 ROADWORKS FINAL INSPECTION 3/17/2023
1.11.6 ROAD FURNITURE FINAL INSPECTION 3/10/2023
1.11.7 BRIDGE FINISHES 2/14/2023
1.11.8 PROVISIONAL SUM COMPLETION 3/9/2023
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
1/17/2020
12/17/2019
12/27/2019
1/8/2020
1/17/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/2/2020
7/22/2020
2/17/2020
11/17/2022
8/7/2020
7/10/2020
7/23/2020
8/7/2020
8/7/2020
9/4/2020
9/4/2020
11/17/2022
11/17/2022
4/1/2023
7/29/2020
3/17/2023
4/1/2023
3/20/2023
7/20/2020
2/17/2020
2/17/2020
7/20/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/10/2021
9/17/2020
9/17/2020
8/19/2021
8/4/2021
8/19/2021
8/12/2021
9/30/2020
12/22/2020
4/15/2021
8/12/2021
8/26/2021
10/14/2020
1/7/2021
4/30/2021
8/26/2021
9/10/2021
10/21/2020
10/28/2020
1/14/2021
1/21/2021
5/7/2021
5/18/2021
9/3/2021
9/10/2021
3/20/2023
8/10/2020
8/10/2020
8/10/2020
8/10/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/21/2020
8/5/2020
8/12/2020
8/19/2020
9/21/2020
3/20/2023
3/6/2023
3/20/2023
9/20/2022
3/17/2023
8/2/2022
10/13/2020
8/6/2020
8/28/2020
9/22/2020
10/13/2020
11/4/2020
9/22/2020
10/13/2020
11/4/2020
11/10/2020
9/25/2020
10/16/2020
11/10/2020
10/21/2020
10/21/2020
12/1/2020
10/16/2020
11/10/2020
12/1/2020
11/4/2020
10/20/2020
10/22/2020
10/26/2020
10/28/2020
11/2/2020
11/4/2020
2/17/2021
11/19/2020
12/17/2020
1/18/2021
2/17/2021
5/17/2021
3/17/2021
4/14/2021
5/17/2021
4/21/2021
3/24/2021
4/21/2021
5/11/2021
4/21/2021
4/22/2021
4/30/2021
5/11/2021
6/23/2021
4/21/2021
5/24/2021
6/23/2021
7/7/2021
5/6/2021
6/9/2021
7/7/2021
9/6/2021
3/3/2021
3/5/2021
3/3/2021
3/5/2021
3/9/2021
6/9/2021
6/11/2021
3/31/2021
4/2/2021
9/6/2021
7/22/2021
7/7/2021
7/22/2021
8/26/2021
7/28/2021
8/26/2021
11/18/2021
8/20/2021
9/28/2021
11/3/2021
11/16/2021
11/18/2021
11/12/2021
8/27/2021
9/13/2021
9/28/2021
10/1/2021
10/8/2021
10/25/2021
11/1/2021
11/10/2021
11/11/2021
11/12/2021
10/27/2021
8/27/2021
10/27/2021
10/29/2021
9/1/2021
10/29/2021
8/2/2022
9/23/2021
8/2/2022
11/23/2021
11/30/2021
9/30/2021
11/30/2021
10/27/2021
10/22/2021
10/25/2021
10/27/2021
8/12/2022
2/5/2021
12/1/2020
12/22/2020
1/14/2021
2/5/2021
3/1/2021
12/22/2020
1/14/2021
2/5/2021
3/1/2021
3/4/2021
12/28/2020
1/19/2021
2/10/2021
3/4/2021
2/24/2021
11/13/2020
12/31/2020
1/6/2021
1/22/2021
1/27/2021
2/16/2021
2/19/2021
2/24/2021
3/25/2021
1/19/2021
2/10/2021
3/4/2021
3/25/2021
4/2/2021
1/21/2021
1/25/2021
2/15/2021
3/8/2021
3/29/2021
3/31/2021
4/2/2021
5/24/2021
2/24/2021
3/24/2021
4/21/2021
5/24/2021
10/20/2021
6/23/2021
7/22/2021
8/20/2021
9/21/2021
10/20/2021
9/27/2021
9/27/2021
10/26/2021
10/26/2021
11/30/2021
10/28/2021
11/30/2021
11/29/2021
11/29/2021
11/18/2021
10/7/2021
11/18/2021
8/18/2021
7/29/2021
7/30/2021
8/6/2021
8/18/2021
11/25/2021
4/15/2021
4/19/2021
4/26/2021
4/28/2021
5/24/2021
9/14/2021
11/16/2021
11/16/2021
11/25/2021
2/25/2022
9/3/2021
10/18/2021
11/18/2021
12/28/2021
1/26/2022
2/25/2022
2/11/2022
9/20/2021
11/2/2021
12/2/2021
2/11/2022
1/13/2022
11/11/2021
12/9/2021
12/10/2021
12/14/2021
1/11/2022
12/9/2021
1/6/2022
1/7/2022
1/13/2022
4/8/2022
6/9/2021
6/11/2021
6/9/2021
6/11/2021
6/15/2021
3/11/2022
3/15/2022
6/23/2021
6/25/2021
4/8/2022
3/25/2022
3/11/2022
3/25/2022
6/22/2022
3/25/2022
5/4/2022
6/9/2022
6/20/2022
6/22/2022
3/8/2022
12/23/2021
1/6/2022
1/21/2022
1/26/2022
2/4/2022
2/18/2022
2/25/2022
3/4/2022
3/7/2022
3/8/2022
6/2/2022
2/22/2022
6/2/2022
6/6/2022
2/24/2022
6/6/2022
8/5/2022
3/17/2022
8/5/2022
8/12/2022
3/24/2022
8/12/2022
12/2/2022
6/2/2021
3/25/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
6/29/2021
4/20/2021
5/12/2021
6/8/2021
6/29/2021
5/4/2021
3/9/2021
4/23/2021
4/28/2021
5/4/2021
7/21/2021
5/12/2021
6/8/2021
6/29/2021
7/21/2021
7/27/2021
5/18/2021
6/10/2021
6/14/2021
7/1/2021
7/23/2021
7/27/2021
12/16/2021
6/17/2021
7/15/2021
9/14/2021
11/18/2021
12/16/2021
8/16/2021
8/16/2021
1/13/2022
7/15/2021
1/13/2022
2/15/2022
8/16/2021
2/15/2022
6/8/2022
3/15/2022
5/13/2022
6/8/2022
7/13/2022
3/17/2022
4/14/2022
6/15/2022
6/29/2022
7/12/2022
7/13/2022
1/6/2022
10/5/2021
11/8/2021
11/26/2021
1/6/2022
1/27/2022
12/29/2021
1/27/2022
2/15/2022
1/13/2022
2/15/2022
9/20/2021
8/18/2021
9/20/2021
9/17/2021
9/17/2021
2/22/2022
6/22/2021
6/24/2021
7/1/2021
7/5/2021
9/2/2021
12/13/2021
2/11/2022
2/11/2022
2/22/2022
3/29/2022
3/1/2022
3/29/2022
4/22/2022
3/15/2022
3/24/2022
4/12/2022
4/22/2022
5/30/2022
3/22/2022
4/20/2022
4/21/2022
4/25/2022
5/26/2022
4/20/2022
5/23/2022
5/24/2022
5/30/2022
8/4/2022
12/30/2021
1/3/2022
1/13/2022
1/17/2022
1/20/2022
4/25/2022
4/27/2022
1/28/2022
2/3/2022
8/4/2022
5/30/2022
5/5/2022
5/30/2022
8/30/2022
6/8/2022
7/13/2022
8/17/2022
8/26/2022
8/30/2022
8/24/2022
6/15/2022
6/29/2022
7/13/2022
7/18/2022
7/25/2022
8/8/2022
8/15/2022
8/22/2022
8/23/2022
8/24/2022
8/10/2022
7/13/2022
8/10/2022
8/12/2022
7/15/2022
8/12/2022
11/25/2022
8/10/2022
11/25/2022
12/2/2022
8/19/2022
12/2/2022
3/17/2023
10/18/2021
7/21/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
11/16/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
10/27/2021
8/20/2021
9/13/2021
9/17/2021
10/5/2021
10/27/2021
12/7/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
12/7/2021
12/13/2021
10/4/2021
10/6/2021
10/8/2021
10/26/2021
11/18/2021
12/9/2021
12/13/2021
3/29/2022
11/2/2021
12/2/2021
12/30/2021
1/28/2022
3/29/2022
3/1/2022
3/1/2022
4/27/2022
12/2/2021
3/1/2022
4/27/2022
5/30/2022
12/30/2021
3/29/2022
5/30/2022
11/18/2022
6/27/2022
11/3/2022
11/18/2022
1/3/2023
6/29/2022
7/27/2022
12/6/2022
12/20/2022
1/2/2023
1/3/2023
9/27/2022
7/6/2022
7/26/2022
8/15/2022
9/27/2022
8/12/2022
7/29/2022
8/12/2022
8/22/2022
4/27/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
4/1/2022
3/3/2022
4/1/2022
3/31/2022
3/31/2022
7/22/2022
6/15/2022
7/22/2022
6/23/2022
6/6/2022
6/7/2022
6/14/2022
6/23/2022
5/31/2022
12/14/2021
12/16/2021
12/23/2021
12/27/2021
1/17/2022
3/18/2022
5/20/2022
5/20/2022
5/31/2022
9/21/2022
1/13/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
9/21/2022
10/14/2022
6/8/2022
7/11/2022
9/1/2022
10/5/2022
10/14/2022
12/9/2022
9/19/2022
11/3/2022
11/7/2022
11/9/2022
12/7/2022
10/17/2022
11/16/2022
11/17/2022
12/9/2022
12/2/2022
4/12/2022
4/14/2022
5/13/2022
5/18/2022
5/20/2022
10/5/2022
10/7/2022
7/11/2022
7/13/2022
12/2/2022
11/3/2022
10/14/2022
11/3/2022
2/20/2023
11/29/2022
1/3/2023
2/7/2023
2/16/2023
2/20/2023
2/14/2023
12/6/2022
12/20/2022
1/3/2023
1/6/2023
1/13/2023
1/27/2023
2/3/2023
2/10/2023
2/13/2023
2/14/2023
1/31/2023
10/27/2022
1/31/2023
2/2/2023
10/31/2022
2/2/2023
2/23/2023
2/13/2023
2/23/2023
3/17/2023
3/1/2023
3/17/2023
3/10/2023
3/10/2023
3/10/2023
12/8/2021
7/12/2022
9/21/2022
3/10/2023
1/24/2023
1/24/2023
2/14/2023
6/28/2022
9/13/2021
7/5/2021
9/13/2021
6/2/2021
4/9/2021
4/27/2021
6/2/2021
11/18/2021
9/8/2021
11/18/2021
3/28/2022
1/25/2022
2/10/2022
2/24/2022
2/28/2022
3/28/2022
6/28/2022
6/10/2022
6/24/2022
6/28/2022
5/20/2022
5/6/2022
5/11/2022
5/18/2022
5/20/2022
10/19/2022
1/14/2022
9/9/2021
11/17/2021
1/14/2022
7/19/2021
7/1/2021
7/13/2021
7/19/2021
3/31/2022
10/25/2021
1/26/2022
3/31/2022
7/21/2022
6/21/2022
7/5/2022
7/19/2022
7/21/2022
9/12/2022
2/17/2022
5/24/2022
6/21/2022
8/24/2022
9/12/2022
10/19/2022
10/3/2022
10/17/2022
10/19/2022
10/11/2022
9/14/2022
9/27/2022
10/4/2022
10/11/2022
1/9/2023
6/1/2022
12/13/2021
3/7/2022
6/1/2022
1/4/2022
10/7/2021
11/18/2021
1/4/2022
8/4/2022
2/21/2022
5/30/2022
8/4/2022
10/11/2022
8/19/2022
9/21/2022
10/5/2022
10/11/2022
12/8/2022
5/23/2022
6/7/2022
6/21/2022
11/24/2022
12/8/2022
1/9/2023
12/22/2022
1/5/2023
1/9/2023
12/19/2022
11/24/2022
12/5/2022
12/12/2022
12/19/2022
2/14/2023
3/17/2022
1/20/2022
2/15/2022
3/17/2022
3/2/2022
12/2/2021
1/10/2022
3/2/2022
5/27/2022
3/30/2022
4/22/2022
5/27/2022
10/7/2022
9/6/2022
9/21/2022
10/5/2022
10/7/2022
11/24/2022
8/4/2022
8/18/2022
9/2/2022
11/10/2022
11/24/2022
1/9/2023
12/22/2022
1/5/2023
1/9/2023
2/14/2023
1/19/2023
1/31/2023
2/7/2023
2/14/2023
3/9/2023
8/24/2021
7/26/2021
4/23/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
6/2/2021
6/2/2021
11/24/2020
1/7/2021
4/30/2021
6/2/2021
3/3/2023
2/23/2023
3/6/2023
3/9/2023
3/8/2023
3/8/2023
3/17/2023
9/10/2021
11/3/2022
1/31/2023
12/9/2022
3/17/2023
3/10/2023
2/14/2023
3/9/2023
4/1/2023
WBS Task Name Start
MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA
1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.2.1 INITIAL 12/17/2019
1.2.1.1 A100 CONTRACTUAL REQUIREMENT 12/17/2019
1.2.1.1.1 PERFORMANCE BOND 12/17/2019
1.2.1.1.2 INSURANCE 12/27/2019
1.2.1.1.3 SOCSO 1/8/2020
1.2.1.1.4 CIDB LEVI 1/17/2020
1.2.1.2 A200 SO/PD'S REQUIREMENT 3/10/2020
1.2.1.2.1 S.O./PD SITE OFFICE 3/10/2020
1.2.1.2.1.1 ESTABLISHMENT 3/10/2020
1.2.1.2.1.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.2.2 LABORATORIES 7/10/2020
1.2.1.2.2.1 ESTABLISHMENT 7/16/2020
1.2.1.2.2.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.2.3 TRANSPORT SERVICE 7/10/2020
1.2.1.2.3.1 VEHICLE 7/23/2020
1.2.1.2.3.2 OPERATION AND MAINTENANCE 7/10/2020
1.2.1.3 A500 CONTRACTOR'S REQUIREMENT 1/20/2020
1.2.1.3.1 SITE OFFICE 1/20/2020
1.2.1.3.1.1 ESTABLISHMENT 1/20/2020
1.2.1.3.1.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.2 SITE STORE 2/4/2020
1.2.1.3.2.1 ESTABLISHMENT 2/4/2020
1.2.1.3.2.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.3 WORKSHOP 2/11/2020
1.2.1.3.3.1 ESTABLISHMENT 2/11/2020
1.2.1.3.3.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.4 WORKERS ACCOMODATION 2/18/2020
1.2.1.3.4.1 ESTABLISHMENT 2/18/2020
1.2.1.3.4.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.5 CONTRACTORS'S SUPERINTENDANCE 2/4/2020
1.2.1.3.6 HOARDING 3/3/2020
1.2.1.3.7 PROJECT SIGNBOARD 1/20/2020
1.2.2 SURVEY WORK 3/3/2020
1.2.2.1 STAGE 1 3/3/2020
1.2.2.1.1 ROW SURVEY WORK 3/3/2020
1.2.2.1.2 OGL 3/12/2020
1.2.2.1.3 DRAWING PREPARATION 7/24/2020
1.2.2.1.4 SUBMISSION OGL DRAWING 8/7/2020
1.2.2.2 STAGE 2 7/24/2020
1.2.2.2.1 SETTING OUT 7/24/2020
1.2.2.2.1.1 CH: 0 TO CH: 1000 7/24/2020
1.2.2.2.1.2 CH:1000 TO CH: 2000 8/5/2020
1.2.2.2.1.3 CH:2000 TO CH: 3000 8/14/2020
1.2.2.2.1.4 CH:3000 TO CH: 4156 8/26/2020
1.2.2.3 STAGE 3 7/8/2021
1.2.2.3.1 AS-BUILT (FORMATION LEVEL) 7/8/2021
1.2.2.3.1.1 CH:0 to CH: 1000 7/8/2021
1.2.2.3.1.2 CH:1000 TO CH: 2000 2/14/2022
1.2.2.3.1.3 CH:2000 TO CH: 3000 4/25/2022
1.2.2.3.1.4 CH:3000 TO CH: 4156 10/17/2022
1.2.2.3.1.5 AS-BUILT DRAWING PREPARATION 10/27/2022
1.2.2.3.1.6 SUBMISSION OF AS-BUILT DRAWINGS 11/17/2022
1.2.3 FINAL 3/10/2020
1.2.3.1 PLANT & MACHINERY MOBILIZATION 3/10/2020
1.2.3.2 PLANT & MACHINERY DEMOBILIZATION 3/17/2023
1.2.3.3 CLEARING AFTER COMPLETION 3/20/2023
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.3.1 INITIAL 2/4/2020
1.3.1.1 PREPARATION OF SAFETY PLAN,HIRARC 2/4/2020
1.3.1.2 SUBMISSION OF SAFETY PLAN 2/17/2020
1.3.1.3 TEAM PREPARATION 2/28/2020
1.3.2 RECURRING WORK 1/20/2020
1.3.2.1 SHO, PROTECTIVE EQUIPMENT 1/20/2020
1.3.2.2 SAFETY REPORT PREPARATION 7/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.4.1 NON PHYSICAL WORKS 7/10/2020
1.4.1.1 EMP. REQUIREMENT 7/10/2020
1.4.1.1.1 INITIAL 7/10/2020
1.4.1.1.1.1 Preparation work EMP 7/30/2020
1.4.1.1.1.2 Presentation of EMP 8/17/2020
1.4.1.1.1.3 RECURRING WORK 7/10/2020
1.4.2 PHYSICAL WORKS 8/18/2020
1.4.2.1 Washing Facilities 9/3/2020
1.4.2.1.1 Wash Trough 9/3/2020
1.4.2.2 SEDIMENT CONTROL 8/18/2020
1.4.2.2.1 SILT TRAP EXCAVATION & INSTALLATION 8/18/2020
1.4.2.2.1.1 CH 0 - CH 1025 8/18/2020
1.4.2.2.1.2 CH 1025 - CH 2075 12/2/2020
1.4.2.2.1.3 CH 2075 - CH 3025 3/26/2021
1.4.2.2.1.4 CH 3025 - CH 4157 7/22/2021
1.4.2.2.2 SEDIMENT BASIN EXCAVATION & INSTALLATION 9/3/2020
1.4.2.2.2.1 CH 0 - CH 1025 9/3/2020
1.4.2.2.2.2 CH 1025 - CH 2075 12/16/2020
1.4.2.2.2.3 CH 2075 - CH 3025 4/9/2021
1.4.2.2.2.4 CH 3025 - CH 4157 8/5/2021
1.4.2.3 SILT FENCE LAYING WORK 9/2/2020
1.4.2.3.1 CH 0 - CH 1025 9/2/2020
1.4.2.3.2 CH 1025 - CH 2075 11/25/2020
1.4.2.3.3 CH 2075 - CH 3025 3/19/2021
1.4.2.3.4 CH 3025 - CH 4157 7/14/2021
1.4.2.4 SAND BAG INSTALLATION WORK 9/17/2020
1.4.2.4.1 CH 0 - CH 1025 9/17/2020
1.4.2.4.2 CH 1025 - CH 2075 12/9/2020
1.4.2.4.3 CH 2075 - CH 3025 4/2/2021
1.4.2.4.4 CH 3025 - CH 4157 7/29/2021
1.4.2.5 SILT CURTAIN INSTALLATION WORKS 10/15/2020
1.4.2.5.1 CH 450 - CH 500 10/15/2020
1.4.2.5.2 CH 1150 - CH 1200 10/22/2020
1.4.2.5.3 CH 1750 - CH 1800 1/8/2021
1.4.2.5.4 CH 2175 - CH 2200 1/15/2021
1.4.2.5.5 CH 2675 - CH 2700 5/3/2021
1.4.2.5.6 CH 2850 - CH 2875 5/10/2021
1.4.2.5.7 CH 3125 - CH 3175 8/27/2021
1.4.2.5.8 CH 4025 - CH 4075 9/6/2021
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.5.1 INITIAL 7/27/2020
1.5.1.1 PREPARATION OF TMP 7/27/2020
1.5.1.2 PRESENTATION OF TMP 8/10/2020
1.5.1.3 SUBMISSION OF TMP 8/10/2020
1.5.2 RECURRING WORK 7/20/2020
1.5.2.1 Traffic Management Team Maintenance 7/20/2020
1.5.2.2 Traffic Report 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.6.1 INITIAL 7/29/2020
1.6.1.1 PREPARATION OF SCHEDULE MAINTENANCE 7/29/2020
1.6.1.2 PRESENTATION OF SCHEDULE 8/12/2020
1.6.1.3 SUBMISSION OF SCHEDULE 8/19/2020
1.6.1.4 TEAM PREPARATION 9/7/2020
1.6.2 RECURRING WORK 3/2/2020
Road Lighting,Grass Cutting,Litter collection,Maintenance Bridge
1.6.2.1 3/2/2020
and Culvert,Maintenance Drainage
1.6.2.2 Grass Cutting & Litter Collection 7/10/2020
1.6.2.3 Settlement Plate Report & Analysis 2/22/2021
1.7 CIVIL WORKS 7/30/2020
1.7.1 CH 0 - CH 1025 7/30/2020
1.7.1.1 GENERAL CLEARANCE 7/30/2020
1.7.1.1.1 CH 0 to CH 250 (EXISTING ROADWAY) 7/30/2020
1.7.1.1.2 CH 250 to CH 500 8/7/2020
1.7.1.1.3 CH 500 to CH 750 9/1/2020
1.7.1.1.4 CH 750 to CH 1025 9/23/2020
1.7.1.2 DEMOLITION WORKS 9/1/2020
1.7.1.2.1 CH 250 to CH 500 9/1/2020
1.7.1.2.2 CH 500 to CH 750 9/23/2020
1.7.1.2.3 CH 750 to CH 1025 10/14/2020
1.7.1.3 TEMPORARY ACCESS 9/23/2020
1.7.1.3.1 CH 250 to CH 500 9/23/2020
1.7.1.3.2 CH 500 to CH 750 10/14/2020
1.7.1.3.3 CH 750 to CH 1025 11/5/2020
1.7.1.4 TEMPORARY CROSSING 10/19/2020
1.7.1.4.1 C1 - CH 850 10/19/2020
1.7.1.5 STRIPPING OF TOPSOIL 9/28/2020
1.7.1.5.1 CH 250 to CH 500 9/28/2020
1.7.1.5.2 CH 500 to CH 750 10/19/2020
1.7.1.5.3 CH 750 to CH 1025 11/11/2020
1.7.1.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/19/2020
1.7.1.6.1 CH 225 - CH 300 10/19/2020
1.7.1.6.2 CH 300 - CH 375 10/21/2020
1.7.1.6.3 CH 400 - CH 440 10/23/2020
1.7.1.6.4 CH 510 - CH 675 10/27/2020
1.7.1.6.5 CH 700 - CH 825 10/30/2020
1.7.1.6.6 CH 850 - CH 1025 11/3/2020
1.7.1.7 EXCAVATE TO SUITABLE MATERIAL 10/21/2020
1.7.1.7.1 CH 225 - CH 300 10/21/2020
1.7.1.7.2 CH 300 - CH 375 11/20/2020
1.7.1.7.3 CH 700 - CH 825 12/18/2020
1.7.1.7.4 CH 825 - CH 1025 1/19/2021
1.7.1.8 EXCAVATE TO UNSUITABLE MATERIAL 2/18/2021
1.7.1.8.1 CH 400 - CH 440 2/18/2021
1.7.1.8.2 CH 510 - CH 675 3/18/2021
1.7.1.8.3 CH 825 - CH 875 4/15/2021
1.7.1.9 INSTRUMENTATION - SETTLEMENT PLATE 3/18/2021
1.7.1.9.1 CH 400 - CH 450 3/18/2021
1.7.1.9.2 CH 515 - CH 675 4/15/2021
1.7.1.10 PC CULVERT INSTALLATION 4/15/2021
1.7.1.10.1 EXCAVATION WORK 4/15/2021
1.7.1.10.1.1 C1 - CH 850 (15.0M) 4/15/2021
1.7.1.10.2 LAYING OF GEOTEXTILE WORK 4/22/2021
1.7.1.10.2.1 C1 - CH 850 (15.0M) 4/22/2021
1.7.1.10.3 FOUNDATION (TYPE B) 4/23/2021
1.7.1.10.3.1 C1 - CH 850 (15.0M) 4/23/2021
1.7.1.10.4 PC CULVERT LAYING 5/3/2021
1.7.1.10.4.1 C1 - CH 850 (15.0M) 5/3/2021
1.7.1.11 FILLING WORKS & COMPACTION 3/25/2021
1.7.1.11.1 CH 400 - CH 440 3/25/2021
1.7.1.11.2 CH 510 - CH 675 4/22/2021
1.7.1.11.3 CH 825 - CH 875 5/25/2021
1.7.1.12 TESTING (FDT) 4/27/2021
1.7.1.12.1 CH 250 to CH 500 4/27/2021
1.7.1.12.2 CH 500 to CH 750 5/31/2021
1.7.1.12.3 CH 750 to CH 1025 6/29/2021
1.7.1.13 SURFACE DRAIN 12/18/2020
1.7.1.13.1 INTERCEPTOR DRAIN (TYPE 2) 12/18/2020
1.7.1.13.1.1 CH 325 to CH 385 12/18/2020
1.7.1.13.1.2 CH 700 to CH 825 1/19/2021
1.7.1.13.1.3 CH 825 to CH 950 2/18/2021
1.7.1.13.2 STONE PITCHED SUMP (TYPE SC1) 1/5/2021
1.7.1.13.2.1 CH 325 to CH 385 1/5/2021
1.7.1.13.2.2 CH 700 to CH 825 2/3/2021
1.7.1.13.2.3 CH 825 to CH 950 3/4/2021
1.7.1.13.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/5/2021
1.7.1.13.3.1 CH 325 to CH 450 1/5/2021
1.7.1.13.3.2 CH 525 to CH 690 2/3/2021
1.7.1.13.3.3 CH 700 to CH 800 2/18/2021
1.7.1.13.4 STONE PITCH SUMP (TYPE SC2) 1/19/2021
1.7.1.13.4.1 CH 325 to CH 450 1/19/2021
1.7.1.13.4.2 CH 525 to CH 690 2/18/2021
1.7.1.13.4.3 CH 700 to CH 800 3/4/2021
1.7.1.13.5 BRICK SUMP (TYPE SF2) 1/21/2021
1.7.1.13.5.1 CH 325 to CH 450 1/21/2021
1.7.1.13.5.2 CH 525 to CH 690 2/22/2021
1.7.1.13.5.3 CH 700 to CH 800 3/8/2021
1.7.1.13.6 EMBANKMENT TOE DRAINS (TYPE 1) 1/19/2021
1.7.1.13.6.1 CH 0 to CH 300 1/19/2021
1.7.1.13.6.2 CH 375 to CH 475 4/22/2021
1.7.1.13.6.3 CH 480 to CH 700 5/25/2021
1.7.1.13.7 BRICK SUMP (TYPE SF3) 2/3/2021
1.7.1.13.7.1 CH 0 to CH 300 2/3/2021
1.7.1.13.7.2 CH 375 to CH 475 5/7/2021
1.7.1.13.7.3 CH 480 to CH 700 6/10/2021
1.7.1.13.8 ROADSIDE DRAIN (TYPE RSD 1) 3/4/2021
1.7.1.13.8.1 CH 300 to CH 375 3/4/2021
1.7.1.13.8.2 CH 700 to CH 1000 3/18/2021
1.7.1.13.9 STONE PITCH SUMP (TYPE SC3) 3/18/2021
1.7.1.13.9.1 CH 300 to CH 375 3/18/2021
1.7.1.13.9.2 CH 700 to CH 1000 4/1/2021
1.7.1.13.10 CASCADE DRAIN 5/7/2021
1.7.1.13.10.1 CH 300 to CH 450 5/7/2021
1.7.1.13.10.2 CH 500 to CH 650 6/10/2021
1.7.1.13.10.3 CH 700 to CH 850 7/8/2021
1.7.1.13.10.4 CH 950 to CH 1025 8/6/2021
1.7.1.14 LANDSCAPING 4/27/2021
1.7.1.14.1 GROUND SURFACE PREPARATION 4/27/2021
1.7.1.14.1.1 CH 250 to CH 500 4/27/2021
1.7.1.14.1.2 CH 500 to CH 750 5/31/2021
1.7.1.14.1.3 CH 750 to CH 1025 6/29/2021
1.7.1.14.2 CLOSE TURFING 5/7/2021
1.7.1.14.2.1 CH 250 to CH 500 5/7/2021
1.7.1.14.2.2 CH 500 to CH 750 6/10/2021
1.7.1.14.2.3 CH 750 to CH 1025 7/8/2021
1.7.1.15 RUBBLE RETAINING WALL 6/1/2021
1.7.1.15.1 EXCAVATION & SURFACE PREPARATION 6/1/2021
1.7.1.15.1.1 CH 400 - CH 440 6/1/2021
1.7.1.15.1.2 CH 510 - CH 675 6/30/2021
1.7.1.15.2 RUBBLE PITCHING ERECTION 6/30/2021
1.7.1.15.2.1 CH 400 - CH 440 6/30/2021
1.7.1.15.2.2 CH 510 - CH 675 7/29/2021
1.7.1.16 NEW PAVEMENT 5/25/2021
1.7.1.16.1 SUBGRADE PREPARATION - 300MM 5/25/2021
1.7.1.16.1.1 CH 250 to CH 500 5/25/2021
1.7.1.16.1.2 CH 500 to CH 1025 7/23/2021
1.7.1.16.2 SUB-BASE - 100MM 7/1/2021
1.7.1.16.2.1 CH 250 to CH 500 7/1/2021
1.7.1.16.2.2 CH 500 to CH 1025 8/30/2021
1.7.1.16.3 ROADBASE - 300MM 8/6/2021
1.7.1.16.3.1 CH 250 to CH 500 8/6/2021
1.7.1.16.3.2 CH 500 to CH 1025 10/6/2021
1.7.1.16.4 PRIME COATING WORK 9/14/2021
1.7.1.16.4.1 CH 250 to CH 500 9/14/2021
1.7.1.16.4.2 CH 500 to CH 1025 11/15/2021
1.7.1.16.5 TACK COATING WORK 9/17/2021
1.7.1.16.5.1 CH 250 to CH 500 9/17/2021
1.7.1.16.5.2 CH 500 to CH 1025 11/17/2021
1.7.1.17 JUNCTION 6/24/2021
1.7.1.17.1 STRIPPING TOP SOIL 6/24/2021
1.7.1.17.1.1 Junction 1 - CH 400 6/24/2021
1.7.1.17.1.2 Junction 2 - CH 690 8/23/2021
1.7.1.17.2 CUT AND FILL WORK 7/1/2021
1.7.1.17.2.1 Junction 1 - CH 400 7/1/2021
1.7.1.17.2.2 Junction 2 - CH 690 8/30/2021
1.7.1.17.3 CUT AND DISPOSE WORK 7/15/2021
1.7.1.17.3.1 Junction 1 - CH 400 7/15/2021
1.7.1.17.3.2 Junction 2 - CH 690 9/14/2021
1.7.1.17.4 TESTING (FDT) 7/30/2021
1.7.1.17.4.1 Junction 1 - CH 400 7/30/2021
1.7.1.17.4.2 Junction 2 - CH 690 9/29/2021
1.7.1.17.5 LANDSCAPING 8/4/2021
1.7.1.17.5.1 Junction 1 - CH 400 8/4/2021
1.7.1.17.5.2 Junction 2 - CH 690 10/4/2021
1.7.1.17.6 SUBGRADE PREPARATION - 300MM 8/19/2021
1.7.1.17.6.1 Junction 1 - CH 400 8/19/2021
1.7.1.17.6.2 Junction 2 - CH 690 10/18/2021
1.7.1.17.7 SUB-BASE - 100MM 8/26/2021
1.7.1.17.7.1 Junction 1 - CH 400 8/26/2021
1.7.1.17.7.2 Junction 2 - CH 690 10/26/2021
1.7.1.17.8 ROADBASE - 300MM 9/3/2021
1.7.1.17.8.1 Junction 1 - CH 400 9/3/2021
1.7.1.17.8.2 Junction 2 - CH 690 11/2/2021
1.7.1.17.9 PRIME COATING WORK 9/10/2021
1.7.1.17.9.1 Junction 1 - CH 400 9/10/2021
1.7.1.17.9.2 Junction 2 - CH 690 11/11/2021
1.7.1.17.10 TACK COATING WORK 9/13/2021
1.7.1.17.10.1 Junction 1 - CH 400 9/13/2021
1.7.1.17.10.2 Junction 2 - CH 690 11/12/2021
1.7.1.18 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 7/30/2021
1.7.1.18.1 CH 250 to CH 500 7/30/2021
1.7.1.18.2 CH 500 to CH 1025 9/29/2021
1.7.1.19 BRICK SUMP (TYPE SF1) 8/30/2021
1.7.1.19.1 CH 250 to CH 500 8/30/2021
1.7.1.19.2 CH 500 to CH 1025 10/28/2021
1.7.1.20 WEARING COURSE LAYING - 50MM 9/21/2021
1.7.1.20.1 CH 250 to CH 500 9/21/2021
1.7.1.20.2 CH 425 to CH 525 (BRIDGE) 7/29/2022
1.7.1.20.3 CH 500 to CH 1025 11/19/2021
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.1.21 COMPACTION WORK 9/24/2021
1.7.1.21.1 CH 250 to CH 500 9/24/2021
1.7.1.21.2 CH 500 to CH 1025 11/24/2021
1.7.1.22 TREATMENT WORK (EXISTING WORK) 10/1/2021
1.7.1.22.1 ROAD SURFACE PREPARATION 10/1/2021
1.7.1.22.2 LAYING TACK COAT 10/25/2021
1.7.1.22.3 LAYING WEARING COURSE 10/26/2021
1.7.2 CH 1025 - CH 2075 11/11/2020
1.7.2.1 GENERAL CLEARANCE 11/11/2020
1.7.2.1.1 CH 1025 to CH 1250 11/11/2020
1.7.2.1.2 CH 1250 to CH 1500 12/2/2020
1.7.2.1.3 CH 1500 to CH 1750 12/23/2020
1.7.2.1.4 CH 1750 to CH 2075 1/15/2021
1.7.2.2 DEMOLITION WORKS 12/2/2020
1.7.2.2.1 CH 1025 to CH 1250 12/2/2020
1.7.2.2.2 CH 1250 to CH 1500 12/23/2020
1.7.2.2.3 CH 1500 to CH 1750 1/15/2021
1.7.2.2.4 CH 1750 to CH 2075 2/8/2021
1.7.2.3 TEMPORARY ACCESS 12/23/2020
1.7.2.3.1 CH 1025 to CH 1250 12/23/2020
1.7.2.3.2 CH 1250 to CH 1500 1/15/2021
1.7.2.3.3 CH 1500 to CH 1750 2/8/2021
1.7.2.3.4 CH 1750 to CH 2075 3/2/2021
1.7.2.4 TEMPORARY CROSSING 11/11/2020
1.7.2.4.1 C2 - CH 1135 11/11/2020
1.7.2.4.2 C3 - CH 1225 12/29/2020
1.7.2.4.3 C4 - CH 1475 1/4/2021
1.7.2.4.4 C5 - CH 1535 1/20/2021
1.7.2.4.5 C6 - CH 1615 1/25/2021
1.7.2.4.6 C7 - CH 1758 2/11/2021
1.7.2.4.7 C8 - CH 1925 2/17/2021
1.7.2.4.8 C9 - CH 2040 2/22/2021
1.7.2.5 STRIPPING OF TOPSOIL 12/29/2020
1.7.2.5.1 CH 1025 to CH 1250 12/29/2020
1.7.2.5.2 CH 1250 to CH 1500 1/20/2021
1.7.2.5.3 CH 1500 to CH 1750 2/11/2021
1.7.2.5.4 CH 1750 to CH 2075 3/5/2021
1.7.2.6 EXCAVATION OF TEMPORARY EARTH DRAIN 1/20/2021
1.7.2.6.1 CH 1025 - CH 1350 1/20/2021
1.7.2.6.2 CH 1375 - CH 1475 1/22/2021
1.7.2.6.3 CH 1555 - CH 1600 2/11/2021
1.7.2.6.4 CH 1650 - CH 1725 3/5/2021
1.7.2.6.5 CH 1750 - CH 1810 3/26/2021
1.7.2.6.6 CH 1825 - CH 1900 3/30/2021
1.7.2.6.7 CH 1900 - CH 2075 4/1/2021
1.7.2.7 EXCAVATE TO SUITABLE MATERIAL 1/26/2021
1.7.2.7.1 CH 1375 - CH 1475 1/26/2021
1.7.2.7.2 CH 1555 - CH 1600 2/25/2021
1.7.2.7.3 CH 1650 - CH 1725 3/25/2021
1.7.2.7.4 CH 1825 - CH 1900 4/22/2021
1.7.2.8 EXCAVATE TO UNSUITABLE MATERIAL 5/25/2021
1.7.2.8.1 CH 1025 - CH 1350 5/25/2021
1.7.2.8.2 CH 1475 - CH 1525 6/24/2021
1.7.2.8.3 CH 1600 - CH 1650 7/23/2021
1.7.2.8.4 CH 1750 - CH 1810 8/23/2021
1.7.2.8.5 CH 1900 - CH 2075 9/22/2021
1.7.2.9 EXCAVATION TO HARD MATERIAL (LEUCOGRANITE) 8/27/2021
1.7.2.9.1 CH 1650 - CH 1725 8/27/2021
1.7.2.10 EXCAVATION TO ROCK (LEUCOGRANITE) 9/28/2021
1.7.2.10.1 CH 1650 - CH 1725 9/28/2021
1.7.2.11 LAYING GEOTEXTILE LAYER 10/27/2021
1.7.2.11.1 CH 1650 - CH 1725 BOTTOM 10/27/2021
1.7.2.11.2 CH 1650 - CH 1725 TOP 11/30/2021
1.7.2.12 SAND FILLING WORKS & COMPACTION 10/29/2021
1.7.2.12.1 CH 1650 - CH 1725 10/29/2021
1.7.2.13 SAND DRAINAGE BLANKET & ROCK FILL BUND 7/23/2021
1.7.2.13.1 SAND DRAINAGE BLANKET 7/23/2021
1.7.2.13.1.1 LAYING OF GEOTEXTILE WORK 7/23/2021
1.7.2.13.1.2 PLACEMENT AND COMPACTION OF SAND BLANKET 7/27/2021
1.7.2.13.2 ROCK FILL BUND 8/11/2021
1.7.2.13.2.1 EXCAVATION WORK 8/11/2021
1.7.2.13.2.2 LAYING OF GEOTEXTILE WORK 8/18/2021
1.7.2.13.2.3 ROCK FILLING WORKS 8/20/2021
1.7.2.14 PC CULVERT INSTALLATION 7/23/2021
1.7.2.14.1 EXCAVATION WORK 7/23/2021
1.7.2.14.1.1 C4 - CH 1475 (30.0M) 7/23/2021
1.7.2.14.2 LAYING OF GEOTEXTILE WORK 7/30/2021
1.7.2.14.2.1 C4 - CH 1475 (30.0M) 7/30/2021
1.7.2.14.3 FOUNDATION (TYPE B) 8/2/2021
1.7.2.14.3.1 C4 - CH 1475 (30.0M) 8/2/2021
1.7.2.14.4 PC CULVERT LAYING 8/9/2021
1.7.2.14.4.1 C4 - CH 1475 (30.0M) 8/9/2021
1.7.2.15 IN-SITU RC BOX CULVERT 1/20/2021
1.7.2.15.1 EXCAVATION WORK 1/20/2021
1.7.2.15.1.1 C2 - CH 1135 (58.0M) 1/20/2021
1.7.2.15.1.2 C3 - CH 1225 (35.0M) 1/27/2021
1.7.2.15.1.3 C5 - CH 1535 (25.0M) 3/5/2021
1.7.2.15.1.4 C6 - CH 1615 (33.0M) 3/12/2021
