This document lists the materials needed for a 1000m drilling activity. It specifies that 1.2 times the total project distance is needed for MD material, 2.2 handholes per 1000m are required, and 1.5 poles per 1000m are needed. It also states that 7 straight connectors are needed for each electrical equipment.
This document lists the materials needed for a 1000m drilling activity. It specifies that 1.2 times the total project distance is needed for MD material, 2.2 handholes per 1000m are required, and 1.5 poles per 1000m are needed. It also states that 7 straight connectors are needed for each electrical equipment.
This document lists the materials needed for a 1000m drilling activity. It specifies that 1.2 times the total project distance is needed for MD material, 2.2 handholes per 1000m are required, and 1.5 poles per 1000m are needed. It also states that 7 straight connectors are needed for each electrical equipment.