PROJECT DESCRIPTION:
100 foot diameter #2 Dieset Fuet
Storage Tank Bottom and 3 foot up the

F watts.

COATING SELECTION
EXPLANATION:
Carboline Phenotine Tank Shietd was
T chosen due to need to have lining
product that had actuat testing with
#2 Fuet 0it for lmmersion service.
The chattenge with the Project was
that the tank coutd onty be down for a
short period ol time and they needed
a product that coutd be aPPtied in
one coat over btasted SSPC SP10
_l surface. Needed Airtess Singte
Leg apptication as ptural was not
Dominion Power Remington avaitabte. Needed a non btushing
coating due to application of materiat
Tank on watls that woutd tie into the ftoor
and touching up potentiaI hotidays
LOCATI0N: Remington, VA, United States after apptication. Needed a 30 day
DATE 0F APPLICATION: April. 20'15 recoat window in the event that
weather prohibited apptication where
MARKET: Power - ConventionaI
Dehumidification was not being used.
TYPE: Rehabititation
With the success of this project
OWNER: Dominion Power the customer has committed to 5
additional tanks of same size in the
PROJECT SIZE: 165 Gattons
coming months.
AREA COATED: Tank bottom

SUBSTRATE: Ferrous Meta[ [Carbon SteeU

EXP0SURE: lmmersion, ChemicaI


rt
SURFACE PREP: SSPC-SP 10 {Near White Btast} *
PRODUCTS: Phenotine Tank Shietd

*