1.7.2.15.1.5 C7 - CH 1758 (28.0M) 3/26/2021
1.7.2.15.1.6 C8 - CH 1925 (28.0M) 4/2/2021
1.7.2.15.1.7 C9 - CH 2040 (43.0M) 4/9/2021
1.7.2.15.2 LAYING OF GEOTEXTILE WORK 1/27/2021
1.7.2.15.2.1 C2 - CH 1135 (58.0M) 1/27/2021
1.7.2.15.2.2 C3 - CH 1225 (35.0M) 2/4/2021
1.7.2.15.2.3 C5 - CH 1535 (25.0M) 3/12/2021
1.7.2.15.2.4 C6 - CH 1615 (33.0M) 3/19/2021
1.7.2.15.2.5 C7 - CH 1758 (28.0M) 4/2/2021
1.7.2.15.2.6 C8 - CH 1925 (28.0M) 4/9/2021
1.7.2.15.2.7 C9 - CH 2040 (43.0M) 4/16/2021
1.7.2.15.3 FOUNDATION (TYPE B) 2/1/2021
1.7.2.15.3.1 C2 - CH 1135 (58.0M) 2/1/2021
1.7.2.15.3.2 C3 - CH 1225 (35.0M) 2/8/2021
1.7.2.15.3.3 C5 - CH 1535 (25.0M) 3/16/2021
1.7.2.15.3.4 C6 - CH 1615 (33.0M) 3/23/2021
1.7.2.15.3.5 C7 - CH 1758 (28.0M) 4/6/2021
1.7.2.15.3.6 C8 - CH 1925 (28.0M) 4/13/2021
1.7.2.15.3.7 C9 - CH 2040 (43.0M) 4/20/2021
1.7.2.15.4 LEAN-CON 2/8/2021
1.7.2.15.4.1 C2 - CH 1135 (58.0M) 2/8/2021
1.7.2.15.4.2 C3 - CH 1225 (35.0M) 2/16/2021
1.7.2.15.4.3 C5 - CH 1535 (25.0M) 3/23/2021
1.7.2.15.4.4 C6 - CH 1615 (33.0M) 3/30/2021
1.7.2.15.4.5 C7 - CH 1758 (28.0M) 4/13/2021
1.7.2.15.4.6 C8 - CH 1925 (28.0M) 4/20/2021
1.7.2.15.4.7 C9 - CH 2040 (43.0M) 4/27/2021
1.7.2.15.5 BASE SLAB 2/10/2021
1.7.2.15.5.1 C2 - CH 1135 (58.0M) 2/10/2021
1.7.2.15.5.2 C3 - CH 1225 (35.0M) 2/18/2021
1.7.2.15.5.3 C5 - CH 1535 (25.0M) 3/25/2021
1.7.2.15.5.4 C6 - CH 1615 (33.0M) 4/1/2021
1.7.2.15.5.5 C7 - CH 1758 (28.0M) 4/15/2021
1.7.2.15.5.6 C8 - CH 1925 (28.0M) 4/22/2021
1.7.2.15.5.7 C9 - CH 2040 (43.0M) 4/30/2021
1.7.2.15.6 SIDEWALL, WINGWALL 4/9/2021
1.7.2.15.6.1 C2 - CH 1135 (58.0M) 4/9/2021
1.7.2.15.6.2 C3 - CH 1225 (35.0M) 5/3/2021
1.7.2.15.6.3 C5 - CH 1535 (25.0M) 5/27/2021
1.7.2.15.6.4 C6 - CH 1615 (33.0M) 6/18/2021
1.7.2.15.6.5 C7 - CH 1758 (28.0M) 7/9/2021
1.7.2.15.6.6 C8 - CH 1925 (28.0M) 8/2/2021
1.7.2.15.6.7 C9 - CH 2040 (43.0M) 8/24/2021
1.7.2.15.7 TOP COVER 6/14/2021
1.7.2.15.7.1 C2 - CH 1135 (58.0M) 6/14/2021
1.7.2.15.7.2 C3 - CH 1225 (35.0M) 7/5/2021
1.7.2.15.7.3 C5 - CH 1535 (25.0M) 7/27/2021
1.7.2.15.7.4 C6 - CH 1615 (33.0M) 8/18/2021
1.7.2.15.7.5 C7 - CH 1758 (28.0M) 9/9/2021
1.7.2.15.7.6 C8 - CH 1925 (28.0M) 10/1/2021
1.7.2.15.7.7 C9 - CH 2040 (43.0M) 10/25/2021
1.7.2.15.8 SUBSURFACE INSTALLATION & FILLINGS 6/14/2021
1.7.2.15.8.1 C2 - CH 1135 (58.0M) 6/14/2021
1.7.2.15.8.2 C3 - CH 1225 (35.0M) 7/5/2021
1.7.2.15.8.3 C5 - CH 1535 (25.0M) 7/27/2021
1.7.2.15.8.4 C6 - CH 1615 (33.0M) 8/18/2021
1.7.2.15.8.5 C7 - CH 1758 (28.0M) 9/9/2021
1.7.2.15.8.6 C8 - CH 1925 (28.0M) 10/1/2021
1.7.2.15.8.7 C9 - CH 2040 (43.0M) 10/25/2021
1.7.2.15.9 BACKFILLING WORKS 7/7/2021
1.7.2.15.9.1 C2 - CH 1135 (58.0M) 7/7/2021
1.7.2.15.9.2 C3 - CH 1225 (35.0M) 7/29/2021
1.7.2.15.9.3 C5 - CH 1535 (25.0M) 8/20/2021
1.7.2.15.9.4 C6 - CH 1615 (33.0M) 9/13/2021
1.7.2.15.9.5 C7 - CH 1758 (28.0M) 10/5/2021
1.7.2.15.9.6 C8 - CH 1925 (28.0M) 10/27/2021
1.7.2.15.9.7 C9 - CH 2040 (43.0M) 11/19/2021
1.7.2.16 FILLING WORKS & COMPACTION 8/5/2021
1.7.2.16.1 CH 1025 - CH 1350 8/5/2021
1.7.2.16.2 CH 1475 - CH 1525 9/21/2021
1.7.2.16.3 CH 1600 - CH 1650 10/20/2021
1.7.2.16.4 CH 1650 - CH 1725 12/1/2021
1.7.2.16.5 CH 1750 - CH 1810 12/29/2021
1.7.2.16.6 CH 1900 - CH 2075 1/27/2022
1.7.2.17 TESTING (FDT) 9/9/2021
1.7.2.17.1 CH 1025 to CH 1250 9/9/2021
1.7.2.17.2 CH 1250 to CH 1500 10/25/2021
1.7.2.17.3 CH 1500 to CH 1750 11/24/2021
1.7.2.17.4 CH 1750 to CH 2075 2/3/2022
1.7.2.18 DIVERSION CHANNEL 7/14/2021
1.7.2.18.1 EARTH CHANNEL EXCAVATION 7/14/2021
1.7.2.18.1.1 CH 1115 7/14/2021
1.7.2.18.1.2 CH 1745 10/12/2021
1.7.2.18.2 GABION WALL ERECTION WORKS 8/13/2021
1.7.2.18.2.1 CH 1115 8/13/2021
1.7.2.18.2.2 CH 1745 11/12/2021
1.7.2.18.3 GEOTEXTILE LAYING 9/13/2021
1.7.2.18.3.1 CH 1115 9/13/2021
1.7.2.18.3.2 CH 1745 12/10/2021
1.7.2.18.4 BACKFILLING WORKS 9/14/2021
1.7.2.18.4.1 CH 1115 9/14/2021
1.7.2.18.4.2 CH 1745 12/13/2021
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.2.18.5 9/17/2021
WEEPHOLE
1.7.2.18.5.1 CH 1115 9/17/2021
1.7.2.18.5.2 CH 1745 12/15/2021
1.7.2.18.6 SLOPE PROTECTION STONE PITCHING 8/13/2021
1.7.2.18.6.1 CH 1115 LF 8/13/2021
1.7.2.18.6.2 CH 1115 RF 8/27/2021
1.7.2.18.6.3 CH 1745 LF 11/12/2021
1.7.2.18.6.4 CH 1745 RF 11/26/2021
1.7.2.18.7 SLOPE PROTECTION GABION CAGE 9/13/2021
1.7.2.18.7.1 CH 1115 9/13/2021
1.7.2.18.7.2 CH 1745 12/10/2021
1.7.2.18.8 SLOPE PROTECTION GEOTEXTILE LAYING 10/12/2021
1.7.2.18.8.1 CH 1115 10/12/2021
1.7.2.18.8.2 CH 1745 1/7/2022
1.7.2.18.9 SLOPE BACKFILLING 10/15/2021
1.7.2.18.9.1 CH 1115 10/15/2021
1.7.2.18.9.2 CH 1745 1/12/2022
1.7.2.19 SURFACE DRAIN 3/4/2021
1.7.2.19.1 INTERCEPTOR DRAIN (TYPE 2) 3/4/2021
1.7.2.19.1.1 CH 1375 to CH 1460 3/4/2021
1.7.2.19.1.2 CH 1550 to CH 1625 3/25/2021
1.7.2.19.1.3 CH 1650 to CH 1700 4/22/2021
1.7.2.19.1.4 CH 1840 to CH 1880 5/25/2021
1.7.2.19.2 STONE PITCHED SUMP (TYPE SC1) 3/18/2021
1.7.2.19.2.1 CH 1375 to CH 1460 3/18/2021
1.7.2.19.2.2 CH 1550 to CH 1625 4/8/2021
1.7.2.19.2.3 CH 1650 to CH 1700 5/7/2021
1.7.2.19.2.4 CH 1840 to CH 1880 6/10/2021
1.7.2.19.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 3/4/2021
1.7.2.19.3.1 CH 1060 to CH 1150 3/4/2021
1.7.2.19.3.2 CH 1475 to CH 1550 4/8/2021
1.7.2.19.3.3 CH 1650 to CH 1725 5/7/2021
1.7.2.19.3.4 CH 1750 to CH 1825 5/25/2021
1.7.2.19.4 STONE PITCHED SUMP (TYPE SC2) 3/18/2021
1.7.2.19.4.1 CH 1060 to CH 1150 3/18/2021
1.7.2.19.4.2 CH 1475 to CH 1550 4/22/2021
1.7.2.19.4.3 CH 1650 to CH 1725 5/25/2021
1.7.2.19.4.4 CH 1750 to CH 1825 6/10/2021
1.7.2.19.5 BRICK SUMP (TYPE SF2) 3/22/2021
1.7.2.19.5.1 CH 1060 to CH 1150 3/22/2021
1.7.2.19.5.2 CH 1475 to CH 1550 4/26/2021
1.7.2.19.5.3 CH 1650 to CH 1725 5/28/2021
1.7.2.19.5.4 CH 1750 to CH 1825 6/14/2021
1.7.2.19.6 EMBANKMENT TOE DRAINS (TYPE 1) 9/6/2021
1.7.2.19.6.1 CH 1000 to CH 1350 9/6/2021
1.7.2.19.6.2 CH 1450 to CH 1750 12/29/2021
1.7.2.19.6.3 CH 1925 to CH 2055 2/28/2022
1.7.2.19.7 BRICK SUMP (TYPE SF3) 9/21/2021
1.7.2.19.7.1 CH 1000 to CH 1350 9/21/2021
1.7.2.19.7.2 CH 1450 to CH 1750 1/12/2022
1.7.2.19.7.3 CH 1925 to CH 2055 3/14/2022
1.7.2.19.8 ROADSIDE DRAIN (TYPE RSD 1) 4/1/2021
1.7.2.19.8.1 CH 1350 to CH 1450 4/1/2021
1.7.2.19.8.2 CH 1450 to CH 1750 5/25/2021
1.7.2.19.8.3 CH 1825 to CH 1900 6/10/2021
1.7.2.19.9 STONE PITCH SUMP (TYPE SC3) 4/15/2021
1.7.2.19.9.1 CH 1350 to CH 1450 4/15/2021
1.7.2.19.9.2 CH 1450 to CH 1750 6/10/2021
1.7.2.19.9.3 CH 1825 to CH 1900 6/24/2021
1.7.2.19.10 CASCADE DRAIN 9/21/2021
1.7.2.19.10.1 CH 1125 to CH 1250 9/21/2021
1.7.2.19.10.2 CH 1350 to CH 1500 1/12/2022
1.7.2.19.10.3 CH 1550 to CH 1725 2/14/2022
1.7.2.19.10.4 CH 1825 to CH 1900 3/14/2022
1.7.2.20 LANDSCAPING 9/9/2021
1.7.2.20.1 GROUND SURFACE PREPARATION 9/9/2021
1.7.2.20.1.1 CH 1025 to CH 1250 9/9/2021
1.7.2.20.1.2 CH 1250 to CH 1500 10/25/2021
1.7.2.20.1.3 CH 1500 to CH 1750 2/3/2022
1.7.2.20.1.4 CH 1750 to CH 2075 3/3/2022
1.7.2.20.2 CLOSE TURFING 9/21/2021
1.7.2.20.2.1 CH 1025 to CH 1250 9/21/2021
1.7.2.20.2.2 CH 1250 to CH 1500 11/3/2021
1.7.2.20.2.3 CH 1500 to CH 1750 2/14/2022
1.7.2.20.2.4 CH 1750 to CH 2075 3/14/2022
1.7.2.21 NEW PAVEMENT 11/19/2021
1.7.2.21.1 SUBGRADE PREPARATION - 300MM 11/19/2021
1.7.2.21.1.1 CH 1025 to CH 1500 11/19/2021
1.7.2.21.1.2 CH 1500 to CH 2075 2/28/2022
1.7.2.21.2 SUB-BASE - 100MM 12/24/2021
1.7.2.21.2.1 CH 1025 to CH 1500 12/24/2021
1.7.2.21.2.2 CH 1500 to CH 2075 4/4/2022
1.7.2.21.3 ROADBASE - 300MM 1/31/2022
1.7.2.21.3.1 CH 1025 to CH 1500 1/31/2022
1.7.2.21.3.2 CH 1500 to CH 2075 5/12/2022
1.7.2.21.4 PRIME COATING WORK 3/9/2022
1.7.2.21.4.1 CH 1025 to CH 1500 3/9/2022
1.7.2.21.4.2 CH 1500 to CH 2075 6/17/2022
1.7.2.21.5 TACK COATING WORK 3/11/2022
1.7.2.21.5.1 CH 1025 to CH 1500 3/11/2022
1.7.2.21.5.2 CH 1500 to CH 2075 6/21/2022
1.7.2.22 JUNCTION 12/17/2021
1.7.2.22.1 STRIPPING TOP SOIL 12/17/2021
1.7.2.22.1.1 Junction 3 - CH 1050 12/17/2021
1.7.2.22.2 CUT AND FILL WORK 12/24/2021
1.7.2.22.2.1 Junction 3 - CH 1050 12/24/2021
1.7.2.22.3 CUT AND DISPOSE WORK 1/7/2022
1.7.2.22.3.1 Junction 3 - CH 1050 1/7/2022
1.7.2.22.4 TESTING (FDT) 1/24/2022
1.7.2.22.4.1 Junction 3 - CH 1050 1/24/2022
1.7.2.22.5 LANDSCAPING 1/27/2022
1.7.2.22.5.1 Junction 3 - CH 1050 1/27/2022
1.7.2.22.6 SUBGRADE PREPARATION - 300MM 2/14/2022
1.7.2.22.6.1 Junction 3 - CH 1050 2/14/2022
1.7.2.22.7 SUB-BASE - 100MM 2/21/2022
1.7.2.22.7.1 Junction 3 - CH 1050 2/21/2022
1.7.2.22.8 ROADBASE - 300MM 2/28/2022
1.7.2.22.8.1 Junction 3 - CH 1050 2/28/2022
1.7.2.22.9 PRIME COATING WORK 3/7/2022
1.7.2.22.9.1 Junction 3 - CH 1050 3/7/2022
1.7.2.22.10 TACK COATING WORK 3/8/2022
1.7.2.22.10.1 Junction 3 - CH 1050 3/8/2022
1.7.2.23 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 1/24/2022
1.7.2.23.1 CH 1025 to CH 1500 1/24/2022
1.7.2.23.2 CH 1500 to CH 2075 5/5/2022
1.7.2.24 BRICK SUMP (TYPE SF1) 2/23/2022
1.7.2.24.1 CH 1025 to CH 1500 2/23/2022
1.7.2.24.2 CH 1500 to CH 2075 6/3/2022
1.7.2.25 WEARING COURSE LAYING - 50MM 3/15/2022
1.7.2.25.1 CH 1025 to CH 1500 3/15/2022
1.7.2.25.2 CH 1500 to CH 2075 8/3/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.2.26 3/18/2022
COMPACTION WORK
1.7.2.26.1 CH 1025 to CH 1500 3/18/2022
1.7.2.26.2 CH 1500 to CH 2075 8/8/2022
1.7.3 CH 2075 - CH 3025 3/5/2021
1.7.3.1 GENERAL CLEARANCE 3/5/2021
1.7.3.1.1 CH 2075 to CH 2250 3/5/2021
1.7.3.1.2 CH 2250 to CH 2500 3/26/2021
1.7.3.1.3 CH 2500 to CH 2750 4/16/2021
1.7.3.1.4 CH 2750 to CH 3025 5/10/2021
1.7.3.2 DEMOLITION WORKS 3/26/2021
1.7.3.2.1 CH 2075 to CH 2250 3/26/2021
1.7.3.2.2 CH 2250 to CH 2500 4/16/2021
1.7.3.2.3 CH 2500 to CH 2750 5/10/2021
1.7.3.2.4 CH 2750 to CH 3025 6/3/2021
1.7.3.3 TEMPORARY ACCESS 4/16/2021
1.7.3.3.1 CH 2075 to CH 2250 4/16/2021
1.7.3.3.2 CH 2250 to CH 2500 5/10/2021
1.7.3.3.3 CH 2500 to CH 2750 6/3/2021
1.7.3.3.4 CH 2750 to CH 3025 6/25/2021
1.7.3.4 TEMPORARY CROSSING 3/5/2021
1.7.3.4.1 C10 - CH 2160 3/5/2021
1.7.3.4.2 C11 - CH 2250 4/21/2021
1.7.3.4.3 C12 - CH 2285 4/26/2021
1.7.3.4.4 C13 - CH 2430 4/30/2021
1.7.3.5 STRIPPING OF TOPSOIL 4/21/2021
1.7.3.5.1 CH 2075 to CH 2250 4/21/2021
1.7.3.5.2 CH 2250 to CH 2500 5/17/2021
1.7.3.5.3 CH 2500 to CH 2750 6/9/2021
1.7.3.5.4 CH 2750 to CH 3025 6/30/2021
1.7.3.6 EXCAVATION OF TEMPORARY EARTH DRAIN 5/17/2021
1.7.3.6.1 CH 2075 to CH 2150 5/17/2021
1.7.3.6.2 CH 2150 to CH 2350 6/9/2021
1.7.3.6.3 CH 2350 to CH 2425 6/11/2021
1.7.3.6.4 CH 2550 to CH 2640 6/30/2021
1.7.3.6.5 CH 2745 to CH 2790 7/22/2021
1.7.3.6.6 CH 2910 to CH 3025 7/26/2021
1.7.3.7 EXCAVATE TO SUITABLE MATERIAL 5/19/2021
1.7.3.7.1 CH 2075 to CH 2150 5/19/2021
1.7.3.7.2 CH 2330 to CH 2425 6/18/2021
1.7.3.7.3 CH 2550 to CH 2640 8/17/2021
1.7.3.7.4 CH 2745 to CH 2790 10/20/2021
1.7.3.7.5 CH 2910 to CH 3025 11/19/2021
1.7.3.8 EXCAVATE FOR SAND REPLACEMENT 7/16/2021
1.7.3.8.1 CH 2425 - CH 2525 (2.0M) 7/16/2021
1.7.3.9 EXCAVATE TO HARD MATERIAL 6/18/2021
1.7.3.9.1 CH 2075 to CH 2150 6/18/2021
1.7.3.9.2 CH 2910 to CH 3025 12/17/2021
1.7.3.10 EXCAVATE TO ROCK 7/16/2021
1.7.3.10.1 CH 2075 to CH 2150 7/16/2021
1.7.3.10.2 CH 2910 to CH 3025 1/14/2022
1.7.3.11 ROCK FACE PROTECTION 8/17/2021
1.7.3.11.1 PLANT MOBILIZATION & WORK PLATFORM 8/17/2021
1.7.3.11.1.1 CH 2075 to CH 2150 8/17/2021
1.7.3.11.1.2 CH 2910 to CH 3025 2/16/2022
1.7.3.11.2 DRILLING AND INSTALL ANCHORING 9/15/2021
1.7.3.11.2.1 CH 2075 to CH 2150 LF 9/15/2021
1.7.3.11.2.2 CH 2075 to CH 2150 RF 10/14/2021
1.7.3.11.2.3 CH 2910 to CH 3025 LF 3/16/2022
1.7.3.11.2.4 CH 2910 to CH 3025 RF 4/13/2022
1.7.3.11.3 INSTALLATION STEEL NETTING 11/25/2021
1.7.3.11.3.1 CH 2075 to CH 2150 11/25/2021
1.7.3.11.3.2 CH 2910 to CH 3025 5/26/2022
1.7.3.12 BOULDER PROTECTION 9/15/2021
1.7.3.12.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.12.1.1 CH 2075 to CH 2150 9/15/2021
1.7.3.12.1.2 CH 2910 to CH 3025 3/16/2022
1.7.3.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 9/20/2021
1.7.3.12.2.1 CH 2075 to CH 2150 9/20/2021
1.7.3.12.2.2 CH 2910 to CH 3025 3/18/2022
1.7.3.12.3 DRILL AND INSTALL DOWEL BAR 10/18/2021
1.7.3.12.3.1 CH 2075 to CH 2150 LF 10/18/2021
1.7.3.12.3.2 CH 2075 to CH 2150 RF 11/18/2021
1.7.3.12.3.3 CH 2910 to CH 3025 LF 4/15/2022
1.7.3.12.3.4 CH 2910 to CH 3025 RF 5/19/2022
1.7.3.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 12/16/2021
1.7.3.12.4.1 CH 2075 to CH 2150 12/16/2021
1.7.3.12.4.2 CH 2910 to CH 3025 6/16/2022
1.7.3.12.5 CONCRETE WORK 12/30/2021
1.7.3.12.5.1 CH 2075 to CH 2150 12/30/2021
1.7.3.12.5.2 CH 2910 to CH 3025 6/30/2022
1.7.3.12.6 FINISH WORK 1/12/2022
1.7.3.12.6.1 CH 2075 to CH 2150 1/12/2022
1.7.3.12.6.2 CH 2910 to CH 3025 7/13/2022
1.7.3.13 ROCK BOLT 9/15/2021
1.7.3.13.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.13.1.1 CH 2075 to CH 2150 9/15/2021
1.7.3.13.1.2 CH 2910 to CH 3025 9/27/2021
1.7.3.13.2 DRILLING WORK AND INSTALLATION WORKS 9/27/2021
1.7.3.13.2.1 CH 2075 to CH 2150 9/27/2021
1.7.3.13.2.2 CH 2910 to CH 3025 10/15/2021
1.7.3.13.3 GUNITING WORK 10/15/2021
1.7.3.13.3.1 CH 2075 to CH 2150 10/15/2021
1.7.3.13.3.2 CH 2910 to CH 3025 11/9/2021
1.7.3.13.4 PULL OUT TEST 12/15/2021
1.7.3.13.4.1 CH 2075 to CH 2150 12/15/2021
1.7.3.13.4.2 CH 2910 to CH 3025 1/4/2022
1.7.3.14 HORIZONTAL DRAIN 9/27/2021
1.7.3.14.1 MARKING OF DRAIN POINT 9/27/2021
1.7.3.14.1.1 CH 2550 to CH 2640 - 6M 9/27/2021
1.7.3.14.1.2 CH 2910 to CH 3025 - 6M 12/28/2021
1.7.3.14.2 INSTALLATION OF PIPE DRAIN 9/29/2021
1.7.3.14.2.1 CH 2550 to CH 2640 - 6M 9/29/2021
1.7.3.14.2.2 CH 2910 to CH 3025 - 6M 12/30/2021
1.7.3.15 EXCAVATE TO UNSUITABLE MATERIAL 12/17/2021
1.7.3.15.1 CH 2150 - CH 2350 12/17/2021
1.7.3.15.2 CH 2425 - CH 2550 1/14/2022
1.7.3.16 LAYING GEOTEXTILE LAYER 8/17/2021
1.7.3.16.1 CH 2425 - CH 2525 (2.0M) BOTTOM 8/17/2021
1.7.3.16.2 CH 2425 - CH 2525 (2.0M) TOP 9/20/2021
1.7.3.17 SAND FILLING WORKS & COMPACTION 8/19/2021
1.7.3.17.1 CH 2425 - CH 2525 (2.0M) 8/19/2021
1.7.3.18 IN-SITU RC BOX CULVERT 5/17/2021
1.7.3.18.1 EXCAVATION WORK 5/17/2021
1.7.3.18.1.1 C10 - CH 2160 (25.0M) 5/17/2021
1.7.3.18.1.2 C11 - CH 2250 (36.0M) 5/24/2021
1.7.3.18.1.3 C12 - CH 2285 (52.0M) 6/9/2021
1.7.3.18.1.4 C13 - CH 2430 (56.0M) 6/16/2021
1.7.3.18.2 LAYING OF GEOTEXTILE WORK 5/24/2021
1.7.3.18.2.1 C10 - CH 2160 (25.0M) 5/24/2021
1.7.3.18.2.2 C11 - CH 2250 (36.0M) 6/1/2021
1.7.3.18.2.3 C12 - CH 2285 (52.0M) 6/16/2021
1.7.3.18.2.4 C13 - CH 2430 (56.0M) 6/23/2021
1.7.3.18.3 FOUNDATION (TYPE B) 5/27/2021
1.7.3.18.3.1 C10 - CH 2160 (25.0M) 5/27/2021
1.7.3.18.3.2 C11 - CH 2250 (36.0M) 6/3/2021
1.7.3.18.3.3 C12 - CH 2285 (52.0M) 6/18/2021
1.7.3.18.3.4 C13 - CH 2430 (56.0M) 6/25/2021
1.7.3.18.4 LEAN-CON 6/3/2021
1.7.3.18.4.1 C10 - CH 2160 (25.0M) 6/3/2021
1.7.3.18.4.2 C11 - CH 2250 (36.0M) 6/11/2021
1.7.3.18.4.3 C12 - CH 2285 (52.0M) 6/25/2021
1.7.3.18.4.4 C13 - CH 2430 (56.0M) 7/2/2021
1.7.3.18.5 BASE SLAB 6/8/2021
1.7.3.18.5.1 C10 - CH 2160 (25.0M) 6/8/2021
1.7.3.18.5.2 C11 - CH 2250 (36.0M) 6/29/2021
1.7.3.18.5.3 C12 - CH 2285 (52.0M) 7/21/2021
1.7.3.18.5.4 C13 - CH 2430 (56.0M) 8/12/2021
1.7.3.18.6 SIDEWALL, WINGWALL 9/15/2021
1.7.3.18.6.1 C10 - CH 2160 (25.0M) 9/15/2021
1.7.3.18.6.2 C11 - CH 2250 (36.0M) 10/7/2021
1.7.3.18.6.3 C12 - CH 2285 (52.0M) 10/29/2021
1.7.3.18.6.4 C13 - CH 2430 (56.0M) 11/23/2021
1.7.3.18.7 TOP COVER 11/17/2021
1.7.3.18.7.1 C10 - CH 2160 (25.0M) 11/17/2021
1.7.3.18.7.2 C11 - CH 2250 (36.0M) 12/8/2021
1.7.3.18.7.3 C12 - CH 2285 (52.0M) 12/29/2021
1.7.3.18.7.4 C13 - CH 2430 (56.0M) 1/20/2022
1.7.3.18.8 SUBSURFACE INSTALLATION & FILLINGS 11/17/2021
1.7.3.18.8.1 C10 - CH 2160 (25.0M) 11/17/2021
1.7.3.18.8.2 C11 - CH 2250 (36.0M) 12/8/2021
1.7.3.18.8.3 C12 - CH 2285 (52.0M) 12/29/2021
1.7.3.18.8.4 C13 - CH 2430 (56.0M) 1/20/2022
1.7.3.18.9 BACKFILLING WORKS 12/10/2021
1.7.3.18.9.1 C10 - CH 2160 (25.0M) 12/10/2021
1.7.3.18.9.2 C11 - CH 2250 (36.0M) 12/31/2021
1.7.3.18.9.3 C12 - CH 2285 (52.0M) 1/24/2022
1.7.3.18.9.4 C13 - CH 2430 (56.0M) 2/16/2022
1.7.3.19 FILLING WORKS & COMPACTION 1/31/2022
1.7.3.19.1 CH 2150 - CH 2350 1/31/2022
1.7.3.19.2 CH 2425 - CH 2550 3/2/2022
1.7.3.20 TESTING (FDT) 3/7/2022
1.7.3.20.1 CH 2075 to CH 2250 3/7/2022
1.7.3.20.2 CH 2250 to CH 2500 3/16/2022
1.7.3.20.3 CH 2500 to CH 2750 4/4/2022
1.7.3.20.4 CH 2750 to CH 3025 4/13/2022
1.7.3.21 DIVERSION CHANNEL 2/23/2022
1.7.3.21.1 EARTH CHANNEL EXCAVATION 2/23/2022
1.7.3.21.1.1 CH 2430 2/23/2022
1.7.3.21.2 GABION WALL ERECTION WORKS 3/23/2022
1.7.3.21.2.1 CH 2430 3/23/2022
1.7.3.21.3 GEOTEXTILE LAYING 4/21/2022
1.7.3.21.3.1 CH 2430 4/21/2022
1.7.3.21.4 BACKFILLING WORKS 4/22/2022
1.7.3.21.4.1 CH 2430 4/22/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.3.21.5 WEEPHOLE 4/26/2022
1.7.3.21.5.1 CH 2430 4/26/2022
1.7.3.21.6 SLOPE PROTECTION STONE PITCHING 3/23/2022
1.7.3.21.6.1 CH 2430 LF 3/23/2022
1.7.3.21.6.2 CH 2430 RF 4/6/2022
1.7.3.21.7 SLOPE PROTECTION GABION CAGE 4/21/2022
1.7.3.21.7.1 CH 2430 4/21/2022
1.7.3.21.8 SLOPE PROTECTION GEOTEXTILE LAYING 5/24/2022
1.7.3.21.8.1 CH 2430 5/24/2022
1.7.3.21.9 SLOPE BACKFILLING 5/27/2022
1.7.3.21.9.1 CH 2430 5/27/2022
1.7.3.22 SURFACE DRAIN 6/18/2021
1.7.3.22.1 INTERCEPTOR DRAIN (TYPE 2) 6/18/2021
1.7.3.22.1.1 CH 2075 to CH 2150 6/18/2021
1.7.3.22.1.2 CH 2330 to CH 2425 7/16/2021
1.7.3.22.1.3 CH 2550 to CH 2640 9/15/2021
1.7.3.22.1.4 CH 2910 to CH 3025 12/17/2021
1.7.3.22.2 STONE PITCHED SUMP (TYPE SC1) 7/2/2021
1.7.3.22.2.1 CH 2075 to CH 2150 7/2/2021
1.7.3.22.2.2 CH 2330 to CH 2425 8/2/2021
1.7.3.22.2.3 CH 2550 to CH 2640 9/30/2021
1.7.3.22.2.4 CH 2910 to CH 3025 12/31/2021
1.7.3.22.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 7/2/2021
1.7.3.22.3.1 CH 2075 to CH 2150 7/2/2021
1.7.3.22.3.2 CH 2250 to CH 2325 7/16/2021
1.7.3.22.3.3 CH 2325 to CH 2400 8/2/2021
1.7.3.22.3.4 CH 2400 to CH 2550 8/17/2021
1.7.3.22.3.5 CH 2550 to CH 2640 9/30/2021
1.7.3.22.3.6 CH 2910 to CH 3000 12/31/2021
1.7.3.22.4 STONE PITCHED SUMP (TYPE SC2) 7/16/2021
1.7.3.22.4.1 CH 2075 to CH 2150 7/16/2021
1.7.3.22.4.2 CH 2250 to CH 2325 8/2/2021
1.7.3.22.4.3 CH 2325 to CH 2400 8/17/2021
1.7.3.22.4.4 CH 2400 to CH 2550 9/1/2021
1.7.3.22.4.5 CH 2550 to CH 2640 10/14/2021
1.7.3.22.4.6 CH 2910 to CH 3000 1/14/2022
1.7.3.22.5 BRICK SUMP (TYPE SF2) 7/21/2021
1.7.3.22.5.1 CH 2075 to CH 2150 7/21/2021
1.7.3.22.5.2 CH 2250 to CH 2325 8/4/2021
1.7.3.22.5.3 CH 2325 to CH 2400 8/19/2021
1.7.3.22.5.4 CH 2400 to CH 2550 9/3/2021
1.7.3.22.5.5 CH 2550 to CH 2640 10/18/2021
1.7.3.22.5.6 CH 2910 to CH 3000 1/19/2022
1.7.3.22.6 EMBANKMENT TOE DRAINS (TYPE 1) 3/14/2022
1.7.3.22.6.1 CH 2175 to CH 2250 3/14/2022
1.7.3.22.6.2 CH 2250 to CH 2325 3/28/2022
1.7.3.22.6.3 CH 2400 to CH 2550 4/11/2022
1.7.3.22.7 BRICK SUMP (TYPE SF3) 3/28/2022
1.7.3.22.7.1 CH 2175 to CH 2250 3/28/2022
1.7.3.22.7.2 CH 2250 to CH 2325 4/11/2022
1.7.3.22.7.3 CH 2400 to CH 2550 4/26/2022
1.7.3.22.8 ROADSIDE DRAIN (TYPE RSD 1) 9/1/2021
1.7.3.22.8.1 CH 2060 to CH 2175 9/1/2021
1.7.3.22.8.2 CH 2175 to CH 2250 9/15/2021
1.7.3.22.8.3 CH 2325 to CH 2400 9/30/2021
1.7.3.22.8.4 CH 2550 to CH 2640 10/14/2021
1.7.3.22.8.5 CH 2740 to CH 2790 10/29/2021
1.7.3.22.8.6 CH 2915 to CH 3050 1/14/2022
1.7.3.22.9 STONE PITCH SUMP (TYPE SC3) 9/15/2021
1.7.3.22.9.1 CH 2060 to CH 2175 9/15/2021
1.7.3.22.9.2 CH 2175 to CH 2250 9/30/2021
1.7.3.22.9.3 CH 2325 to CH 2400 10/14/2021
1.7.3.22.9.4 CH 2550 to CH 2640 10/29/2021
1.7.3.22.9.5 CH 2740 to CH 2790 11/16/2021
1.7.3.22.9.6 CH 2915 to CH 3050 1/31/2022
1.7.3.22.10 CASCADE DRAIN 4/11/2022
1.7.3.22.10.1 CH 2060 to CH 2175 4/11/2022
1.7.3.22.10.2 CH 2225 to CH 2350 5/12/2022
1.7.3.22.10.3 CH 2400 to CH 2565 6/10/2022
1.7.3.22.10.4 CH 2900 to CH 3050 7/8/2022
1.7.3.23 LANDSCAPING 3/14/2022
1.7.3.23.1 GROUND SURFACE PREPARATION 3/14/2022
1.7.3.23.1.1 CH 2075 to CH 2250 3/14/2022
1.7.3.23.1.2 CH 2250 to CH 2500 4/4/2022
1.7.3.23.1.3 CH 2500 to CH 2750 4/13/2022
1.7.3.23.1.4 CH 2750 to CH 3025 4/25/2022
1.7.3.23.2 CLOSE TURFING 3/28/2022
1.7.3.23.2.1 CH 2075 to CH 2250 3/28/2022
1.7.3.23.2.2 CH 2250 to CH 2500 4/13/2022
1.7.3.23.2.3 CH 2500 to CH 2750 4/28/2022
1.7.3.23.2.4 CH 2750 to CH 3025 5/17/2022
1.7.3.24 NEW PAVEMENT 4/8/2022
1.7.3.24.1 SUBGRADE PREPARATION - 300MM 4/8/2022
1.7.3.24.1.1 CH 2075 to CH 2500 4/8/2022
1.7.3.24.1.2 CH 2500 to CH 3025 5/11/2022
1.7.3.24.2 SUB-BASE - 100MM 5/19/2022
1.7.3.24.2.1 CH 2075 to CH 2500 5/19/2022
1.7.3.24.2.2 CH 2500 to CH 3025 6/16/2022
1.7.3.24.3 ROADBASE - 300MM 6/23/2022
1.7.3.24.3.1 CH 2075 to CH 2500 6/23/2022
1.7.3.24.3.2 CH 2500 to CH 3025 7/21/2022
1.7.3.24.4 PRIME COATING WORK 7/28/2022
1.7.3.24.4.1 CH 2075 to CH 2500 7/28/2022
1.7.3.24.4.2 CH 2500 to CH 3025 8/25/2022
1.7.3.24.5 TACK COATING WORK 8/1/2022
1.7.3.24.5.1 CH 2075 to CH 2500 8/1/2022
1.7.3.24.5.2 CH 2500 to CH 3025 8/29/2022
1.7.3.25 JUNCTION 6/9/2022
1.7.3.25.1 STRIPPING TOP SOIL 6/9/2022
1.7.3.25.1.1 Junction 4 - CH 2750 6/9/2022
1.7.3.25.2 CUT AND FILL WORK 6/16/2022
1.7.3.25.2.1 Junction 4 - CH 2750 6/16/2022
1.7.3.25.3 CUT AND DISPOSE WORK 6/30/2022
1.7.3.25.3.1 Junction 4 - CH 2750 6/30/2022
1.7.3.25.4 TESTING (FDT) 7/14/2022
1.7.3.25.4.1 Junction 4 - CH 2750 7/14/2022
1.7.3.25.5 LANDSCAPING 7/19/2022
1.7.3.25.5.1 Junction 4 - CH 2750 7/19/2022
1.7.3.25.6 SUBGRADE PREPARATION - 300MM 8/2/2022
1.7.3.25.6.1 Junction 4 - CH 2750 8/2/2022
1.7.3.25.7 SUB-BASE - 100MM 8/9/2022
1.7.3.25.7.1 Junction 4 - CH 2750 8/9/2022
1.7.3.25.8 ROADBASE - 300MM 8/16/2022
1.7.3.25.8.1 Junction 4 - CH 2750 8/16/2022
1.7.3.25.9 PRIME COATING WORK 8/23/2022
1.7.3.25.9.1 Junction 4 - CH 2750 8/23/2022
1.7.3.25.10 TACK COATING WORK 8/24/2022
1.7.3.25.10.1 Junction 4 - CH 2750 8/24/2022
1.7.3.26 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 6/16/2022
1.7.3.26.1 CH 2075 to CH 2500 6/16/2022
1.7.3.26.2 CH 2500 to CH 3025 7/14/2022
1.7.3.27 BRICK SUMP (TYPE SF1) 7/14/2022
1.7.3.27.1 CH 2075 to CH 2500 7/14/2022
1.7.3.27.2 CH 2500 to CH 3025 8/11/2022
1.7.3.28 WEARING COURSE LAYING - 50MM 8/8/2022
1.7.3.28.1 CH 2075 to CH 2500 8/8/2022
1.7.3.28.2 CH 2500 to CH 3025 11/23/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.3.29 8/15/2022
COMPACTION WORK
1.7.3.29.1 CH 2075 to CH 2500 8/15/2022
1.7.3.29.2 CH 2500 to CH 3025 11/28/2022
1.7.4 CH 3025 - CH 4156 6/30/2021
1.7.4.1 GENERAL CLEARANCE 6/30/2021
1.7.4.1.1 CH 3025 to CH 3250 6/30/2021
1.7.4.1.2 CH 3250 to CH 3500 7/22/2021
1.7.4.1.3 CH 3500 to CH 3750 8/13/2021
1.7.4.1.4 CH 3750 to CH 4000 9/6/2021
1.7.4.1.5 CH 4000 to CH 4156.876 9/28/2021
1.7.4.2 DEMOLITION WORKS 7/22/2021
1.7.4.2.1 CH 3025 to CH 3250 7/22/2021
1.7.4.2.2 CH 3250 to CH 3500 8/13/2021
1.7.4.2.3 CH 3500 to CH 3750 9/6/2021
1.7.4.2.4 CH 3750 to CH 4000 9/28/2021
1.7.4.2.5 CH 4000 to CH 4156.876 10/20/2021
1.7.4.3 TEMPORARY ACCESS 8/13/2021
1.7.4.3.1 CH 3025 to CH 3250 8/13/2021
1.7.4.3.2 CH 3250 to CH 3500 9/6/2021
1.7.4.3.3 CH 3500 to CH 3750 9/28/2021
1.7.4.3.4 CH 3750 to CH 4000 10/20/2021
1.7.4.3.5 CH 4000 to CH 4156.876 11/12/2021
1.7.4.4 TEMPORARY CROSSING 8/18/2021
1.7.4.4.1 C14 - CH 3410 8/18/2021
1.7.4.4.2 C15 - CH 3575 9/9/2021
1.7.4.4.3 C16 - CH 3735 9/14/2021
1.7.4.4.4 C17 - CH 3950 10/1/2021
1.7.4.4.5 C18 - CH 4025 10/25/2021
1.7.4.5 STRIPPING OF TOPSOIL 8/18/2021
1.7.4.5.1 CH 3025 to CH 3250 8/18/2021
1.7.4.5.2 CH 3250 to CH 3500 9/9/2021
1.7.4.5.3 CH 3500 to CH 3750 10/1/2021
1.7.4.5.4 CH 3750 to CH 4000 10/25/2021
1.7.4.5.5 CH 4000 to CH 4156.876 11/17/2021
1.7.4.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/1/2021
1.7.4.6.1 CH 3200 to CH 3375 10/1/2021
1.7.4.6.2 CH 3375 to CH 3450 10/5/2021
1.7.4.6.3 CH 3450 to CH 3550 10/7/2021
1.7.4.6.4 CH 3550 to CH 3775 10/25/2021
1.7.4.6.5 CH 3775 to CH 3925 11/17/2021
1.7.4.6.6 CH 3925 to CH 4075 12/8/2021
1.7.4.6.7 CH 4075 to CH 4156.876 12/10/2021
1.7.4.7 EXCAVATE TO SUITABLE MATERIAL 10/5/2021
1.7.4.7.1 CH 3200 to CH 3375 10/5/2021
1.7.4.7.2 CH 3450 to CH 3550 11/3/2021
1.7.4.7.3 CH 3650 to CH 3750 12/3/2021
1.7.4.7.4 CH 3775 to CH 3925 12/31/2021
1.7.4.7.5 CH 4075 to CH 4156.876 3/2/2022
1.7.4.8 EXCAVATE FOR SAND REPLACEMENT 1/31/2022
1.7.4.8.1 CH 3975 - CH 4075 (1.5M) 1/31/2022
1.7.4.9 EXCAVATE TO HARD MATERIAL 11/3/2021
