Designation: Engineer Time Work Contents Dept Name: Date
Designation: Engineer Time Work Contents Dept Name: Date
8:30
9:00
9:30 Discussed with Uday san to educate INC letter preparation and Uday san sent the INC for shank damage in Pricol ball pin.
10:00
10:30
11:00 Discussed with Bowl feeder vendor hope fully they completed the bowl feeder before 17.10.2020. Bowl feeder coating only pending.
11:30
12:00 Discussed with Non ruster oil vendor regarding oil availability.
12:30
13:00 Quality department performance July to September report reviewed by mahendra san.
13:30
14:30
15:00 Preparing INC for Skited parts and angle diameter undersize an
15:30
End
Daily Business Report
Dept: Quality Name : Rajadurai.V
Date: ### Designation: Engineer
WORK CONTENTS
Time
8:30
9:00
9:30
10:00
10:30 Non ruster oil PO prepared and sent to mahendra san for approval.
11:00
11:30
12:00 September month In process rejection report update and sent to Shrikanth san for counter action.
12:30
13:00 Quality department performance July to September report reviewed by mahendra san.
13:30
14:00
14:30
15:00
15:30 As per mahendra san Instruction last 3 months (July,Aug,Sep) In process top 3 rejection report prepared and sent to Shrikanth san
16:00
16:30
End
Daily Business Report
Dept: Quality Name : Rajadurai.V
Date: ### Designation: Engineer
WORK CONTENTS
Time
8:30
9:00
9:30
10:00 Verifying Daily In process rejection report production quantity mismatch found.
10:30 Co-ordinate with Uday getting the correct production quantity and update the same.
11:00
11:30
12:00
12:30
13:00 Instrument calibration RFQ prepared and sent to 3 vendors for Quotation.
13:30
14:00 Holding parts rechecking time Uday san occurred forging parts mix up same has communicated to Shrikanth san also.
14:30 Forging parts mix up INC prepared and sent to Shrikanth san for Counter action.
15:00
15:30
16:00
16:30 Co-ordinate with Uday san preparing Quality department Daily performance report.
17:00
End
Daily Business Report
Dept: Quality Name : Rajadurai.V
Date: ### Designation: Engineer
WORK CONTENTS
Time
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
End
Daily Business Report
Dept: Quality Name : Rajadurai.V
Date: ### Designation: Engineer
WORK CONTENTS
Time
8:30 Covid-19 form filled and submit to HR. Kamaraj san Instruction given for Factory inside Isolation.
9:00
9:30 Discussed with udai regarding pending activities.
10:00 Mail sent to production regarding OET certification & Last 3 Months rejection action plans.
10:30 Last 15 days Line quality check sheet, FML report, Change points, Final Inspector check sheets verified and signed.
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
End
1. Nov’20- 45000 nos 45000 11250 33750
2. Dec’20- 75000 nos 75000 18750 56250
3. Jan’21- 80000 nos 80000 20000 60000