Transformer Sizing Calculation
20 % spare Escalation has been considered on MD Load in KVA at Congestion senario of Lighting panel 1 &
2 , Small power 1 & 2 Emergency Small power 1 & 2, VAC panel 1 & 3, E & M UPS Load , S& T UPS
load(65kVA), Fire pumps, Sewage pumps, waste water pump & Plumbing pumps.
3 Therefore after 20% escalation total load on ASS-1 & ASS-2 = 2336.93KVA
Note:
It is assumed 2.5 MVA Distribution Transformer will be required. However the final rating of the
transformer is to be provided by others.
The rating of the Transformer is proposed, it is indicated to arrive rating for incomer feeder for
MDB-1 & MDB-2.
Rating of Bus Duct shall be 4000A based on above resumption