1.7.4.9.1 CH 3200 to CH 3375 11/3/2021
1.7.4.9.2 CH 3825 to CH 3875 1/31/2022
1.7.4.9.3 CH 4075 to CH 4156.876 3/30/2022
1.7.4.10 EXCAVATE TO ROCK 12/3/2021
1.7.4.10.1 CH 3200 to CH 3375 12/3/2021
1.7.4.10.2 CH 3825 to CH 3875 3/2/2022
1.7.4.10.3 CH 4075 to CH 4156.876 4/28/2022
1.7.4.11 ROCK FACE PROTECTION 3/16/2022
1.7.4.11.1 PLANT MOBILIZATION & WORK PLATFORM 3/16/2022
1.7.4.11.1.1 CH 3200 to CH 3375 3/16/2022
1.7.4.11.1.2 CH 3825 to CH 3875 4/13/2022
1.7.4.11.1.3 CH 4075 to CH 4156 5/31/2022
1.7.4.11.2 DRILLING AND INSTALL ANCHORING 5/17/2022
1.7.4.11.2.1 CH 3200 to CH 3375 LF 5/17/2022
1.7.4.11.2.2 CH 3200 to CH 3375 RF 6/14/2022
1.7.4.11.2.3 CH 3825 to CH 3875 LF 7/12/2022
1.7.4.11.2.4 CH 3825 to CH 3875 RF 8/9/2022
1.7.4.11.2.5 CH 4075 to CH 4156 LF 9/7/2022
1.7.4.11.2.6 CH 4075 to CH 4156 RF 10/6/2022
1.7.4.11.3 INSTALLATION STEEL NETTING 7/12/2022
1.7.4.11.3.1 CH 3200 to CH 3375 7/12/2022
1.7.4.11.3.2 CH 3825 to CH 3875 9/7/2022
1.7.4.11.3.3 CH 4075 to CH 4156 11/7/2022
1.7.4.12 BOULDER PROTECTION 4/13/2022
1.7.4.12.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.12.1.1 CH 3200 to CH 3375 4/13/2022
1.7.4.12.1.2 CH 3825 to CH 3875 5/17/2022
1.7.4.12.1.3 CH 4075 to CH 4156 6/28/2022
1.7.4.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 4/15/2022
1.7.4.12.2.1 CH 3200 to CH 3375 4/15/2022
1.7.4.12.2.2 CH 3825 to CH 3875 5/19/2022
1.7.4.12.2.3 CH 4075 to CH 4156 6/30/2022
1.7.4.12.3 DRILL AND INSTALL DOWEL BAR 6/16/2022
1.7.4.12.3.1 CH 3200 to CH 3375 LF 6/16/2022
1.7.4.12.3.2 CH 3200 to CH 3375 LF 7/14/2022
1.7.4.12.3.3 CH 3825 to CH 3875 LF 8/11/2022
1.7.4.12.3.4 CH 3825 to CH 3875 LF 9/9/2022
1.7.4.12.3.5 CH 4075 to CH 4156 LF 10/10/2022
1.7.4.12.3.6 CH 4075 to CH 4156 LF 11/9/2022
1.7.4.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 8/11/2022
1.7.4.12.4.1 CH 3200 to CH 3375 8/11/2022
1.7.4.12.4.2 CH 3825 to CH 3875 10/10/2022
1.7.4.12.4.3 CH 4075 to CH 4156 12/7/2022
1.7.4.12.5 CONCRETE WORK 8/25/2022
1.7.4.12.5.1 CH 3200 to CH 3375 8/25/2022
1.7.4.12.5.2 CH 3825 to CH 3875 10/25/2022
1.7.4.12.5.3 CH 4075 to CH 4156 12/21/2022
1.7.4.12.6 FINISH WORK 9/8/2022
1.7.4.12.6.1 CH 3200 to CH 3375 9/8/2022
1.7.4.12.6.2 CH 3825 to CH 3875 11/8/2022
1.7.4.12.6.3 CH 4075 to CH 4156 1/3/2023
1.7.4.13 ROCK BOLT 4/13/2022
1.7.4.13.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.13.1.1 CH 3200 to CH 3375 4/13/2022
1.7.4.13.1.2 CH 3825 to CH 3875 5/17/2022
1.7.4.13.1.3 CH 4075 to CH 4156 6/28/2022
1.7.4.13.2 DRILLING WORK AND INSTALLATION WORKS 4/25/2022
1.7.4.13.2.1 CH 3200 to CH 3375 4/25/2022
1.7.4.13.2.2 CH 3825 to CH 3875 5/26/2022
1.7.4.13.2.3 CH 4075 to CH 4156 7/7/2022
1.7.4.13.3 GUNITING WORK 5/18/2022
1.7.4.13.3.1 CH 3200 to CH 3375 5/18/2022
1.7.4.13.3.2 CH 3825 to CH 3875 6/15/2022
1.7.4.13.3.3 CH 4075 to CH 4156 7/27/2022
1.7.4.13.4 PULL OUT TEST 7/13/2022
1.7.4.13.4.1 CH 3200 to CH 3375 7/13/2022
1.7.4.13.4.2 CH 3825 to CH 3875 8/10/2022
1.7.4.13.4.3 CH 4075 to CH 4156 9/23/2022
1.7.4.14 HORIZONTAL DRAIN 12/14/2021
1.7.4.14.1 MARKING OF DRAIN POINT 12/14/2021
1.7.4.14.1.1 CH 3200 to CH 3375 - 6M 5/19/2022
1.7.4.14.1.2 CH 3450 to CH 3500 - 6M 12/14/2021
1.7.4.14.1.3 CH 3500 to CH 3550 - 6M 12/16/2021
1.7.4.14.1.4 CH 3650 to CH 3750 - 6M 1/11/2022
1.7.4.14.1.5 CH 3775 to CH 3925 - 12M 2/11/2022
1.7.4.14.1.6 CH 4075 to CH 4156 - 6M 7/28/2022
1.7.4.14.2 INSTALLATION OF PIPE DRAIN 12/16/2021
1.7.4.14.2.1 CH 3200 to CH 3375 - 6M 5/23/2022
1.7.4.14.2.2 CH 3450 to CH 3500 - 6M 12/16/2021
1.7.4.14.2.3 CH 3500 to CH 3550 - 6M 12/27/2021
1.7.4.14.2.4 CH 3650 to CH 3750 - 6M 1/13/2022
1.7.4.14.2.5 CH 3775 to CH 3925 - 12M 2/15/2022
1.7.4.14.2.6 CH 4075 to CH 4156 - 6M 8/1/2022
1.7.4.15 EXCAVATE TO UNSUITABLE MATERIAL 3/30/2022
1.7.4.15.1 CH 3300 - CH 3350 3/30/2022
1.7.4.15.2 CH 3375 - CH 3475 4/28/2022
1.7.4.15.3 CH 3525 - CH 3650 5/31/2022
1.7.4.15.4 CH 3700 - CH 3825 6/28/2022
1.7.4.15.5 CH 3875 - CH 4075 7/26/2022
1.7.4.16 LAYING GEOTEXTILE LAYER 3/2/2022
1.7.4.16.1 CH 3975 - CH 4075 (1.5M) BOTTOM 3/2/2022
1.7.4.16.2 CH 3975 - CH 4075 (1.5M) TOP 4/1/2022
1.7.4.17 SAND FILLING WORKS & COMPACTION 3/4/2022
1.7.4.17.1 CH 3975 - CH 4075 (1.5M) 3/4/2022
1.7.4.18 SAND DRAINAGE BLANKET & ROCK FILL BUND 5/31/2022
1.7.4.18.1 SAND DRAINAGE BLANKET 5/31/2022
1.7.4.18.1.1 LAYING OF GEOTEXTILE WORK 5/31/2022
1.7.4.18.1.2 PLACEMENT AND COMPACTION OF SAND BLANKET 6/2/2022
1.7.4.18.2 ROCK FILL BUND 6/16/2022
1.7.4.18.2.1 EXCAVATION WORK 6/16/2022
1.7.4.18.2.2 LAYING OF GEOTEXTILE WORK 6/23/2022
1.7.4.18.2.3 ROCK FILLING WORKS 6/27/2022
1.7.4.19 PC CULVERT INSTALLATION 5/31/2022
1.7.4.19.1 EXCAVATION WORK 5/31/2022
1.7.4.19.1.1 C15 - CH 3575 (12.0M) 5/31/2022
1.7.4.19.2 LAYING OF GEOTEXTILE WORK 6/7/2022
1.7.4.19.2.1 C15 - CH 3575 (12.0M) 6/7/2022
1.7.4.19.3 FOUNDATION (TYPE B) 6/8/2022
1.7.4.19.3.1 C15 - CH 3575 (12.0M) 6/8/2022
1.7.4.19.4 PC CULVERT LAYING 6/15/2022
1.7.4.19.4.1 C15 - CH 3575 (12.0M) 6/15/2022
1.7.4.20 IN-SITU RC BOX CULVERT 10/1/2021
1.7.4.20.1 EXCAVATION WORK 10/1/2021
1.7.4.20.1.1 C14 - CH 3410 (70.0M) 10/1/2021
1.7.4.20.1.2 C16 - CH 3735 (38.0M) 10/25/2021
1.7.4.20.1.3 C17 - CH 3950 (32.0M) 11/17/2021
1.7.4.20.1.4 C18 - CH 4025 (45.0M) 12/8/2021
1.7.4.20.2 LAYING OF GEOTEXTILE WORK 10/8/2021
1.7.4.20.2.1 C14 - CH 3410 (70.0M) 10/8/2021
1.7.4.20.2.2 C16 - CH 3735 (38.0M) 11/1/2021
1.7.4.20.2.3 C17 - CH 3950 (32.0M) 11/24/2021
1.7.4.20.2.4 C18 - CH 4025 (45.0M) 12/15/2021
1.7.4.20.3 FOUNDATION (TYPE B) 10/12/2021
1.7.4.20.3.1 C14 - CH 3410 (70.0M) 10/12/2021
1.7.4.20.3.2 C16 - CH 3735 (38.0M) 11/3/2021
1.7.4.20.3.3 C17 - CH 3950 (32.0M) 11/26/2021
1.7.4.20.3.4 C18 - CH 4025 (45.0M) 12/17/2021
1.7.4.20.4 LEAN-CON 10/20/2021
1.7.4.20.4.1 C14 - CH 3410 (70.0M) 10/20/2021
1.7.4.20.4.2 C16 - CH 3735 (38.0M) 11/12/2021
1.7.4.20.4.3 C17 - CH 3950 (32.0M) 12/3/2021
1.7.4.20.4.4 C18 - CH 4025 (45.0M) 12/24/2021
1.7.4.20.5 BASE SLAB 10/22/2021
1.7.4.20.5.1 C14 - CH 3410 (70.0M) 10/22/2021
1.7.4.20.5.2 C16 - CH 3735 (38.0M) 11/16/2021
1.7.4.20.5.3 C17 - CH 3950 (32.0M) 12/7/2021
1.7.4.20.5.4 C18 - CH 4025 (45.0M) 12/28/2021
1.7.4.20.6 SIDEWALL, WINGWALL 12/22/2021
1.7.4.20.6.1 C14 - CH 3410 (70.0M) 12/22/2021
1.7.4.20.6.2 C16 - CH 3735 (38.0M) 1/12/2022
1.7.4.20.6.3 C17 - CH 3950 (32.0M) 2/7/2022
1.7.4.20.6.4 C18 - CH 4025 (45.0M) 2/28/2022
1.7.4.20.7 TOP COVER 2/22/2022
1.7.4.20.7.1 C14 - CH 3410 (70.0M) 2/22/2022
1.7.4.20.7.2 C16 - CH 3735 (38.0M) 3/15/2022
1.7.4.20.7.3 C17 - CH 3950 (32.0M) 4/5/2022
1.7.4.20.7.4 C18 - CH 4025 (45.0M) 4/27/2022
1.7.4.20.8 SUBSURFACE INSTALLATION & FILLINGS 2/22/2022
1.7.4.20.8.1 C14 - CH 3410 (70.0M) 2/22/2022
1.7.4.20.8.2 C16 - CH 3735 (38.0M) 3/15/2022
1.7.4.20.8.3 C17 - CH 3950 (32.0M) 4/5/2022
1.7.4.20.8.4 C18 - CH 4025 (45.0M) 4/27/2022
1.7.4.20.9 BACKFILLING WORKS 3/17/2022
1.7.4.20.9.1 C14 - CH 3410 (70.0M) 3/17/2022
1.7.4.20.9.2 C16 - CH 3735 (38.0M) 4/7/2022
1.7.4.20.9.3 C17 - CH 3950 (32.0M) 4/29/2022
1.7.4.20.9.4 C18 - CH 4025 (45.0M) 5/25/2022
1.7.4.21 FILLING WORKS & COMPACTION 12/17/2021
1.7.4.21.1 CH 3050 - CH 3075 12/17/2021
1.7.4.21.2 CH 3300 - CH 3350 4/28/2022
1.7.4.21.3 CH 3375 - CH 3475 5/31/2022
1.7.4.21.4 CH 3525 - CH 3650 6/28/2022
1.7.4.21.5 CH 3700 - CH 3825 7/26/2022
1.7.4.21.6 CH 3875 - CH 4075 8/23/2022
1.7.4.22 TESTING (FDT) 5/31/2022
1.7.4.22.1 CH 3025 to CH 3250 5/31/2022
1.7.4.22.2 CH 3250 to CH 3500 7/1/2022
1.7.4.22.3 CH 3500 to CH 3750 8/23/2022
1.7.4.22.4 CH 3750 to CH 4000 9/27/2022
1.7.4.22.5 CH 4000 to CH 4156.876 10/6/2022
1.7.4.23 DIVERSION CHANNEL 6/24/2022
1.7.4.23.1 EARTH CHANNEL EXCAVATION 6/24/2022
1.7.4.23.1.1 CH 3580 6/24/2022
1.7.4.23.1.2 CH 3960 7/22/2022
1.7.4.23.1.3 CH 4035 8/19/2022
1.7.4.23.2 GABION WALL ERECTION WORKS 7/22/2022
1.7.4.23.2.1 CH 3580 7/22/2022
1.7.4.23.2.2 CH 3960 8/19/2022
1.7.4.23.2.3 CH 4035 10/6/2022
1.7.4.23.3 GEOTEXTILE LAYING 8/19/2022
1.7.4.23.3.1 CH 3580 8/19/2022
1.7.4.23.3.2 CH 3960 9/20/2022
1.7.4.23.3.3 CH 4035 11/7/2022
1.7.4.23.4 BACKFILLING WORKS 8/22/2022
1.7.4.23.4.1 CH 3580 8/22/2022
1.7.4.23.4.2 CH 3960 9/21/2022
1.7.4.23.4.3 CH 4035 11/8/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.4.23.5 8/24/2022
WEEPHOLE
1.7.4.23.5.1 CH 3580 8/24/2022
1.7.4.23.5.2 CH 3960 9/23/2022
1.7.4.23.5.3 CH 4035 11/10/2022
1.7.4.23.6 SLOPE PROTECTION STONE PITCHING 7/22/2022
1.7.4.23.6.1 CH 3580 LF 7/22/2022
1.7.4.23.6.2 CH 3580 RF 8/5/2022
1.7.4.23.6.3 CH 3960 LF 8/19/2022
1.7.4.23.6.4 CH 3960 RF 9/5/2022
1.7.4.23.6.5 CH 4035 LF 9/20/2022
1.7.4.23.6.6 CH 4035 RF 10/4/2022
1.7.4.23.7 SLOPE PROTECTION GABION CAGE 8/19/2022
1.7.4.23.7.1 CH 3580 8/19/2022
1.7.4.23.7.2 CH 3960 9/20/2022
1.7.4.23.7.3 CH 4035 10/18/2022
1.7.4.23.8 SLOPE PROTECTION GEOTEXTILE LAYING 9/20/2022
1.7.4.23.8.1 CH 3580 9/20/2022
1.7.4.23.8.2 CH 3960 10/18/2022
1.7.4.23.8.3 CH 4035 11/17/2022
1.7.4.23.9 SLOPE BACKFILLING 9/23/2022
1.7.4.23.9.1 CH 3580 9/23/2022
1.7.4.23.9.2 CH 3960 10/21/2022
1.7.4.23.9.3 CH 4035 12/8/2022
1.7.4.24 SURFACE DRAIN 12/31/2021
1.7.4.24.1 INTERCEPTOR DRAIN (TYPE 2) 12/31/2021
1.7.4.24.1.1 CH 3200 to CH 3290 12/31/2021
1.7.4.24.1.2 CH 3300 to CH 3375 1/14/2022
1.7.4.24.1.3 CH 3450 to CH 3550 1/31/2022
1.7.4.24.1.4 CH 3660 to CH 3715 2/16/2022
1.7.4.24.1.5 CH 3775 to CH 3900 3/2/2022
1.7.4.24.1.6 CH 4075 to CH 4156.876 3/30/2022
1.7.4.24.2 STONE PITCHED SUMP (TYPE SC1) 1/14/2022
1.7.4.24.2.1 CH 3200 to CH 3290 1/14/2022
1.7.4.24.2.2 CH 3300 to CH 3375 1/31/2022
1.7.4.24.2.3 CH 3450 to CH 3550 2/16/2022
1.7.4.24.2.4 CH 3660 to CH 3715 3/2/2022
1.7.4.24.2.5 CH 3775 to CH 3900 3/16/2022
1.7.4.24.2.6 CH 4075 to CH 4156.876 4/13/2022
1.7.4.24.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/14/2022
1.7.4.24.3.1 CH 3200 to CH 3290 1/14/2022
1.7.4.24.3.2 CH 3290 to CH 3375 1/31/2022
1.7.4.24.3.3 CH 3400 to CH 3450 2/16/2022
1.7.4.24.3.4 CH 3450 to CH 3550 3/2/2022
1.7.4.24.3.5 CH 3660 to CH 3725 3/16/2022
1.7.4.24.3.6 CH 3725 to CH 3775 3/30/2022
1.7.4.24.3.7 CH 3775 to CH 3900 4/13/2022
1.7.4.24.3.8 CH 4075 to CH 4156.876 4/28/2022
1.7.4.24.4 STONE PITCHED SUMP (TYPE SC2) 1/31/2022
1.7.4.24.4.1 CH 3200 to CH 3290 1/31/2022
1.7.4.24.4.2 CH 3290 to CH 3375 2/16/2022
1.7.4.24.4.3 CH 3400 to CH 3450 3/2/2022
1.7.4.24.4.4 CH 3450 to CH 3550 3/16/2022
1.7.4.24.4.5 CH 3660 to CH 3725 3/30/2022
1.7.4.24.4.6 CH 3725 to CH 3775 4/13/2022
1.7.4.24.4.7 CH 3775 to CH 3900 4/28/2022
1.7.4.24.4.8 CH 4075 to CH 4156.876 5/17/2022
1.7.4.24.5 BRICK SUMP (TYPE SF2) 2/4/2022
1.7.4.24.5.1 CH 3200 to CH 3290 2/4/2022
1.7.4.24.5.2 CH 3290 to CH 3375 2/18/2022
1.7.4.24.5.3 CH 3400 to CH 3450 3/4/2022
1.7.4.24.5.4 CH 3450 to CH 3550 3/18/2022
1.7.4.24.5.5 CH 3660 to CH 3725 4/1/2022
1.7.4.24.5.6 CH 3725 to CH 3775 4/15/2022
1.7.4.24.5.7 CH 3775 to CH 3900 5/4/2022
1.7.4.24.5.8 CH 4075 to CH 4156.876 5/19/2022
1.7.4.24.6 EMBANKMENT TOE DRAINS (TYPE 1) 4/26/2022
1.7.4.24.6.1 CH 3050 to CH 3075 4/26/2022
1.7.4.24.6.2 CH 3275 to CH 3380 5/31/2022
1.7.4.24.6.3 CH 3380 to CH 3460 6/28/2022
1.7.4.24.6.4 CH 3550 to CH 3785 8/23/2022
1.7.4.24.6.5 CH 3925 to CH 4075 9/22/2022
1.7.4.24.7 BRICK SUMP (TYPE SF3) 5/12/2022
1.7.4.24.7.1 CH 3050 to CH 3075 5/12/2022
1.7.4.24.7.2 CH 3275 to CH 3380 6/14/2022
1.7.4.24.7.3 CH 3380 to CH 3460 7/12/2022
1.7.4.24.7.4 CH 3550 to CH 3785 9/7/2022
1.7.4.24.7.5 CH 3925 to CH 4075 10/6/2022
1.7.4.24.8 ROADSIDE DRAIN (TYPE RSD 1) 4/28/2022
1.7.4.24.8.1 CH 3210 to CH 3275 4/28/2022
1.7.4.24.8.2 CH 3275 to CH 3380 5/17/2022
1.7.4.24.8.3 CH 3460 to CH 3550 5/31/2022
1.7.4.24.8.4 CH 3785 to CH 3925 6/14/2022
1.7.4.24.8.5 CH 4075 to CH 4156.876 6/28/2022
1.7.4.24.9 STONE PITCH SUMP (TYPE SC3) 5/17/2022
1.7.4.24.9.1 CH 3210 to CH 3275 5/17/2022
1.7.4.24.9.2 CH 3275 to CH 3380 5/31/2022
1.7.4.24.9.3 CH 3460 to CH 3550 6/14/2022
1.7.4.24.9.4 CH 3785 to CH 3925 6/28/2022
1.7.4.24.9.5 CH 4075 to CH 4156.876 7/12/2022
1.7.4.24.10 CASCADE DRAIN 8/5/2022
1.7.4.24.10.1 CH 3375 to CH 3475 8/5/2022
1.7.4.24.10.2 CH 3525 to CH 3700 9/7/2022
1.7.4.24.10.3 CH 3700 to CH 3850 10/6/2022
1.7.4.24.10.4 CH 3900 to CH 4100 11/7/2022
1.7.4.25 LANDSCAPING 5/31/2022
1.7.4.25.1 GROUND SURFACE PREPARATION 5/31/2022
1.7.4.25.1.1 CH 3025 to CH 3250 5/31/2022
1.7.4.25.1.2 CH 3250 to CH 3500 7/1/2022
1.7.4.25.1.3 CH 3500 to CH 3750 8/23/2022
1.7.4.25.1.4 CH 3750 to CH 4000 9/27/2022
1.7.4.25.1.5 CH 4000 to CH 4156.876 10/6/2022
1.7.4.25.2 CLOSE TURFING 6/9/2022
1.7.4.25.2.1 CH 3025 to CH 3250 6/9/2022
1.7.4.25.2.2 CH 3250 to CH 3500 7/12/2022
1.7.4.25.2.3 CH 3500 to CH 3750 9/2/2022
1.7.4.25.2.4 CH 3750 to CH 4000 10/6/2022
1.7.4.25.2.5 CH 4000 to CH 4156.876 10/20/2022
1.7.4.26 NEW PAVEMENT 7/26/2022
1.7.4.26.1 SUBGRADE PREPARATION - 300MM 7/26/2022
1.7.4.26.1.1 CH 3025 to CH 3500 7/26/2022
1.7.4.26.1.2 CH 3500 to CH 4156.876 11/1/2022
1.7.4.26.2 SUB-BASE - 100MM 8/30/2022
1.7.4.26.2.1 CH 3025 to CH 3500 8/30/2022
1.7.4.26.2.2 CH 3500 to CH 4156.876 12/7/2022
1.7.4.26.3 ROADBASE - 300MM 10/6/2022
1.7.4.26.3.1 CH 3025 to CH 3500 10/6/2022
1.7.4.26.3.2 CH 3500 to CH 4156.876 1/11/2023
1.7.4.26.4 PRIME COATING WORK 11/14/2022
1.7.4.26.4.1 CH 3025 to CH 3500 11/14/2022
1.7.4.26.4.2 CH 3500 to CH 4156.876 2/15/2023
1.7.4.26.5 TACK COATING WORK 11/16/2022
1.7.4.26.5.1 CH 3025 to CH 3500 11/16/2022
1.7.4.26.5.2 CH 3500 to CH 4156.876 2/17/2023
1.7.4.27 JUNCTION 11/30/2022
1.7.4.27.1 STRIPPING TOP SOIL 11/30/2022
1.7.4.27.1.1 Junction 5 - CH 4156 11/30/2022
1.7.4.27.2 CUT AND FILL WORK 12/7/2022
1.7.4.27.2.1 Junction 5 - CH 4156 12/7/2022
1.7.4.27.3 CUT AND DISPOSE WORK 12/21/2022
1.7.4.27.3.1 Junction 5 - CH 4156 12/21/2022
1.7.4.27.4 TESTING (FDT) 1/4/2023
1.7.4.27.4.1 Junction 5 - CH 4156 1/4/2023
1.7.4.27.5 LANDSCAPING 1/9/2023
1.7.4.27.5.1 Junction 5 - CH 4156 1/9/2023
1.7.4.27.6 SUBGRADE PREPARATION - 300MM 1/23/2023
1.7.4.27.6.1 Junction 5 - CH 4156 1/23/2023
1.7.4.27.7 SUB-BASE - 100MM 1/30/2023
1.7.4.27.7.1 Junction 5 - CH 4156 1/30/2023
1.7.4.27.8 ROADBASE - 300MM 2/6/2023
1.7.4.27.8.1 Junction 5 - CH 4156 2/6/2023
1.7.4.27.9 PRIME COATING WORK 2/13/2023
1.7.4.27.9.1 Junction 5 - CH 4156 2/13/2023
1.7.4.27.10 TACK COATING WORK 2/14/2023
1.7.4.27.10.1 Junction 5 - CH 4156 2/14/2023
1.7.4.28 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 9/29/2022
1.7.4.28.1 CH 3025 to CH 3500 9/29/2022
1.7.4.28.2 CH 3500 to CH 4156.876 1/4/2023
1.7.4.29 BRICK SUMP (TYPE SF1) 10/28/2022
1.7.4.29.1 CH 3025 to CH 3500 10/28/2022
1.7.4.29.2 CH 3500 to CH 4156.876 2/1/2023
1.7.4.30 WEARING COURSE LAYING - 50MM 2/9/2023
1.7.4.30.1 CH 3025 to CH 3500 2/9/2023
1.7.4.30.2 CH 3500 to CH 4156.876 2/21/2023
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.4.31 2/14/2023
COMPACTION WORK
1.7.4.31.1 CH 3025 to CH 3500 2/14/2023
1.7.4.31.2 CH 3500 to CH 4156.876 3/2/2023
1.8 ROAD FURNITURE 11/11/2021
1.8.1 TRAFFIC BARRIER 11/11/2021
1.8.1.1 GUARD RAIL INSTALLATION WORK 11/11/2021
1.8.1.1.1 CH 0 to CH 1025 11/11/2021
1.8.1.1.2 CH 1025 to CH 2075 6/15/2022
1.8.1.1.3 CH 2075 to CH 3025 8/23/2022
1.8.1.1.4 CH 3025 to CH 4156.876 2/13/2023
1.8.1.2 PC NEW JERSEY BARRIER (NJB) 1/18/2023
1.8.1.2.1 CH 4156.876 1/18/2023
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.9.1 STRUCTURE WORK - SUNGAI BENG: CH425 - CH525 2/18/2021
1.9.1.1 CAISSON PILING WORKS 2/18/2021
1.9.1.1.1 POINT 1 & 2 2/18/2021
1.9.1.1.1.1 Plants & equipment mobilisation 2/18/2021
1.9.1.1.1.2 Hand dig excavation 2/24/2021
1.9.1.1.1.3 Permanent casing work 3/24/2021
1.9.1.1.1.4 Rebars placement 4/14/2021
1.9.1.1.1.5 Concreting work 4/28/2021
1.9.1.1.1.6 Pile Testing 6/16/2021
1.9.1.1.1.7 Temporary platform fixing 6/22/2021
1.9.1.1.1.8 Decking placement 6/30/2021
1.9.1.1.2 POINT 2 & 3 5/3/2021
1.9.1.1.2.1 Plants & equipment mobilisation 5/3/2021
1.9.1.1.2.2 Hand dig excavation 5/5/2021
1.9.1.1.2.3 Permanent casing work 6/8/2021
1.9.1.1.2.4 Rebars placement 6/29/2021
1.9.1.1.2.5 Concreting work 7/13/2021
1.9.1.1.2.6 Pile Testing 8/27/2021
1.9.1.1.2.7 Temporary platform fixing 9/1/2021
1.9.1.1.2.8 Decking placement 9/8/2021
1.9.1.2 ABUTMENT 2/24/2021
1.9.1.2.1 ABUTMENT A 2/24/2021
1.9.1.2.1.1 Cut and dispose 2/24/2021
1.9.1.2.1.2 Filling works 3/12/2021
1.9.1.2.1.3 Stone pitching 3/18/2021
1.9.1.2.1.4 MS handrail 3/25/2021
1.9.1.2.1.5 Concreting work 4/2/2021
1.9.1.2.1.6 Gabion cage rock filled work 3/30/2021
1.9.1.2.1.7 Subsoil drains 3/31/2021
1.9.1.2.2 ABUTMENT B 3/22/2021
1.9.1.2.2.1 Cut and dispose 3/22/2021
1.9.1.2.2.2 Filling works 3/26/2021
1.9.1.2.2.3 Stone pitching 4/1/2021
1.9.1.2.2.4 MS handrail 4/12/2021
1.9.1.2.2.5 Concreting work 4/19/2021
1.9.1.2.2.6 Gabion cage rock filled work 4/15/2021
1.9.1.2.2.7 Subsoil drains 4/16/2021
1.9.1.2.3 PERMEABLE LAYER WORKS 3/18/2021
1.9.1.2.3.1 Crush stone pitching 3/18/2021
1.9.1.2.3.2 Lean concrete 4/15/2021
1.9.1.2.3.3 Bituminous paint 4/23/2021
1.9.1.2.3.4 Formwork for wing wall 4/27/2021
1.9.1.2.3.5 Rebars fixing 5/20/2021
1.9.1.2.3.6 Concreting work 5/28/2021
1.9.1.3 PIER CASTING/ERECTION WORKS 7/6/2021
1.9.1.3.1 PIER 1 & 2 7/6/2021
1.9.1.3.1.1 Formwork for piers 7/6/2021
1.9.1.3.1.2 Rebars placement 8/4/2021
1.9.1.3.1.3 Concreting work 9/3/2021
1.9.1.3.2 PIER 3 & 4 9/14/2021
1.9.1.3.2.1 Formwork for piers 9/14/2021
1.9.1.3.2.2 Rebars placement 10/13/2021
1.9.1.3.2.3 Concreting work 11/15/2021
1.9.1.4 TWIN SPINE BEAM 10/12/2021
1.9.1.4.1 SCAFFOLDING ERECTION WORKS 10/12/2021
1.9.1.4.1.1 Span 1 10/12/2021
1.9.1.4.1.2 Span 2 10/27/2021
1.9.1.4.1.3 Span 3 1/11/2022
1.9.1.4.2 FORMWORK 11/12/2021
1.9.1.4.2.1 Span 1 & 2 11/12/2021
1.9.1.4.2.2 Striking formwork Span 1 12/30/2021
1.9.1.4.2.3 Span 3 1/26/2022
1.9.1.4.3 REBAR WORK 11/26/2021
1.9.1.4.3.1 Span 1 11/26/2021
1.9.1.4.3.2 Span 2 12/14/2021
1.9.1.4.3.3 Span 3 2/11/2022
1.9.1.4.4 CONCRETING WORKS 12/10/2021
1.9.1.4.4.1 Span 1 12/10/2021
1.9.1.4.4.2 Span 2 12/28/2021
1.9.1.4.4.3 Span 3 2/25/2022
1.9.1.4.5 BRIDGE BEARING 3/1/2022
1.9.1.4.5.1 Installation Works 3/1/2022
1.9.1.5 IN-SITU PARAPET 3/29/2022
1.9.1.5.1 FORMWORK ERECTION WORK 3/29/2022
1.9.1.5.1.1 Span 1 3/29/2022
1.9.1.5.1.2 Span 2 4/12/2022
1.9.1.5.1.3 Span 3 4/27/2022
1.9.1.5.1.4 Span 4 5/13/2022
1.9.1.5.1.5 Span 5 5/30/2022
1.9.1.5.2 REBAR PLACEMENT 4/12/2022
1.9.1.5.2.1 Span 1 4/12/2022
1.9.1.5.2.2 Span 2 4/27/2022
1.9.1.5.2.3 Span 3 5/13/2022
1.9.1.5.2.4 Span 4 5/30/2022
1.9.1.5.2.5 Span 5 6/13/2022
1.9.1.5.3 CONCRETING WORKS 4/27/2022
1.9.1.5.3.1 Span 1 4/27/2022
1.9.1.5.3.2 Span 2 5/13/2022
1.9.1.5.3.3 Span 3 5/30/2022
1.9.1.5.3.4 Span 4 6/13/2022
1.9.1.5.3.5 Span 5 6/27/2022
1.9.1.6 MISCELLANEOUS/SUNDRIES WORKS 4/29/2022
1.9.1.6.1 GI handrail 4/29/2022
1.9.1.6.2 uPVC rain water downpipe 5/9/2022
1.9.1.6.3 Expansion joints 5/12/2022
1.9.1.6.4 Protective coatings 5/19/2022
1.9.2 STRUCTURE WORK - ALOR 1: CH2625 - CH2750 5/10/2021
1.9.2.1 CAISSON PILING WORKS 5/10/2021
1.9.2.1.1 POINT 1 & 2 5/10/2021
1.9.2.1.1.1 Plants & equipment preparation 5/10/2021
1.9.2.1.1.2 Hand dig excavation 5/12/2021
1.9.2.1.1.3 Permanent casing work 6/15/2021
1.9.2.1.1.4 Rebars placement 7/6/2021
1.9.2.1.1.5 Concreting work 7/14/2021
1.9.2.1.1.6 Pile Testing 8/20/2021
1.9.2.1.1.7 Temporary platform fixing 8/24/2021
1.9.2.1.1.8 Decking placement 9/2/2021
1.9.2.1.2 POINT 3 & 4 7/19/2021
1.9.2.1.2.1 Plants & equipment preparation 7/19/2021
1.9.2.1.2.2 Hand dig excavation 7/21/2021
1.9.2.1.2.3 Permanent casing work 8/19/2021
1.9.2.1.2.4 Rebars placement 9/10/2021
1.9.2.1.2.5 Concreting work 9/21/2021
1.9.2.1.2.6 Pile Testing 10/27/2021
1.9.2.1.2.7 Temporary platform fixing 10/29/2021
1.9.2.1.2.8 Decking placement 11/10/2021
1.9.2.1.3 POINT 5 & 6 9/24/2021
1.9.2.1.3.1 Plants & equipment preparation 9/24/2021
1.9.2.1.3.2 Hand dig excavation 9/27/2021
1.9.2.1.3.3 Permanent casing work 10/26/2021
1.9.2.1.3.4 Rebars placement 11/18/2021
1.9.2.1.3.5 Concreting work 11/25/2021
1.9.2.1.3.6 Pile Testing 12/30/2021
1.9.2.1.3.7 Temporary platform fixing 1/3/2022
1.9.2.1.3.8 Decking placement 1/10/2022
1.9.2.2 ABUTMENT 5/12/2021
1.9.2.2.1 ABUTMENT A 5/12/2021
1.9.2.2.1.1 Cut and dispose 5/12/2021
1.9.2.2.1.2 Filling works 5/19/2021
1.9.2.2.1.3 Stone pitching 5/31/2021
1.9.2.2.1.4 MS handrail 6/11/2021
1.9.2.2.1.5 Concreting work 6/18/2021
1.9.2.2.1.6 Gabion cage rock filled work 6/16/2021
1.9.2.2.1.7 Subsoil drains 6/22/2021
1.9.2.2.2 ABUTMENT B 6/2/2021
1.9.2.2.2.1 Cut and dispose 6/2/2021
1.9.2.2.2.2 Filling works 6/8/2021
1.9.2.2.2.3 Stone pitching 6/15/2021
1.9.2.2.2.4 MS handrail 6/24/2021
1.9.2.2.2.5 Concreting work 6/30/2021
1.9.2.2.2.6 Gabion cage rock filled work 6/30/2021
1.9.2.2.2.7 Subsoil drains 7/2/2021
1.9.2.2.3 PERMEABLE LAYER WORKS 6/8/2021
1.9.2.2.3.1 Crush stone pitching 6/8/2021
1.9.2.2.3.2 Lean concrete 6/22/2021
1.9.2.2.3.3 Bituminous paint 6/25/2021
1.9.2.2.3.4 Formwork for wing wall 6/29/2021
1.9.2.2.3.5 Rebars fixing 7/9/2021
1.9.2.2.3.6 Concreting work 7/16/2021
1.9.2.3 PIER CASTING/ERECTION WORKS 8/20/2021
1.9.2.3.1 PIER 1 & 2 8/20/2021
1.9.2.3.1.1 Formwork for piers 8/20/2021
1.9.2.3.1.2 Rebars placement 9/21/2021
1.9.2.3.1.3 Concreting work 10/20/2021
1.9.2.3.2 PIER 3 & 4 11/25/2021
1.9.2.3.2.1 Formwork for piers 11/25/2021
1.9.2.3.2.2 Rebars placement 12/23/2021
1.9.2.3.2.3 Concreting work 1/21/2022
1.9.2.3.3 PIER 5 & 6 1/27/2022
1.9.2.3.3.1 Formwork for piers 1/27/2022
1.9.2.3.3.2 Rebars placement 2/28/2022
1.9.2.3.3.3 Concreting work 3/28/2022
1.9.2.4 TWIN SPINE BEAM 10/26/2021
1.9.2.4.1 SCAFFOLDING ERECTION WORKS 10/26/2021
1.9.2.4.1.1 Span 1 10/26/2021
1.9.2.4.1.2 Span 2 11/11/2021
1.9.2.4.1.3 Span 3 11/25/2021
1.9.2.4.1.4 Span 4 5/25/2022
1.9.2.4.1.5 Span 5 6/8/2022
1.9.2.4.2 FORMWORK ERECTION WORK 11/29/2021
1.9.2.4.2.1 Span 1 11/29/2021
1.9.2.4.2.2 Span 2 3/2/2022
1.9.2.4.2.3 Span 3 3/16/2022
1.9.2.4.2.4 Striking formwork Span 1 2/4/2022
1.9.2.4.2.5 Striking formwork Span 2 5/10/2022
1.9.2.4.2.6 Span 4 6/8/2022
1.9.2.4.2.7 Span 5 6/22/2022
1.9.2.4.3 REBAR PLACEMENT 12/13/2021
1.9.2.4.3.1 Span 1 12/13/2021
1.9.2.4.3.2 Span 2 3/16/2022
1.9.2.4.3.3 Span 3 3/30/2022
1.9.2.4.3.4 Span 4 6/22/2022
1.9.2.4.3.5 Span 5 7/6/2022
1.9.2.4.4 CONCRETING WORK 12/27/2021
1.9.2.4.4.1 Span 1 12/27/2021
1.9.2.4.4.2 Span 2 3/30/2022
1.9.2.4.4.3 Span 3 4/28/2022
1.9.2.4.4.4 Span 4 7/6/2022
1.9.2.4.4.5 Span 5 7/20/2022
1.9.2.5 BRIDGE BEARING INSTALLATION 1/31/2022
1.9.2.5.1 Span 1 1/31/2022
1.9.2.5.2 Span 2 5/6/2022
1.9.2.5.3 Span 3 6/6/2022
1.9.2.5.4 Span 4 8/9/2022
1.9.2.5.5 Span 5 8/25/2022
1.9.2.6 IN-SITU PARAPET 7/22/2022
1.9.2.6.1 FORMWORK ERECTION WORK 7/22/2022
1.9.2.6.1.1 Span 1 7/22/2022
1.9.2.6.1.2 Span 2 8/5/2022
1.9.2.6.1.3 Span 3 8/19/2022
1.9.2.6.1.4 Span 4 9/5/2022
1.9.2.6.1.5 Span 5 9/20/2022
1.9.2.6.2 REBAR PLACEMENT WORK 8/5/2022
1.9.2.6.2.1 Span 1 8/5/2022
1.9.2.6.2.2 Span 2 8/19/2022
1.9.2.6.2.3 Span 3 9/5/2022
1.9.2.6.2.4 Span 4 9/20/2022
1.9.2.6.2.5 Span 5 10/4/2022
1.9.2.6.3 CONCRETING WORK 9/13/2022
1.9.2.6.3.1 Span 1 9/13/2022
1.9.2.6.3.2 Span 2 9/15/2022
1.9.2.6.3.3 Span 3 9/20/2022
1.9.2.6.3.4 Span 4 10/4/2022
1.9.2.6.3.5 Span 5 10/18/2022
1.9.2.7 MISCELLANEOUS/SUNDRIES WORKS 9/5/2022
1.9.2.7.1 GI handrail 9/5/2022
1.9.2.7.2 uPVC rain water downpipe 9/15/2022
1.9.2.7.3 Expansion joints 9/28/2022
1.9.2.7.4 Protective coatings 10/5/2022
1.9.3 STRUCTURE WORK - SUNGAI DURAU: CH2800 - CH2900 7/22/2021
1.9.3.1 CAISSON PILING WORKS 7/22/2021
1.9.3.1.1 POINT 1 & 2 7/22/2021
1.9.3.1.1.1 Plants & equipment preparation 7/22/2021
1.9.3.1.1.2 Hand dig excavation 7/26/2021
1.9.3.1.1.3 Permanent casing work 8/24/2021
1.9.3.1.1.4 Rebars placement 9/15/2021
1.9.3.1.1.5 Concreting work 10/14/2021
1.9.3.1.1.6 Pile Testing 11/22/2021
1.9.3.1.1.7 Temporary platform fixing 11/24/2021
1.9.3.1.1.8 Decking placement 12/6/2021
1.9.3.1.2 POINT 3 & 4 10/18/2021
1.9.3.1.2.1 Plants & equipment preparation 10/18/2021
1.9.3.1.2.2 Hand dig excavation 10/21/2021
1.9.3.1.2.3 Permanent casing work 11/22/2021
1.9.3.1.2.4 Rebars placement 12/13/2021
1.9.3.1.2.5 Concreting work 1/10/2022
1.9.3.1.2.6 Pile Testing 2/16/2022
