MUMBAI METRO RAIL CORPORATION

DESIGN/DOCUMENT REVIEW SHEET


Definitions
Status - P: Pending, C: Closed Date: 18/11/2020

Document Reference
No. LDC comments DDC Comments Status Closure Date
Ref. Rev. Page No.

Noted.
Type 2 coordination is always done with local starter that too on
starter enclosed in one panel(unit). UGC05 breaker is at
500 A TPN MCCB are considered for TVS Panels.
remote(over 150m)/out of sight for TVE SWC, as per design
The same shall be checked as per TYPE 2
1 JKC-GCC-MEP-SVN-180002-A4 A4 requirement local circuit breaker in starter is inevitable. Type 2 P 10/11/2020
Coordination of Motor Load and as per
coordination with TVE motor is therefore not in scope of UGC 05.
Discrimation studies
Inputs for discrimination study will be obtained from TVE
requirements prior to obtaining the Closure certificate.

Noted &Closed C 13/11/2020

Noted Input for discrimination studies will be Conducted after


Kindly arrange Discrimination studies for the obtaining inputs (Load) from SWC. Thereafter consolidated P 10/11/2020
complete Electrical Schemetics Discrimination study will be performed and will be shared prior to
the closure certificate.
Noted &Closed C 13/11/2020

Noted. Please find the attached Type -2 Co-ordination chart


Star Delta starters are considered for Fire Panels. provided in the report in which 160A MCCCB has been
Kindly check the starting current of the motor recommended for Star Delta Starter. This is not final make, It is
P 10/11/2020
with Star Delta and design accordingly. 160 A will assured on finalisation of vendor the type 2 coordination shall
not suffice for 75 KW motor with sta delta started again be applied as per name plate rating of pump motor and
starter gear of approved vendor make.

Noted &Closed C 13/11/2020


In Load calculation term defined as ECS panels,
TVS panels but in Mode Operation,
Noted & Revised calculation submitted. P 10/11/2020
Nomenclature are different as VAC panels. Kindly
use the same terminology at all places

Noted &Closed C 13/11/2020

The false ceilling drawing are 3.5 mtr. We have issues related to
As per Architect Drawings, False ceiling at Public layout of all services above the false ceiling height are likely to
ares is 3.5 Meter but Dialux calcualtion mounting reduce. the lighting calculations shall be revisited after finalization P 10/11/2020
height are considered as 3 Meter. of false ceiling level.

Noted &Closed C 13/11/2020

1. Cable Sizing, Short ckt, Earth strip, capacitor Calculation.


1. Cable Sizing, Short ckt, Earth strip, capacitor a. Cable Sizing Calc-ASS1 and ASS2 :
Calculation. Main voltage drop is the voltage drop from terminal transformer
a. Cable Sizing Calc-ASS1 and ASS2 : to MDB=0.18%. This is provided in Bus Duct Voltage Drop
%VD Main to be corrected and Voltage drop calculation We have checked and find no error. Hence no change.
calculations shall be corrected. b. Design Methodology-VD :
2 JKC-GCC-MEP-SVN-180002 A5 b. Design Methodology-VD : In design methodology of short circuit the formula indicated in P 10/11/2020
Short circuit current at receiving end and sending the methodology have been corrected, how so ever formula used
end shall be corrected. in the spreadsheet is correct, therefore values in spreadsheet are
unchanged.
2. Bus Duct Sizing 2. Bus Duct Sizing
a. Fault Current at sec side of Transformer For current from transformer from secondary refer "SVN-Fault
formula shall be rechecked. Level Calculation at MDB-1" This reference is now indicated in
Bus Duct Sizing

1.a Pending. Kindly check the VD at UPS Panel.


UDB will always be functional at normal supply as
1. This is the online UPS so UDB will always feed from UPS & will
well. Also provide the VD upto last circuit in UDB
be functional at normal supply as well. UPDB voltage drop has 18/11/2020
which is always higher as circuit runs upto 100
been revised in the calculation.
meter.
1.b and 2.a Noted & Closed
1. Cable Sizing, Short ckt, Earth strip, capacitor
Calculation.
a. Cable Sizing Calc-ASS1 and ASS2 :
i) Kindly provide backup data for Diversity factors
for Lifts & Escalators. Factor for ECS-04&5 is 1
and rest escalators is 0.8. 1. Cable Sizing, Short ckt, Earth strip, capacitor Calculation.
Factor for Lift 5 &3 is 0.8 and rest lifts is 1. a. Cable Sizing Calc-ASS1 and ASS2 :
Kindly justify the same. i) Diversity Factor for All eascalators will be is 0.8 & Diversity
c. ASS-2 Switch. Sizing : Factor for all Lift will be 1 also revised in the calculation. refer the
3 JKC-GCC-MEP-SVN-180002 A6 P 18/11/2020
i) Status of UPS-3B(S&T) & PSD(Standby) is "S" attachment for backup.
but its Diversity/MD factor is 1. Kindly justify and
provide the backup for the same. c. ASS-2 Switch. Sizing :
i) Noted & Corrected in the calculation.

Contract No.: UGC 05


Document No.: JKC-GCC-MEP-SVN-180002
Rev. No. A6
Document Name: CRD Drawing Submission of the Design Calculations Electrical System - Vidyanagari Station
Date of Receiving: 18.11.2020
Discipline: MEP

Checked by Reviewed by Verified by