Construction of greenhouse in Chinari community of Tavush Marz.


Length of greenhouse - 28.0 m; width of greenhouse - 18.0 m; surface of greenhouse - 504.0 m 2; quantity - 1pc
Bill of Quantity
Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
1. Earth works
1 Leveling of the ground of 3 category by bulldozer m2 875.00
2
2 Leveling of the ground of 3 category by hand m 25.00
3
3 Earth works by hand; ground category 4 m 8.00
4 Earth works by excavator; ground category 4 m3 80.00
5 Backfill of soil by hand m3 22.00
2. Foundations
1 Compaction of soil together with gravel; H=100 mm m3 7.20
3
2 Implementation of rubble concrete monolithic foundations; beton B-12.5 m 30.00
3
3 Implementation of concrete monolithic belt foundations; beton B-15 m 29.00
3. Metal frame
Steel trusses (arches 16 pieces)
1 Steel upper boom of arch; steel profiles 40x30x2mm; L=10186mm; 16pcs m 162.98
2 Steel bottom boom of arch; steel profiles 40x30x2mm; L=10386mm; 16pcs m 166.18
3 Steel connections; steel profiles 30x30x2mm; L=460mm; 208pcs m 95.68
4 Steel connections; steel profiles 30x30x2mm; L=867mm; 192pcs m 166.46
5 Assembling of steel trusses pcs 16.00
6 Instalation of steel trusses pcs 16.00
7 Double painting of steel profiles m2 78.00
Side of greenhouse
1 Steel pillars; steel profiles 50x50x2mm; L=2900mm; 30pcs m 87.00
2 Steel longitudinal connections; steel profiles 40x30x2mm; L=1950mm; 104pcs m 202.80
3 Steel slanting connections; steel profiles 40x30x2mm; L=2900mm; 8pcs m 23.20

4 Steel profiles for 14pcs of side windows; 40x30x2mm L=1860mm 28pcs; 40x30x2mm L=540mm 28pcs; 40x30x2mm m
L=460mm 14pcs 73.64

5 Steel longitudinal connections; steel profiles 40x30x2mm; L=3970mm; 70pcs m 277.90


2 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
6 Steel profiles; 20x3mm m 42.00
7 Purchase and installation of steel hinges for side windows pcs 28.00
8 Purchase and installation of steel handles for side windows pcs 14.00
9 Purchase and installation of bolts for side windows pcs 28.00
10 Purchase and installation of steel chain for side windows; L = 600 mm pcs 14.00
11 Double painting of steel profiles m2 99.00
Central part of greenhouse
1 Steel pillars; steel profiles 50x50x2mm; L=2900mm; 8pcs m 23.20
2 Steel longitudinal connections; steel profiles 40x30x2mm; L=3970mm; 7pcs m 27.79
3 Steel slanting connections; steel profiles 40x30x2mm; L=4490mm; 4pcs m 17.96
4 Double painting of steel profiles m2 11.00
Frontal part of greenhouse
Steel profiles for 12pcs of frontal windows; 40x30x2mm L=1710mm 16pcs; 40x30x2mm L=1510mm 8pcs; 40x30x2mm
1
L=490mm 24pcs; 40x30x2mm L=410mm 12pcs
m 56.12

2 Steel profiles; 20x3mm m 32.00


3 Purchase and installation of steel hinges for frontal windows pcs 24.00
4 Purchase and installation of steel handles for frontal windows pcs 12.00
5 Purchase and installation of bolts for frontal windows pcs 24.00
6 Purchase and installation of steel chain for frontal windows; L = 600 mm pcs 12.00
7 Steel profiles for 4pcs of frontal doors; 40x30x2mm L=1990mm 16pcs; 40x30x2mm L=712mm 24pcs m 48.93
8 Steel profiles; 20x3mm m 15.00
9 Purchase and installation of steel hinges for frontal doors pcs 16.00
10 Purchase and installation of steel handles for frontal doors pcs 4.00
11 Purchase and installation of bolts for frontal doors pcs 16.00
12 Steel horizontal connections; 40x30x2mm L=1800mm 40pcs m 72.00
13 Steel horizontal connections; 40x30x2mm L=1600mm 4pcs m 6.40
14 Steel horizontal connections; 40x30x2mm L=8320mm 4pcs m 33.28
15 Steel vertical connections; 40x30x2mm L=2500mm 16pcs m 40.00
16 Steel vertical connections; 40x30x2mm L=1160mm 8pcs m 9.28
3 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
17 Steel vertical connections; 40x30x2mm L=1770mm 8pcs m 14.16
18 Double painting of steel profiles m2 40.00
4. Covering of greenhouse
1 Covering of greenhouse frontal parts by polycarbonate sheet with 10 mm thick. m2 158.00
2 Covering of greenhouse side parts by polycarbonate sheet with 10 mm thick. m2 136.00
Purchase and installation of five layer greenhouse polyethylene film; 2 x 672 m2 (from Israel or similar; thickness not less
3 than 200 microns)
m2 1344.00