1.9.3.1.2.7 Temporary platform fixing 2/18/2022
1.9.3.1.2.8 Decking placement 2/28/2022
1.9.3.1.3 POINT 5 & 6 1/12/2022
1.9.3.1.3.1 Plants & equipment preparation 1/12/2022
1.9.3.1.3.2 Hand dig excavation 1/13/2022
1.9.3.1.3.3 Permanent casing work 2/15/2022
1.9.3.1.3.4 Rebars placement 3/8/2022
1.9.3.1.3.5 Concreting work 4/5/2022
1.9.3.1.3.6 Pile Testing 5/12/2022
1.9.3.1.3.7 Temporary platform fixing 5/17/2022
1.9.3.1.3.8 Decking placement 5/25/2022
1.9.3.2 ABUTMENT 7/26/2021
1.9.3.2.1 ABUTMENT A 7/26/2021
1.9.3.2.1.1 Cut and dispose 7/26/2021
1.9.3.2.1.2 Filling works 8/9/2021
1.9.3.2.1.3 Stone pitching 9/1/2021
1.9.3.2.1.4 MS handrail 9/15/2021
1.9.3.2.1.5 Concreting work 9/30/2021
1.9.3.2.1.6 Gabion cage rock filled work 9/21/2021
1.9.3.2.1.7 Subsoil drains 9/22/2021
1.9.3.2.2 ABUTMENT B 9/3/2021
1.9.3.2.2.1 Cut and dispose 9/3/2021
1.9.3.2.2.2 Filling works 9/20/2021
1.9.3.2.2.3 Stone pitching 10/11/2021
1.9.3.2.2.4 MS handrail 10/26/2021
1.9.3.2.2.5 Concreting work 11/11/2021
1.9.3.2.2.6 Gabion cage rock filled work 10/29/2021
1.9.3.2.2.7 Subsoil drains 11/15/2021
1.9.3.2.3 PERMEABLE LAYER WORKS 10/26/2021
1.9.3.2.3.1 Crush stone pitching 10/26/2021
1.9.3.2.3.2 Lean concrete 11/10/2021
1.9.3.2.3.3 Bituminous paint 11/15/2021
1.9.3.2.3.4 Formwork for wing wall 12/15/2021
1.9.3.2.3.5 Rebars fixing 12/27/2021
1.9.3.2.3.6 Concreting work 1/3/2022
1.9.3.3 PIER CASTING/ERECTION WORKS 12/21/2021
1.9.3.3.1 PIER 1 & 2 12/21/2021
1.9.3.3.1.1 Formwork for piers 12/21/2021
1.9.3.3.1.2 Rebars placement 1/19/2022
1.9.3.3.1.3 Concreting work 2/18/2022
1.9.3.3.2 PIER 3 & 4 3/24/2022
1.9.3.3.2.1 Formwork for piers 3/24/2022
1.9.3.3.2.2 Rebars placement 4/22/2022
1.9.3.3.2.3 Concreting work 5/25/2022
1.9.3.3.3 PIER 5 & 6 6/9/2022
1.9.3.3.3.1 Formwork for piers 6/9/2022
1.9.3.3.3.2 Rebars placement 7/6/2022
1.9.3.3.3.3 Concreting work 8/3/2022
1.9.3.4 TWIN SPINE BEAM 2/22/2022
1.9.3.4.1 SCAFFOLDING ERECTION WORKS 2/22/2022
1.9.3.4.1.1 Span 1 2/22/2022
1.9.3.4.1.2 Span 2 3/9/2022
1.9.3.4.1.3 Span 3 3/24/2022
1.9.3.4.1.4 Span 4 6/3/2022
1.9.3.4.1.5 Span 5 8/5/2022
1.9.3.4.2 FORMWORK ERECTION WORK 3/24/2022
1.9.3.4.2.1 Span 1 3/24/2022
1.9.3.4.2.2 Span 2 6/30/2022
1.9.3.4.2.3 Span 3 7/14/2022
1.9.3.4.2.4 Striking formwork Span 1 5/11/2022
1.9.3.4.2.5 Striking formwork Span 2 5/27/2022
1.9.3.4.2.6 Span 4 9/7/2022
1.9.3.4.2.7 Span 5 9/7/2022
1.9.3.4.3 REBAR PLACEMENT 3/17/2022
1.9.3.4.3.1 Span 1 3/17/2022
1.9.3.4.3.2 Span 2 4/1/2022
1.9.3.4.3.3 Span 3 4/15/2022
1.9.3.4.3.4 Span 4 9/22/2022
1.9.3.4.3.5 Span 5 9/22/2022
1.9.3.4.4 CONCRETING WORKS 3/31/2022
1.9.3.4.4.1 Span 1 3/31/2022
1.9.3.4.4.2 Span 2 4/15/2022
1.9.3.4.4.3 Span 3 5/4/2022
1.9.3.4.4.4 Span 4 10/6/2022
1.9.3.4.4.5 Span 5 10/10/2022
1.9.3.5 BRIDGE BEARING INSTALLATION 5/9/2022
1.9.3.5.1 Span 1 5/9/2022
1.9.3.5.2 Span 2 5/25/2022
1.9.3.5.3 Span 3 6/8/2022
1.9.3.5.4 Span 4 11/11/2022
1.9.3.5.5 Span 5 11/25/2022
1.9.3.6 IN-SITU PARAPET 10/12/2022
1.9.3.6.1 FORMWORK ERECTION WORK 10/12/2022
1.9.3.6.1.1 Span 1 10/12/2022
1.9.3.6.1.2 Span 2 10/27/2022
1.9.3.6.1.3 Span 3 11/11/2022
1.9.3.6.1.4 Span 4 11/25/2022
1.9.3.6.1.5 Span 5 12/9/2022
1.9.3.6.2 REBAR PLACEMENT 10/27/2022
1.9.3.6.2.1 Span 1 10/27/2022
1.9.3.6.2.2 Span 2 11/11/2022
1.9.3.6.2.3 Span 3 11/25/2022
1.9.3.6.2.4 Span 4 12/9/2022
1.9.3.6.2.5 Span 5 12/23/2022
1.9.3.6.3 CONCRETING WORKS 11/11/2022
1.9.3.6.3.1 Span 1 11/11/2022
1.9.3.6.3.2 Span 2 11/25/2022
1.9.3.6.3.3 Span 3 12/9/2022
1.9.3.6.3.4 Span 4 12/23/2022
1.9.3.6.3.5 Span 5 1/6/2023
1.9.3.7 MISCELLANEOUS/SUNDRIES WORKS 11/15/2022
1.9.3.7.1 GI handrail 11/15/2022
1.9.3.7.2 uPVC rain water downpipe 11/25/2022
1.9.3.7.3 Expansion joints 12/6/2022
1.9.3.7.4 Protective coatings 12/13/2022
1.9.4 STRUCTURE WORK - ALOR 2: CH3075 - CH3200 9/15/2021
1.9.4.1 CAISSON PILING WORKS 9/15/2021
1.9.4.1.1 POINT 1 & 2 9/15/2021
1.9.4.1.1.1 Plants & equipment preparation 9/15/2021
1.9.4.1.1.2 Hand dig excavation 9/20/2021
1.9.4.1.1.3 Permanent casing work 10/4/2021
1.9.4.1.1.4 Rebars placement 10/26/2021
1.9.4.1.1.5 Concreting work 11/25/2021
1.9.4.1.1.6 Pile Testing 12/29/2021
1.9.4.1.1.7 Temporary platform fixing 12/31/2021
1.9.4.1.1.8 Decking placement 1/12/2022
1.9.4.1.2 POINT 3 & 4 10/18/2021
1.9.4.1.2.1 Plants & equipment preparation 10/18/2021
1.9.4.1.2.2 Hand dig excavation 10/21/2021
1.9.4.1.2.3 Permanent casing work 10/29/2021
1.9.4.1.2.4 Rebars placement 11/23/2021
1.9.4.1.2.5 Concreting work 12/21/2021
1.9.4.1.2.6 Pile Testing 1/25/2022
1.9.4.1.2.7 Temporary platform fixing 1/27/2022
1.9.4.1.2.8 Decking placement 2/8/2022
1.9.4.1.3 POINT 5 & 6 11/22/2021
1.9.4.1.3.1 Plants & equipment preparation 11/22/2021
1.9.4.1.3.2 Hand dig excavation 11/23/2021
1.9.4.1.3.3 Permanent casing work 12/2/2021
1.9.4.1.3.4 Rebars placement 12/23/2021
1.9.4.1.3.5 Concreting work 1/21/2022
1.9.4.1.3.6 Pile Testing 2/28/2022
1.9.4.1.3.7 Temporary platform fixing 3/2/2022
1.9.4.1.3.8 Decking placement 3/10/2022
1.9.4.2 ABUTMENT 9/20/2021
1.9.4.2.1 ABUTMENT A 9/20/2021
1.9.4.2.1.1 Cut and dispose 9/20/2021
1.9.4.2.1.2 Filling works 10/4/2021
1.9.4.2.1.3 Stone pitching 10/26/2021
1.9.4.2.1.4 MS handrail 11/11/2021
1.9.4.2.1.5 Concreting work 11/25/2021
1.9.4.2.1.6 Gabion cage rock filled work 11/16/2021
1.9.4.2.1.7 Subsoil drains 11/17/2021
1.9.4.2.2 ABUTMENT B 10/28/2021
1.9.4.2.2.1 Cut and dispose 10/28/2021
1.9.4.2.2.2 Filling works 11/15/2021
1.9.4.2.2.3 Stone pitching 12/6/2021
1.9.4.2.2.4 MS handrail 12/20/2021
1.9.4.2.2.5 Concreting work 1/3/2022
1.9.4.2.2.6 Gabion cage rock filled work 12/23/2021
1.9.4.2.2.7 Subsoil drains 1/5/2022
1.9.4.2.3 PERMEABLE LAYER WORKS 12/20/2021
1.9.4.2.3.1 Crush stone pitching 12/20/2021
1.9.4.2.3.2 Lean concrete 1/3/2022
1.9.4.2.3.3 Bituminous paint 1/7/2022
1.9.4.2.3.4 Formwork for wing wall 2/9/2022
1.9.4.2.3.5 Rebars fixing 2/21/2022
1.9.4.2.3.6 Concreting work 3/1/2022
1.9.4.3 PIER CASTING/ERECTION WORKS 1/28/2022
1.9.4.3.1 PIER 1 & 2 1/28/2022
1.9.4.3.1.1 Formwork for piers 1/28/2022
1.9.4.3.1.2 Rebars placement 3/1/2022
1.9.4.3.1.3 Concreting work 3/29/2022
1.9.4.3.2 PIER 3 & 4 2/23/2022
1.9.4.3.2.1 Formwork for piers 2/23/2022
1.9.4.3.2.2 Rebars placement 3/23/2022
1.9.4.3.2.3 Concreting work 4/21/2022
1.9.4.3.3 PIER 5 & 6 3/25/2022
1.9.4.3.3.1 Formwork for piers 3/25/2022
1.9.4.3.3.2 Rebars placement 4/25/2022
1.9.4.3.3.3 Concreting work 5/26/2022
1.9.4.4 TWIN SPINE BEAM 3/31/2022
1.9.4.4.1 SCAFFOLDING ERECTION WORKS 3/31/2022
1.9.4.4.1.1 Span 1 3/31/2022
1.9.4.4.1.2 Span 2 4/14/2022
1.9.4.4.1.3 Span 3 4/29/2022
1.9.4.4.1.4 Span 4 8/9/2022
1.9.4.4.1.5 Span 5 8/23/2022
1.9.4.4.2 FORMWORK ERECTION WORK 5/5/2022
1.9.4.4.2.1 Span 1 5/5/2022
1.9.4.4.2.2 Span 2 5/30/2022
1.9.4.4.2.3 Span 3 6/13/2022
1.9.4.4.2.4 Striking formwork Span 1 7/26/2022
1.9.4.4.2.5 Striking formwork Span 2 8/2/2022
1.9.4.4.2.6 Span 4 8/23/2022
1.9.4.4.2.7 Span 5 9/7/2022
1.9.4.4.3 REBAR PLACEMENT WORK 5/20/2022
1.9.4.4.3.1 Span 1 5/20/2022
1.9.4.4.3.2 Span 2 6/13/2022
1.9.4.4.3.3 Span 3 6/27/2022
1.9.4.4.3.4 Span 4 9/7/2022
1.9.4.4.3.5 Span 5 9/22/2022
1.9.4.4.4 CONCRETING WORKS 6/20/2022
1.9.4.4.4.1 Span 1 6/20/2022
1.9.4.4.4.2 Span 2 6/27/2022
1.9.4.4.4.3 Span 3 7/11/2022
1.9.4.4.4.4 Span 4 9/22/2022
1.9.4.4.4.5 Span 5 10/6/2022
1.9.4.5 BRIDGE BEARING INSTALLATION 7/22/2022
1.9.4.5.1 Span 1 7/22/2022
1.9.4.5.2 Span 2 8/5/2022
1.9.4.5.3 Span 3 8/19/2022
1.9.4.5.4 Span 4 10/27/2022
1.9.4.5.5 Span 5 11/11/2022
1.9.4.6 IN-SITU PARAPET 10/11/2022
1.9.4.6.1 FORMWORK ERECTION WORK 10/11/2022
1.9.4.6.1.1 Span 1 10/11/2022
1.9.4.6.1.2 Span 2 10/27/2022
1.9.4.6.1.3 Span 3 11/11/2022
1.9.4.6.1.4 Span 4 11/25/2022
1.9.4.6.1.5 Span 5 12/9/2022
1.9.4.6.2 REBAR PLACEMENT WORK 10/26/2022
1.9.4.6.2.1 Span 1 10/26/2022
1.9.4.6.2.2 Span 2 11/11/2022
1.9.4.6.2.3 Span 3 11/25/2022
1.9.4.6.2.4 Span 4 12/9/2022
1.9.4.6.2.5 Span 5 12/23/2022
1.9.4.6.3 CONCRETING WORK 11/10/2022
1.9.4.6.3.1 Span 1 11/10/2022
1.9.4.6.3.2 Span 2 11/25/2022
1.9.4.6.3.3 Span 3 12/9/2022
1.9.4.6.3.4 Span 4 12/23/2022
1.9.4.6.3.5 Span 5 1/6/2023
1.9.4.7 MISCELLANEOUS/SUNDRIES WORKS 1/10/2023
1.9.4.7.1 GI handrail 1/10/2023
1.9.4.7.2 uPVC rain water downpipe 1/20/2023
1.9.4.7.3 Expansion joints 2/1/2023
1.9.4.7.4 Protective coatings 2/8/2023
1.1 PROVISIONAL SUM 11/24/2020
1.10.1 RELOCATION AND PROTECTION OF UTILITY SERVICES 4/23/2021
1.10.1.1 TNB UTILITY (CH 2400 - CH 3600) 4/23/2021
1.10.1.1.1 CH 2250 to CH 2500 4/23/2021
1.10.1.1.2 CH 2500 to CH 3000 5/27/2021
1.10.1.1.3 CH 3000 to CH 3500 6/25/2021
1.10.1.1.4 CH 3500 to CH 3750 7/26/2021
1.10.1.2 WATER UTILITY (CH 2400 - CH 3600) 5/27/2021
1.10.1.2.1 CH 2250 to CH 2500 5/27/2021
1.10.1.2.2 CH 2500 to CH 3000 6/25/2021
1.10.1.2.3 CH 3000 to CH 3500 7/26/2021
1.10.1.2.4 CH 3500 to CH 3750 8/24/2021
1.10.2 SOIL INVESTIGATION WORKS 11/24/2020
1.10.2.1 IN-SITU TESTING & REPORT 11/24/2020
1.10.2.1.1 CH 0 - CH 1025 11/24/2020
1.10.2.1.2 CH 1025 - CH 2075 1/7/2021
1.10.2.1.3 CH 2075 - CH 3025 4/30/2021
1.10.2.1.4 CH 3025 - CH 4157 6/2/2021
1.10.3 SLOPE STABILIZATION AND GEOLOGICAL MAPPING 3/3/2023
1.10.4 G1 TEMPORARY RD FURNITURE 2/23/2023
1.10.5 G2 SIGNBOARD 3/6/2023
1.10.6 ROAD SAFETY AUDIT STAGE 4 3/9/2023
1.10.7 PRIME COST SUM 3/8/2023
1.10.7.1 ROAD LIGHT AND TRAFFIC LIGHT 3/8/2023
1.11 FINAL SITE INSPECTION 9/10/2021
1.11.1 PRELIMINARIES COMPLETION 9/10/2021
1.11.2 CUT & FILL 11/3/2022
1.11.3 GEOTECHNICAL WORKS FINAL INSPECTION 1/31/2023
1.11.4 DRAINAGE WORK FINAL INSPECTION 12/9/2022
1.11.5 ROADWORKS FINAL INSPECTION 3/17/2023
1.11.6 ROAD FURNITURE FINAL INSPECTION 3/10/2023
1.11.7 BRIDGE FINISHES 2/14/2023
1.11.8 PROVISIONAL SUM COMPLETION 3/9/2023
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
1/17/2020
12/17/2019
12/27/2019
1/8/2020
1/17/2020
3/20/2023
3/20/2023
7/15/2020
3/20/2023
3/20/2023
7/22/2020
3/20/2023
3/20/2023
8/6/2020
3/20/2023
3/20/2023
3/20/2023
2/3/2020
3/20/2023
3/20/2023
2/10/2020
3/20/2023
3/20/2023
2/17/2020
3/20/2023
3/20/2023
3/9/2020
3/20/2023
3/2/2020
7/22/2020
2/17/2020
11/17/2022
8/7/2020
7/10/2020
7/23/2020
8/7/2020
8/7/2020
9/4/2020
9/4/2020
8/4/2020
8/13/2020
8/25/2020
9/4/2020
11/17/2022
11/17/2022
7/16/2021
2/22/2022
5/5/2022
10/26/2022
11/16/2022
11/17/2022
4/1/2023
7/29/2020
3/17/2023
4/1/2023
3/20/2023
7/20/2020
2/17/2020
2/17/2020
7/20/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
8/17/2020
8/17/2020
3/20/2023
9/10/2021
9/17/2020
9/17/2020
8/19/2021
8/4/2021
9/2/2020
12/15/2020
4/8/2021
8/4/2021
8/19/2021
9/17/2020
12/30/2020
4/22/2021
8/19/2021
8/12/2021
9/30/2020
12/22/2020
4/15/2021
8/12/2021
8/26/2021
10/14/2020
1/7/2021
4/30/2021
8/26/2021
9/10/2021
10/21/2020
10/28/2020
1/14/2021
1/21/2021
5/7/2021
5/18/2021
9/3/2021
9/10/2021
3/20/2023
8/10/2020
8/10/2020
8/10/2020
8/10/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/21/2020
8/5/2020
8/12/2020
8/19/2020
9/21/2020
3/20/2023
3/6/2023
3/20/2023
9/20/2022
3/17/2023
8/2/2022
10/13/2020
8/6/2020
8/28/2020
9/22/2020
10/13/2020
11/4/2020
9/22/2020
10/13/2020
11/4/2020
11/10/2020
9/25/2020
10/16/2020
11/10/2020
10/21/2020
10/21/2020
12/1/2020
10/16/2020
11/10/2020
12/1/2020
11/4/2020
10/20/2020
10/22/2020
10/26/2020
10/28/2020
11/2/2020
11/4/2020
2/17/2021
11/19/2020
12/17/2020
1/18/2021
2/17/2021
5/17/2021
3/17/2021
4/14/2021
5/17/2021
4/21/2021
3/24/2021
4/21/2021
5/11/2021
4/21/2021
4/21/2021
4/22/2021
4/22/2021
4/30/2021
4/30/2021
5/11/2021
5/11/2021
6/23/2021
4/21/2021
5/24/2021
6/23/2021
7/7/2021
5/6/2021
6/9/2021
7/7/2021
9/6/2021
3/3/2021
1/4/2021
2/2/2021
3/3/2021
3/5/2021
1/6/2021
2/4/2021
3/5/2021
3/3/2021
1/18/2021
2/17/2021
3/3/2021
3/5/2021
1/20/2021
2/19/2021
3/5/2021
3/9/2021
1/22/2021
2/23/2021
3/9/2021
6/9/2021
2/2/2021
5/6/2021
6/9/2021
6/11/2021
2/4/2021
5/10/2021
6/11/2021
3/31/2021
3/17/2021
3/31/2021
4/2/2021
3/19/2021
4/2/2021
9/6/2021
6/9/2021
7/7/2021
8/5/2021
9/6/2021
7/22/2021
7/7/2021
5/6/2021
6/9/2021
7/7/2021
7/22/2021
5/24/2021
6/23/2021
7/22/2021
8/26/2021
7/28/2021
6/29/2021
7/28/2021
8/26/2021
7/28/2021
8/26/2021
11/18/2021
8/20/2021
6/23/2021
8/20/2021
9/28/2021
7/29/2021
9/28/2021
11/3/2021
9/6/2021
11/3/2021
11/16/2021
9/15/2021
11/16/2021
11/18/2021
9/20/2021
11/18/2021
11/12/2021
8/27/2021
6/30/2021
8/27/2021
9/13/2021
7/14/2021
9/13/2021
9/28/2021
7/29/2021
9/28/2021
10/1/2021
8/3/2021
10/1/2021
10/8/2021
8/11/2021
10/8/2021
10/25/2021
8/25/2021
10/25/2021
11/1/2021
9/2/2021
11/1/2021
11/10/2021
9/9/2021
11/10/2021
11/11/2021
9/10/2021
11/11/2021
11/12/2021
9/13/2021
11/12/2021
10/27/2021
8/27/2021
10/27/2021
10/29/2021
9/1/2021
10/29/2021
8/2/2022
9/23/2021
8/2/2022
11/23/2021
11/30/2021
9/30/2021
11/30/2021
10/27/2021
10/22/2021
10/25/2021
10/27/2021
8/12/2022
2/5/2021
12/1/2020
12/22/2020
1/14/2021
2/5/2021
3/1/2021
12/22/2020
1/14/2021
2/5/2021
3/1/2021
3/4/2021
12/28/2020
1/19/2021
2/10/2021
3/4/2021
2/24/2021
11/13/2020
12/31/2020
1/6/2021
1/22/2021
1/27/2021
2/16/2021
2/19/2021
2/24/2021
3/25/2021
1/19/2021
2/10/2021
3/4/2021
3/25/2021
4/2/2021
1/21/2021
1/25/2021
2/15/2021
3/8/2021
3/29/2021
3/31/2021
4/2/2021
5/24/2021
2/24/2021
3/24/2021
4/21/2021
5/24/2021
10/20/2021
6/23/2021
7/22/2021
8/20/2021
9/21/2021
10/20/2021
9/27/2021
9/27/2021
10/26/2021
10/26/2021
11/30/2021
10/28/2021
11/30/2021
11/29/2021
11/29/2021
11/18/2021
10/7/2021
9/23/2021
10/7/2021
11/18/2021
10/14/2021
10/18/2021
11/18/2021
8/18/2021
7/29/2021
7/29/2021
7/30/2021
7/30/2021
8/6/2021
8/6/2021
8/18/2021
8/18/2021
11/25/2021
4/15/2021
1/26/2021
2/3/2021
3/11/2021
3/18/2021
4/1/2021
4/8/2021
4/15/2021
4/19/2021
1/29/2021
2/5/2021
3/15/2021
3/22/2021
4/5/2021
4/12/2021
4/19/2021
4/26/2021
2/5/2021
2/15/2021
3/22/2021
3/29/2021
4/12/2021
4/19/2021
4/26/2021
4/28/2021
2/9/2021
2/17/2021
3/24/2021
3/31/2021
4/14/2021
4/21/2021
4/28/2021
5/24/2021
3/3/2021
3/10/2021
4/14/2021
4/21/2021
5/6/2021
5/17/2021
5/24/2021
9/14/2021
4/30/2021
5/25/2021
6/17/2021
7/8/2021
7/30/2021
8/23/2021
9/14/2021
11/16/2021
7/2/2021
7/26/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
11/16/2021
7/2/2021
7/26/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
11/25/2021
7/13/2021
8/4/2021
8/26/2021
9/20/2021
10/11/2021
11/2/2021
11/25/2021
2/25/2022
9/3/2021
10/18/2021
11/18/2021
12/28/2021
1/26/2022
2/25/2022
2/11/2022
9/20/2021
11/2/2021
12/2/2021
2/11/2022
1/13/2022
11/11/2021
8/12/2021
11/11/2021
12/9/2021
9/10/2021
12/9/2021
12/10/2021
9/13/2021
12/10/2021
12/14/2021
9/15/2021
12/14/2021
1/11/2022
10/14/2021
1/11/2022
12/9/2021
8/26/2021
9/10/2021
11/25/2021
12/9/2021
1/6/2022
10/11/2021
1/6/2022
1/7/2022
10/12/2021
1/7/2022
1/13/2022
10/18/2021
1/13/2022
4/8/2022
6/9/2021
3/17/2021
4/7/2021
5/6/2021
6/9/2021
6/11/2021
3/19/2021
4/9/2021
5/10/2021
6/11/2021
6/9/2021
3/17/2021
4/21/2021
5/24/2021
6/9/2021
6/11/2021
3/19/2021
4/23/2021
5/27/2021
6/11/2021
6/15/2021
3/23/2021
4/27/2021
5/31/2021
6/15/2021
3/11/2022
9/20/2021
1/11/2022
3/11/2022
3/15/2022
9/22/2021
1/13/2022
3/15/2022
6/23/2021
4/14/2021
6/9/2021
6/23/2021
6/25/2021
4/16/2021
6/11/2021
6/25/2021
4/8/2022
10/18/2021
2/11/2022
3/11/2022
4/8/2022
3/25/2022
3/11/2022
9/20/2021
11/2/2021
2/11/2022
3/11/2022
3/25/2022
10/4/2021
11/18/2021
2/25/2022
3/25/2022
6/22/2022
3/25/2022
12/16/2021
3/25/2022
5/4/2022
1/21/2022
5/4/2022
6/9/2022
3/1/2022
6/9/2022
6/20/2022
3/10/2022
6/20/2022
6/22/2022
3/14/2022
6/22/2022
3/8/2022
12/23/2021
12/23/2021
1/6/2022
1/6/2022
1/21/2022
1/21/2022
1/26/2022
1/26/2022
2/4/2022
2/4/2022
2/18/2022
2/18/2022
2/25/2022
2/25/2022
3/4/2022
3/4/2022
3/7/2022
3/7/2022
3/8/2022
3/8/2022
6/2/2022
2/22/2022
6/2/2022
6/6/2022
2/24/2022
6/6/2022
8/5/2022
3/17/2022
8/5/2022
8/12/2022
3/24/2022
8/12/2022
12/2/2022
6/2/2021
3/25/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
6/29/2021
4/20/2021
5/12/2021
6/8/2021
6/29/2021
5/4/2021
3/9/2021
4/23/2021
4/28/2021
5/4/2021
7/21/2021
5/12/2021
6/8/2021
6/29/2021
7/21/2021
7/27/2021
5/18/2021
6/10/2021
6/14/2021
7/1/2021
7/23/2021
7/27/2021
12/16/2021
6/17/2021
7/15/2021
9/14/2021
11/18/2021
12/16/2021
8/16/2021
8/16/2021
1/13/2022
7/15/2021
1/13/2022
2/15/2022
8/16/2021
2/15/2022
6/8/2022
3/15/2022
9/14/2021
3/15/2022
5/13/2022
10/13/2021
11/15/2021
4/12/2022
5/13/2022
6/8/2022
12/8/2021
6/8/2022
7/13/2022
3/17/2022
9/17/2021
3/17/2022
4/14/2022
10/15/2021
4/14/2022
6/15/2022
11/17/2021
12/15/2021
5/18/2022
6/15/2022
6/29/2022
12/29/2021
6/29/2022
7/12/2022
1/11/2022
7/12/2022
7/13/2022
1/12/2022
7/13/2022
1/6/2022
10/5/2021
9/24/2021
10/5/2021
11/8/2021
10/14/2021
11/8/2021
11/26/2021
11/8/2021
11/26/2021
1/6/2022
12/17/2021
1/6/2022
1/27/2022
12/29/2021
9/28/2021
12/29/2021
1/27/2022
10/27/2021
1/27/2022
2/15/2022
1/13/2022
2/15/2022
9/20/2021
8/18/2021
9/20/2021
9/17/2021
9/17/2021
2/22/2022
6/22/2021
5/21/2021
5/31/2021
6/15/2021
6/22/2021
6/24/2021
5/25/2021
6/2/2021
6/17/2021
6/24/2021
7/1/2021
6/2/2021
6/10/2021
6/24/2021
7/1/2021
7/5/2021
6/4/2021
6/14/2021
6/28/2021
7/5/2021
9/2/2021
6/28/2021
7/19/2021
8/11/2021
9/2/2021
12/13/2021
10/6/2021
10/28/2021
11/22/2021
12/13/2021
2/11/2022
12/7/2021
12/28/2021
1/19/2022
2/11/2022
2/11/2022
12/7/2021
12/28/2021
1/19/2022
2/11/2022
2/22/2022
12/16/2021
1/6/2022
1/28/2022
2/22/2022
3/29/2022
3/1/2022
3/29/2022
4/22/2022
3/15/2022
3/24/2022
4/12/2022
4/22/2022
5/30/2022
3/22/2022
3/22/2022
4/20/2022
4/20/2022
4/21/2022
4/21/2022
4/25/2022
4/25/2022
5/26/2022
5/26/2022
4/20/2022
4/5/2022
4/20/2022
5/23/2022
5/23/2022
5/24/2022
5/24/2022
5/30/2022
5/30/2022
8/4/2022
12/30/2021
7/1/2021
7/30/2021
9/29/2021
12/30/2021
1/3/2022
7/5/2021
8/3/2021
10/1/2021
1/3/2022
1/13/2022
7/15/2021
7/30/2021
8/16/2021
8/30/2021
10/13/2021
1/13/2022
1/17/2022
7/19/2021
8/3/2021
8/18/2021
9/2/2021
10/15/2021
1/17/2022
1/20/2022
7/22/2021
8/5/2021
8/20/2021
9/6/2021
10/20/2021
1/20/2022
4/25/2022
3/25/2022
4/8/2022
4/25/2022
4/27/2022
3/29/2022
4/12/2022
4/27/2022
1/28/2022
9/14/2021
9/29/2021
10/13/2021
10/28/2021
11/15/2021
1/28/2022
2/3/2022
9/17/2021
10/1/2021
10/15/2021
11/1/2021
11/17/2021
2/3/2022
8/4/2022
5/11/2022
6/9/2022
7/7/2022
8/4/2022
5/30/2022
5/5/2022
3/22/2022
4/12/2022
4/22/2022
5/5/2022
5/30/2022
4/8/2022
4/27/2022
5/13/2022
5/30/2022
8/30/2022
6/8/2022
5/10/2022
6/8/2022
7/13/2022
6/15/2022
7/13/2022
8/17/2022
7/20/2022
8/17/2022
8/26/2022
7/29/2022
8/26/2022
8/30/2022
8/2/2022
8/30/2022
8/24/2022
6/15/2022
6/15/2022
6/29/2022
6/29/2022
7/13/2022
7/13/2022
7/18/2022
7/18/2022
7/25/2022
7/25/2022
8/8/2022
8/8/2022
8/15/2022
8/15/2022
8/22/2022
8/22/2022
8/23/2022
8/23/2022
8/24/2022
8/24/2022
8/10/2022
7/13/2022
8/10/2022
8/12/2022
7/15/2022
8/12/2022
11/25/2022
8/10/2022
11/25/2022
12/2/2022
8/19/2022
12/2/2022
3/17/2023
10/18/2021
7/21/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
11/16/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
10/27/2021
8/20/2021
9/13/2021
9/17/2021
10/5/2021
10/27/2021
12/7/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
12/7/2021
12/13/2021
10/4/2021
10/6/2021
10/8/2021
10/26/2021
11/18/2021
12/9/2021
12/13/2021
3/29/2022
11/2/2021
12/2/2021
12/30/2021
1/28/2022
3/29/2022
3/1/2022
3/1/2022
4/27/2022
12/2/2021
3/1/2022
4/27/2022
5/30/2022
12/30/2021
3/29/2022
5/30/2022
11/18/2022
6/27/2022
4/12/2022
5/13/2022
6/27/2022
11/3/2022
6/13/2022
7/11/2022
8/8/2022
9/6/2022
10/5/2022
11/3/2022
11/18/2022
7/25/2022
9/21/2022
11/18/2022
1/3/2023
6/29/2022
4/14/2022
5/18/2022
6/29/2022
7/27/2022
5/18/2022
6/15/2022
7/27/2022
12/6/2022
7/13/2022
8/10/2022
9/8/2022
10/7/2022
11/8/2022
12/6/2022
12/20/2022
8/24/2022
10/21/2022
12/20/2022
1/2/2023
9/7/2022
11/7/2022
1/2/2023
1/3/2023
9/8/2022
11/8/2022
1/3/2023
9/27/2022
7/6/2022
4/22/2022
5/25/2022
7/6/2022
7/26/2022
5/17/2022
6/14/2022
7/26/2022
8/15/2022
6/6/2022
7/4/2022
8/15/2022
9/27/2022
7/15/2022
8/12/2022
9/27/2022
8/12/2022
7/29/2022
5/20/2022
12/15/2021
12/17/2021
1/12/2022
2/14/2022
7/29/2022
8/12/2022
5/31/2022
12/24/2021
1/4/2022
1/24/2022
2/23/2022
8/12/2022
8/22/2022
4/27/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
4/1/2022
3/3/2022
4/1/2022
3/31/2022
3/31/2022
7/22/2022
6/15/2022
6/1/2022
6/15/2022
7/22/2022
6/22/2022
6/24/2022
7/22/2022
6/23/2022
6/6/2022
6/6/2022
6/7/2022
6/7/2022
6/14/2022
6/14/2022
6/23/2022
6/23/2022
5/31/2022
12/14/2021
10/7/2021
10/29/2021
11/23/2021
12/14/2021
12/16/2021
10/11/2021
11/2/2021
11/25/2021
12/16/2021
12/23/2021
10/18/2021
11/11/2021
12/2/2021
12/23/2021
12/27/2021
10/21/2021
11/15/2021
12/6/2021
12/27/2021
1/17/2022
11/15/2021
12/6/2021
12/27/2021
1/17/2022
3/18/2022
1/11/2022
2/4/2022
2/25/2022
3/18/2022
5/20/2022
3/14/2022
4/4/2022
4/26/2022
5/20/2022
5/20/2022
3/14/2022
4/4/2022
4/26/2022
5/20/2022
5/31/2022
3/23/2022
4/13/2022
5/9/2022
5/31/2022
9/21/2022
1/13/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
9/21/2022
10/14/2022
6/8/2022
7/11/2022
9/1/2022
10/5/2022
10/14/2022
12/9/2022
9/19/2022
7/21/2022
8/18/2022
9/19/2022
11/3/2022
8/18/2022
9/19/2022
11/3/2022
11/7/2022
8/19/2022
9/20/2022
11/7/2022
11/9/2022
8/23/2022
9/22/2022
11/9/2022
12/7/2022
9/22/2022
10/20/2022
12/7/2022
10/17/2022
8/4/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
11/16/2022
9/19/2022
10/17/2022
11/16/2022
11/17/2022
9/20/2022
10/18/2022
11/17/2022
12/9/2022
9/26/2022
10/25/2022
12/9/2022
12/2/2022
4/12/2022
1/13/2022
1/28/2022
2/15/2022
3/1/2022
3/15/2022
4/12/2022
4/14/2022
1/17/2022
2/3/2022
2/17/2022
3/3/2022
3/17/2022
4/14/2022
5/13/2022
1/28/2022
2/15/2022
3/1/2022
3/15/2022
3/29/2022
4/12/2022
4/27/2022
5/13/2022
5/18/2022
2/3/2022
2/17/2022
3/3/2022
3/17/2022
3/31/2022
4/14/2022
4/29/2022
5/18/2022
5/20/2022
2/7/2022
2/21/2022
3/7/2022
3/21/2022
4/4/2022
4/18/2022
5/5/2022
5/20/2022
10/5/2022
5/11/2022
6/13/2022
7/11/2022
9/6/2022
10/5/2022
10/7/2022
5/13/2022
6/15/2022
7/13/2022
9/8/2022
10/7/2022
7/11/2022
5/13/2022
5/30/2022
6/13/2022
6/27/2022
7/11/2022
7/13/2022
5/18/2022
6/1/2022
6/15/2022
6/29/2022
7/13/2022
12/2/2022
9/2/2022
10/5/2022
11/3/2022
12/2/2022
11/3/2022
10/14/2022
6/8/2022
7/11/2022
9/1/2022
10/5/2022
10/14/2022
11/3/2022
6/22/2022
7/25/2022
9/15/2022
10/19/2022
11/3/2022
2/20/2023
11/29/2022
8/22/2022
11/29/2022
1/3/2023
9/28/2022
1/3/2023
2/7/2023
11/3/2022
2/7/2023
2/16/2023
11/15/2022
2/16/2023
2/20/2023
11/17/2022
2/20/2023
2/14/2023
12/6/2022
12/6/2022
12/20/2022
12/20/2022
1/3/2023
1/3/2023
1/6/2023
1/6/2023
1/13/2023
1/13/2023
1/27/2023
1/27/2023
2/3/2023
2/3/2023
2/10/2023
2/10/2023
2/13/2023
2/13/2023
2/14/2023
2/14/2023
1/31/2023
10/27/2022
1/31/2023
2/2/2023
10/31/2022
2/2/2023
2/23/2023
2/13/2023
2/23/2023
3/17/2023
3/1/2023
3/17/2023
3/10/2023
3/10/2023
3/10/2023
12/8/2021
7/12/2022
9/21/2022
3/10/2023
1/24/2023
1/24/2023
2/14/2023
6/28/2022
9/13/2021
7/5/2021
2/23/2021
3/23/2021
4/13/2021
4/27/2021
4/30/2021
6/21/2021
6/29/2021
7/5/2021
9/13/2021
5/4/2021
6/4/2021
6/28/2021
7/12/2021
7/15/2021
8/30/2021
9/7/2021
9/13/2021
6/2/2021
4/9/2021
3/11/2021
3/17/2021
3/24/2021
4/1/2021
4/8/2021
4/8/2021
4/9/2021
4/27/2021
3/25/2021
3/31/2021
4/9/2021
4/16/2021
4/21/2021
4/26/2021
4/27/2021
6/2/2021
4/14/2021
4/22/2021
4/26/2021
5/19/2021
5/27/2021
6/2/2021
11/18/2021
9/8/2021
8/3/2021
9/2/2021
9/8/2021
11/18/2021
10/12/2021
11/12/2021
11/18/2021
3/28/2022
1/25/2022
10/26/2021
11/11/2021
1/25/2022
2/10/2022
11/25/2021
1/10/2022
2/10/2022
2/24/2022
12/9/2021
12/27/2021
2/24/2022
2/28/2022
12/13/2021
12/29/2021
2/28/2022
3/28/2022
3/28/2022
6/28/2022
6/10/2022
4/11/2022
4/26/2022
5/12/2022
5/27/2022
6/10/2022
6/24/2022
4/26/2022
5/12/2022
5/27/2022
6/10/2022
6/24/2022
6/28/2022
4/28/2022
5/17/2022
5/31/2022
6/14/2022
6/28/2022
5/20/2022
5/6/2022
5/11/2022
5/18/2022
5/20/2022
10/19/2022
1/14/2022
9/9/2021
5/11/2021
6/14/2021
7/5/2021
7/13/2021
7/16/2021
8/23/2021
9/1/2021
9/9/2021
11/17/2021
7/19/2021
8/18/2021
9/9/2021
9/20/2021
9/23/2021
10/28/2021
11/9/2021
11/17/2021
1/14/2022
9/24/2021
10/25/2021
11/17/2021
11/24/2021
11/29/2021
12/31/2021
1/7/2022
1/14/2022
7/19/2021
7/1/2021
5/18/2021
5/28/2021
6/10/2021
