MESURES DE DENSITE EN PLACE au DENSITOMETRE A MEMBRANE GA-LABO-R4-F27-V0

In situ density measurements with a membrane densitometer

#N/A NF P 94-061-2 5/14/2019

Contract No. H359304 Earthworks - Valley Beneficiation Plant and Railway Station Storage

Works Compaction 2nd Layer Pk188-189 Material Pisolite


Part of Works South Road Zone PK188- PK189 Proctor OPM

Date of set up 8/27/2020 Reception Date 8/27/2020 Dry Density (t/m3): 1.769
Implementation workshop Compacting Reception Hour 15h44 Moisture Content (%): 21.20
Compactor: CA512 Number of pass 6 Speed 6km/h Specific Weight (t/m3):

MEASUREMENT POINT 3 4

Zone No PK188 PK189


Distance from the axis

MEASUREMENT

1st Reading (V0) 110.0 115

2nd Reading (V1) 2610.0 2515

Volume of the hole V = (V1-V0) 2500.0 2402

Hole depth 15.0 15.0

Weight of wet material WW 5230.0 5001.0

Wet density WD = WW/V 2.092 2.084


###
MOISTURE CONTENT

Tare Number A1 A2

Wet material weight + tare WeWt g 501.6 547.4

Dry material weight + tare DWt g 466 515

Tare weight g 305 370

Dry material weight DW 161 145

Weight of water WWa = WeWt - DWt 35.6 32.4

Moisture Content W = (WWa x 100)/DW 22.10 22.3

Means Moisture Content % 22.10 22.3


Dry density DD (WD x 100) / (100 +
w)
t/m3 1,713 1.704
Compactness C1 = (DD*100) / DDOPM % 96.8 96.3
Layer Thickness after survey cm

Laboratory Technician Laboratory Manager Engineer HATCH COMILOG