S.No Interlock No. Description Proposal/Remarks Equipment / Instrument / Area/Activity
S.No Interlock No. Description Proposal/Remarks Equipment / Instrument / Area/Activity
S.No Interlock No. Description Proposal/Remarks Equipment / Instrument / Area/Activity
FD-0103 & GD-0103 (Jetty When FD-0103 & GD-0103 Detects, XV- FD and GD shall not be given interlock to close
2 I-02
Detectors) 0106/0103 shall close the valves. It should generate two sets of
alarm (H and HH for each detector), based on
which the panel operator shall operate the
ESD after evaluating the situatuion.
XV-102 & XV-0105 shall close. FCV-0103 shall XV-105 Valve control shall be independent of
At Refrigerated condition operation and decision shall be on panel
open
10 I-10 operator.
10 I-10
XV-0106 shall close, XV-0103 & XV-0105 shall XV-106 Valve control shall be independent of
T-101A in operation
open operation and decision shall be on panel
operator. when T 101A tank is in ship loading
then T 101B tank may recieve liquid from TT
XV-0103 shall close, XV-0106 & XV-0105 shall XV-103 Valve control shall be independent of
T-101B in operation
open operation and decision shall be on panel
operator. when T 101B tank is in ship loading
then T 101A tank may recieve liquid from TT
Truck unloading Operation at P-103 A/B/C/D/E shall start & XV-0101 shall -
pressurized conditions open
XV-0106 shall close, XV-0103 & XV-0105 shall
11 I-11 T-101A in operation -
open
XV-0103 shall close, XV-0106 & XV-0105 shall
T-101B in operation -
open