6/17/2021
6/21/2021
6/29/2021
7/1/2021
7/13/2021
6/4/2021
6/14/2021
6/23/2021
6/29/2021
7/1/2021
7/9/2021
7/13/2021
7/19/2021
6/21/2021
6/24/2021
6/28/2021
7/8/2021
7/15/2021
7/19/2021
3/31/2022
10/25/2021
9/20/2021
10/18/2021
10/25/2021
1/26/2022
12/22/2021
1/20/2022
1/26/2022
3/31/2022
2/25/2022
3/25/2022
3/31/2022
7/21/2022
6/21/2022
11/10/2021
11/24/2021
12/8/2021
6/7/2022
6/21/2022
7/5/2022
12/10/2021
3/15/2022
3/29/2022
2/17/2022
5/24/2022
6/21/2022
7/5/2022
7/19/2022
12/24/2021
3/29/2022
4/27/2022
7/5/2022
7/19/2022
7/21/2022
12/28/2021
3/31/2022
4/29/2022
7/7/2022
7/21/2022
9/12/2022
2/17/2022
5/24/2022
6/21/2022
8/24/2022
9/12/2022
10/19/2022
10/3/2022
8/4/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
10/19/2022
9/14/2022
9/19/2022
9/21/2022
10/5/2022
10/19/2022
10/11/2022
9/14/2022
9/27/2022
10/4/2022
10/11/2022
1/9/2023
6/1/2022
12/13/2021
7/23/2021
8/23/2021
9/14/2021
10/13/2021
10/15/2021
11/23/2021
12/3/2021
12/13/2021
3/7/2022
10/20/2021
11/19/2021
12/10/2021
1/7/2022
1/11/2022
2/17/2022
2/25/2022
3/7/2022
6/1/2022
1/12/2022
2/14/2022
3/7/2022
4/4/2022
4/6/2022
5/13/2022
5/24/2022
6/1/2022
1/4/2022
10/7/2021
8/6/2021
8/30/2021
9/14/2021
9/29/2021
10/4/2021
10/6/2021
10/7/2021
11/18/2021
9/17/2021
10/8/2021
10/25/2021
11/10/2021
11/12/2021
11/17/2021
11/18/2021
1/4/2022
11/9/2021
11/12/2021
11/16/2021
12/24/2021
12/31/2021
1/4/2022
8/4/2022
2/21/2022
1/17/2022
2/17/2022
2/21/2022
5/30/2022
4/21/2022
5/24/2022
5/30/2022
8/4/2022
6/29/2022
8/2/2022
8/4/2022
10/11/2022
8/19/2022
3/8/2022
3/23/2022
4/7/2022
6/17/2022
8/19/2022
9/21/2022
4/6/2022
7/13/2022
7/27/2022
5/18/2022
6/2/2022
9/21/2022
9/21/2022
10/5/2022
3/30/2022
4/14/2022
4/29/2022
10/5/2022
10/5/2022
10/11/2022
4/1/2022
4/18/2022
5/5/2022
10/7/2022
10/11/2022
12/8/2022
5/23/2022
6/7/2022
6/21/2022
11/24/2022
12/8/2022
1/9/2023
12/22/2022
10/26/2022
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
1/9/2023
11/14/2022
11/28/2022
12/12/2022
12/26/2022
1/9/2023
12/19/2022
11/24/2022
12/5/2022
12/12/2022
12/19/2022
2/14/2023
3/17/2022
1/20/2022
9/17/2021
10/15/2021
10/25/2021
11/24/2021
11/26/2021
12/30/2021
1/11/2022
1/20/2022
2/15/2022
10/20/2021
11/19/2021
11/22/2021
12/20/2021
12/22/2021
1/26/2022
2/7/2022
2/15/2022
3/17/2022
11/22/2021
12/20/2021
12/22/2021
1/20/2022
1/24/2022
3/1/2022
3/9/2022
3/17/2022
3/2/2022
12/2/2021
10/1/2021
10/25/2021
11/10/2021
11/24/2021
11/29/2021
12/1/2021
12/2/2021
1/10/2022
11/12/2021
12/3/2021
12/17/2021
12/31/2021
1/4/2022
1/7/2022
1/10/2022
3/2/2022
12/31/2021
1/6/2022
1/11/2022
2/18/2022
2/28/2022
3/2/2022
5/27/2022
3/30/2022
2/28/2022
3/28/2022
3/30/2022
4/22/2022
3/22/2022
4/20/2022
4/22/2022
5/27/2022
4/22/2022
5/25/2022
5/27/2022
10/7/2022
9/6/2022
4/13/2022
4/28/2022
5/17/2022
8/22/2022
9/6/2022
9/21/2022
5/19/2022
6/10/2022
6/24/2022
8/1/2022
8/8/2022
9/6/2022
9/21/2022
10/5/2022
6/2/2022
6/24/2022
7/8/2022
9/21/2022
10/5/2022
10/7/2022
6/21/2022
6/28/2022
7/12/2022
9/23/2022
10/7/2022
11/24/2022
8/4/2022
8/18/2022
9/2/2022
11/10/2022
11/24/2022
1/9/2023
12/22/2022
10/25/2022
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
11/9/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
1/9/2023
11/11/2022
11/28/2022
12/12/2022
12/26/2022
1/9/2023
2/14/2023
1/19/2023
1/31/2023
2/7/2023
2/14/2023
3/9/2023
8/24/2021
7/26/2021
4/23/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
6/2/2021
6/2/2021
11/24/2020
1/7/2021
4/30/2021
6/2/2021
3/3/2023
2/23/2023
3/6/2023
3/9/2023
3/8/2023
3/8/2023
3/17/2023
9/10/2021
11/3/2022
1/31/2023
12/9/2022
3/17/2023
3/10/2023
2/14/2023
3/9/2023
4/1/2023
WBS Task Name Start
MEMBINA DAN MENYIAPKAN JALAN DARI KG BENG KE KG RAJA
1 INTAN SURAYA,HULU PERAK, PERAK DARUL RIDZUAN (FASA 1 - DARI 12/9/2019
KG BENG KE KG BATU RENG)
1.1 SITE POSESSION 12/9/2019
1.2 GENERAL ITEM & PRELIMINARIES 12/17/2019
1.2.1 INITIAL 12/17/2019
1.2.1.1 A100 CONTRACTUAL REQUIREMENT 12/17/2019
1.2.1.1.1 PERFORMANCE BOND 12/17/2019
1.2.1.1.2 INSURANCE 12/27/2019
1.2.1.1.3 SOCSO 1/8/2020
1.2.1.1.4 CIDB LEVI 1/17/2020
1.2.1.2 A200 SO/PD'S REQUIREMENT 3/10/2020
1.2.1.2.1 S.O./PD SITE OFFICE 3/10/2020
1.2.1.2.1.1 ESTABLISHMENT 3/10/2020
1.2.1.2.1.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.2.2 LABORATORIES 7/10/2020
1.2.1.2.2.1 ESTABLISHMENT 7/16/2020
1.2.1.2.2.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.2.3 TRANSPORT SERVICE 7/10/2020
1.2.1.2.3.1 VEHICLE 7/23/2020
1.2.1.2.3.2 OPERATION AND MAINTENANCE 7/10/2020
1.2.1.3 A500 CONTRACTOR'S REQUIREMENT 1/20/2020
1.2.1.3.1 SITE OFFICE 1/20/2020
1.2.1.3.1.1 ESTABLISHMENT 1/20/2020
1.2.1.3.1.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.2 SITE STORE 2/4/2020
1.2.1.3.2.1 ESTABLISHMENT 2/4/2020
1.2.1.3.2.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.3 WORKSHOP 2/11/2020
1.2.1.3.3.1 ESTABLISHMENT 2/11/2020
1.2.1.3.3.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.4 WORKERS ACCOMODATION 2/18/2020
1.2.1.3.4.1 ESTABLISHMENT 2/18/2020
1.2.1.3.4.2 MAINTENANCE AND REMOVAL 7/10/2020
1.2.1.3.5 CONTRACTORS'S SUPERINTENDANCE 2/4/2020
1.2.1.3.6 HOARDING 3/3/2020
1.2.1.3.7 PROJECT SIGNBOARD 1/20/2020
1.2.2 SURVEY WORK 3/3/2020
1.2.2.1 STAGE 1 3/3/2020
1.2.2.1.1 ROW SURVEY WORK 3/3/2020
1.2.2.1.2 OGL 3/12/2020
1.2.2.1.3 DRAWING PREPARATION 7/24/2020
1.2.2.1.4 SUBMISSION OGL DRAWING 8/7/2020
1.2.2.2 STAGE 2 7/24/2020
1.2.2.2.1 SETTING OUT 7/24/2020
1.2.2.2.1.1 CH: 0 TO CH: 1000 7/24/2020
1.2.2.2.1.2 CH:1000 TO CH: 2000 8/5/2020
1.2.2.2.1.3 CH:2000 TO CH: 3000 8/14/2020
1.2.2.2.1.4 CH:3000 TO CH: 4156 8/26/2020
1.2.2.3 STAGE 3 7/8/2021
1.2.2.3.1 AS-BUILT (FORMATION LEVEL) 7/8/2021
1.2.2.3.1.1 CH:0 to CH: 1000 7/8/2021
1.2.2.3.1.2 CH:1000 TO CH: 2000 2/14/2022
1.2.2.3.1.3 CH:2000 TO CH: 3000 4/25/2022
1.2.2.3.1.4 CH:3000 TO CH: 4156 10/17/2022
1.2.2.3.1.5 AS-BUILT DRAWING PREPARATION 10/27/2022
1.2.2.3.1.6 SUBMISSION OF AS-BUILT DRAWINGS 11/17/2022
1.2.3 FINAL 3/10/2020
1.2.3.1 PLANT & MACHINERY MOBILIZATION 3/10/2020
1.2.3.2 PLANT & MACHINERY DEMOBILIZATION 3/17/2023
1.2.3.3 CLEARING AFTER COMPLETION 3/20/2023
1.3 OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT 1/20/2020
1.3.1 INITIAL 2/4/2020
1.3.1.1 PREPARATION OF SAFETY PLAN,HIRARC 2/4/2020
1.3.1.2 SUBMISSION OF SAFETY PLAN 2/17/2020
1.3.1.3 TEAM PREPARATION 2/28/2020
1.3.2 RECURRING WORK 1/20/2020
1.3.2.1 SHO, PROTECTIVE EQUIPMENT 1/20/2020
1.3.2.2 SAFETY REPORT PREPARATION 7/20/2020
1.4 ENVIRONMENTAL PROTECTION WORKS 7/10/2020
1.4.1 NON PHYSICAL WORKS 7/10/2020
1.4.1.1 EMP. REQUIREMENT 7/10/2020
1.4.1.1.1 INITIAL 7/10/2020
1.4.1.1.1.1 Preparation work EMP 7/30/2020
1.4.1.1.1.2 Presentation of EMP 8/17/2020
1.4.1.1.1.3 RECURRING WORK 7/10/2020
1.4.2 PHYSICAL WORKS 8/18/2020
1.4.2.1 Washing Facilities 9/3/2020
1.4.2.1.1 Wash Trough 9/3/2020
1.4.2.2 SEDIMENT CONTROL 8/18/2020
1.4.2.2.1 SILT TRAP EXCAVATION & INSTALLATION 8/18/2020
1.4.2.2.1.1 CH 0 - CH 1025 8/18/2020
1.4.2.2.1.2 CH 1025 - CH 2075 12/2/2020
1.4.2.2.1.3 CH 2075 - CH 3025 3/26/2021
1.4.2.2.1.4 CH 3025 - CH 4157 7/22/2021
1.4.2.2.2 SEDIMENT BASIN EXCAVATION & INSTALLATION 9/3/2020
1.4.2.2.2.1 CH 0 - CH 1025 9/3/2020
1.4.2.2.2.2 CH 1025 - CH 2075 12/16/2020
1.4.2.2.2.3 CH 2075 - CH 3025 4/9/2021
1.4.2.2.2.4 CH 3025 - CH 4157 8/5/2021
1.4.2.3 SILT FENCE LAYING WORK 9/2/2020
1.4.2.3.1 CH 0 - CH 1025 9/2/2020
1.4.2.3.2 CH 1025 - CH 2075 11/25/2020
1.4.2.3.3 CH 2075 - CH 3025 3/19/2021
1.4.2.3.4 CH 3025 - CH 4157 7/14/2021
1.4.2.4 SAND BAG INSTALLATION WORK 9/17/2020
1.4.2.4.1 CH 0 - CH 1025 9/17/2020
1.4.2.4.2 CH 1025 - CH 2075 12/9/2020
1.4.2.4.3 CH 2075 - CH 3025 4/2/2021
1.4.2.4.4 CH 3025 - CH 4157 7/29/2021
1.4.2.5 SILT CURTAIN INSTALLATION WORKS 10/15/2020
1.4.2.5.1 CH 450 - CH 500 10/15/2020
1.4.2.5.2 CH 1150 - CH 1200 10/22/2020
1.4.2.5.3 CH 1750 - CH 1800 1/8/2021
1.4.2.5.4 CH 2175 - CH 2200 1/15/2021
1.4.2.5.5 CH 2675 - CH 2700 5/3/2021
1.4.2.5.6 CH 2850 - CH 2875 5/10/2021
1.4.2.5.7 CH 3125 - CH 3175 8/27/2021
1.4.2.5.8 CH 4025 - CH 4075 9/6/2021
1.5 TRAFFIC MANAGEMENT 7/20/2020
1.5.1 INITIAL 7/27/2020
1.5.1.1 PREPARATION OF TMP 7/27/2020
1.5.1.2 PRESENTATION OF TMP 8/10/2020
1.5.1.3 SUBMISSION OF TMP 8/10/2020
1.5.2 RECURRING WORK 7/20/2020
1.5.2.1 Traffic Management Team Maintenance 7/20/2020
1.5.2.2 Traffic Report 7/20/2020
1.6 ROUTINE MAINTENANCE 3/2/2020
1.6.1 INITIAL 7/29/2020
1.6.1.1 PREPARATION OF SCHEDULE MAINTENANCE 7/29/2020
1.6.1.2 PRESENTATION OF SCHEDULE 8/12/2020
1.6.1.3 SUBMISSION OF SCHEDULE 8/19/2020
1.6.1.4 TEAM PREPARATION 9/7/2020
1.6.2 RECURRING WORK 3/2/2020
Road Lighting,Grass Cutting,Litter collection,Maintenance Bridge
1.6.2.1 3/2/2020
and Culvert,Maintenance Drainage
1.6.2.2 Grass Cutting & Litter Collection 7/10/2020
1.6.2.3 Settlement Plate Report & Analysis 2/22/2021
1.7 CIVIL WORKS 7/30/2020
1.7.1 CH 0 - CH 1025 7/30/2020
1.7.1.1 GENERAL CLEARANCE 7/30/2020
1.7.1.1.1 CH 0 to CH 250 (EXISTING ROADWAY) 7/30/2020
1.7.1.1.2 CH 250 to CH 500 8/7/2020
1.7.1.1.3 CH 500 to CH 750 9/1/2020
1.7.1.1.4 CH 750 to CH 1025 9/23/2020
1.7.1.2 DEMOLITION WORKS 9/1/2020
1.7.1.2.1 CH 250 to CH 500 9/1/2020
1.7.1.2.2 CH 500 to CH 750 9/23/2020
1.7.1.2.3 CH 750 to CH 1025 10/14/2020
1.7.1.3 TEMPORARY ACCESS 9/23/2020
1.7.1.3.1 CH 250 to CH 500 9/23/2020
1.7.1.3.2 CH 500 to CH 750 10/14/2020
1.7.1.3.3 CH 750 to CH 1025 11/5/2020
1.7.1.4 TEMPORARY CROSSING 10/19/2020
1.7.1.4.1 C1 - CH 850 10/19/2020
1.7.1.5 STRIPPING OF TOPSOIL 9/28/2020
1.7.1.5.1 CH 250 to CH 500 9/28/2020
1.7.1.5.2 CH 500 to CH 750 10/19/2020
1.7.1.5.3 CH 750 to CH 1025 11/11/2020
1.7.1.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/19/2020
1.7.1.6.1 CH 225 - CH 300 10/19/2020
1.7.1.6.2 CH 300 - CH 375 10/21/2020
1.7.1.6.3 CH 400 - CH 440 10/23/2020
1.7.1.6.4 CH 510 - CH 675 10/27/2020
1.7.1.6.5 CH 700 - CH 825 10/30/2020
1.7.1.6.6 CH 850 - CH 1025 11/3/2020
1.7.1.7 EXCAVATE TO SUITABLE MATERIAL 10/21/2020
1.7.1.7.1 CH 225 - CH 300 10/21/2020
1.7.1.7.2 CH 300 - CH 375 11/20/2020
1.7.1.7.3 CH 700 - CH 825 12/18/2020
1.7.1.7.4 CH 825 - CH 1025 1/19/2021
1.7.1.8 EXCAVATE TO UNSUITABLE MATERIAL 2/18/2021
1.7.1.8.1 CH 400 - CH 440 2/18/2021
1.7.1.8.2 CH 510 - CH 675 3/18/2021
1.7.1.8.3 CH 825 - CH 875 4/15/2021
1.7.1.9 INSTRUMENTATION - SETTLEMENT PLATE 3/18/2021
1.7.1.9.1 CH 400 - CH 450 3/18/2021
1.7.1.9.2 CH 515 - CH 675 4/15/2021
1.7.1.10 PC CULVERT INSTALLATION 4/15/2021
1.7.1.10.1 EXCAVATION WORK 4/15/2021
1.7.1.10.1.1 C1 - CH 850 (15.0M) 4/15/2021
1.7.1.10.2 LAYING OF GEOTEXTILE WORK 4/22/2021
1.7.1.10.2.1 C1 - CH 850 (15.0M) 4/22/2021
1.7.1.10.3 FOUNDATION (TYPE B) 4/23/2021
1.7.1.10.3.1 C1 - CH 850 (15.0M) 4/23/2021
1.7.1.10.4 PC CULVERT LAYING 5/3/2021
1.7.1.10.4.1 C1 - CH 850 (15.0M) 5/3/2021
1.7.1.11 FILLING WORKS & COMPACTION 3/25/2021
1.7.1.11.1 CH 400 - CH 440 3/25/2021
1.7.1.11.2 CH 510 - CH 675 4/22/2021
1.7.1.11.3 CH 825 - CH 875 5/25/2021
1.7.1.12 TESTING (FDT) 4/27/2021
1.7.1.12.1 CH 250 to CH 500 4/27/2021
1.7.1.12.2 CH 500 to CH 750 5/31/2021
1.7.1.12.3 CH 750 to CH 1025 6/29/2021
1.7.1.13 SURFACE DRAIN 12/18/2020
1.7.1.13.1 INTERCEPTOR DRAIN (TYPE 2) 12/18/2020
1.7.1.13.1.1 CH 325 to CH 385 12/18/2020
1.7.1.13.1.2 CH 700 to CH 825 1/19/2021
1.7.1.13.1.3 CH 825 to CH 950 2/18/2021
1.7.1.13.2 STONE PITCHED SUMP (TYPE SC1) 1/5/2021
1.7.1.13.2.1 CH 325 to CH 385 1/5/2021
1.7.1.13.2.2 CH 700 to CH 825 2/3/2021
1.7.1.13.2.3 CH 825 to CH 950 3/4/2021
1.7.1.13.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/5/2021
1.7.1.13.3.1 CH 325 to CH 450 1/5/2021
1.7.1.13.3.2 CH 525 to CH 690 2/3/2021
1.7.1.13.3.3 CH 700 to CH 800 2/18/2021
1.7.1.13.4 STONE PITCH SUMP (TYPE SC2) 1/19/2021
1.7.1.13.4.1 CH 325 to CH 450 1/19/2021
1.7.1.13.4.2 CH 525 to CH 690 2/18/2021
1.7.1.13.4.3 CH 700 to CH 800 3/4/2021
1.7.1.13.5 BRICK SUMP (TYPE SF2) 1/21/2021
1.7.1.13.5.1 CH 325 to CH 450 1/21/2021
1.7.1.13.5.2 CH 525 to CH 690 2/22/2021
1.7.1.13.5.3 CH 700 to CH 800 3/8/2021
1.7.1.13.6 EMBANKMENT TOE DRAINS (TYPE 1) 1/19/2021
1.7.1.13.6.1 CH 0 to CH 300 1/19/2021
1.7.1.13.6.2 CH 375 to CH 475 4/22/2021
1.7.1.13.6.3 CH 480 to CH 700 5/25/2021
1.7.1.13.7 BRICK SUMP (TYPE SF3) 2/3/2021
1.7.1.13.7.1 CH 0 to CH 300 2/3/2021
1.7.1.13.7.2 CH 375 to CH 475 5/7/2021
1.7.1.13.7.3 CH 480 to CH 700 6/10/2021
1.7.1.13.8 ROADSIDE DRAIN (TYPE RSD 1) 3/4/2021
1.7.1.13.8.1 CH 300 to CH 375 3/4/2021
1.7.1.13.8.2 CH 700 to CH 1000 3/18/2021
1.7.1.13.9 STONE PITCH SUMP (TYPE SC3) 3/18/2021
1.7.1.13.9.1 CH 300 to CH 375 3/18/2021
1.7.1.13.9.2 CH 700 to CH 1000 4/1/2021
1.7.1.13.10 CASCADE DRAIN 5/7/2021
1.7.1.13.10.1 CH 300 to CH 450 5/7/2021
1.7.1.13.10.2 CH 500 to CH 650 6/10/2021
1.7.1.13.10.3 CH 700 to CH 850 7/8/2021
1.7.1.13.10.4 CH 950 to CH 1025 8/6/2021
1.7.1.14 LANDSCAPING 4/27/2021
1.7.1.14.1 GROUND SURFACE PREPARATION 4/27/2021
1.7.1.14.1.1 CH 250 to CH 500 4/27/2021
1.7.1.14.1.2 CH 500 to CH 750 5/31/2021
1.7.1.14.1.3 CH 750 to CH 1025 6/29/2021
1.7.1.14.2 CLOSE TURFING 5/7/2021
1.7.1.14.2.1 CH 250 to CH 500 5/7/2021
1.7.1.14.2.2 CH 500 to CH 750 6/10/2021
1.7.1.14.2.3 CH 750 to CH 1025 7/8/2021
1.7.1.15 RUBBLE RETAINING WALL 6/1/2021
1.7.1.15.1 EXCAVATION & SURFACE PREPARATION 6/1/2021
1.7.1.15.1.1 CH 400 - CH 440 6/1/2021
1.7.1.15.1.2 CH 510 - CH 675 6/30/2021
1.7.1.15.2 RUBBLE PITCHING ERECTION 6/30/2021
1.7.1.15.2.1 CH 400 - CH 440 6/30/2021
1.7.1.15.2.2 CH 510 - CH 675 7/29/2021
1.7.1.16 NEW PAVEMENT 5/25/2021
1.7.1.16.1 SUBGRADE PREPARATION - 300MM 5/25/2021
1.7.1.16.1.1 CH 250 to CH 500 5/25/2021
1.7.1.16.1.2 CH 500 to CH 1025 7/23/2021
1.7.1.16.2 SUB-BASE - 100MM 7/1/2021
1.7.1.16.2.1 CH 250 to CH 500 7/1/2021
1.7.1.16.2.2 CH 500 to CH 1025 8/30/2021
1.7.1.16.3 ROADBASE - 300MM 8/6/2021
1.7.1.16.3.1 CH 250 to CH 500 8/6/2021
1.7.1.16.3.2 CH 500 to CH 1025 10/6/2021
1.7.1.16.4 PRIME COATING WORK 9/14/2021
1.7.1.16.4.1 CH 250 to CH 500 9/14/2021
1.7.1.16.4.2 CH 500 to CH 1025 11/15/2021
1.7.1.16.5 TACK COATING WORK 9/17/2021
1.7.1.16.5.1 CH 250 to CH 500 9/17/2021
1.7.1.16.5.2 CH 500 to CH 1025 11/17/2021
1.7.1.17 JUNCTION 6/24/2021
1.7.1.17.1 STRIPPING TOP SOIL 6/24/2021
1.7.1.17.1.1 Junction 1 - CH 400 6/24/2021
1.7.1.17.1.2 Junction 2 - CH 690 8/23/2021
1.7.1.17.2 CUT AND FILL WORK 7/1/2021
1.7.1.17.2.1 Junction 1 - CH 400 7/1/2021
1.7.1.17.2.2 Junction 2 - CH 690 8/30/2021
1.7.1.17.3 CUT AND DISPOSE WORK 7/15/2021
1.7.1.17.3.1 Junction 1 - CH 400 7/15/2021
1.7.1.17.3.2 Junction 2 - CH 690 9/14/2021
1.7.1.17.4 TESTING (FDT) 7/30/2021
1.7.1.17.4.1 Junction 1 - CH 400 7/30/2021
1.7.1.17.4.2 Junction 2 - CH 690 9/29/2021
1.7.1.17.5 LANDSCAPING 8/4/2021
1.7.1.17.5.1 Junction 1 - CH 400 8/4/2021
1.7.1.17.5.2 Junction 2 - CH 690 10/4/2021
1.7.1.17.6 SUBGRADE PREPARATION - 300MM 8/19/2021
1.7.1.17.6.1 Junction 1 - CH 400 8/19/2021
1.7.1.17.6.2 Junction 2 - CH 690 10/18/2021
1.7.1.17.7 SUB-BASE - 100MM 8/26/2021
1.7.1.17.7.1 Junction 1 - CH 400 8/26/2021
1.7.1.17.7.2 Junction 2 - CH 690 10/26/2021
1.7.1.17.8 ROADBASE - 300MM 9/3/2021
1.7.1.17.8.1 Junction 1 - CH 400 9/3/2021
1.7.1.17.8.2 Junction 2 - CH 690 11/2/2021
1.7.1.17.9 PRIME COATING WORK 9/10/2021
1.7.1.17.9.1 Junction 1 - CH 400 9/10/2021
1.7.1.17.9.2 Junction 2 - CH 690 11/11/2021
1.7.1.17.10 TACK COATING WORK 9/13/2021
1.7.1.17.10.1 Junction 1 - CH 400 9/13/2021
1.7.1.17.10.2 Junction 2 - CH 690 11/12/2021
1.7.1.18 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 7/30/2021
1.7.1.18.1 CH 250 to CH 500 7/30/2021
1.7.1.18.2 CH 500 to CH 1025 9/29/2021
1.7.1.19 BRICK SUMP (TYPE SF1) 8/30/2021
1.7.1.19.1 CH 250 to CH 500 8/30/2021
1.7.1.19.2 CH 500 to CH 1025 10/28/2021
1.7.1.20 WEARING COURSE LAYING - 50MM 9/21/2021
1.7.1.20.1 CH 250 to CH 500 9/21/2021
1.7.1.20.2 CH 425 to CH 525 (BRIDGE) 7/29/2022
1.7.1.20.3 CH 500 to CH 1025 11/19/2021
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.1.21 COMPACTION WORK 9/24/2021
1.7.1.21.1 CH 250 to CH 500 9/24/2021
1.7.1.21.2 CH 500 to CH 1025 11/24/2021
1.7.1.22 TREATMENT WORK (EXISTING WORK) 10/1/2021
1.7.1.22.1 ROAD SURFACE PREPARATION 10/1/2021
1.7.1.22.2 LAYING TACK COAT 10/25/2021
1.7.1.22.3 LAYING WEARING COURSE 10/26/2021
1.7.2 CH 1025 - CH 2075 11/11/2020
1.7.2.1 GENERAL CLEARANCE 11/11/2020
1.7.2.1.1 CH 1025 to CH 1250 11/11/2020
1.7.2.1.2 CH 1250 to CH 1500 12/2/2020
1.7.2.1.3 CH 1500 to CH 1750 12/23/2020
1.7.2.1.4 CH 1750 to CH 2075 1/15/2021
1.7.2.2 DEMOLITION WORKS 12/2/2020
1.7.2.2.1 CH 1025 to CH 1250 12/2/2020
1.7.2.2.2 CH 1250 to CH 1500 12/23/2020
1.7.2.2.3 CH 1500 to CH 1750 1/15/2021
1.7.2.2.4 CH 1750 to CH 2075 2/8/2021
1.7.2.3 TEMPORARY ACCESS 12/23/2020
1.7.2.3.1 CH 1025 to CH 1250 12/23/2020
1.7.2.3.2 CH 1250 to CH 1500 1/15/2021
1.7.2.3.3 CH 1500 to CH 1750 2/8/2021
1.7.2.3.4 CH 1750 to CH 2075 3/2/2021
1.7.2.4 TEMPORARY CROSSING 11/11/2020
1.7.2.4.1 C2 - CH 1135 11/11/2020
1.7.2.4.2 C3 - CH 1225 12/29/2020
1.7.2.4.3 C4 - CH 1475 1/4/2021
1.7.2.4.4 C5 - CH 1535 1/20/2021
1.7.2.4.5 C6 - CH 1615 1/25/2021
1.7.2.4.6 C7 - CH 1758 2/11/2021
1.7.2.4.7 C8 - CH 1925 2/17/2021
1.7.2.4.8 C9 - CH 2040 2/22/2021
1.7.2.5 STRIPPING OF TOPSOIL 12/29/2020
1.7.2.5.1 CH 1025 to CH 1250 12/29/2020
1.7.2.5.2 CH 1250 to CH 1500 1/20/2021
1.7.2.5.3 CH 1500 to CH 1750 2/11/2021
1.7.2.5.4 CH 1750 to CH 2075 3/5/2021
1.7.2.6 EXCAVATION OF TEMPORARY EARTH DRAIN 1/20/2021
1.7.2.6.1 CH 1025 - CH 1350 1/20/2021
1.7.2.6.2 CH 1375 - CH 1475 1/22/2021
1.7.2.6.3 CH 1555 - CH 1600 2/11/2021
1.7.2.6.4 CH 1650 - CH 1725 3/5/2021
1.7.2.6.5 CH 1750 - CH 1810 3/26/2021
1.7.2.6.6 CH 1825 - CH 1900 3/30/2021
1.7.2.6.7 CH 1900 - CH 2075 4/1/2021
1.7.2.7 EXCAVATE TO SUITABLE MATERIAL 1/26/2021
1.7.2.7.1 CH 1375 - CH 1475 1/26/2021
1.7.2.7.2 CH 1555 - CH 1600 2/25/2021
1.7.2.7.3 CH 1650 - CH 1725 3/25/2021
1.7.2.7.4 CH 1825 - CH 1900 4/22/2021
1.7.2.8 EXCAVATE TO UNSUITABLE MATERIAL 5/25/2021
1.7.2.8.1 CH 1025 - CH 1350 5/25/2021
1.7.2.8.2 CH 1475 - CH 1525 6/24/2021
1.7.2.8.3 CH 1600 - CH 1650 7/23/2021
1.7.2.8.4 CH 1750 - CH 1810 8/23/2021
1.7.2.8.5 CH 1900 - CH 2075 9/22/2021
1.7.2.9 EXCAVATION TO HARD MATERIAL (LEUCOGRANITE) 8/27/2021
1.7.2.9.1 CH 1650 - CH 1725 8/27/2021
1.7.2.10 EXCAVATION TO ROCK (LEUCOGRANITE) 9/28/2021
1.7.2.10.1 CH 1650 - CH 1725 9/28/2021
1.7.2.11 LAYING GEOTEXTILE LAYER 10/27/2021
1.7.2.11.1 CH 1650 - CH 1725 BOTTOM 10/27/2021
1.7.2.11.2 CH 1650 - CH 1725 TOP 11/30/2021
1.7.2.12 SAND FILLING WORKS & COMPACTION 10/29/2021
1.7.2.12.1 CH 1650 - CH 1725 10/29/2021
1.7.2.13 SAND DRAINAGE BLANKET & ROCK FILL BUND 7/23/2021
1.7.2.13.1 SAND DRAINAGE BLANKET 7/23/2021
1.7.2.13.1.1 LAYING OF GEOTEXTILE WORK 7/23/2021
1.7.2.13.1.1.1 CH 1475 - CH 1525 7/23/2021
1.7.2.13.1.1.2 CH 1750 - CH 1810 9/22/2021
1.7.2.13.1.2 PLACEMENT AND COMPACTION OF SAND BLANKET 7/27/2021
1.7.2.13.1.2.1 CH 1475 - CH 1525 7/27/2021
1.7.2.13.1.2.2 CH 1750 - CH 1810 9/24/2021
1.7.2.13.2 ROCK FILL BUND 8/11/2021
1.7.2.13.2.1 EXCAVATION WORK 8/11/2021
1.7.2.13.2.1.1 CH 1475 - CH 1525 8/11/2021
1.7.2.13.2.1.2 CH 1750 - CH 1810 10/8/2021
1.7.2.13.2.2 LAYING OF GEOTEXTILE WORK 8/18/2021
1.7.2.13.2.2.1 CH 1475 - CH 1525 8/18/2021
1.7.2.13.2.2.2 CH 1750 - CH 1810 10/15/2021
1.7.2.13.2.3 ROCK FILLING WORKS 8/20/2021
1.7.2.13.2.3.1 CH 1475 - CH 1525 8/20/2021
1.7.2.13.2.3.2 CH 1750 - CH 1810 10/20/2021
1.7.2.14 PC CULVERT INSTALLATION 7/23/2021
1.7.2.14.1 EXCAVATION WORK 7/23/2021
1.7.2.14.1.1 C4 - CH 1475 (30.0M) 7/23/2021
1.7.2.14.2 LAYING OF GEOTEXTILE WORK 7/30/2021
1.7.2.14.2.1 C4 - CH 1475 (30.0M) 7/30/2021
1.7.2.14.3 FOUNDATION (TYPE B) 8/2/2021
1.7.2.14.3.1 C4 - CH 1475 (30.0M) 8/2/2021
1.7.2.14.4 PC CULVERT LAYING 8/9/2021
1.7.2.14.4.1 C4 - CH 1475 (30.0M) 8/9/2021
1.7.2.15 IN-SITU RC BOX CULVERT 1/20/2021
1.7.2.15.1 EXCAVATION WORK 1/20/2021
1.7.2.15.1.1 C2 - CH 1135 (58.0M) 1/20/2021
1.7.2.15.1.2 C3 - CH 1225 (35.0M) 1/27/2021
1.7.2.15.1.3 C5 - CH 1535 (25.0M) 3/5/2021
1.7.2.15.1.4 C6 - CH 1615 (33.0M) 3/12/2021
1.7.2.15.1.5 C7 - CH 1758 (28.0M) 3/26/2021
1.7.2.15.1.6 C8 - CH 1925 (28.0M) 4/2/2021
1.7.2.15.1.7 C9 - CH 2040 (43.0M) 4/9/2021
1.7.2.15.2 LAYING OF GEOTEXTILE WORK 1/27/2021
1.7.2.15.2.1 C2 - CH 1135 (58.0M) 1/27/2021
1.7.2.15.2.2 C3 - CH 1225 (35.0M) 2/4/2021
1.7.2.15.2.3 C5 - CH 1535 (25.0M) 3/12/2021
1.7.2.15.2.4 C6 - CH 1615 (33.0M) 3/19/2021
1.7.2.15.2.5 C7 - CH 1758 (28.0M) 4/2/2021
1.7.2.15.2.6 C8 - CH 1925 (28.0M) 4/9/2021
1.7.2.15.2.7 C9 - CH 2040 (43.0M) 4/16/2021
1.7.2.15.3 FOUNDATION (TYPE B) 2/1/2021
1.7.2.15.3.1 C2 - CH 1135 (58.0M) 2/1/2021
1.7.2.15.3.2 C3 - CH 1225 (35.0M) 2/8/2021
1.7.2.15.3.3 C5 - CH 1535 (25.0M) 3/16/2021
1.7.2.15.3.4 C6 - CH 1615 (33.0M) 3/23/2021
1.7.2.15.3.5 C7 - CH 1758 (28.0M) 4/6/2021
1.7.2.15.3.6 C8 - CH 1925 (28.0M) 4/13/2021
1.7.2.15.3.7 C9 - CH 2040 (43.0M) 4/20/2021
1.7.2.15.4 LEAN-CON 2/8/2021
1.7.2.15.4.1 C2 - CH 1135 (58.0M) 2/8/2021
1.7.2.15.4.2 C3 - CH 1225 (35.0M) 2/16/2021
1.7.2.15.4.3 C5 - CH 1535 (25.0M) 3/23/2021
1.7.2.15.4.4 C6 - CH 1615 (33.0M) 3/30/2021
1.7.2.15.4.5 C7 - CH 1758 (28.0M) 4/13/2021
1.7.2.15.4.6 C8 - CH 1925 (28.0M) 4/20/2021
1.7.2.15.4.7 C9 - CH 2040 (43.0M) 4/27/2021
1.7.2.15.5 BASE SLAB 2/10/2021
1.7.2.15.5.1 C2 - CH 1135 (58.0M) 2/10/2021
1.7.2.15.5.2 C3 - CH 1225 (35.0M) 2/18/2021
1.7.2.15.5.3 C5 - CH 1535 (25.0M) 3/25/2021
1.7.2.15.5.4 C6 - CH 1615 (33.0M) 4/1/2021
1.7.2.15.5.5 C7 - CH 1758 (28.0M) 4/15/2021
1.7.2.15.5.6 C8 - CH 1925 (28.0M) 4/22/2021
1.7.2.15.5.7 C9 - CH 2040 (43.0M) 4/30/2021
1.7.2.15.6 SIDEWALL, WINGWALL 4/9/2021
1.7.2.15.6.1 C2 - CH 1135 (58.0M) 4/9/2021
1.7.2.15.6.2 C3 - CH 1225 (35.0M) 5/3/2021
1.7.2.15.6.3 C5 - CH 1535 (25.0M) 5/27/2021
1.7.2.15.6.4 C6 - CH 1615 (33.0M) 6/18/2021
1.7.2.15.6.5 C7 - CH 1758 (28.0M) 7/9/2021
1.7.2.15.6.6 C8 - CH 1925 (28.0M) 8/2/2021
1.7.2.15.6.7 C9 - CH 2040 (43.0M) 8/24/2021
1.7.2.15.7 TOP COVER 6/14/2021
1.7.2.15.7.1 C2 - CH 1135 (58.0M) 6/14/2021
1.7.2.15.7.2 C3 - CH 1225 (35.0M) 7/5/2021
1.7.2.15.7.3 C5 - CH 1535 (25.0M) 7/27/2021
1.7.2.15.7.4 C6 - CH 1615 (33.0M) 8/18/2021
1.7.2.15.7.5 C7 - CH 1758 (28.0M) 9/9/2021
1.7.2.15.7.6 C8 - CH 1925 (28.0M) 10/1/2021
1.7.2.15.7.7 C9 - CH 2040 (43.0M) 10/25/2021
1.7.2.15.8 SUBSURFACE INSTALLATION & FILLINGS 6/14/2021
1.7.2.15.8.1 C2 - CH 1135 (58.0M) 6/14/2021
1.7.2.15.8.2 C3 - CH 1225 (35.0M) 7/5/2021
1.7.2.15.8.3 C5 - CH 1535 (25.0M) 7/27/2021
1.7.2.15.8.4 C6 - CH 1615 (33.0M) 8/18/2021
1.7.2.15.8.5 C7 - CH 1758 (28.0M) 9/9/2021
1.7.2.15.8.6 C8 - CH 1925 (28.0M) 10/1/2021
1.7.2.15.8.7 C9 - CH 2040 (43.0M) 10/25/2021
1.7.2.15.9 BACKFILLING WORKS 7/7/2021
1.7.2.15.9.1 C2 - CH 1135 (58.0M) 7/7/2021
1.7.2.15.9.2 C3 - CH 1225 (35.0M) 7/29/2021
1.7.2.15.9.3 C5 - CH 1535 (25.0M) 8/20/2021
1.7.2.15.9.4 C6 - CH 1615 (33.0M) 9/13/2021
1.7.2.15.9.5 C7 - CH 1758 (28.0M) 10/5/2021
1.7.2.15.9.6 C8 - CH 1925 (28.0M) 10/27/2021
1.7.2.15.9.7 C9 - CH 2040 (43.0M) 11/19/2021
1.7.2.16 FILLING WORKS & COMPACTION 8/5/2021
1.7.2.16.1 CH 1025 - CH 1350 8/5/2021
1.7.2.16.2 CH 1475 - CH 1525 9/21/2021
1.7.2.16.3 CH 1600 - CH 1650 10/20/2021
1.7.2.16.4 CH 1650 - CH 1725 12/1/2021
1.7.2.16.5 CH 1750 - CH 1810 12/29/2021
1.7.2.16.6 CH 1900 - CH 2075 1/27/2022
1.7.2.17 TESTING (FDT) 9/9/2021
1.7.2.17.1 CH 1025 to CH 1250 9/9/2021
1.7.2.17.2 CH 1250 to CH 1500 10/25/2021
1.7.2.17.3 CH 1500 to CH 1750 11/24/2021
1.7.2.17.4 CH 1750 to CH 2075 2/3/2022
1.7.2.18 DIVERSION CHANNEL 7/14/2021
1.7.2.18.1 EARTH CHANNEL EXCAVATION 7/14/2021
1.7.2.18.1.1 CH 1115 7/14/2021
1.7.2.18.1.2 CH 1745 10/12/2021
1.7.2.18.2 GABION WALL ERECTION WORKS 8/13/2021
1.7.2.18.2.1 CH 1115 8/13/2021
1.7.2.18.2.2 CH 1745 11/12/2021
1.7.2.18.3 GEOTEXTILE LAYING 9/13/2021
1.7.2.18.3.1 CH 1115 9/13/2021
1.7.2.18.3.2 CH 1745 12/10/2021
1.7.2.18.4 BACKFILLING WORKS 9/14/2021
1.7.2.18.4.1 CH 1115 9/14/2021
1.7.2.18.4.2 CH 1745 12/13/2021
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.2.18.5 9/17/2021
WEEPHOLE
1.7.2.18.5.1 CH 1115 9/17/2021
1.7.2.18.5.2 CH 1745 12/15/2021
1.7.2.18.6 SLOPE PROTECTION STONE PITCHING 8/13/2021
1.7.2.18.6.1 CH 1115 LF 8/13/2021
1.7.2.18.6.2 CH 1115 RF 8/27/2021
