Document Reference
No. LDC comments DDC Comments Status Closure Date
Ref. Rev. Page No.
Noted.
Type 2 coordination is always done with local starter that too on
starter enclosed in one panel(unit). UGC05 breaker is at
500 A TPN MCCB are considered for TVS Panels.
remote(over 150m)/out of sight for TVE SWC, as per design
The same shall be checked as per TYPE 2
1 JKC-GCC-MEP-SVN-180002-A4 A4 requirement local circuit breaker in starter is inevitable. Type 2 P 10/11/2020
Coordination of Motor Load and as per
coordination with TVE motor is therefore not in scope of UGC 05.
Discrimation studies
Inputs for discrimination study will be obtained from TVE
requirements prior to obtaining the Closure certificate.
The false ceilling drawing are 3.5 mtr. We have issues related to
As per Architect Drawings, False ceiling at Public layout of all services above the false ceiling height are likely to
ares is 3.5 Meter but Dialux calcualtion mounting reduce. the lighting calculations shall be revisited after finalization P 10/11/2020
height are considered as 3 Meter. of false ceiling level.