4 All the necessary galvanized profiles for fixing of polyethylene film and polikarbonate sheets, galvanized screws and springs set 1.0

5. Blind area
1 Earth works by hand; ground category 3 m3 16.00
2 Leveling of the ground of 3 category by hand m3 16.00
3 Compaction of soil together with gravel; H=100 mm m3 8.00
4 Preliminary concrete layer; beton B-12.5; thickness 70mm m3 5.60
5 Implementation of cement-sand mixture preparatory layer, thickness 30mm m2 80.00
6 Implementation of concrete monolithic belt foundations for beton borders; beton B-12.5 m3 2.00
7 Purchase and installation of beton border; size 500 x 200 x 80մմ m 100.00
6. External water-supply
1 Earth works by excavator; ground category 4 m3 32.00
2 Earth works by hand; ground category 3 m 3
6.00
3 Installation of polyethylene pipes Ø25x3,0mm, with hydraulic test m 110.00
4 lementation preparatory and protection layers from soft ground m 3
17.00
5 Connection to the existing pipeline Ø25mm pcs 1.00
6 Backfill of soil by bulldozer m3 20.00
7 Leveling of the ground of 3 category by hand m3 1.00
7. External electric power supply
1 Earth works by hand; ground category 4 m3 3.00
2 Implementation of rubble concrete monolithic foundations; beton B-12.5 m 3
2.70
3 Installation of poles pipes Ø108x4mm; L=6000mm 5pcs m 30.00
4 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
4 Cross bars; 50x50x5mm; L=600mm 5pcs m 3.00
5 Steel column; steel pipe d=57x2,5mm - 2.0m; steel angle 50x50x5mm - 0.6m pcs 1.00
6 Cross bars bolts Ш-1Б-К-25 pcs 24.00
7 Dielectric pcs 24.00
8 Alu cable; ԱՊՎ 1x25mm2 m 500.00
9 Double painting of steel profiles m 2
0.40
10 Contact-breaker pcs 1.00
11 Electricity supply meter, 50A pcs 1.00
12 Steel box with lock; 400x600x250mm pcs 1.00
13 Group dashboard (plastic box); 6 module pcs 1.00
14 Automatic switch 16 A pcs 6.00
8. Internal lighting
1 Ceiling lights with LED lamp 18Wt pcs 24.0
2 Bipolar electrical switch pcs 3.0
3 Cable ՊՊՎ 2x2.5mm 2
m 160.0
4 Viniplaste pipe d=20mm m 160.0
9. Other works
1 Purchase and installation of electrical pump (230V; 0,4A; 80W) pcs 4.00
Purchase and installation of electrical single-phase axial fan for mixing air in the greenhouse capacity not less than
2 3000m3/h; 230V
pcs 4.00