1.7.2.18.6.3 CH 1745 LF 11/12/2021
1.7.2.18.6.4 CH 1745 RF 11/26/2021
1.7.2.18.7 SLOPE PROTECTION GABION CAGE 9/13/2021
1.7.2.18.7.1 CH 1115 9/13/2021
1.7.2.18.7.2 CH 1745 12/10/2021
1.7.2.18.8 SLOPE PROTECTION GEOTEXTILE LAYING 10/12/2021
1.7.2.18.8.1 CH 1115 10/12/2021
1.7.2.18.8.2 CH 1745 1/7/2022
1.7.2.18.9 SLOPE BACKFILLING 10/15/2021
1.7.2.18.9.1 CH 1115 10/15/2021
1.7.2.18.9.2 CH 1745 1/12/2022
1.7.2.19 SURFACE DRAIN 3/4/2021
1.7.2.19.1 INTERCEPTOR DRAIN (TYPE 2) 3/4/2021
1.7.2.19.1.1 CH 1375 to CH 1460 3/4/2021
1.7.2.19.1.2 CH 1550 to CH 1625 3/25/2021
1.7.2.19.1.3 CH 1650 to CH 1700 4/22/2021
1.7.2.19.1.4 CH 1840 to CH 1880 5/25/2021
1.7.2.19.2 STONE PITCHED SUMP (TYPE SC1) 3/18/2021
1.7.2.19.2.1 CH 1375 to CH 1460 3/18/2021
1.7.2.19.2.2 CH 1550 to CH 1625 4/8/2021
1.7.2.19.2.3 CH 1650 to CH 1700 5/7/2021
1.7.2.19.2.4 CH 1840 to CH 1880 6/10/2021
1.7.2.19.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 3/4/2021
1.7.2.19.3.1 CH 1060 to CH 1150 3/4/2021
1.7.2.19.3.2 CH 1475 to CH 1550 4/8/2021
1.7.2.19.3.3 CH 1650 to CH 1725 5/7/2021
1.7.2.19.3.4 CH 1750 to CH 1825 5/25/2021
1.7.2.19.4 STONE PITCHED SUMP (TYPE SC2) 3/18/2021
1.7.2.19.4.1 CH 1060 to CH 1150 3/18/2021
1.7.2.19.4.2 CH 1475 to CH 1550 4/22/2021
1.7.2.19.4.3 CH 1650 to CH 1725 5/25/2021
1.7.2.19.4.4 CH 1750 to CH 1825 6/10/2021
1.7.2.19.5 BRICK SUMP (TYPE SF2) 3/22/2021
1.7.2.19.5.1 CH 1060 to CH 1150 3/22/2021
1.7.2.19.5.2 CH 1475 to CH 1550 4/26/2021
1.7.2.19.5.3 CH 1650 to CH 1725 5/28/2021
1.7.2.19.5.4 CH 1750 to CH 1825 6/14/2021
1.7.2.19.6 EMBANKMENT TOE DRAINS (TYPE 1) 9/6/2021
1.7.2.19.6.1 CH 1000 to CH 1350 9/6/2021
1.7.2.19.6.2 CH 1450 to CH 1750 12/29/2021
1.7.2.19.6.3 CH 1925 to CH 2055 2/28/2022
1.7.2.19.7 BRICK SUMP (TYPE SF3) 9/21/2021
1.7.2.19.7.1 CH 1000 to CH 1350 9/21/2021
1.7.2.19.7.2 CH 1450 to CH 1750 1/12/2022
1.7.2.19.7.3 CH 1925 to CH 2055 3/14/2022
1.7.2.19.8 ROADSIDE DRAIN (TYPE RSD 1) 4/1/2021
1.7.2.19.8.1 CH 1350 to CH 1450 4/1/2021
1.7.2.19.8.2 CH 1450 to CH 1750 5/25/2021
1.7.2.19.8.3 CH 1825 to CH 1900 6/10/2021
1.7.2.19.9 STONE PITCH SUMP (TYPE SC3) 4/15/2021
1.7.2.19.9.1 CH 1350 to CH 1450 4/15/2021
1.7.2.19.9.2 CH 1450 to CH 1750 6/10/2021
1.7.2.19.9.3 CH 1825 to CH 1900 6/24/2021
1.7.2.19.10 CASCADE DRAIN 9/21/2021
1.7.2.19.10.1 CH 1125 to CH 1250 9/21/2021
1.7.2.19.10.2 CH 1350 to CH 1500 1/12/2022
1.7.2.19.10.3 CH 1550 to CH 1725 2/14/2022
1.7.2.19.10.4 CH 1825 to CH 1900 3/14/2022
1.7.2.20 LANDSCAPING 9/9/2021
1.7.2.20.1 GROUND SURFACE PREPARATION 9/9/2021
1.7.2.20.1.1 CH 1025 to CH 1250 9/9/2021
1.7.2.20.1.2 CH 1250 to CH 1500 10/25/2021
1.7.2.20.1.3 CH 1500 to CH 1750 2/3/2022
1.7.2.20.1.4 CH 1750 to CH 2075 3/3/2022
1.7.2.20.2 CLOSE TURFING 9/21/2021
1.7.2.20.2.1 CH 1025 to CH 1250 9/21/2021
1.7.2.20.2.2 CH 1250 to CH 1500 11/3/2021
1.7.2.20.2.3 CH 1500 to CH 1750 2/14/2022
1.7.2.20.2.4 CH 1750 to CH 2075 3/14/2022
1.7.2.21 NEW PAVEMENT 11/19/2021
1.7.2.21.1 SUBGRADE PREPARATION - 300MM 11/19/2021
1.7.2.21.1.1 CH 1025 to CH 1500 11/19/2021
1.7.2.21.1.2 CH 1500 to CH 2075 2/28/2022
1.7.2.21.2 SUB-BASE - 100MM 12/24/2021
1.7.2.21.2.1 CH 1025 to CH 1500 12/24/2021
1.7.2.21.2.2 CH 1500 to CH 2075 4/4/2022
1.7.2.21.3 ROADBASE - 300MM 1/31/2022
1.7.2.21.3.1 CH 1025 to CH 1500 1/31/2022
1.7.2.21.3.2 CH 1500 to CH 2075 5/12/2022
1.7.2.21.4 PRIME COATING WORK 3/9/2022
1.7.2.21.4.1 CH 1025 to CH 1500 3/9/2022
1.7.2.21.4.2 CH 1500 to CH 2075 6/17/2022
1.7.2.21.5 TACK COATING WORK 3/11/2022
1.7.2.21.5.1 CH 1025 to CH 1500 3/11/2022
1.7.2.21.5.2 CH 1500 to CH 2075 6/21/2022
1.7.2.22 JUNCTION 12/17/2021
1.7.2.22.1 STRIPPING TOP SOIL 12/17/2021
1.7.2.22.1.1 Junction 3 - CH 1050 12/17/2021
1.7.2.22.2 CUT AND FILL WORK 12/24/2021
1.7.2.22.2.1 Junction 3 - CH 1050 12/24/2021
1.7.2.22.3 CUT AND DISPOSE WORK 1/7/2022
1.7.2.22.3.1 Junction 3 - CH 1050 1/7/2022
1.7.2.22.4 TESTING (FDT) 1/24/2022
1.7.2.22.4.1 Junction 3 - CH 1050 1/24/2022
1.7.2.22.5 LANDSCAPING 1/27/2022
1.7.2.22.5.1 Junction 3 - CH 1050 1/27/2022
1.7.2.22.6 SUBGRADE PREPARATION - 300MM 2/14/2022
1.7.2.22.6.1 Junction 3 - CH 1050 2/14/2022
1.7.2.22.7 SUB-BASE - 100MM 2/21/2022
1.7.2.22.7.1 Junction 3 - CH 1050 2/21/2022
1.7.2.22.8 ROADBASE - 300MM 2/28/2022
1.7.2.22.8.1 Junction 3 - CH 1050 2/28/2022
1.7.2.22.9 PRIME COATING WORK 3/7/2022
1.7.2.22.9.1 Junction 3 - CH 1050 3/7/2022
1.7.2.22.10 TACK COATING WORK 3/8/2022
1.7.2.22.10.1 Junction 3 - CH 1050 3/8/2022
1.7.2.23 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 1/24/2022
1.7.2.23.1 CH 1025 to CH 1500 1/24/2022
1.7.2.23.2 CH 1500 to CH 2075 5/5/2022
1.7.2.24 BRICK SUMP (TYPE SF1) 2/23/2022
1.7.2.24.1 CH 1025 to CH 1500 2/23/2022
1.7.2.24.2 CH 1500 to CH 2075 6/3/2022
1.7.2.25 WEARING COURSE LAYING - 50MM 3/15/2022
1.7.2.25.1 CH 1025 to CH 1500 3/15/2022
1.7.2.25.2 CH 1500 to CH 2075 8/3/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.2.26 3/18/2022
COMPACTION WORK
1.7.2.26.1 CH 1025 to CH 1500 3/18/2022
1.7.2.26.2 CH 1500 to CH 2075 8/8/2022
1.7.3 CH 2075 - CH 3025 3/5/2021
1.7.3.1 GENERAL CLEARANCE 3/5/2021
1.7.3.1.1 CH 2075 to CH 2250 3/5/2021
1.7.3.1.2 CH 2250 to CH 2500 3/26/2021
1.7.3.1.3 CH 2500 to CH 2750 4/16/2021
1.7.3.1.4 CH 2750 to CH 3025 5/10/2021
1.7.3.2 DEMOLITION WORKS 3/26/2021
1.7.3.2.1 CH 2075 to CH 2250 3/26/2021
1.7.3.2.2 CH 2250 to CH 2500 4/16/2021
1.7.3.2.3 CH 2500 to CH 2750 5/10/2021
1.7.3.2.4 CH 2750 to CH 3025 6/3/2021
1.7.3.3 TEMPORARY ACCESS 4/16/2021
1.7.3.3.1 CH 2075 to CH 2250 4/16/2021
1.7.3.3.2 CH 2250 to CH 2500 5/10/2021
1.7.3.3.3 CH 2500 to CH 2750 6/3/2021
1.7.3.3.4 CH 2750 to CH 3025 6/25/2021
1.7.3.4 TEMPORARY CROSSING 3/5/2021
1.7.3.4.1 C10 - CH 2160 3/5/2021
1.7.3.4.2 C11 - CH 2250 4/21/2021
1.7.3.4.3 C12 - CH 2285 4/26/2021
1.7.3.4.4 C13 - CH 2430 4/30/2021
1.7.3.5 STRIPPING OF TOPSOIL 4/21/2021
1.7.3.5.1 CH 2075 to CH 2250 4/21/2021
1.7.3.5.2 CH 2250 to CH 2500 5/17/2021
1.7.3.5.3 CH 2500 to CH 2750 6/9/2021
1.7.3.5.4 CH 2750 to CH 3025 6/30/2021
1.7.3.6 EXCAVATION OF TEMPORARY EARTH DRAIN 5/17/2021
1.7.3.6.1 CH 2075 to CH 2150 5/17/2021
1.7.3.6.2 CH 2150 to CH 2350 6/9/2021
1.7.3.6.3 CH 2350 to CH 2425 6/11/2021
1.7.3.6.4 CH 2550 to CH 2640 6/30/2021
1.7.3.6.5 CH 2745 to CH 2790 7/22/2021
1.7.3.6.6 CH 2910 to CH 3025 7/26/2021
1.7.3.7 EXCAVATE TO SUITABLE MATERIAL 5/19/2021
1.7.3.7.1 CH 2075 to CH 2150 5/19/2021
1.7.3.7.2 CH 2330 to CH 2425 6/18/2021
1.7.3.7.3 CH 2550 to CH 2640 8/17/2021
1.7.3.7.4 CH 2745 to CH 2790 10/20/2021
1.7.3.7.5 CH 2910 to CH 3025 11/19/2021
1.7.3.8 EXCAVATE FOR SAND REPLACEMENT 7/16/2021
1.7.3.8.1 CH 2425 - CH 2525 (2.0M) 7/16/2021
1.7.3.9 EXCAVATE TO HARD MATERIAL 6/18/2021
1.7.3.9.1 CH 2075 to CH 2150 6/18/2021
1.7.3.9.2 CH 2910 to CH 3025 12/17/2021
1.7.3.10 EXCAVATE TO ROCK 7/16/2021
1.7.3.10.1 CH 2075 to CH 2150 7/16/2021
1.7.3.10.2 CH 2910 to CH 3025 1/14/2022
1.7.3.11 ROCK FACE PROTECTION 8/17/2021
1.7.3.11.1 PLANT MOBILIZATION & WORK PLATFORM 8/17/2021
1.7.3.11.1.1 CH 2075 to CH 2150 8/17/2021
1.7.3.11.1.2 CH 2910 to CH 3025 2/16/2022
1.7.3.11.2 DRILLING AND INSTALL ANCHORING 9/15/2021
1.7.3.11.2.1 CH 2075 to CH 2150 LF 9/15/2021
1.7.3.11.2.2 CH 2075 to CH 2150 RF 10/14/2021
1.7.3.11.2.3 CH 2910 to CH 3025 LF 3/16/2022
1.7.3.11.2.4 CH 2910 to CH 3025 RF 4/13/2022
1.7.3.11.3 INSTALLATION STEEL NETTING 11/25/2021
1.7.3.11.3.1 CH 2075 to CH 2150 11/25/2021
1.7.3.11.3.2 CH 2910 to CH 3025 5/26/2022
1.7.3.12 BOULDER PROTECTION 9/15/2021
1.7.3.12.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.12.1.1 CH 2075 to CH 2150 9/15/2021
1.7.3.12.1.2 CH 2910 to CH 3025 3/16/2022
1.7.3.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 9/20/2021
1.7.3.12.2.1 CH 2075 to CH 2150 9/20/2021
1.7.3.12.2.2 CH 2910 to CH 3025 3/18/2022
1.7.3.12.3 DRILL AND INSTALL DOWEL BAR 10/18/2021
1.7.3.12.3.1 CH 2075 to CH 2150 LF 10/18/2021
1.7.3.12.3.2 CH 2075 to CH 2150 RF 11/18/2021
1.7.3.12.3.3 CH 2910 to CH 3025 LF 4/15/2022
1.7.3.12.3.4 CH 2910 to CH 3025 RF 5/19/2022
1.7.3.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 12/16/2021
1.7.3.12.4.1 CH 2075 to CH 2150 12/16/2021
1.7.3.12.4.2 CH 2910 to CH 3025 6/16/2022
1.7.3.12.5 CONCRETE WORK 12/30/2021
1.7.3.12.5.1 CH 2075 to CH 2150 12/30/2021
1.7.3.12.5.2 CH 2910 to CH 3025 6/30/2022
1.7.3.12.6 FINISH WORK 1/12/2022
1.7.3.12.6.1 CH 2075 to CH 2150 1/12/2022
1.7.3.12.6.2 CH 2910 to CH 3025 7/13/2022
1.7.3.13 ROCK BOLT 9/15/2021
1.7.3.13.1 PLANT MOBILIZATION & WORK PLATFORM 9/15/2021
1.7.3.13.1.1 CH 2075 to CH 2150 9/15/2021
1.7.3.13.1.2 CH 2910 to CH 3025 9/27/2021
1.7.3.13.2 DRILLING WORK AND INSTALLATION WORKS 9/27/2021
1.7.3.13.2.1 CH 2075 to CH 2150 9/27/2021
1.7.3.13.2.2 CH 2910 to CH 3025 10/15/2021
1.7.3.13.3 GUNITING WORK 10/15/2021
1.7.3.13.3.1 CH 2075 to CH 2150 10/15/2021
1.7.3.13.3.2 CH 2910 to CH 3025 11/9/2021
1.7.3.13.4 PULL OUT TEST 12/15/2021
1.7.3.13.4.1 CH 2075 to CH 2150 12/15/2021
1.7.3.13.4.2 CH 2910 to CH 3025 1/4/2022
1.7.3.14 HORIZONTAL DRAIN 9/27/2021
1.7.3.14.1 MARKING OF DRAIN POINT 9/27/2021
1.7.3.14.1.1 CH 2550 to CH 2640 - 6M 9/27/2021
1.7.3.14.1.2 CH 2910 to CH 3025 - 6M 12/28/2021
1.7.3.14.2 INSTALLATION OF PIPE DRAIN 9/29/2021
1.7.3.14.2.1 CH 2550 to CH 2640 - 6M 9/29/2021
1.7.3.14.2.2 CH 2910 to CH 3025 - 6M 12/30/2021
1.7.3.15 EXCAVATE TO UNSUITABLE MATERIAL 12/17/2021
1.7.3.15.1 CH 2150 - CH 2350 12/17/2021
1.7.3.15.2 CH 2425 - CH 2550 1/14/2022
1.7.3.16 LAYING GEOTEXTILE LAYER 8/17/2021
1.7.3.16.1 CH 2425 - CH 2525 (2.0M) BOTTOM 8/17/2021
1.7.3.16.2 CH 2425 - CH 2525 (2.0M) TOP 9/20/2021
1.7.3.17 SAND FILLING WORKS & COMPACTION 8/19/2021
1.7.3.17.1 CH 2425 - CH 2525 (2.0M) 8/19/2021
1.7.3.18 IN-SITU RC BOX CULVERT 5/17/2021
1.7.3.18.1 EXCAVATION WORK 5/17/2021
1.7.3.18.1.1 C10 - CH 2160 (25.0M) 5/17/2021
1.7.3.18.1.2 C11 - CH 2250 (36.0M) 5/24/2021
1.7.3.18.1.3 C12 - CH 2285 (52.0M) 6/9/2021
1.7.3.18.1.4 C13 - CH 2430 (56.0M) 6/16/2021
1.7.3.18.2 LAYING OF GEOTEXTILE WORK 5/24/2021
1.7.3.18.2.1 C10 - CH 2160 (25.0M) 5/24/2021
1.7.3.18.2.2 C11 - CH 2250 (36.0M) 6/1/2021
1.7.3.18.2.3 C12 - CH 2285 (52.0M) 6/16/2021
1.7.3.18.2.4 C13 - CH 2430 (56.0M) 6/23/2021
1.7.3.18.3 FOUNDATION (TYPE B) 5/27/2021
1.7.3.18.3.1 C10 - CH 2160 (25.0M) 5/27/2021
1.7.3.18.3.2 C11 - CH 2250 (36.0M) 6/3/2021
1.7.3.18.3.3 C12 - CH 2285 (52.0M) 6/18/2021
1.7.3.18.3.4 C13 - CH 2430 (56.0M) 6/25/2021
1.7.3.18.4 LEAN-CON 6/3/2021
1.7.3.18.4.1 C10 - CH 2160 (25.0M) 6/3/2021
1.7.3.18.4.2 C11 - CH 2250 (36.0M) 6/11/2021
1.7.3.18.4.3 C12 - CH 2285 (52.0M) 6/25/2021
1.7.3.18.4.4 C13 - CH 2430 (56.0M) 7/2/2021
1.7.3.18.5 BASE SLAB 6/8/2021
1.7.3.18.5.1 C10 - CH 2160 (25.0M) 6/8/2021
1.7.3.18.5.2 C11 - CH 2250 (36.0M) 6/29/2021
1.7.3.18.5.3 C12 - CH 2285 (52.0M) 7/21/2021
1.7.3.18.5.4 C13 - CH 2430 (56.0M) 8/12/2021
1.7.3.18.6 SIDEWALL, WINGWALL 9/15/2021
1.7.3.18.6.1 C10 - CH 2160 (25.0M) 9/15/2021
1.7.3.18.6.2 C11 - CH 2250 (36.0M) 10/7/2021
1.7.3.18.6.3 C12 - CH 2285 (52.0M) 10/29/2021
1.7.3.18.6.4 C13 - CH 2430 (56.0M) 11/23/2021
1.7.3.18.7 TOP COVER 11/17/2021
1.7.3.18.7.1 C10 - CH 2160 (25.0M) 11/17/2021
1.7.3.18.7.2 C11 - CH 2250 (36.0M) 12/8/2021
1.7.3.18.7.3 C12 - CH 2285 (52.0M) 12/29/2021
1.7.3.18.7.4 C13 - CH 2430 (56.0M) 1/20/2022
1.7.3.18.8 SUBSURFACE INSTALLATION & FILLINGS 11/17/2021
1.7.3.18.8.1 C10 - CH 2160 (25.0M) 11/17/2021
1.7.3.18.8.2 C11 - CH 2250 (36.0M) 12/8/2021
1.7.3.18.8.3 C12 - CH 2285 (52.0M) 12/29/2021
1.7.3.18.8.4 C13 - CH 2430 (56.0M) 1/20/2022
1.7.3.18.9 BACKFILLING WORKS 12/10/2021
1.7.3.18.9.1 C10 - CH 2160 (25.0M) 12/10/2021
1.7.3.18.9.2 C11 - CH 2250 (36.0M) 12/31/2021
1.7.3.18.9.3 C12 - CH 2285 (52.0M) 1/24/2022
1.7.3.18.9.4 C13 - CH 2430 (56.0M) 2/16/2022
1.7.3.19 FILLING WORKS & COMPACTION 1/31/2022
1.7.3.19.1 CH 2150 - CH 2350 1/31/2022
1.7.3.19.2 CH 2425 - CH 2550 3/2/2022
1.7.3.20 TESTING (FDT) 3/7/2022
1.7.3.20.1 CH 2075 to CH 2250 3/7/2022
1.7.3.20.2 CH 2250 to CH 2500 3/16/2022
1.7.3.20.3 CH 2500 to CH 2750 4/4/2022
1.7.3.20.4 CH 2750 to CH 3025 4/13/2022
1.7.3.21 DIVERSION CHANNEL 2/23/2022
1.7.3.21.1 EARTH CHANNEL EXCAVATION 2/23/2022
1.7.3.21.1.1 CH 2430 2/23/2022
1.7.3.21.2 GABION WALL ERECTION WORKS 3/23/2022
1.7.3.21.2.1 CH 2430 3/23/2022
1.7.3.21.3 GEOTEXTILE LAYING 4/21/2022
1.7.3.21.3.1 CH 2430 4/21/2022
1.7.3.21.4 BACKFILLING WORKS 4/22/2022
1.7.3.21.4.1 CH 2430 4/22/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.3.21.5 4/26/2022
WEEPHOLE
1.7.3.21.5.1 CH 2430 4/26/2022
1.7.3.21.6 SLOPE PROTECTION STONE PITCHING 3/23/2022
1.7.3.21.6.1 CH 2430 LF 3/23/2022
1.7.3.21.6.2 CH 2430 RF 4/6/2022
1.7.3.21.7 SLOPE PROTECTION GABION CAGE 4/21/2022
1.7.3.21.7.1 CH 2430 4/21/2022
1.7.3.21.8 SLOPE PROTECTION GEOTEXTILE LAYING 5/24/2022
1.7.3.21.8.1 CH 2430 5/24/2022
1.7.3.21.9 SLOPE BACKFILLING 5/27/2022
1.7.3.21.9.1 CH 2430 5/27/2022
1.7.3.22 SURFACE DRAIN 6/18/2021
1.7.3.22.1 INTERCEPTOR DRAIN (TYPE 2) 6/18/2021
1.7.3.22.1.1 CH 2075 to CH 2150 6/18/2021
1.7.3.22.1.2 CH 2330 to CH 2425 7/16/2021
1.7.3.22.1.3 CH 2550 to CH 2640 9/15/2021
1.7.3.22.1.4 CH 2910 to CH 3025 12/17/2021
1.7.3.22.2 STONE PITCHED SUMP (TYPE SC1) 7/2/2021
1.7.3.22.2.1 CH 2075 to CH 2150 7/2/2021
1.7.3.22.2.2 CH 2330 to CH 2425 8/2/2021
1.7.3.22.2.3 CH 2550 to CH 2640 9/30/2021
1.7.3.22.2.4 CH 2910 to CH 3025 12/31/2021
1.7.3.22.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 7/2/2021
1.7.3.22.3.1 CH 2075 to CH 2150 7/2/2021
1.7.3.22.3.2 CH 2250 to CH 2325 7/16/2021
1.7.3.22.3.3 CH 2325 to CH 2400 8/2/2021
1.7.3.22.3.4 CH 2400 to CH 2550 8/17/2021
1.7.3.22.3.5 CH 2550 to CH 2640 9/30/2021
1.7.3.22.3.6 CH 2910 to CH 3000 12/31/2021
1.7.3.22.4 STONE PITCHED SUMP (TYPE SC2) 7/16/2021
1.7.3.22.4.1 CH 2075 to CH 2150 7/16/2021
1.7.3.22.4.2 CH 2250 to CH 2325 8/2/2021
1.7.3.22.4.3 CH 2325 to CH 2400 8/17/2021
1.7.3.22.4.4 CH 2400 to CH 2550 9/1/2021
1.7.3.22.4.5 CH 2550 to CH 2640 10/14/2021
1.7.3.22.4.6 CH 2910 to CH 3000 1/14/2022
1.7.3.22.5 BRICK SUMP (TYPE SF2) 7/21/2021
1.7.3.22.5.1 CH 2075 to CH 2150 7/21/2021
1.7.3.22.5.2 CH 2250 to CH 2325 8/4/2021
1.7.3.22.5.3 CH 2325 to CH 2400 8/19/2021
1.7.3.22.5.4 CH 2400 to CH 2550 9/3/2021
1.7.3.22.5.5 CH 2550 to CH 2640 10/18/2021
1.7.3.22.5.6 CH 2910 to CH 3000 1/19/2022
1.7.3.22.6 EMBANKMENT TOE DRAINS (TYPE 1) 3/14/2022
1.7.3.22.6.1 CH 2175 to CH 2250 3/14/2022
1.7.3.22.6.2 CH 2250 to CH 2325 3/28/2022
1.7.3.22.6.3 CH 2400 to CH 2550 4/11/2022
1.7.3.22.7 BRICK SUMP (TYPE SF3) 3/28/2022
1.7.3.22.7.1 CH 2175 to CH 2250 3/28/2022
1.7.3.22.7.2 CH 2250 to CH 2325 4/11/2022
1.7.3.22.7.3 CH 2400 to CH 2550 4/26/2022
1.7.3.22.8 ROADSIDE DRAIN (TYPE RSD 1) 9/1/2021
1.7.3.22.8.1 CH 2060 to CH 2175 9/1/2021
1.7.3.22.8.2 CH 2175 to CH 2250 9/15/2021
1.7.3.22.8.3 CH 2325 to CH 2400 9/30/2021
1.7.3.22.8.4 CH 2550 to CH 2640 10/14/2021
1.7.3.22.8.5 CH 2740 to CH 2790 10/29/2021
1.7.3.22.8.6 CH 2915 to CH 3050 1/14/2022
1.7.3.22.9 STONE PITCH SUMP (TYPE SC3) 9/15/2021
1.7.3.22.9.1 CH 2060 to CH 2175 9/15/2021
1.7.3.22.9.2 CH 2175 to CH 2250 9/30/2021
1.7.3.22.9.3 CH 2325 to CH 2400 10/14/2021
1.7.3.22.9.4 CH 2550 to CH 2640 10/29/2021
1.7.3.22.9.5 CH 2740 to CH 2790 11/16/2021
1.7.3.22.9.6 CH 2915 to CH 3050 1/31/2022
1.7.3.22.10 CASCADE DRAIN 4/11/2022
1.7.3.22.10.1 CH 2060 to CH 2175 4/11/2022
1.7.3.22.10.2 CH 2225 to CH 2350 5/12/2022
1.7.3.22.10.3 CH 2400 to CH 2565 6/10/2022
1.7.3.22.10.4 CH 2900 to CH 3050 7/8/2022
1.7.3.23 LANDSCAPING 3/14/2022
1.7.3.23.1 GROUND SURFACE PREPARATION 3/14/2022
1.7.3.23.1.1 CH 2075 to CH 2250 3/14/2022
1.7.3.23.1.2 CH 2250 to CH 2500 4/4/2022
1.7.3.23.1.3 CH 2500 to CH 2750 4/13/2022
1.7.3.23.1.4 CH 2750 to CH 3025 4/25/2022
1.7.3.23.2 CLOSE TURFING 3/28/2022
1.7.3.23.2.1 CH 2075 to CH 2250 3/28/2022
1.7.3.23.2.2 CH 2250 to CH 2500 4/13/2022
1.7.3.23.2.3 CH 2500 to CH 2750 4/28/2022
1.7.3.23.2.4 CH 2750 to CH 3025 5/17/2022
1.7.3.24 NEW PAVEMENT 4/8/2022
1.7.3.24.1 SUBGRADE PREPARATION - 300MM 4/8/2022
1.7.3.24.1.1 CH 2075 to CH 2500 4/8/2022
1.7.3.24.1.2 CH 2500 to CH 3025 5/11/2022
1.7.3.24.2 SUB-BASE - 100MM 5/19/2022
1.7.3.24.2.1 CH 2075 to CH 2500 5/19/2022
1.7.3.24.2.2 CH 2500 to CH 3025 6/16/2022
1.7.3.24.3 ROADBASE - 300MM 6/23/2022
1.7.3.24.3.1 CH 2075 to CH 2500 6/23/2022
1.7.3.24.3.2 CH 2500 to CH 3025 7/21/2022
1.7.3.24.4 PRIME COATING WORK 7/28/2022
1.7.3.24.4.1 CH 2075 to CH 2500 7/28/2022
1.7.3.24.4.2 CH 2500 to CH 3025 8/25/2022
1.7.3.24.5 TACK COATING WORK 8/1/2022
1.7.3.24.5.1 CH 2075 to CH 2500 8/1/2022
1.7.3.24.5.2 CH 2500 to CH 3025 8/29/2022
1.7.3.25 JUNCTION 6/9/2022
1.7.3.25.1 STRIPPING TOP SOIL 6/9/2022
1.7.3.25.1.1 Junction 4 - CH 2750 6/9/2022
1.7.3.25.2 CUT AND FILL WORK 6/16/2022
1.7.3.25.2.1 Junction 4 - CH 2750 6/16/2022
1.7.3.25.3 CUT AND DISPOSE WORK 6/30/2022
1.7.3.25.3.1 Junction 4 - CH 2750 6/30/2022
1.7.3.25.4 TESTING (FDT) 7/14/2022
1.7.3.25.4.1 Junction 4 - CH 2750 7/14/2022
1.7.3.25.5 LANDSCAPING 7/19/2022
1.7.3.25.5.1 Junction 4 - CH 2750 7/19/2022
1.7.3.25.6 SUBGRADE PREPARATION - 300MM 8/2/2022
1.7.3.25.6.1 Junction 4 - CH 2750 8/2/2022
1.7.3.25.7 SUB-BASE - 100MM 8/9/2022
1.7.3.25.7.1 Junction 4 - CH 2750 8/9/2022
1.7.3.25.8 ROADBASE - 300MM 8/16/2022
1.7.3.25.8.1 Junction 4 - CH 2750 8/16/2022
1.7.3.25.9 PRIME COATING WORK 8/23/2022
1.7.3.25.9.1 Junction 4 - CH 2750 8/23/2022
1.7.3.25.10 TACK COATING WORK 8/24/2022
1.7.3.25.10.1 Junction 4 - CH 2750 8/24/2022
1.7.3.26 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 6/16/2022
1.7.3.26.1 CH 2075 to CH 2500 6/16/2022
1.7.3.26.2 CH 2500 to CH 3025 7/14/2022
1.7.3.27 BRICK SUMP (TYPE SF1) 7/14/2022
1.7.3.27.1 CH 2075 to CH 2500 7/14/2022
1.7.3.27.2 CH 2500 to CH 3025 8/11/2022
1.7.3.28 WEARING COURSE LAYING - 50MM 8/8/2022
1.7.3.28.1 CH 2075 to CH 2500 8/8/2022
1.7.3.28.2 CH 2500 to CH 3025 11/23/2022
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.3.29 8/15/2022
COMPACTION WORK
1.7.3.29.1 CH 2075 to CH 2500 8/15/2022
1.7.3.29.2 CH 2500 to CH 3025 11/28/2022
1.7.4 CH 3025 - CH 4156 6/30/2021
1.7.4.1 GENERAL CLEARANCE 6/30/2021
1.7.4.1.1 CH 3025 to CH 3250 6/30/2021
1.7.4.1.2 CH 3250 to CH 3500 7/22/2021
1.7.4.1.3 CH 3500 to CH 3750 8/13/2021
1.7.4.1.4 CH 3750 to CH 4000 9/6/2021
1.7.4.1.5 CH 4000 to CH 4156.876 9/28/2021
1.7.4.2 DEMOLITION WORKS 7/22/2021
1.7.4.2.1 CH 3025 to CH 3250 7/22/2021
1.7.4.2.2 CH 3250 to CH 3500 8/13/2021
1.7.4.2.3 CH 3500 to CH 3750 9/6/2021
1.7.4.2.4 CH 3750 to CH 4000 9/28/2021
1.7.4.2.5 CH 4000 to CH 4156.876 10/20/2021
1.7.4.3 TEMPORARY ACCESS 8/13/2021
1.7.4.3.1 CH 3025 to CH 3250 8/13/2021
1.7.4.3.2 CH 3250 to CH 3500 9/6/2021
1.7.4.3.3 CH 3500 to CH 3750 9/28/2021
1.7.4.3.4 CH 3750 to CH 4000 10/20/2021
1.7.4.3.5 CH 4000 to CH 4156.876 11/12/2021
1.7.4.4 TEMPORARY CROSSING 8/18/2021
1.7.4.4.1 C14 - CH 3410 8/18/2021
1.7.4.4.2 C15 - CH 3575 9/9/2021
1.7.4.4.3 C16 - CH 3735 9/14/2021
1.7.4.4.4 C17 - CH 3950 10/1/2021
1.7.4.4.5 C18 - CH 4025 10/25/2021
1.7.4.5 STRIPPING OF TOPSOIL 8/18/2021
1.7.4.5.1 CH 3025 to CH 3250 8/18/2021
1.7.4.5.2 CH 3250 to CH 3500 9/9/2021
1.7.4.5.3 CH 3500 to CH 3750 10/1/2021
1.7.4.5.4 CH 3750 to CH 4000 10/25/2021
1.7.4.5.5 CH 4000 to CH 4156.876 11/17/2021
1.7.4.6 EXCAVATION OF TEMPORARY EARTH DRAIN 10/1/2021
1.7.4.6.1 CH 3200 to CH 3375 10/1/2021
1.7.4.6.2 CH 3375 to CH 3450 10/5/2021
1.7.4.6.3 CH 3450 to CH 3550 10/7/2021
1.7.4.6.4 CH 3550 to CH 3775 10/25/2021
1.7.4.6.5 CH 3775 to CH 3925 11/17/2021
1.7.4.6.6 CH 3925 to CH 4075 12/8/2021
1.7.4.6.7 CH 4075 to CH 4156.876 12/10/2021
1.7.4.7 EXCAVATE TO SUITABLE MATERIAL 10/5/2021
1.7.4.7.1 CH 3200 to CH 3375 10/5/2021
1.7.4.7.2 CH 3450 to CH 3550 11/3/2021
1.7.4.7.3 CH 3650 to CH 3750 12/3/2021
1.7.4.7.4 CH 3775 to CH 3925 12/31/2021
1.7.4.7.5 CH 4075 to CH 4156.876 3/2/2022
1.7.4.8 EXCAVATE FOR SAND REPLACEMENT 1/31/2022
1.7.4.8.1 CH 3975 - CH 4075 (1.5M) 1/31/2022
1.7.4.9 EXCAVATE TO HARD MATERIAL 11/3/2021
1.7.4.9.1 CH 3200 to CH 3375 11/3/2021
1.7.4.9.2 CH 3825 to CH 3875 1/31/2022
1.7.4.9.3 CH 4075 to CH 4156.876 3/30/2022
1.7.4.10 EXCAVATE TO ROCK 12/3/2021
1.7.4.10.1 CH 3200 to CH 3375 12/3/2021
1.7.4.10.2 CH 3825 to CH 3875 3/2/2022
1.7.4.10.3 CH 4075 to CH 4156.876 4/28/2022
1.7.4.11 ROCK FACE PROTECTION 3/16/2022
1.7.4.11.1 PLANT MOBILIZATION & WORK PLATFORM 3/16/2022
1.7.4.11.1.1 CH 3200 to CH 3375 3/16/2022
1.7.4.11.1.2 CH 3825 to CH 3875 4/13/2022
1.7.4.11.1.3 CH 4075 to CH 4156 5/31/2022
1.7.4.11.2 DRILLING AND INSTALL ANCHORING 5/17/2022
1.7.4.11.2.1 CH 3200 to CH 3375 LF 5/17/2022
1.7.4.11.2.2 CH 3200 to CH 3375 RF 6/14/2022
1.7.4.11.2.3 CH 3825 to CH 3875 LF 7/12/2022
1.7.4.11.2.4 CH 3825 to CH 3875 RF 8/9/2022
1.7.4.11.2.5 CH 4075 to CH 4156 LF 9/7/2022
1.7.4.11.2.6 CH 4075 to CH 4156 RF 10/6/2022
1.7.4.11.3 INSTALLATION STEEL NETTING 7/12/2022
1.7.4.11.3.1 CH 3200 to CH 3375 7/12/2022
1.7.4.11.3.2 CH 3825 to CH 3875 9/7/2022
1.7.4.11.3.3 CH 4075 to CH 4156 11/7/2022
1.7.4.12 BOULDER PROTECTION 4/13/2022
1.7.4.12.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.12.1.1 CH 3200 to CH 3375 4/13/2022
1.7.4.12.1.2 CH 3825 to CH 3875 5/17/2022
1.7.4.12.1.3 CH 4075 to CH 4156 6/28/2022
1.7.4.12.2 EXCAVATE AND REMOVE LOOSE BOULDER MATERIAL 4/15/2022
1.7.4.12.2.1 CH 3200 to CH 3375 4/15/2022
1.7.4.12.2.2 CH 3825 to CH 3875 5/19/2022
1.7.4.12.2.3 CH 4075 to CH 4156 6/30/2022
1.7.4.12.3 DRILL AND INSTALL DOWEL BAR 6/16/2022
1.7.4.12.3.1 CH 3200 to CH 3375 LF 6/16/2022
1.7.4.12.3.2 CH 3200 to CH 3375 LF 7/14/2022
1.7.4.12.3.3 CH 3825 to CH 3875 LF 8/11/2022
1.7.4.12.3.4 CH 3825 to CH 3875 LF 9/9/2022
1.7.4.12.3.5 CH 4075 to CH 4156 LF 10/10/2022
1.7.4.12.3.6 CH 4075 to CH 4156 LF 11/9/2022
1.7.4.12.4 INSTALL OF REINFORCEMENT WORK & PVC PIPE 8/11/2022
1.7.4.12.4.1 CH 3200 to CH 3375 8/11/2022
1.7.4.12.4.2 CH 3825 to CH 3875 10/10/2022
1.7.4.12.4.3 CH 4075 to CH 4156 12/7/2022
1.7.4.12.5 CONCRETE WORK 8/25/2022
1.7.4.12.5.1 CH 3200 to CH 3375 8/25/2022
1.7.4.12.5.2 CH 3825 to CH 3875 10/25/2022
1.7.4.12.5.3 CH 4075 to CH 4156 12/21/2022
1.7.4.12.6 FINISH WORK 9/8/2022
1.7.4.12.6.1 CH 3200 to CH 3375 9/8/2022
1.7.4.12.6.2 CH 3825 to CH 3875 11/8/2022
1.7.4.12.6.3 CH 4075 to CH 4156 1/3/2023
1.7.4.13 ROCK BOLT 4/13/2022
1.7.4.13.1 PLANT MOBILIZATION & WORK PLATFORM 4/13/2022
1.7.4.13.1.1 CH 3200 to CH 3375 4/13/2022
1.7.4.13.1.2 CH 3825 to CH 3875 5/17/2022
1.7.4.13.1.3 CH 4075 to CH 4156 6/28/2022
1.7.4.13.2 DRILLING WORK AND INSTALLATION WORKS 4/25/2022
1.7.4.13.2.1 CH 3200 to CH 3375 4/25/2022
1.7.4.13.2.2 CH 3825 to CH 3875 5/26/2022
1.7.4.13.2.3 CH 4075 to CH 4156 7/7/2022
1.7.4.13.3 GUNITING WORK 5/18/2022
1.7.4.13.3.1 CH 3200 to CH 3375 5/18/2022
1.7.4.13.3.2 CH 3825 to CH 3875 6/15/2022
1.7.4.13.3.3 CH 4075 to CH 4156 7/27/2022
1.7.4.13.4 PULL OUT TEST 7/13/2022
1.7.4.13.4.1 CH 3200 to CH 3375 7/13/2022
1.7.4.13.4.2 CH 3825 to CH 3875 8/10/2022
1.7.4.13.4.3 CH 4075 to CH 4156 9/23/2022
1.7.4.14 HORIZONTAL DRAIN 12/14/2021
1.7.4.14.1 MARKING OF DRAIN POINT 12/14/2021
1.7.4.14.1.1 CH 3200 to CH 3375 - 6M 5/19/2022
1.7.4.14.1.2 CH 3450 to CH 3500 - 6M 12/14/2021
1.7.4.14.1.3 CH 3500 to CH 3550 - 6M 12/16/2021
1.7.4.14.1.4 CH 3650 to CH 3750 - 6M 1/11/2022
1.7.4.14.1.5 CH 3775 to CH 3925 - 12M 2/11/2022
1.7.4.14.1.6 CH 4075 to CH 4156 - 6M 7/28/2022
1.7.4.14.2 INSTALLATION OF PIPE DRAIN 12/16/2021
1.7.4.14.2.1 CH 3200 to CH 3375 - 6M 5/23/2022
1.7.4.14.2.2 CH 3450 to CH 3500 - 6M 12/16/2021
1.7.4.14.2.3 CH 3500 to CH 3550 - 6M 12/27/2021
1.7.4.14.2.4 CH 3650 to CH 3750 - 6M 1/13/2022
1.7.4.14.2.5 CH 3775 to CH 3925 - 12M 2/15/2022
1.7.4.14.2.6 CH 4075 to CH 4156 - 6M 8/1/2022
1.7.4.15 EXCAVATE TO UNSUITABLE MATERIAL 3/30/2022
1.7.4.15.1 CH 3300 - CH 3350 3/30/2022
1.7.4.15.2 CH 3375 - CH 3475 4/28/2022
1.7.4.15.3 CH 3525 - CH 3650 5/31/2022
1.7.4.15.4 CH 3700 - CH 3825 6/28/2022
1.7.4.15.5 CH 3875 - CH 4075 7/26/2022
1.7.4.16 LAYING GEOTEXTILE LAYER 3/2/2022
1.7.4.16.1 CH 3975 - CH 4075 (1.5M) BOTTOM 3/2/2022
1.7.4.16.2 CH 3975 - CH 4075 (1.5M) TOP 4/1/2022
1.7.4.17 SAND FILLING WORKS & COMPACTION 3/4/2022
1.7.4.17.1 CH 3975 - CH 4075 (1.5M) 3/4/2022
1.7.4.18 SAND DRAINAGE BLANKET & ROCK FILL BUND 5/31/2022
1.7.4.18.1 SAND DRAINAGE BLANKET 5/31/2022
1.7.4.18.1.1 LAYING OF GEOTEXTILE WORK 5/31/2022
1.7.4.18.1.1.1 CH 3415 - CH 3460 5/31/2022
1.7.4.18.1.2 PLACEMENT AND COMPACTION OF SAND BLANKET 6/2/2022
1.7.4.18.1.2.1 CH 3415 - CH 3460 6/2/2022
1.7.4.18.2 ROCK FILL BUND 6/16/2022
1.7.4.18.2.1 EXCAVATION WORK 6/16/2022
1.7.4.18.2.1.1 CH 3415 - CH 3460 6/16/2022
1.7.4.18.2.2 LAYING OF GEOTEXTILE WORK 6/23/2022
1.7.4.18.2.2.1 CH 3415 - CH 3460 6/23/2022
1.7.4.18.2.3 ROCK FILLING WORKS 6/27/2022
1.7.4.18.2.3.1 CH 3415 - CH 3460 6/27/2022
1.7.4.19 PC CULVERT INSTALLATION 5/31/2022
1.7.4.19.1 EXCAVATION WORK 5/31/2022
1.7.4.19.1.1 C15 - CH 3575 (12.0M) 5/31/2022
1.7.4.19.2 LAYING OF GEOTEXTILE WORK 6/7/2022
1.7.4.19.2.1 C15 - CH 3575 (12.0M) 6/7/2022
1.7.4.19.3 FOUNDATION (TYPE B) 6/8/2022
1.7.4.19.3.1 C15 - CH 3575 (12.0M) 6/8/2022
1.7.4.19.4 PC CULVERT LAYING 6/15/2022
1.7.4.19.4.1 C15 - CH 3575 (12.0M) 6/15/2022
1.7.4.20 IN-SITU RC BOX CULVERT 10/1/2021
1.7.4.20.1 EXCAVATION WORK 10/1/2021
1.7.4.20.1.1 C14 - CH 3410 (70.0M) 10/1/2021
1.7.4.20.1.2 C16 - CH 3735 (38.0M) 10/25/2021
1.7.4.20.1.3 C17 - CH 3950 (32.0M) 11/17/2021
1.7.4.20.1.4 C18 - CH 4025 (45.0M) 12/8/2021
1.7.4.20.2 LAYING OF GEOTEXTILE WORK 10/8/2021
1.7.4.20.2.1 C14 - CH 3410 (70.0M) 10/8/2021
1.7.4.20.2.2 C16 - CH 3735 (38.0M) 11/1/2021
1.7.4.20.2.3 C17 - CH 3950 (32.0M) 11/24/2021
1.7.4.20.2.4 C18 - CH 4025 (45.0M) 12/15/2021
1.7.4.20.3 FOUNDATION (TYPE B) 10/12/2021
1.7.4.20.3.1 C14 - CH 3410 (70.0M) 10/12/2021
1.7.4.20.3.2 C16 - CH 3735 (38.0M) 11/3/2021
1.7.4.20.3.3 C17 - CH 3950 (32.0M) 11/26/2021
1.7.4.20.3.4 C18 - CH 4025 (45.0M) 12/17/2021
1.7.4.20.4 LEAN-CON 10/20/2021
1.7.4.20.4.1 C14 - CH 3410 (70.0M) 10/20/2021
1.7.4.20.4.2 C16 - CH 3735 (38.0M) 11/12/2021
1.7.4.20.4.3 C17 - CH 3950 (32.0M) 12/3/2021
1.7.4.20.4.4 C18 - CH 4025 (45.0M) 12/24/2021
1.7.4.20.5 BASE SLAB 10/22/2021
1.7.4.20.5.1 C14 - CH 3410 (70.0M) 10/22/2021
1.7.4.20.5.2 C16 - CH 3735 (38.0M) 11/16/2021
1.7.4.20.5.3 C17 - CH 3950 (32.0M) 12/7/2021
1.7.4.20.5.4 C18 - CH 4025 (45.0M) 12/28/2021
1.7.4.20.6 SIDEWALL, WINGWALL 12/22/2021
1.7.4.20.6.1 C14 - CH 3410 (70.0M) 12/22/2021
1.7.4.20.6.2 C16 - CH 3735 (38.0M) 1/12/2022
1.7.4.20.6.3 C17 - CH 3950 (32.0M) 2/7/2022
1.7.4.20.6.4 C18 - CH 4025 (45.0M) 2/28/2022
1.7.4.20.7 TOP COVER 2/22/2022
1.7.4.20.7.1 C14 - CH 3410 (70.0M) 2/22/2022
1.7.4.20.7.2 C16 - CH 3735 (38.0M) 3/15/2022
1.7.4.20.7.3 C17 - CH 3950 (32.0M) 4/5/2022
1.7.4.20.7.4 C18 - CH 4025 (45.0M) 4/27/2022
1.7.4.20.8 SUBSURFACE INSTALLATION & FILLINGS 2/22/2022
1.7.4.20.8.1 C14 - CH 3410 (70.0M) 2/22/2022
1.7.4.20.8.2 C16 - CH 3735 (38.0M) 3/15/2022
1.7.4.20.8.3 C17 - CH 3950 (32.0M) 4/5/2022
1.7.4.20.8.4 C18 - CH 4025 (45.0M) 4/27/2022
1.7.4.20.9 BACKFILLING WORKS 3/17/2022
1.7.4.20.9.1 C14 - CH 3410 (70.0M) 3/17/2022
1.7.4.20.9.2 C16 - CH 3735 (38.0M) 4/7/2022
1.7.4.20.9.3 C17 - CH 3950 (32.0M) 4/29/2022
1.7.4.20.9.4 C18 - CH 4025 (45.0M) 5/25/2022
1.7.4.21 FILLING WORKS & COMPACTION 12/17/2021
1.7.4.21.1 CH 3050 - CH 3075 12/17/2021
1.7.4.21.2 CH 3300 - CH 3350 4/28/2022
1.7.4.21.3 CH 3375 - CH 3475 5/31/2022
1.7.4.21.4 CH 3525 - CH 3650 6/28/2022
1.7.4.21.5 CH 3700 - CH 3825 7/26/2022
1.7.4.21.6 CH 3875 - CH 4075 8/23/2022
1.7.4.22 TESTING (FDT) 5/31/2022
1.7.4.22.1 CH 3025 to CH 3250 5/31/2022
1.7.4.22.2 CH 3250 to CH 3500 7/1/2022
1.7.4.22.3 CH 3500 to CH 3750 8/23/2022
1.7.4.22.4 CH 3750 to CH 4000 9/27/2022
1.7.4.22.5 CH 4000 to CH 4156.876 10/6/2022
1.7.4.23 DIVERSION CHANNEL 6/24/2022
1.7.4.23.1 EARTH CHANNEL EXCAVATION 6/24/2022
1.7.4.23.1.1 CH 3580 6/24/2022
1.7.4.23.1.2 CH 3960 7/22/2022
1.7.4.23.1.3 CH 4035 8/19/2022
1.7.4.23.2 GABION WALL ERECTION WORKS 7/22/2022
1.7.4.23.2.1 CH 3580 7/22/2022
1.7.4.23.2.2 CH 3960 8/19/2022
1.7.4.23.2.3 CH 4035 10/6/2022
1.7.4.23.3 GEOTEXTILE LAYING 8/19/2022
1.7.4.23.3.1 CH 3580 8/19/2022
1.7.4.23.3.2 CH 3960 9/20/2022
1.7.4.23.3.3 CH 4035 11/7/2022
1.7.4.23.4 BACKFILLING WORKS 8/22/2022
1.7.4.23.4.1 CH 3580 8/22/2022
1.7.4.23.4.2 CH 3960 9/21/2022
1.7.4.23.4.3 CH 4035 11/8/2022
C20 CONCRETE LINED DRAIN (100MM) WITH 1.2M C/C UPVC
1.7.4.23.5 8/24/2022
WEEPHOLE
1.7.4.23.5.1 CH 3580 8/24/2022
1.7.4.23.5.2 CH 3960 9/23/2022
1.7.4.23.5.3 CH 4035 11/10/2022
1.7.4.23.6 SLOPE PROTECTION STONE PITCHING 7/22/2022
1.7.4.23.6.1 CH 3580 LF 7/22/2022
1.7.4.23.6.2 CH 3580 RF 8/5/2022
1.7.4.23.6.3 CH 3960 LF 8/19/2022
1.7.4.23.6.4 CH 3960 RF 9/5/2022
1.7.4.23.6.5 CH 4035 LF 9/20/2022
1.7.4.23.6.6 CH 4035 RF 10/4/2022
1.7.4.23.7 SLOPE PROTECTION GABION CAGE 8/19/2022
1.7.4.23.7.1 CH 3580 8/19/2022
1.7.4.23.7.2 CH 3960 9/20/2022
1.7.4.23.7.3 CH 4035 10/18/2022
1.7.4.23.8 SLOPE PROTECTION GEOTEXTILE LAYING 9/20/2022
1.7.4.23.8.1 CH 3580 9/20/2022
1.7.4.23.8.2 CH 3960 10/18/2022
1.7.4.23.8.3 CH 4035 11/17/2022
1.7.4.23.9 SLOPE BACKFILLING 9/23/2022
1.7.4.23.9.1 CH 3580 9/23/2022
1.7.4.23.9.2 CH 3960 10/21/2022
1.7.4.23.9.3 CH 4035 12/8/2022
1.7.4.24 SURFACE DRAIN 12/31/2021
1.7.4.24.1 INTERCEPTOR DRAIN (TYPE 2) 12/31/2021
1.7.4.24.1.1 CH 3200 to CH 3290 12/31/2021
1.7.4.24.1.2 CH 3300 to CH 3375 1/14/2022
1.7.4.24.1.3 CH 3450 to CH 3550 1/31/2022
1.7.4.24.1.4 CH 3660 to CH 3715 2/16/2022
1.7.4.24.1.5 CH 3775 to CH 3900 3/2/2022
1.7.4.24.1.6 CH 4075 to CH 4156.876 3/30/2022
1.7.4.24.2 STONE PITCHED SUMP (TYPE SC1) 1/14/2022
1.7.4.24.2.1 CH 3200 to CH 3290 1/14/2022
1.7.4.24.2.2 CH 3300 to CH 3375 1/31/2022
1.7.4.24.2.3 CH 3450 to CH 3550 2/16/2022
1.7.4.24.2.4 CH 3660 to CH 3715 3/2/2022
1.7.4.24.2.5 CH 3775 to CH 3900 3/16/2022
1.7.4.24.2.6 CH 4075 to CH 4156.876 4/13/2022
1.7.4.24.3 BENCH DRAIN (TYPE 1) / BERM DRAIN (TYPE 1) 1/14/2022
1.7.4.24.3.1 CH 3200 to CH 3290 1/14/2022
1.7.4.24.3.2 CH 3290 to CH 3375 1/31/2022
1.7.4.24.3.3 CH 3400 to CH 3450 2/16/2022
1.7.4.24.3.4 CH 3450 to CH 3550 3/2/2022
1.7.4.24.3.5 CH 3660 to CH 3725 3/16/2022
1.7.4.24.3.6 CH 3725 to CH 3775 3/30/2022
1.7.4.24.3.7 CH 3775 to CH 3900 4/13/2022
1.7.4.24.3.8 CH 4075 to CH 4156.876 4/28/2022
1.7.4.24.4 STONE PITCHED SUMP (TYPE SC2) 1/31/2022
1.7.4.24.4.1 CH 3200 to CH 3290 1/31/2022
1.7.4.24.4.2 CH 3290 to CH 3375 2/16/2022
1.7.4.24.4.3 CH 3400 to CH 3450 3/2/2022
1.7.4.24.4.4 CH 3450 to CH 3550 3/16/2022
1.7.4.24.4.5 CH 3660 to CH 3725 3/30/2022
1.7.4.24.4.6 CH 3725 to CH 3775 4/13/2022
1.7.4.24.4.7 CH 3775 to CH 3900 4/28/2022
1.7.4.24.4.8 CH 4075 to CH 4156.876 5/17/2022
1.7.4.24.5 BRICK SUMP (TYPE SF2) 2/4/2022
1.7.4.24.5.1 CH 3200 to CH 3290 2/4/2022
1.7.4.24.5.2 CH 3290 to CH 3375 2/18/2022
1.7.4.24.5.3 CH 3400 to CH 3450 3/4/2022
1.7.4.24.5.4 CH 3450 to CH 3550 3/18/2022
1.7.4.24.5.5 CH 3660 to CH 3725 4/1/2022
1.7.4.24.5.6 CH 3725 to CH 3775 4/15/2022
1.7.4.24.5.7 CH 3775 to CH 3900 5/4/2022
1.7.4.24.5.8 CH 4075 to CH 4156.876 5/19/2022
1.7.4.24.6 EMBANKMENT TOE DRAINS (TYPE 1) 4/26/2022
1.7.4.24.6.1 CH 3050 to CH 3075 4/26/2022
1.7.4.24.6.2 CH 3275 to CH 3380 5/31/2022
1.7.4.24.6.3 CH 3380 to CH 3460 6/28/2022
1.7.4.24.6.4 CH 3550 to CH 3785 8/23/2022
1.7.4.24.6.5 CH 3925 to CH 4075 9/22/2022
1.7.4.24.7 BRICK SUMP (TYPE SF3) 5/12/2022
1.7.4.24.7.1 CH 3050 to CH 3075 5/12/2022
1.7.4.24.7.2 CH 3275 to CH 3380 6/14/2022
1.7.4.24.7.3 CH 3380 to CH 3460 7/12/2022
1.7.4.24.7.4 CH 3550 to CH 3785 9/7/2022
1.7.4.24.7.5 CH 3925 to CH 4075 10/6/2022
1.7.4.24.8 ROADSIDE DRAIN (TYPE RSD 1) 4/28/2022
1.7.4.24.8.1 CH 3210 to CH 3275 4/28/2022
1.7.4.24.8.2 CH 3275 to CH 3380 5/17/2022
1.7.4.24.8.3 CH 3460 to CH 3550 5/31/2022
1.7.4.24.8.4 CH 3785 to CH 3925 6/14/2022
1.7.4.24.8.5 CH 4075 to CH 4156.876 6/28/2022
1.7.4.24.9 STONE PITCH SUMP (TYPE SC3) 5/17/2022
1.7.4.24.9.1 CH 3210 to CH 3275 5/17/2022
1.7.4.24.9.2 CH 3275 to CH 3380 5/31/2022
1.7.4.24.9.3 CH 3460 to CH 3550 6/14/2022
1.7.4.24.9.4 CH 3785 to CH 3925 6/28/2022
1.7.4.24.9.5 CH 4075 to CH 4156.876 7/12/2022
1.7.4.24.10 CASCADE DRAIN 8/5/2022
1.7.4.24.10.1 CH 3375 to CH 3475 8/5/2022
1.7.4.24.10.2 CH 3525 to CH 3700 9/7/2022
1.7.4.24.10.3 CH 3700 to CH 3850 10/6/2022
1.7.4.24.10.4 CH 3900 to CH 4100 11/7/2022
1.7.4.25 LANDSCAPING 5/31/2022
1.7.4.25.1 GROUND SURFACE PREPARATION 5/31/2022
1.7.4.25.1.1 CH 3025 to CH 3250 5/31/2022
1.7.4.25.1.2 CH 3250 to CH 3500 7/1/2022
1.7.4.25.1.3 CH 3500 to CH 3750 8/23/2022
1.7.4.25.1.4 CH 3750 to CH 4000 9/27/2022
1.7.4.25.1.5 CH 4000 to CH 4156.876 10/6/2022
1.7.4.25.2 CLOSE TURFING 6/9/2022
1.7.4.25.2.1 CH 3025 to CH 3250 6/9/2022
1.7.4.25.2.2 CH 3250 to CH 3500 7/12/2022
1.7.4.25.2.3 CH 3500 to CH 3750 9/2/2022
1.7.4.25.2.4 CH 3750 to CH 4000 10/6/2022
1.7.4.25.2.5 CH 4000 to CH 4156.876 10/20/2022
1.7.4.26 NEW PAVEMENT 7/26/2022
1.7.4.26.1 SUBGRADE PREPARATION - 300MM 7/26/2022
1.7.4.26.1.1 CH 3025 to CH 3500 7/26/2022
1.7.4.26.1.2 CH 3500 to CH 4156.876 11/1/2022
1.7.4.26.2 SUB-BASE - 100MM 8/30/2022
1.7.4.26.2.1 CH 3025 to CH 3500 8/30/2022
1.7.4.26.2.2 CH 3500 to CH 4156.876 12/7/2022
1.7.4.26.3 ROADBASE - 300MM 10/6/2022
1.7.4.26.3.1 CH 3025 to CH 3500 10/6/2022
1.7.4.26.3.2 CH 3500 to CH 4156.876 1/11/2023
1.7.4.26.4 PRIME COATING WORK 11/14/2022
1.7.4.26.4.1 CH 3025 to CH 3500 11/14/2022
1.7.4.26.4.2 CH 3500 to CH 4156.876 2/15/2023
1.7.4.26.5 TACK COATING WORK 11/16/2022
1.7.4.26.5.1 CH 3025 to CH 3500 11/16/2022
1.7.4.26.5.2 CH 3500 to CH 4156.876 2/17/2023
1.7.4.27 JUNCTION 11/30/2022
1.7.4.27.1 STRIPPING TOP SOIL 11/30/2022
1.7.4.27.1.1 Junction 5 - CH 4156 11/30/2022
1.7.4.27.2 CUT AND FILL WORK 12/7/2022
1.7.4.27.2.1 Junction 5 - CH 4156 12/7/2022
1.7.4.27.3 CUT AND DISPOSE WORK 12/21/2022
1.7.4.27.3.1 Junction 5 - CH 4156 12/21/2022
1.7.4.27.4 TESTING (FDT) 1/4/2023
1.7.4.27.4.1 Junction 5 - CH 4156 1/4/2023
1.7.4.27.5 LANDSCAPING 1/9/2023
1.7.4.27.5.1 Junction 5 - CH 4156 1/9/2023
1.7.4.27.6 SUBGRADE PREPARATION - 300MM 1/23/2023
1.7.4.27.6.1 Junction 5 - CH 4156 1/23/2023
1.7.4.27.7 SUB-BASE - 100MM 1/30/2023
1.7.4.27.7.1 Junction 5 - CH 4156 1/30/2023
1.7.4.27.8 ROADBASE - 300MM 2/6/2023
1.7.4.27.8.1 Junction 5 - CH 4156 2/6/2023
1.7.4.27.9 PRIME COATING WORK 2/13/2023
1.7.4.27.9.1 Junction 5 - CH 4156 2/13/2023
1.7.4.27.10 TACK COATING WORK 2/14/2023
1.7.4.27.10.1 Junction 5 - CH 4156 2/14/2023
1.7.4.28 SHOULDER DRAIN - 225MM HALF-ROUND GLAZED 9/29/2022
1.7.4.28.1 CH 3025 to CH 3500 9/29/2022
1.7.4.28.2 CH 3500 to CH 4156.876 1/4/2023
1.7.4.29 BRICK SUMP (TYPE SF1) 10/28/2022
1.7.4.29.1 CH 3025 to CH 3500 10/28/2022
1.7.4.29.2 CH 3500 to CH 4156.876 2/1/2023
1.7.4.30 WEARING COURSE LAYING - 50MM 2/9/2023
1.7.4.30.1 CH 3025 to CH 3500 2/9/2023
1.7.4.30.2 CH 3500 to CH 4156.876 2/21/2023
UNPAVED SHOULDER WORK - LAY SUITABLE MATERIAL AND
1.7.4.31 2/14/2023
COMPACTION WORK
1.7.4.31.1 CH 3025 to CH 3500 2/14/2023
1.7.4.31.2 CH 3500 to CH 4156.876 3/2/2023
1.8 ROAD FURNITURE 11/11/2021
1.8.1 TRAFFIC BARRIER 11/11/2021
1.8.1.1 GUARD RAIL INSTALLATION WORK 11/11/2021
1.8.1.1.1 CH 0 to CH 1025 11/11/2021
1.8.1.1.2 CH 1025 to CH 2075 6/15/2022
1.8.1.1.3 CH 2075 to CH 3025 8/23/2022
1.8.1.1.4 CH 3025 to CH 4156.876 2/13/2023
1.8.1.2 PC NEW JERSEY BARRIER (NJB) 1/18/2023
1.8.1.2.1 CH 4156.876 1/18/2023
1.9 STRUCTURE WORK: BRIDGES 2/18/2021
1.9.1 STRUCTURE WORK - SUNGAI BENG: CH425 - CH525 2/18/2021
1.9.1.1 CAISSON PILING WORKS 2/18/2021
1.9.1.1.1 POINT 1 & 2 2/18/2021
1.9.1.1.1.1 Plants & equipment mobilisation 2/18/2021
1.9.1.1.1.2 Hand dig excavation 2/24/2021
1.9.1.1.1.3 Permanent casing work 3/24/2021
1.9.1.1.1.4 Rebars placement 4/14/2021
1.9.1.1.1.5 Concreting work 4/28/2021
1.9.1.1.1.6 Pile Testing 6/16/2021
1.9.1.1.1.7 Temporary platform fixing 6/22/2021
1.9.1.1.1.8 Decking placement 6/30/2021
1.9.1.1.2 POINT 2 & 3 5/3/2021
1.9.1.1.2.1 Plants & equipment mobilisation 5/3/2021
1.9.1.1.2.2 Hand dig excavation 5/5/2021
1.9.1.1.2.3 Permanent casing work 6/8/2021
1.9.1.1.2.4 Rebars placement 6/29/2021
1.9.1.1.2.5 Concreting work 7/13/2021
1.9.1.1.2.6 Pile Testing 8/27/2021
1.9.1.1.2.7 Temporary platform fixing 9/1/2021
1.9.1.1.2.8 Decking placement 9/8/2021
1.9.1.2 ABUTMENT 2/24/2021
1.9.1.2.1 ABUTMENT A 2/24/2021
1.9.1.2.1.1 Cut and dispose 2/24/2021
1.9.1.2.1.2 Filling works 3/12/2021
1.9.1.2.1.3 Stone pitching 3/18/2021
1.9.1.2.1.4 MS handrail 3/25/2021
1.9.1.2.1.5 Concreting work 4/2/2021
1.9.1.2.1.6 Gabion cage rock filled work 3/30/2021
1.9.1.2.1.7 Subsoil drains 3/31/2021
1.9.1.2.2 ABUTMENT B 3/22/2021
1.9.1.2.2.1 Cut and dispose 3/22/2021
1.9.1.2.2.2 Filling works 3/26/2021
1.9.1.2.2.3 Stone pitching 4/1/2021
1.9.1.2.2.4 MS handrail 4/12/2021
1.9.1.2.2.5 Concreting work 4/19/2021
1.9.1.2.2.6 Gabion cage rock filled work 4/15/2021
1.9.1.2.2.7 Subsoil drains 4/16/2021
1.9.1.2.3 PERMEABLE LAYER WORKS 3/18/2021
1.9.1.2.3.1 Crush stone pitching 3/18/2021
1.9.1.2.3.2 Lean concrete 4/15/2021
1.9.1.2.3.3 Bituminous paint 4/23/2021
1.9.1.2.3.4 Formwork for wing wall 4/27/2021
1.9.1.2.3.5 Rebars fixing 5/20/2021
1.9.1.2.3.6 Concreting work 5/28/2021
1.9.1.3 PIER CASTING/ERECTION WORKS 7/6/2021
1.9.1.3.1 PIER 1 & 2 7/6/2021
1.9.1.3.1.1 Formwork for piers 7/6/2021
1.9.1.3.1.2 Rebars placement 8/4/2021
1.9.1.3.1.3 Concreting work 9/3/2021
1.9.1.3.2 PIER 3 & 4 9/14/2021
1.9.1.3.2.1 Formwork for piers 9/14/2021
1.9.1.3.2.2 Rebars placement 10/13/2021
1.9.1.3.2.3 Concreting work 11/15/2021
1.9.1.4 TWIN SPINE BEAM 10/12/2021
1.9.1.4.1 SCAFFOLDING ERECTION WORKS 10/12/2021
1.9.1.4.1.1 Span 1 10/12/2021
1.9.1.4.1.2 Span 2 10/27/2021
1.9.1.4.1.3 Span 3 1/11/2022
1.9.1.4.2 FORMWORK 11/12/2021
1.9.1.4.2.1 Span 1 & 2 11/12/2021
1.9.1.4.2.2 Striking formwork Span 1 12/30/2021
1.9.1.4.2.3 Span 3 1/26/2022
1.9.1.4.3 REBAR WORK 11/26/2021
1.9.1.4.3.1 Span 1 11/26/2021
1.9.1.4.3.2 Span 2 12/14/2021
1.9.1.4.3.3 Span 3 2/11/2022
1.9.1.4.4 CONCRETING WORKS 12/10/2021
1.9.1.4.4.1 Span 1 12/10/2021
1.9.1.4.4.2 Span 2 12/28/2021
1.9.1.4.4.3 Span 3 2/25/2022
1.9.1.4.5 BRIDGE BEARING 3/1/2022
1.9.1.4.5.1 Installation Works 3/1/2022
1.9.1.5 IN-SITU PARAPET 3/29/2022
1.9.1.5.1 FORMWORK ERECTION WORK 3/29/2022
1.9.1.5.1.1 Span 1 3/29/2022
1.9.1.5.1.2 Span 2 4/12/2022
1.9.1.5.1.3 Span 3 4/27/2022
1.9.1.5.1.4 Span 4 5/13/2022
1.9.1.5.1.5 Span 5 5/30/2022
1.9.1.5.2 REBAR PLACEMENT 4/12/2022
1.9.1.5.2.1 Span 1 4/12/2022
1.9.1.5.2.2 Span 2 4/27/2022
1.9.1.5.2.3 Span 3 5/13/2022
1.9.1.5.2.4 Span 4 5/30/2022
1.9.1.5.2.5 Span 5 6/13/2022
1.9.1.5.3 CONCRETING WORKS 4/27/2022
1.9.1.5.3.1 Span 1 4/27/2022
1.9.1.5.3.2 Span 2 5/13/2022
1.9.1.5.3.3 Span 3 5/30/2022
1.9.1.5.3.4 Span 4 6/13/2022
1.9.1.5.3.5 Span 5 6/27/2022
1.9.1.6 MISCELLANEOUS/SUNDRIES WORKS 4/29/2022
1.9.1.6.1 GI handrail 4/29/2022
1.9.1.6.2 uPVC rain water downpipe 5/9/2022
1.9.1.6.3 Expansion joints 5/12/2022
1.9.1.6.4 Protective coatings 5/19/2022
1.9.2 STRUCTURE WORK - ALOR 1: CH2625 - CH2750 5/10/2021
1.9.2.1 CAISSON PILING WORKS 5/10/2021
1.9.2.1.1 POINT 1 & 2 5/10/2021
1.9.2.1.1.1 Plants & equipment preparation 5/10/2021
1.9.2.1.1.2 Hand dig excavation 5/12/2021
1.9.2.1.1.3 Permanent casing work 6/15/2021
1.9.2.1.1.4 Rebars placement 7/6/2021
1.9.2.1.1.5 Concreting work 7/14/2021
1.9.2.1.1.6 Pile Testing 8/20/2021
1.9.2.1.1.7 Temporary platform fixing 8/24/2021
1.9.2.1.1.8 Decking placement 9/2/2021
1.9.2.1.2 POINT 3 & 4 7/19/2021
1.9.2.1.2.1 Plants & equipment preparation 7/19/2021
1.9.2.1.2.2 Hand dig excavation 7/21/2021
1.9.2.1.2.3 Permanent casing work 8/19/2021
1.9.2.1.2.4 Rebars placement 9/10/2021
1.9.2.1.2.5 Concreting work 9/21/2021
1.9.2.1.2.6 Pile Testing 10/27/2021
1.9.2.1.2.7 Temporary platform fixing 10/29/2021
1.9.2.1.2.8 Decking placement 11/10/2021
1.9.2.1.3 POINT 5 & 6 9/24/2021
1.9.2.1.3.1 Plants & equipment preparation 9/24/2021
1.9.2.1.3.2 Hand dig excavation 9/27/2021
1.9.2.1.3.3 Permanent casing work 10/26/2021
1.9.2.1.3.4 Rebars placement 11/18/2021
1.9.2.1.3.5 Concreting work 11/25/2021
1.9.2.1.3.6 Pile Testing 12/30/2021
1.9.2.1.3.7 Temporary platform fixing 1/3/2022
1.9.2.1.3.8 Decking placement 1/10/2022
1.9.2.2 ABUTMENT 5/12/2021
1.9.2.2.1 ABUTMENT A 5/12/2021
1.9.2.2.1.1 Cut and dispose 5/12/2021
1.9.2.2.1.2 Filling works 5/19/2021
1.9.2.2.1.3 Stone pitching 5/31/2021
1.9.2.2.1.4 MS handrail 6/11/2021
1.9.2.2.1.5 Concreting work 6/18/2021
1.9.2.2.1.6 Gabion cage rock filled work 6/16/2021
1.9.2.2.1.7 Subsoil drains 6/22/2021
1.9.2.2.2 ABUTMENT B 6/2/2021
1.9.2.2.2.1 Cut and dispose 6/2/2021
1.9.2.2.2.2 Filling works 6/8/2021
1.9.2.2.2.3 Stone pitching 6/15/2021
1.9.2.2.2.4 MS handrail 6/24/2021
1.9.2.2.2.5 Concreting work 6/30/2021
1.9.2.2.2.6 Gabion cage rock filled work 6/30/2021
1.9.2.2.2.7 Subsoil drains 7/2/2021
1.9.2.2.3 PERMEABLE LAYER WORKS 6/8/2021
1.9.2.2.3.1 Crush stone pitching 6/8/2021
1.9.2.2.3.2 Lean concrete 6/22/2021
1.9.2.2.3.3 Bituminous paint 6/25/2021
1.9.2.2.3.4 Formwork for wing wall 6/29/2021
1.9.2.2.3.5 Rebars fixing 7/9/2021
1.9.2.2.3.6 Concreting work 7/16/2021
1.9.2.3 PIER CASTING/ERECTION WORKS 8/20/2021
1.9.2.3.1 PIER 1 & 2 8/20/2021
1.9.2.3.1.1 Formwork for piers 8/20/2021
1.9.2.3.1.2 Rebars placement 9/21/2021
1.9.2.3.1.3 Concreting work 10/20/2021
1.9.2.3.2 PIER 3 & 4 11/25/2021
1.9.2.3.2.1 Formwork for piers 11/25/2021
1.9.2.3.2.2 Rebars placement 12/23/2021
1.9.2.3.2.3 Concreting work 1/21/2022
1.9.2.3.3 PIER 5 & 6 1/27/2022
1.9.2.3.3.1 Formwork for piers 1/27/2022
1.9.2.3.3.2 Rebars placement 2/28/2022
1.9.2.3.3.3 Concreting work 3/28/2022
1.9.2.4 TWIN SPINE BEAM 10/26/2021
1.9.2.4.1 SCAFFOLDING ERECTION WORKS 10/26/2021
1.9.2.4.1.1 Span 1 10/26/2021
1.9.2.4.1.2 Span 2 11/11/2021
1.9.2.4.1.3 Span 3 11/25/2021
1.9.2.4.1.4 Span 4 5/25/2022
1.9.2.4.1.5 Span 5 6/8/2022
1.9.2.4.2 FORMWORK ERECTION WORK 11/29/2021
1.9.2.4.2.1 Span 1 11/29/2021
1.9.2.4.2.2 Span 2 3/2/2022
1.9.2.4.2.3 Span 3 3/16/2022
1.9.2.4.2.4 Striking formwork Span 1 2/4/2022
1.9.2.4.2.5 Striking formwork Span 2 5/10/2022
1.9.2.4.2.6 Span 4 6/8/2022
1.9.2.4.2.7 Span 5 6/22/2022
1.9.2.4.3 REBAR PLACEMENT 12/13/2021
1.9.2.4.3.1 Span 1 12/13/2021
1.9.2.4.3.2 Span 2 3/16/2022
1.9.2.4.3.3 Span 3 3/30/2022
1.9.2.4.3.4 Span 4 6/22/2022
1.9.2.4.3.5 Span 5 7/6/2022
1.9.2.4.4 CONCRETING WORK 12/27/2021
1.9.2.4.4.1 Span 1 12/27/2021
1.9.2.4.4.2 Span 2 3/30/2022
1.9.2.4.4.3 Span 3 4/28/2022
1.9.2.4.4.4 Span 4 7/6/2022
1.9.2.4.4.5 Span 5 7/20/2022
1.9.2.5 BRIDGE BEARING INSTALLATION 1/31/2022
1.9.2.5.1 Span 1 1/31/2022
1.9.2.5.2 Span 2 5/6/2022
1.9.2.5.3 Span 3 6/6/2022
1.9.2.5.4 Span 4 8/9/2022
1.9.2.5.5 Span 5 8/25/2022
1.9.2.6 IN-SITU PARAPET 7/22/2022
1.9.2.6.1 FORMWORK ERECTION WORK 7/22/2022
1.9.2.6.1.1 Span 1 7/22/2022
1.9.2.6.1.2 Span 2 8/5/2022
1.9.2.6.1.3 Span 3 8/19/2022
1.9.2.6.1.4 Span 4 9/5/2022
1.9.2.6.1.5 Span 5 9/20/2022
1.9.2.6.2 REBAR PLACEMENT WORK 8/5/2022
1.9.2.6.2.1 Span 1 8/5/2022
1.9.2.6.2.2 Span 2 8/19/2022
1.9.2.6.2.3 Span 3 9/5/2022
1.9.2.6.2.4 Span 4 9/20/2022
1.9.2.6.2.5 Span 5 10/4/2022
1.9.2.6.3 CONCRETING WORK 9/13/2022
1.9.2.6.3.1 Span 1 9/13/2022
1.9.2.6.3.2 Span 2 9/15/2022
1.9.2.6.3.3 Span 3 9/20/2022
1.9.2.6.3.4 Span 4 10/4/2022
1.9.2.6.3.5 Span 5 10/18/2022
1.9.2.7 MISCELLANEOUS/SUNDRIES WORKS 9/5/2022
1.9.2.7.1 GI handrail 9/5/2022
1.9.2.7.2 uPVC rain water downpipe 9/15/2022
1.9.2.7.3 Expansion joints 9/28/2022
1.9.2.7.4 Protective coatings 10/5/2022
1.9.3 STRUCTURE WORK - SUNGAI DURAU: CH2800 - CH2900 7/22/2021
1.9.3.1 CAISSON PILING WORKS 7/22/2021
1.9.3.1.1 POINT 1 & 2 7/22/2021
1.9.3.1.1.1 Plants & equipment preparation 7/22/2021
1.9.3.1.1.2 Hand dig excavation 7/26/2021
1.9.3.1.1.3 Permanent casing work 8/24/2021
1.9.3.1.1.4 Rebars placement 9/15/2021
1.9.3.1.1.5 Concreting work 10/14/2021
1.9.3.1.1.6 Pile Testing 11/22/2021
1.9.3.1.1.7 Temporary platform fixing 11/24/2021
1.9.3.1.1.8 Decking placement 12/6/2021
1.9.3.1.2 POINT 3 & 4 10/18/2021
1.9.3.1.2.1 Plants & equipment preparation 10/18/2021
1.9.3.1.2.2 Hand dig excavation 10/21/2021
1.9.3.1.2.3 Permanent casing work 11/22/2021
1.9.3.1.2.4 Rebars placement 12/13/2021
1.9.3.1.2.5 Concreting work 1/10/2022
1.9.3.1.2.6 Pile Testing 2/16/2022
1.9.3.1.2.7 Temporary platform fixing 2/18/2022
1.9.3.1.2.8 Decking placement 2/28/2022
1.9.3.1.3 POINT 5 & 6 1/12/2022
1.9.3.1.3.1 Plants & equipment preparation 1/12/2022
1.9.3.1.3.2 Hand dig excavation 1/13/2022
1.9.3.1.3.3 Permanent casing work 2/15/2022
1.9.3.1.3.4 Rebars placement 3/8/2022
1.9.3.1.3.5 Concreting work 4/5/2022
1.9.3.1.3.6 Pile Testing 5/12/2022
1.9.3.1.3.7 Temporary platform fixing 5/17/2022
1.9.3.1.3.8 Decking placement 5/25/2022
1.9.3.2 ABUTMENT 7/26/2021
1.9.3.2.1 ABUTMENT A 7/26/2021
1.9.3.2.1.1 Cut and dispose 7/26/2021
1.9.3.2.1.2 Filling works 8/9/2021
1.9.3.2.1.3 Stone pitching 9/1/2021
1.9.3.2.1.4 MS handrail 9/15/2021
1.9.3.2.1.5 Concreting work 9/30/2021
1.9.3.2.1.6 Gabion cage rock filled work 9/21/2021
1.9.3.2.1.7 Subsoil drains 9/22/2021
1.9.3.2.2 ABUTMENT B 9/3/2021
1.9.3.2.2.1 Cut and dispose 9/3/2021
1.9.3.2.2.2 Filling works 9/20/2021
1.9.3.2.2.3 Stone pitching 10/11/2021
1.9.3.2.2.4 MS handrail 10/26/2021
1.9.3.2.2.5 Concreting work 11/11/2021
1.9.3.2.2.6 Gabion cage rock filled work 10/29/2021
1.9.3.2.2.7 Subsoil drains 11/15/2021
1.9.3.2.3 PERMEABLE LAYER WORKS 10/26/2021
1.9.3.2.3.1 Crush stone pitching 10/26/2021
1.9.3.2.3.2 Lean concrete 11/10/2021
1.9.3.2.3.3 Bituminous paint 11/15/2021
1.9.3.2.3.4 Formwork for wing wall 12/15/2021
1.9.3.2.3.5 Rebars fixing 12/27/2021
1.9.3.2.3.6 Concreting work 1/3/2022
1.9.3.3 PIER CASTING/ERECTION WORKS 12/21/2021
1.9.3.3.1 PIER 1 & 2 12/21/2021
1.9.3.3.1.1 Formwork for piers 12/21/2021
1.9.3.3.1.2 Rebars placement 1/19/2022
1.9.3.3.1.3 Concreting work 2/18/2022
1.9.3.3.2 PIER 3 & 4 3/24/2022
1.9.3.3.2.1 Formwork for piers 3/24/2022
1.9.3.3.2.2 Rebars placement 4/22/2022
1.9.3.3.2.3 Concreting work 5/25/2022
1.9.3.3.3 PIER 5 & 6 6/9/2022
1.9.3.3.3.1 Formwork for piers 6/9/2022
1.9.3.3.3.2 Rebars placement 7/6/2022
1.9.3.3.3.3 Concreting work 8/3/2022
1.9.3.4 TWIN SPINE BEAM 2/22/2022
1.9.3.4.1 SCAFFOLDING ERECTION WORKS 2/22/2022
1.9.3.4.1.1 Span 1 2/22/2022
1.9.3.4.1.2 Span 2 3/9/2022
1.9.3.4.1.3 Span 3 3/24/2022
1.9.3.4.1.4 Span 4 6/3/2022
1.9.3.4.1.5 Span 5 8/5/2022
1.9.3.4.2 FORMWORK ERECTION WORK 3/24/2022
1.9.3.4.2.1 Span 1 3/24/2022
1.9.3.4.2.2 Span 2 6/30/2022
1.9.3.4.2.3 Span 3 7/14/2022
1.9.3.4.2.4 Striking formwork Span 1 5/11/2022
1.9.3.4.2.5 Striking formwork Span 2 5/27/2022
1.9.3.4.2.6 Span 4 9/7/2022
1.9.3.4.2.7 Span 5 9/7/2022
1.9.3.4.3 REBAR PLACEMENT 3/17/2022
1.9.3.4.3.1 Span 1 3/17/2022
1.9.3.4.3.2 Span 2 4/1/2022
1.9.3.4.3.3 Span 3 4/15/2022
1.9.3.4.3.4 Span 4 9/22/2022
1.9.3.4.3.5 Span 5 9/22/2022
1.9.3.4.4 CONCRETING WORKS 3/31/2022
1.9.3.4.4.1 Span 1 3/31/2022
1.9.3.4.4.2 Span 2 4/15/2022
1.9.3.4.4.3 Span 3 5/4/2022
1.9.3.4.4.4 Span 4 10/6/2022
1.9.3.4.4.5 Span 5 10/10/2022
1.9.3.5 BRIDGE BEARING INSTALLATION 5/9/2022
1.9.3.5.1 Span 1 5/9/2022
1.9.3.5.2 Span 2 5/25/2022
1.9.3.5.3 Span 3 6/8/2022
1.9.3.5.4 Span 4 11/11/2022
1.9.3.5.5 Span 5 11/25/2022
1.9.3.6 IN-SITU PARAPET 10/12/2022
1.9.3.6.1 FORMWORK ERECTION WORK 10/12/2022
1.9.3.6.1.1 Span 1 10/12/2022
1.9.3.6.1.2 Span 2 10/27/2022
1.9.3.6.1.3 Span 3 11/11/2022
1.9.3.6.1.4 Span 4 11/25/2022
1.9.3.6.1.5 Span 5 12/9/2022
1.9.3.6.2 REBAR PLACEMENT 10/27/2022
1.9.3.6.2.1 Span 1 10/27/2022
1.9.3.6.2.2 Span 2 11/11/2022
1.9.3.6.2.3 Span 3 11/25/2022
1.9.3.6.2.4 Span 4 12/9/2022
1.9.3.6.2.5 Span 5 12/23/2022
1.9.3.6.3 CONCRETING WORKS 11/11/2022
1.9.3.6.3.1 Span 1 11/11/2022
1.9.3.6.3.2 Span 2 11/25/2022
1.9.3.6.3.3 Span 3 12/9/2022
1.9.3.6.3.4 Span 4 12/23/2022
1.9.3.6.3.5 Span 5 1/6/2023
1.9.3.7 MISCELLANEOUS/SUNDRIES WORKS 11/15/2022
1.9.3.7.1 GI handrail 11/15/2022
1.9.3.7.2 uPVC rain water downpipe 11/25/2022
1.9.3.7.3 Expansion joints 12/6/2022
1.9.3.7.4 Protective coatings 12/13/2022
1.9.4 STRUCTURE WORK - ALOR 2: CH3075 - CH3200 9/15/2021
1.9.4.1 CAISSON PILING WORKS 9/15/2021
1.9.4.1.1 POINT 1 & 2 9/15/2021
1.9.4.1.1.1 Plants & equipment preparation 9/15/2021
1.9.4.1.1.2 Hand dig excavation 9/20/2021