3 Installation of polyethylene pipes Ø110mm m 30.00


4 Installation of polyethylene pipes Ø110mm m 8.00
5 Installation of polyethylene angle Ø110mm 90º pcs 4.00
10. Heating system
Front and side heating
1 Purchase and installation of steel pipe Ø57x3mm m 632.00
2 Purchase and installation of steel pipe Ø76x3mm m 45.00
3 Purchase and installation of steel pipe Ø57x3mm m 75.00
4 Purchase and installation of steel pipe Ø25x2mm m 35.00
5 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
5 Purchase and installation of steel pipe Ø32x2mm m 50.00
6 Hydraulic testing of the heating system m 837.00
7 Double painting of steel pipes of heating system m 2
146.00
8 Purchase and installation of valve Ø25mm pcs 64.00
9 Purchase and installation of valve Ø65mm pcs 2.00
10 Purchase and installation of automatic air-conditioning valve Ø25mm pcs 2.00
11 Purchase and installation of water drainage valve Ø25mm pcs 16.00
12 Metal construction for fixing of pipes ton 0.08
External heating network
1 Purchase and installation of steel pipe Ø76x3mm m 15.00
2
2 Double painting of steel pipes m 4.77
3
3 Insulation of pipes with mineral wool covered with metal foil (5m2) m 0.25
3
4 Earth works by hand; ground category 4 m 4.50
3
5 Backfill of soil by hand m 4.50
6 Purchase and installation of PVS pipe Ø160mm m 15.00
Boiler room
1 Purchase and installation of steel pipe Ø76x3mm m 18.00
2 Purchase and installation of steel pipe Ø57x3mm m 15.00
3 Purchase and installation of steel pipe Ø25x2mm m 25.00
4 Purchase and installation of steel pipe Ø20x2mm m 5.00
5 Purchase and installation of steel pipe Ø15x2mm m 5.00
6 Purchase and installation of valve Ø50mm pcs 4.00
7 Purchase and installation of valve Ø20mm pcs 4.00
8 Purchase and installation of valve Ø25mm pcs 6.00
9 Purchase and installation of valve Ø15mm pcs 2.00
10 Purchase and installation of valve Ø15mm pcs 1.00
11 Purchase and installation of valve Ø80mm pcs 5.00
12 Purchase and installation of steel valve Ø80mm pcs 2.00
13 Purchase and installation of PVS pipe Ø50mm m 8.00
6 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
14 Purchase and installation of fittings Ø50mm pcs 5.00
15 Purchase and installation of check valve Ø80mm pcs 2.00
16 Purchase and installation of check valve Ø25mm pcs 1.00
17 Purchase and installation of safety valve Ø25mm pcs 2.00
18 Purchase and installation of pressure meter pcs 3.00
19 Purchase and installation of thermometer pcs 3.00
2
20 Double painting of steel pipes m 15.00
21 Purchase and installation of automatic air-conditioning valve Ø20mm pcs 2.00
22 Testing of the heating system m 63.00
23 Purchase and installation of fire-extinguisher pcs 2.00
Heating boilers
1 Purchase and installation of heating boiler N=100kW pcs 2.00
2 Purchase and installation of automatic combined burner 100kW pcs 2.00
3 Purchase and installation of circulating pump G=8 մա H=12m N=1.5kW pcs 2.00
4 Purchase and installation of pump G=2 մա H=25m N=1.5kW pcs 1.00
5 Purchase and installation of expansion tank 150litre pcs 1.00
6 Purchase and installation of filter Ø273mm 400mm pcs 1.00
7 Purchase and installation of of water treatment electromagnetic equipment pcs 1.00
8 Purchase and installation of deflector Ø315mm pcs 1.00
9 Purchase and installation of steel chimney pipe; Ø219x6mm; 2pcs x 6m ton 0.378
10 Insulation of pipes with mineral wool covered with metal foil 80mm m3 0.28
11 Purchase and installation of ceramic sink pcs 1.00
12 Purchase and installation of water valve Ø50mm pcs 1.00
Gas supply
1 Purchase and installation of steel pipe on the base Ø108x4mm (with testing) m 3.00
2 Purchase and installation of steel pipe on the base Ø57x3mm (with testing) m 5.00
3 Purchase and installation of steel pipe Ø20mm (with testing) m 10.00
4 Purchase and installation of steel pipe Ø25mm (with testing) m 5.00
5 Purchase and installation of steel pipe Ø15mm (with testing) m 3.00
7 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
6 Purchase and installation of protective steel pipe Ø159mm m 1.20
7 Purchase and installation of gas valve Ø15mm pcs 2.00
8 Purchase and installation of gas valve Ø25mm pcs 4.00
9 Purchase and installation of gas valve Ø20mm pcs 3.00
10 Purchase and installation of flexible pipe m 2.00
11 Purchase and installation of signaling device pcs 1.00
12 Purchase and installation of pressure meter pcs 2.00
13 Purchase and installation of explosive valve pcs 2.00
14 Double painting of steel pipes m2 5.00
Liquid fuel
1 Purchase and installation of fuel tank V=2.4ton pcs 1.00
2 Purchase and installation of steel pipe Ø25mm m 15.00
3 Purchase and installation of steel pipe Ø20mm m 15.00