1.9.4.1.1.3 Permanent casing work 10/4/2021
1.9.4.1.1.4 Rebars placement 10/26/2021
1.9.4.1.1.5 Concreting work 11/25/2021
1.9.4.1.1.6 Pile Testing 12/29/2021
1.9.4.1.1.7 Temporary platform fixing 12/31/2021
1.9.4.1.1.8 Decking placement 1/12/2022
1.9.4.1.2 POINT 3 & 4 10/18/2021
1.9.4.1.2.1 Plants & equipment preparation 10/18/2021
1.9.4.1.2.2 Hand dig excavation 10/21/2021
1.9.4.1.2.3 Permanent casing work 10/29/2021
1.9.4.1.2.4 Rebars placement 11/23/2021
1.9.4.1.2.5 Concreting work 12/21/2021
1.9.4.1.2.6 Pile Testing 1/25/2022
1.9.4.1.2.7 Temporary platform fixing 1/27/2022
1.9.4.1.2.8 Decking placement 2/8/2022
1.9.4.1.3 POINT 5 & 6 11/22/2021
1.9.4.1.3.1 Plants & equipment preparation 11/22/2021
1.9.4.1.3.2 Hand dig excavation 11/23/2021
1.9.4.1.3.3 Permanent casing work 12/2/2021
1.9.4.1.3.4 Rebars placement 12/23/2021
1.9.4.1.3.5 Concreting work 1/21/2022
1.9.4.1.3.6 Pile Testing 2/28/2022
1.9.4.1.3.7 Temporary platform fixing 3/2/2022
1.9.4.1.3.8 Decking placement 3/10/2022
1.9.4.2 ABUTMENT 9/20/2021
1.9.4.2.1 ABUTMENT A 9/20/2021
1.9.4.2.1.1 Cut and dispose 9/20/2021
1.9.4.2.1.2 Filling works 10/4/2021
1.9.4.2.1.3 Stone pitching 10/26/2021
1.9.4.2.1.4 MS handrail 11/11/2021
1.9.4.2.1.5 Concreting work 11/25/2021
1.9.4.2.1.6 Gabion cage rock filled work 11/16/2021
1.9.4.2.1.7 Subsoil drains 11/17/2021
1.9.4.2.2 ABUTMENT B 10/28/2021
1.9.4.2.2.1 Cut and dispose 10/28/2021
1.9.4.2.2.2 Filling works 11/15/2021
1.9.4.2.2.3 Stone pitching 12/6/2021
1.9.4.2.2.4 MS handrail 12/20/2021
1.9.4.2.2.5 Concreting work 1/3/2022
1.9.4.2.2.6 Gabion cage rock filled work 12/23/2021
1.9.4.2.2.7 Subsoil drains 1/5/2022
1.9.4.2.3 PERMEABLE LAYER WORKS 12/20/2021
1.9.4.2.3.1 Crush stone pitching 12/20/2021
1.9.4.2.3.2 Lean concrete 1/3/2022
1.9.4.2.3.3 Bituminous paint 1/7/2022
1.9.4.2.3.4 Formwork for wing wall 2/9/2022
1.9.4.2.3.5 Rebars fixing 2/21/2022
1.9.4.2.3.6 Concreting work 3/1/2022
1.9.4.3 PIER CASTING/ERECTION WORKS 1/28/2022
1.9.4.3.1 PIER 1 & 2 1/28/2022
1.9.4.3.1.1 Formwork for piers 1/28/2022
1.9.4.3.1.2 Rebars placement 3/1/2022
1.9.4.3.1.3 Concreting work 3/29/2022
1.9.4.3.2 PIER 3 & 4 2/23/2022
1.9.4.3.2.1 Formwork for piers 2/23/2022
1.9.4.3.2.2 Rebars placement 3/23/2022
1.9.4.3.2.3 Concreting work 4/21/2022
1.9.4.3.3 PIER 5 & 6 3/25/2022
1.9.4.3.3.1 Formwork for piers 3/25/2022
1.9.4.3.3.2 Rebars placement 4/25/2022
1.9.4.3.3.3 Concreting work 5/26/2022
1.9.4.4 TWIN SPINE BEAM 3/31/2022
1.9.4.4.1 SCAFFOLDING ERECTION WORKS 3/31/2022
1.9.4.4.1.1 Span 1 3/31/2022
1.9.4.4.1.2 Span 2 4/14/2022
1.9.4.4.1.3 Span 3 4/29/2022
1.9.4.4.1.4 Span 4 8/9/2022
1.9.4.4.1.5 Span 5 8/23/2022
1.9.4.4.2 FORMWORK ERECTION WORK 5/5/2022
1.9.4.4.2.1 Span 1 5/5/2022
1.9.4.4.2.2 Span 2 5/30/2022
1.9.4.4.2.3 Span 3 6/13/2022
1.9.4.4.2.4 Striking formwork Span 1 7/26/2022
1.9.4.4.2.5 Striking formwork Span 2 8/2/2022
1.9.4.4.2.6 Span 4 8/23/2022
1.9.4.4.2.7 Span 5 9/7/2022
1.9.4.4.3 REBAR PLACEMENT WORK 5/20/2022
1.9.4.4.3.1 Span 1 5/20/2022
1.9.4.4.3.2 Span 2 6/13/2022
1.9.4.4.3.3 Span 3 6/27/2022
1.9.4.4.3.4 Span 4 9/7/2022
1.9.4.4.3.5 Span 5 9/22/2022
1.9.4.4.4 CONCRETING WORKS 6/20/2022
1.9.4.4.4.1 Span 1 6/20/2022
1.9.4.4.4.2 Span 2 6/27/2022
1.9.4.4.4.3 Span 3 7/11/2022
1.9.4.4.4.4 Span 4 9/22/2022
1.9.4.4.4.5 Span 5 10/6/2022
1.9.4.5 BRIDGE BEARING INSTALLATION 7/22/2022
1.9.4.5.1 Span 1 7/22/2022
1.9.4.5.2 Span 2 8/5/2022
1.9.4.5.3 Span 3 8/19/2022
1.9.4.5.4 Span 4 10/27/2022
1.9.4.5.5 Span 5 11/11/2022
1.9.4.6 IN-SITU PARAPET 10/11/2022
1.9.4.6.1 FORMWORK ERECTION WORK 10/11/2022
1.9.4.6.1.1 Span 1 10/11/2022
1.9.4.6.1.2 Span 2 10/27/2022
1.9.4.6.1.3 Span 3 11/11/2022
1.9.4.6.1.4 Span 4 11/25/2022
1.9.4.6.1.5 Span 5 12/9/2022
1.9.4.6.2 REBAR PLACEMENT WORK 10/26/2022
1.9.4.6.2.1 Span 1 10/26/2022
1.9.4.6.2.2 Span 2 11/11/2022
1.9.4.6.2.3 Span 3 11/25/2022
1.9.4.6.2.4 Span 4 12/9/2022
1.9.4.6.2.5 Span 5 12/23/2022
1.9.4.6.3 CONCRETING WORK 11/10/2022
1.9.4.6.3.1 Span 1 11/10/2022
1.9.4.6.3.2 Span 2 11/25/2022
1.9.4.6.3.3 Span 3 12/9/2022
1.9.4.6.3.4 Span 4 12/23/2022
1.9.4.6.3.5 Span 5 1/6/2023
1.9.4.7 MISCELLANEOUS/SUNDRIES WORKS 1/10/2023
1.9.4.7.1 GI handrail 1/10/2023
1.9.4.7.2 uPVC rain water downpipe 1/20/2023
1.9.4.7.3 Expansion joints 2/1/2023
1.9.4.7.4 Protective coatings 2/8/2023
1.1 PROVISIONAL SUM 11/24/2020
1.10.1 RELOCATION AND PROTECTION OF UTILITY SERVICES 4/23/2021
1.10.1.1 TNB UTILITY (CH 2400 - CH 3600) 4/23/2021
1.10.1.1.1 CH 2250 to CH 2500 4/23/2021
1.10.1.1.2 CH 2500 to CH 3000 5/27/2021
1.10.1.1.3 CH 3000 to CH 3500 6/25/2021
1.10.1.1.4 CH 3500 to CH 3750 7/26/2021
1.10.1.2 WATER UTILITY (CH 2400 - CH 3600) 5/27/2021
1.10.1.2.1 CH 2250 to CH 2500 5/27/2021
1.10.1.2.2 CH 2500 to CH 3000 6/25/2021
1.10.1.2.3 CH 3000 to CH 3500 7/26/2021
1.10.1.2.4 CH 3500 to CH 3750 8/24/2021
1.10.2 SOIL INVESTIGATION WORKS 11/24/2020
1.10.2.1 IN-SITU TESTING & REPORT 11/24/2020
1.10.2.1.1 CH 0 - CH 1025 11/24/2020
1.10.2.1.2 CH 1025 - CH 2075 1/7/2021
1.10.2.1.3 CH 2075 - CH 3025 4/30/2021
1.10.2.1.4 CH 3025 - CH 4157 6/2/2021
1.10.3 SLOPE STABILIZATION AND GEOLOGICAL MAPPING 3/3/2023
1.10.4 G1 TEMPORARY RD FURNITURE 2/23/2023
1.10.5 G2 SIGNBOARD 3/6/2023
1.10.6 ROAD SAFETY AUDIT STAGE 4 3/9/2023
1.10.7 PRIME COST SUM 3/8/2023
1.10.7.1 ROAD LIGHT AND TRAFFIC LIGHT 3/8/2023
1.11 FINAL SITE INSPECTION 9/10/2021
1.11.1 PRELIMINARIES COMPLETION 9/10/2021
1.11.2 CUT & FILL 11/3/2022
1.11.3 GEOTECHNICAL WORKS FINAL INSPECTION 1/31/2023
1.11.4 DRAINAGE WORK FINAL INSPECTION 12/9/2022
1.11.5 ROADWORKS FINAL INSPECTION 3/17/2023
1.11.6 ROAD FURNITURE FINAL INSPECTION 3/10/2023
1.11.7 BRIDGE FINISHES 2/14/2023
1.11.8 PROVISIONAL SUM COMPLETION 3/9/2023
1.12 HAND OVER 4/1/2023
Finish

4/1/2023

12/9/2019
4/1/2023
3/20/2023
1/17/2020
12/17/2019
12/27/2019
1/8/2020
1/17/2020
3/20/2023
3/20/2023
7/15/2020
3/20/2023
3/20/2023
7/22/2020
3/20/2023
3/20/2023
8/6/2020
3/20/2023
3/20/2023
3/20/2023
2/3/2020
3/20/2023
3/20/2023
2/10/2020
3/20/2023
3/20/2023
2/17/2020
3/20/2023
3/20/2023
3/9/2020
3/20/2023
3/2/2020
7/22/2020
2/17/2020
11/17/2022
8/7/2020
7/10/2020
7/23/2020
8/7/2020
8/7/2020
9/4/2020
9/4/2020
8/4/2020
8/13/2020
8/25/2020
9/4/2020
11/17/2022
11/17/2022
7/16/2021
2/22/2022
5/5/2022
10/26/2022
11/16/2022
11/17/2022
4/1/2023
7/29/2020
3/17/2023
4/1/2023
3/20/2023
7/20/2020
2/17/2020
2/17/2020
7/20/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
3/20/2023
8/17/2020
8/17/2020
3/20/2023
9/10/2021
9/17/2020
9/17/2020
8/19/2021
8/4/2021
9/2/2020
12/15/2020
4/8/2021
8/4/2021
8/19/2021
9/17/2020
12/30/2020
4/22/2021
8/19/2021
8/12/2021
9/30/2020
12/22/2020
4/15/2021
8/12/2021
8/26/2021
10/14/2020
1/7/2021
4/30/2021
8/26/2021
9/10/2021
10/21/2020
10/28/2020
1/14/2021
1/21/2021
5/7/2021
5/18/2021
9/3/2021
9/10/2021
3/20/2023
8/10/2020
8/10/2020
8/10/2020
8/10/2020
3/20/2023
3/20/2023
3/20/2023
3/20/2023
9/21/2020
8/5/2020
8/12/2020
8/19/2020
9/21/2020
3/20/2023
3/6/2023
3/20/2023
9/20/2022
3/17/2023
8/2/2022
10/13/2020
8/6/2020
8/28/2020
9/22/2020
10/13/2020
11/4/2020
9/22/2020
10/13/2020
11/4/2020
11/10/2020
9/25/2020
10/16/2020
11/10/2020
10/21/2020
10/21/2020
12/1/2020
10/16/2020
11/10/2020
12/1/2020
11/4/2020
10/20/2020
10/22/2020
10/26/2020
10/28/2020
11/2/2020
11/4/2020
2/17/2021
11/19/2020
12/17/2020
1/18/2021
2/17/2021
5/17/2021
3/17/2021
4/14/2021
5/17/2021
4/21/2021
3/24/2021
4/21/2021
5/11/2021
4/21/2021
4/21/2021
4/22/2021
4/22/2021
4/30/2021
4/30/2021
5/11/2021
5/11/2021
6/23/2021
4/21/2021
5/24/2021
6/23/2021
7/7/2021
5/6/2021
6/9/2021
7/7/2021
9/6/2021
3/3/2021
1/4/2021
2/2/2021
3/3/2021
3/5/2021
1/6/2021
2/4/2021
3/5/2021
3/3/2021
1/18/2021
2/17/2021
3/3/2021
3/5/2021
1/20/2021
2/19/2021
3/5/2021
3/9/2021
1/22/2021
2/23/2021
3/9/2021
6/9/2021
2/2/2021
5/6/2021
6/9/2021
6/11/2021
2/4/2021
5/10/2021
6/11/2021
3/31/2021
3/17/2021
3/31/2021
4/2/2021
3/19/2021
4/2/2021
9/6/2021
6/9/2021
7/7/2021
8/5/2021
9/6/2021
7/22/2021
7/7/2021
5/6/2021
6/9/2021
7/7/2021
7/22/2021
5/24/2021
6/23/2021
7/22/2021
8/26/2021
7/28/2021
6/29/2021
7/28/2021
8/26/2021
7/28/2021
8/26/2021
11/18/2021
8/20/2021
6/23/2021
8/20/2021
9/28/2021
7/29/2021
9/28/2021
11/3/2021
9/6/2021
11/3/2021
11/16/2021
9/15/2021
11/16/2021
11/18/2021
9/20/2021
11/18/2021
11/12/2021
8/27/2021
6/30/2021
8/27/2021
9/13/2021
7/14/2021
9/13/2021
9/28/2021
7/29/2021
9/28/2021
10/1/2021
8/3/2021
10/1/2021
10/8/2021
8/11/2021
10/8/2021
10/25/2021
8/25/2021
10/25/2021
11/1/2021
9/2/2021
11/1/2021
11/10/2021
9/9/2021
11/10/2021
11/11/2021
9/10/2021
11/11/2021
11/12/2021
9/13/2021
11/12/2021
10/27/2021
8/27/2021
10/27/2021
10/29/2021
9/1/2021
10/29/2021
8/2/2022
9/23/2021
8/2/2022
11/23/2021
11/30/2021
9/30/2021
11/30/2021
10/27/2021
10/22/2021
10/25/2021
10/27/2021
8/12/2022
2/5/2021
12/1/2020
12/22/2020
1/14/2021
2/5/2021
3/1/2021
12/22/2020
1/14/2021
2/5/2021
3/1/2021
3/4/2021
12/28/2020
1/19/2021
2/10/2021
3/4/2021
2/24/2021
11/13/2020
12/31/2020
1/6/2021
1/22/2021
1/27/2021
2/16/2021
2/19/2021
2/24/2021
3/25/2021
1/19/2021
2/10/2021
3/4/2021
3/25/2021
4/2/2021
1/21/2021
1/25/2021
2/15/2021
3/8/2021
3/29/2021
3/31/2021
4/2/2021
5/24/2021
2/24/2021
3/24/2021
4/21/2021
5/24/2021
10/20/2021
6/23/2021
7/22/2021
8/20/2021
9/21/2021
10/20/2021
9/27/2021
9/27/2021
10/26/2021
10/26/2021
11/30/2021
10/28/2021
11/30/2021
11/29/2021
11/29/2021
11/18/2021
10/7/2021
9/23/2021
7/26/2021
9/23/2021
10/7/2021
8/9/2021
10/7/2021
11/18/2021
10/14/2021
8/17/2021
10/14/2021
10/18/2021
8/19/2021
10/18/2021
11/18/2021
9/20/2021
11/18/2021
8/18/2021
7/29/2021
7/29/2021
7/30/2021
7/30/2021
8/6/2021
8/6/2021
8/18/2021
8/18/2021
11/25/2021
4/15/2021
1/26/2021
2/3/2021
3/11/2021
3/18/2021
4/1/2021
4/8/2021
4/15/2021
4/19/2021
1/29/2021
2/5/2021
3/15/2021
3/22/2021
4/5/2021
4/12/2021
4/19/2021
4/26/2021
2/5/2021
2/15/2021
3/22/2021
3/29/2021
4/12/2021
4/19/2021
4/26/2021
4/28/2021
2/9/2021
2/17/2021
3/24/2021
3/31/2021
4/14/2021
4/21/2021
4/28/2021
5/24/2021
3/3/2021
3/10/2021
4/14/2021
4/21/2021
5/6/2021
5/17/2021
5/24/2021
9/14/2021
4/30/2021
5/25/2021
6/17/2021
7/8/2021
7/30/2021
8/23/2021
9/14/2021
11/16/2021
7/2/2021
7/26/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
11/16/2021
7/2/2021
7/26/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
11/25/2021
7/13/2021
8/4/2021
8/26/2021
9/20/2021
10/11/2021
11/2/2021
11/25/2021
2/25/2022
9/3/2021
10/18/2021
11/18/2021
12/28/2021
1/26/2022
2/25/2022
2/11/2022
9/20/2021
11/2/2021
12/2/2021
2/11/2022
1/13/2022
11/11/2021
8/12/2021
11/11/2021
12/9/2021
9/10/2021
12/9/2021
12/10/2021
9/13/2021
12/10/2021
12/14/2021
9/15/2021
12/14/2021
1/11/2022
10/14/2021
1/11/2022
12/9/2021
8/26/2021
9/10/2021
11/25/2021
12/9/2021
1/6/2022
10/11/2021
1/6/2022
1/7/2022
10/12/2021
1/7/2022
1/13/2022
10/18/2021
1/13/2022
4/8/2022
6/9/2021
3/17/2021
4/7/2021
5/6/2021
6/9/2021
6/11/2021
3/19/2021
4/9/2021
5/10/2021
6/11/2021
6/9/2021
3/17/2021
4/21/2021
5/24/2021
6/9/2021
6/11/2021
3/19/2021
4/23/2021
5/27/2021
6/11/2021
6/15/2021
3/23/2021
4/27/2021
5/31/2021
6/15/2021
3/11/2022
9/20/2021
1/11/2022
3/11/2022
3/15/2022
9/22/2021
1/13/2022
3/15/2022
6/23/2021
4/14/2021
6/9/2021
6/23/2021
6/25/2021
4/16/2021
6/11/2021
6/25/2021
4/8/2022
10/18/2021
2/11/2022
3/11/2022
4/8/2022
3/25/2022
3/11/2022
9/20/2021
11/2/2021
2/11/2022
3/11/2022
3/25/2022
10/4/2021
11/18/2021
2/25/2022
3/25/2022
6/22/2022
3/25/2022
12/16/2021
3/25/2022
5/4/2022
1/21/2022
5/4/2022
6/9/2022
3/1/2022
6/9/2022
6/20/2022
3/10/2022
6/20/2022
6/22/2022
3/14/2022
6/22/2022
3/8/2022
12/23/2021
12/23/2021
1/6/2022
1/6/2022
1/21/2022
1/21/2022
1/26/2022
1/26/2022
2/4/2022
2/4/2022
2/18/2022
2/18/2022
2/25/2022
2/25/2022
3/4/2022
3/4/2022
3/7/2022
3/7/2022
3/8/2022
3/8/2022
6/2/2022
2/22/2022
6/2/2022
6/6/2022
2/24/2022
6/6/2022
8/5/2022
3/17/2022
8/5/2022
8/12/2022
3/24/2022
8/12/2022
12/2/2022
6/2/2021
3/25/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
4/15/2021
5/7/2021
6/2/2021
6/24/2021
6/29/2021
4/20/2021
5/12/2021
6/8/2021
6/29/2021
5/4/2021
3/9/2021
4/23/2021
4/28/2021
5/4/2021
7/21/2021
5/12/2021
6/8/2021
6/29/2021
7/21/2021
7/27/2021
5/18/2021
6/10/2021
6/14/2021
7/1/2021
7/23/2021
7/27/2021
12/16/2021
6/17/2021
7/15/2021
9/14/2021
11/18/2021
12/16/2021
8/16/2021
8/16/2021
1/13/2022
7/15/2021
1/13/2022
2/15/2022
8/16/2021
2/15/2022
6/8/2022
3/15/2022
9/14/2021
3/15/2022
5/13/2022
10/13/2021
11/15/2021
4/12/2022
5/13/2022
6/8/2022
12/8/2021
6/8/2022
7/13/2022
3/17/2022
9/17/2021
3/17/2022
4/14/2022
10/15/2021
4/14/2022
6/15/2022
11/17/2021
12/15/2021
5/18/2022
6/15/2022
6/29/2022
12/29/2021
6/29/2022
7/12/2022
1/11/2022
7/12/2022
7/13/2022
1/12/2022
7/13/2022
1/6/2022
10/5/2021
9/24/2021
10/5/2021
11/8/2021
10/14/2021
11/8/2021
11/26/2021
11/8/2021
11/26/2021
1/6/2022
12/17/2021
1/6/2022
1/27/2022
12/29/2021
9/28/2021
12/29/2021
1/27/2022
10/27/2021
1/27/2022
2/15/2022
1/13/2022
2/15/2022
9/20/2021
8/18/2021
9/20/2021
9/17/2021
9/17/2021
2/22/2022
6/22/2021
5/21/2021
5/31/2021
6/15/2021
6/22/2021
6/24/2021
5/25/2021
6/2/2021
6/17/2021
6/24/2021
7/1/2021
6/2/2021
6/10/2021
6/24/2021
7/1/2021
7/5/2021
6/4/2021
6/14/2021
6/28/2021
7/5/2021
9/2/2021
6/28/2021
7/19/2021
8/11/2021
9/2/2021
12/13/2021
10/6/2021
10/28/2021
11/22/2021
12/13/2021
2/11/2022
12/7/2021
12/28/2021
1/19/2022
2/11/2022
2/11/2022
12/7/2021
12/28/2021
1/19/2022
2/11/2022
2/22/2022
12/16/2021
1/6/2022
1/28/2022
2/22/2022
3/29/2022
3/1/2022
3/29/2022
4/22/2022
3/15/2022
3/24/2022
4/12/2022
4/22/2022
5/30/2022
3/22/2022
3/22/2022
4/20/2022
4/20/2022
4/21/2022
4/21/2022
4/25/2022
4/25/2022
5/26/2022
5/26/2022
4/20/2022
4/5/2022
4/20/2022
5/23/2022
5/23/2022
5/24/2022
5/24/2022
5/30/2022
5/30/2022
8/4/2022
12/30/2021
7/1/2021
7/30/2021
9/29/2021
12/30/2021
1/3/2022
7/5/2021
8/3/2021
10/1/2021
1/3/2022
1/13/2022
7/15/2021
7/30/2021
8/16/2021
8/30/2021
10/13/2021
1/13/2022
1/17/2022
7/19/2021
8/3/2021
8/18/2021
9/2/2021
10/15/2021
1/17/2022
1/20/2022
7/22/2021
8/5/2021
8/20/2021
9/6/2021
10/20/2021
1/20/2022
4/25/2022
3/25/2022
4/8/2022
4/25/2022
4/27/2022
3/29/2022
4/12/2022
4/27/2022
1/28/2022
9/14/2021
9/29/2021
10/13/2021
10/28/2021
11/15/2021
1/28/2022
2/3/2022
9/17/2021
10/1/2021
10/15/2021
11/1/2021
11/17/2021
2/3/2022
8/4/2022
5/11/2022
6/9/2022
7/7/2022
8/4/2022
5/30/2022
5/5/2022
3/22/2022
4/12/2022
4/22/2022
5/5/2022
5/30/2022
4/8/2022
4/27/2022
5/13/2022
5/30/2022
8/30/2022
6/8/2022
5/10/2022
6/8/2022
7/13/2022
6/15/2022
7/13/2022
8/17/2022
7/20/2022
8/17/2022
8/26/2022
7/29/2022
8/26/2022
8/30/2022
8/2/2022
8/30/2022
8/24/2022
6/15/2022
6/15/2022
6/29/2022
6/29/2022
7/13/2022
7/13/2022
7/18/2022
7/18/2022
7/25/2022
7/25/2022
8/8/2022
8/8/2022
8/15/2022
8/15/2022
8/22/2022
8/22/2022
8/23/2022
8/23/2022
8/24/2022
8/24/2022
8/10/2022
7/13/2022
8/10/2022
8/12/2022
7/15/2022
8/12/2022
11/25/2022
8/10/2022
11/25/2022
12/2/2022
8/19/2022
12/2/2022
3/17/2023
10/18/2021
7/21/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
8/12/2021
9/3/2021
9/27/2021
10/18/2021
11/11/2021
11/16/2021
8/17/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
10/27/2021
8/20/2021
9/13/2021
9/17/2021
10/5/2021
10/27/2021
12/7/2021
9/8/2021
9/30/2021
10/22/2021
11/16/2021
12/7/2021
12/13/2021
10/4/2021
10/6/2021
10/8/2021
10/26/2021
11/18/2021
12/9/2021
12/13/2021
3/29/2022
11/2/2021
12/2/2021
12/30/2021
1/28/2022
3/29/2022
3/1/2022
3/1/2022
4/27/2022
12/2/2021
3/1/2022
4/27/2022
5/30/2022
12/30/2021
3/29/2022
5/30/2022
11/18/2022
6/27/2022
4/12/2022
5/13/2022
6/27/2022
11/3/2022
6/13/2022
7/11/2022
8/8/2022
9/6/2022
10/5/2022
11/3/2022
11/18/2022
7/25/2022
9/21/2022
11/18/2022
1/3/2023
6/29/2022
4/14/2022
5/18/2022
6/29/2022
7/27/2022
5/18/2022
6/15/2022
7/27/2022
12/6/2022
7/13/2022
8/10/2022
9/8/2022
10/7/2022
11/8/2022
12/6/2022
12/20/2022
8/24/2022
10/21/2022
12/20/2022
1/2/2023
9/7/2022
11/7/2022
1/2/2023
1/3/2023
9/8/2022
11/8/2022
1/3/2023
9/27/2022
7/6/2022
4/22/2022
5/25/2022
7/6/2022
7/26/2022
5/17/2022
6/14/2022
7/26/2022
8/15/2022
6/6/2022
7/4/2022
8/15/2022
9/27/2022
7/15/2022
8/12/2022
9/27/2022
8/12/2022
7/29/2022
5/20/2022
12/15/2021
12/17/2021
1/12/2022
2/14/2022
7/29/2022
8/12/2022
5/31/2022
12/24/2021
1/4/2022
1/24/2022
2/23/2022
8/12/2022
8/22/2022
4/27/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
4/1/2022
3/3/2022
4/1/2022
3/31/2022
3/31/2022
7/22/2022
6/15/2022
6/1/2022
6/1/2022
6/15/2022
6/15/2022
7/22/2022
6/22/2022
6/22/2022
6/24/2022
6/24/2022
7/22/2022
7/22/2022
6/23/2022
6/6/2022
6/6/2022
6/7/2022
6/7/2022
6/14/2022
6/14/2022
6/23/2022
6/23/2022
5/31/2022
12/14/2021
10/7/2021
10/29/2021
11/23/2021
12/14/2021
12/16/2021
10/11/2021
11/2/2021
11/25/2021
12/16/2021
12/23/2021
10/18/2021
11/11/2021
12/2/2021
12/23/2021
12/27/2021
10/21/2021
11/15/2021
12/6/2021
12/27/2021
1/17/2022
11/15/2021
12/6/2021
12/27/2021
1/17/2022
3/18/2022
1/11/2022
2/4/2022
2/25/2022
3/18/2022
5/20/2022
3/14/2022
4/4/2022
4/26/2022
5/20/2022
5/20/2022
3/14/2022
4/4/2022
4/26/2022
5/20/2022
5/31/2022
3/23/2022
4/13/2022
5/9/2022
5/31/2022
9/21/2022
1/13/2022
5/30/2022
6/27/2022
7/25/2022
8/22/2022
9/21/2022
10/14/2022
6/8/2022
7/11/2022
9/1/2022
10/5/2022
10/14/2022
12/9/2022
9/19/2022
7/21/2022
8/18/2022
9/19/2022
11/3/2022
8/18/2022
9/19/2022
11/3/2022
11/7/2022
8/19/2022
9/20/2022
11/7/2022
11/9/2022
8/23/2022
9/22/2022
11/9/2022
12/7/2022
9/22/2022
10/20/2022
12/7/2022
10/17/2022
8/4/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
11/16/2022
9/19/2022
10/17/2022
11/16/2022
11/17/2022
9/20/2022
10/18/2022
11/17/2022
12/9/2022
9/26/2022
10/25/2022
12/9/2022
12/2/2022
4/12/2022
1/13/2022
1/28/2022
2/15/2022
3/1/2022
3/15/2022
4/12/2022
4/14/2022
1/17/2022
2/3/2022
2/17/2022
3/3/2022
3/17/2022
4/14/2022
5/13/2022
1/28/2022
2/15/2022
3/1/2022
3/15/2022
3/29/2022
4/12/2022
4/27/2022
5/13/2022
5/18/2022
2/3/2022
2/17/2022
3/3/2022
3/17/2022
3/31/2022
4/14/2022
4/29/2022
5/18/2022
5/20/2022
2/7/2022
2/21/2022
3/7/2022
3/21/2022
4/4/2022
4/18/2022
5/5/2022
5/20/2022
10/5/2022
5/11/2022
6/13/2022
7/11/2022
9/6/2022
10/5/2022
10/7/2022
5/13/2022
6/15/2022
7/13/2022
9/8/2022
10/7/2022
7/11/2022
5/13/2022
5/30/2022
6/13/2022
6/27/2022
7/11/2022
7/13/2022
5/18/2022
6/1/2022
6/15/2022
6/29/2022
7/13/2022
12/2/2022
9/2/2022
10/5/2022
11/3/2022
12/2/2022
11/3/2022
10/14/2022
6/8/2022
7/11/2022
9/1/2022
10/5/2022
10/14/2022
11/3/2022
6/22/2022
7/25/2022
9/15/2022
10/19/2022
11/3/2022
2/20/2023
11/29/2022
8/22/2022
11/29/2022
1/3/2023
9/28/2022
1/3/2023
2/7/2023
11/3/2022
2/7/2023
2/16/2023
11/15/2022
2/16/2023
2/20/2023
11/17/2022
2/20/2023
2/14/2023
12/6/2022
12/6/2022
12/20/2022
12/20/2022
1/3/2023
1/3/2023
1/6/2023
1/6/2023
1/13/2023
1/13/2023
1/27/2023
1/27/2023
2/3/2023
2/3/2023
2/10/2023
2/10/2023
2/13/2023
2/13/2023
2/14/2023
2/14/2023
1/31/2023
10/27/2022
1/31/2023
2/2/2023
10/31/2022
2/2/2023
2/23/2023
2/13/2023
2/23/2023
3/17/2023
3/1/2023
3/17/2023
3/10/2023
3/10/2023
3/10/2023
12/8/2021
7/12/2022
9/21/2022
3/10/2023
1/24/2023
1/24/2023
2/14/2023
6/28/2022
9/13/2021
7/5/2021
2/23/2021
3/23/2021
4/13/2021
4/27/2021
4/30/2021
6/21/2021
6/29/2021
7/5/2021
9/13/2021
5/4/2021
6/4/2021
6/28/2021
7/12/2021
7/15/2021
8/30/2021
9/7/2021
9/13/2021
6/2/2021
4/9/2021
3/11/2021
3/17/2021
3/24/2021
4/1/2021
4/8/2021
4/8/2021
4/9/2021
4/27/2021
3/25/2021
3/31/2021
4/9/2021
4/16/2021
4/21/2021
4/26/2021
4/27/2021
6/2/2021
4/14/2021
4/22/2021
4/26/2021
5/19/2021
5/27/2021
6/2/2021
11/18/2021
9/8/2021
8/3/2021
9/2/2021
9/8/2021
11/18/2021
10/12/2021
11/12/2021
11/18/2021
3/28/2022
1/25/2022
10/26/2021
11/11/2021
1/25/2022
2/10/2022
11/25/2021
1/10/2022
2/10/2022
2/24/2022
12/9/2021
12/27/2021
2/24/2022
2/28/2022
12/13/2021
12/29/2021
2/28/2022
3/28/2022
3/28/2022
6/28/2022
6/10/2022
4/11/2022
4/26/2022
5/12/2022
5/27/2022
6/10/2022
6/24/2022
4/26/2022
5/12/2022
5/27/2022
6/10/2022
6/24/2022
6/28/2022
4/28/2022
5/17/2022
5/31/2022
6/14/2022
6/28/2022
5/20/2022
5/6/2022
5/11/2022
5/18/2022
5/20/2022
10/19/2022
1/14/2022
9/9/2021
5/11/2021
6/14/2021
7/5/2021
7/13/2021
7/16/2021
8/23/2021
9/1/2021
9/9/2021
11/17/2021
7/19/2021
8/18/2021
9/9/2021
9/20/2021
9/23/2021
10/28/2021
11/9/2021
11/17/2021
1/14/2022
9/24/2021
10/25/2021
11/17/2021
11/24/2021
11/29/2021
12/31/2021
1/7/2022
1/14/2022
7/19/2021
7/1/2021
5/18/2021
5/28/2021
6/10/2021
6/17/2021
6/21/2021
6/29/2021
7/1/2021
7/13/2021
6/4/2021
6/14/2021
6/23/2021
6/29/2021
7/1/2021
7/9/2021
7/13/2021
7/19/2021
6/21/2021
6/24/2021
6/28/2021
7/8/2021
7/15/2021
7/19/2021
3/31/2022
10/25/2021
9/20/2021
10/18/2021
10/25/2021
1/26/2022
12/22/2021
1/20/2022
1/26/2022
3/31/2022
2/25/2022
3/25/2022
3/31/2022
7/21/2022
6/21/2022
11/10/2021
11/24/2021
12/8/2021
6/7/2022
6/21/2022
7/5/2022
12/10/2021
3/15/2022
3/29/2022
2/17/2022
5/24/2022
6/21/2022
7/5/2022
7/19/2022
12/24/2021
3/29/2022
4/27/2022
7/5/2022
7/19/2022
7/21/2022
12/28/2021
3/31/2022
4/29/2022
7/7/2022
7/21/2022
9/12/2022
2/17/2022
5/24/2022
6/21/2022
8/24/2022
9/12/2022
10/19/2022
10/3/2022
8/4/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
8/18/2022
9/2/2022
9/19/2022
10/3/2022
10/17/2022
10/19/2022
9/14/2022
9/19/2022
9/21/2022
10/5/2022
10/19/2022
10/11/2022
9/14/2022
9/27/2022
10/4/2022
10/11/2022
1/9/2023
6/1/2022
12/13/2021
7/23/2021
8/23/2021
9/14/2021
10/13/2021
10/15/2021
11/23/2021
12/3/2021
12/13/2021
3/7/2022
10/20/2021
11/19/2021
12/10/2021
1/7/2022
1/11/2022
2/17/2022
2/25/2022
3/7/2022
6/1/2022
1/12/2022
2/14/2022
3/7/2022
4/4/2022
4/6/2022
5/13/2022
5/24/2022
6/1/2022
1/4/2022
10/7/2021
8/6/2021
8/30/2021
9/14/2021
9/29/2021
10/4/2021
10/6/2021
10/7/2021
11/18/2021
9/17/2021
10/8/2021
10/25/2021
11/10/2021
11/12/2021
11/17/2021
11/18/2021
1/4/2022
11/9/2021
11/12/2021
11/16/2021
12/24/2021
12/31/2021
1/4/2022
8/4/2022
2/21/2022
1/17/2022
2/17/2022
2/21/2022
5/30/2022
4/21/2022
5/24/2022
5/30/2022
8/4/2022
6/29/2022
8/2/2022
8/4/2022
10/11/2022
8/19/2022
3/8/2022
3/23/2022
4/7/2022
6/17/2022
8/19/2022
9/21/2022
4/6/2022
7/13/2022
7/27/2022
5/18/2022
6/2/2022
9/21/2022
9/21/2022
10/5/2022
3/30/2022
4/14/2022
4/29/2022
10/5/2022
10/5/2022
10/11/2022
4/1/2022
4/18/2022
5/5/2022
10/7/2022
10/11/2022
12/8/2022
5/23/2022
6/7/2022
6/21/2022
11/24/2022
12/8/2022
1/9/2023
12/22/2022
10/26/2022
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
1/9/2023
11/14/2022
11/28/2022
12/12/2022
12/26/2022
1/9/2023
12/19/2022
11/24/2022
12/5/2022
12/12/2022
12/19/2022
2/14/2023
3/17/2022
1/20/2022
9/17/2021
10/15/2021
10/25/2021
11/24/2021
11/26/2021
12/30/2021
1/11/2022
1/20/2022
2/15/2022
10/20/2021
11/19/2021
11/22/2021
12/20/2021
12/22/2021
1/26/2022
2/7/2022
2/15/2022
3/17/2022
11/22/2021
12/20/2021
12/22/2021
1/20/2022
1/24/2022
3/1/2022
3/9/2022
3/17/2022
3/2/2022
12/2/2021
10/1/2021
10/25/2021
11/10/2021
11/24/2021
11/29/2021
12/1/2021
12/2/2021
1/10/2022
11/12/2021
12/3/2021
12/17/2021
12/31/2021
1/4/2022
1/7/2022
1/10/2022
3/2/2022
12/31/2021
1/6/2022
1/11/2022
2/18/2022
2/28/2022
3/2/2022
5/27/2022
3/30/2022
2/28/2022
3/28/2022
3/30/2022
4/22/2022
3/22/2022
4/20/2022
4/22/2022
5/27/2022
4/22/2022
5/25/2022
5/27/2022
10/7/2022
9/6/2022
4/13/2022
4/28/2022
5/17/2022
8/22/2022
9/6/2022
9/21/2022
5/19/2022
6/10/2022
6/24/2022
8/1/2022
8/8/2022
9/6/2022
9/21/2022
10/5/2022
6/2/2022
6/24/2022
7/8/2022
9/21/2022
10/5/2022
10/7/2022
6/21/2022
6/28/2022
7/12/2022
9/23/2022
10/7/2022
11/24/2022
8/4/2022
8/18/2022
9/2/2022
11/10/2022
11/24/2022
1/9/2023
12/22/2022
10/25/2022
11/10/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
11/9/2022
11/24/2022
12/8/2022
12/22/2022
1/5/2023
1/9/2023
11/11/2022
11/28/2022
12/12/2022
12/26/2022
1/9/2023
2/14/2023
1/19/2023
1/31/2023
2/7/2023
2/14/2023
3/9/2023
8/24/2021
7/26/2021
4/23/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
5/27/2021
6/25/2021
7/26/2021
8/24/2021
6/2/2021
6/2/2021
11/24/2020
1/7/2021
4/30/2021
6/2/2021
3/3/2023
2/23/2023
3/6/2023
3/9/2023
3/8/2023
3/8/2023
3/17/2023
9/10/2021
11/3/2022
1/31/2023
12/9/2022
3/17/2023
3/10/2023
2/14/2023
3/9/2023
4/1/2023