4 Purchase and installation of flexible pipe m 3.00
5 Purchase and installation of valve Ø25mm pcs 4.00
6 Purchase and installation of valve Ø20mm pcs 2.00
7 Purchase and installation of liquid fuel filter Ø25mm pcs 2.00
8 Double painting of steel pipes and fuel tank m2 24.70
9 Purchase and installation of steel pallet ton 0.08
11. Boiler house
Earth works
1 Earth works by hand; ground category 3 m3 8.73
3
2 Earth works by excavator; ground category 3 m 15.00
3
3 Backfill of soil by hand m 1.20
4 Loading of waste soil by excavator m 3
7.50
5 Transportation for 3 km ton 12.70
Foundations
1 Compaction of soil together with gravel; H=100 mm m3 0.57
3
2 Implementation of preliminary concrete layer; beton B-7.5 H=100 mm m 0.57
8 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
3
3 Implementation of concrete monolithic belt foundations; beton B-12.5 m 4.70
Reinforced concrete construction
1 Construction of reinforced columns; beton B15 L=3.1m m3 1.50
2 Armature A500C Ø16mm ton 0.1178
3 Armature A-1 Ø8mm ton 0.05289
3
4 Construction of reinforced roof; beton B 15 m 0.882
5 Armature A-1 Ø8mm ton 0.0745
6 Construction of secondary reinforced bicycles; beton B 15 m3 0.24
7 Armature A500C Ø14mm ton 0.0329
8 Armature A-1 Ø8mm ton 0.01296
3
9 Construction of reinforced crossbars; beton B 15 m 0.30
10 Armature A500C Ø16mm ton 0.00605
11 Armature A-1 Ø8mm ton 0.00986
12 Installation of embedded items. Steel plate 5,0mm 0.24m2 ton 0.024
13 Armature A500C Ø14mm ton 0.00552
Walls
1 Construction of walls from concrete blocks; thickness 20 cm m3 17.06
2 Armature AI Ø 8mm ton 0.15
3
3 Filling the empty spaces of walls with lightweight concrete B 7.5 m 8.53
Windows and doors
Metal-based laminate windows; moving part; white (glass pack, with handles including hinges). The thickness of the profile
1 m2 2.16
at least 60 mm. (4 cameras)
Metal-based laminate door, white, the moving part (glass pack, with handles including hinges). The thickness of the profile
2 m2 3.60
at least 60 mm
3 Purchase of white plastic window-sills and installation (width 20 cm) m 1.80
Floor
1 Implementation of gravel preparatory layer, thickness 50mm m3 0.63
2 Floor reinforcement; armature A500C Ø10mm ton 0.078
2
3 Construction of reinforced floor; beton B12,5; thickness 70mm m 0.126
9 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
2
4 Leveling cement-sand layer; thickness 30mm m 0.126
Foundation
1 Implementation of gravel preparatory layer, thickness 100mm m3 0.098
3
2 Construction of concrete bases; beton B15 m 1.00
3 Anchor of base; L = 600mm Ø16 (8 pcs) ton 0.0128
Finishing works
1 Plastering of walls by cement-sand m2 144.00
2 Plastering of slope by cement-sand m2 2.00
3 Facing the foundation with basalt slabs; thickness 30mm; height 300mm m2 9.48
4 Metal mesh; 150x150mm, Ø3mm m 2
10.00
2
5 Painting of the walls by facade paint m 80.00
2
6 Painting of the walls by latex paint m 66.00
Blind area
1 Implementation of gravel preparatory layer, thickness 50mm m3 0.098
2 Implementation of blind area; beton B12,5; thickness 70mm m 3
1.46
2
3 Implementation of cement-sand leveling layer; thickness 30mm m 20.80
Sun blind
1 Metal carcass; պողպ. խող. 40x20x2մմ m 21.85
2 Purchase and installation of steel carcass ; steel corner 45x4mm m 1.52
3 Double painting of steel construction m2 3.00
4 Implementation of transparent polycarbonate coating; thickness 10mm m2 2.84
Internal lighting
1 Ceiling lights with LED lamp 18Wt pcs 3.00
2 Bipolar electrical socket UH~220V,6A pcs 5.00
3 Unipolar electrical switch pcs 2.00
4 Distribution box pcs 4.00
5 Box for switch and socket pcs 7.00
6 Cable ՊՊՎ 2x2.5mm2 m 50.00
7 Group dashboard (plastic box); 4 module pcs 1.00
10 - 10

Total Price
(material + work)
№ Description of works Unit Quantity
AMD
Unit Total
8 Unipolar automatic switch; 16A pcs 3.00
Roof
1 Construction of the roof wooden carcass m3 0.567
3
2 Construction of wooden boarding (30 mm thick board) m 0.03
3 Covering of roof part by galvanized profiled covering; silver color, type ԿՊ-21; thickness 0.55mm m 2
24.50
2
4 Covering of ridge part by galvanized 0.55mm thick tinplate; silver color m 2.00
3
5 Construction of the boardwalk of the ridge; thickness 30mm m 0.058
6 Covering by galvanized 0.55 mm thick tinplate; silver color m2 4.50
7 Construction of wooden boarding (30 mm thick board) m3 0.12
8 Fire protection of roof wooden construction m 3
0.755
9 Construction of roof drainage from galvanized 0.55mm thick tinplate m 9.80
10 Construction of roof downpipe from galvanized 0.55mm thick tinplate m 8.00
Total
Overhead expences 13.30%
Total
Profit 11%
Total
VAT 0% 0.0
Grand Total

Construction company:

Director:

Signature Date: