Abu Dhabi National
Housing Guidelines
for Integrated
Communities
FINAL
This page intentionally left blank
CONTENTS
GlossaryVII
1 Introduction 2
1.1 Purpose 2
1.2 Planning & Design Process 2
1.3 Structure of Guideline 3
Appendix 1 87
Glossary
This page intentionally left blank
Glossary
TERM DEFINITION
Building Approval Approval of building design by ADHA and the municipalities at key gate stages.
The Project Brief amended so that it is aligned with the Developed Design and any decisions
Detail Project Brief
made during Stage 4.
A stage of work that is primarily the responsibility of the DPM or developer and
Developed Design
involves detailed master plan and schematic architectural design.
Detailed Master Plan Report organised as per DPM requirements, including the detailed master plan.
The 'Developer' refers to the entity that will be taking the project through into implementation.
Developer
This could be a private sector developer or Musanada.
The brief prepared that brings together the strategic definition of the project with the choice of
Initial Project Brief
appropriate site (which itself is based on the required level of site appraisal).
A stage also known as Stage 2 Preparation and Brief, which involves pre-concept master
Pre-Concept Design
planning and pre-concept building design.
Pre-Concept Master A minimum of three (3) visionary and illustrative master plan design options which demonstrate
Plan the design intent for the site.
Further development of the initial project brief document as the master plan and building
Project Brief
design evolves.
Project Budget The budget for the project agreed with GSEC, up to and including the construction cost.
Schematic Architectural design of buildings during Stage 4: Developed Design Stage. Includes structural
Architecture design and building service systems.
A report prepared by DPM which studies at least three (3) site options, and recommends
Site Options Report
the optional site for development.
A process undertaken by ADHA to review, test and agree to (or otherwise) the site options
Site Validation
report recommendations.
The brief prepared to enable the Strategic Definition of the project. Strategic considerations
Strategic Brief might include initial site considerations, key project outcomes, preliminary planning
parameters, consideration of project type and project programme.
A stage focused on detailed design of infrastructure and buildings. This stage initiates
Technical Design
construction.
Scope of Work. In reference to the stage 2 of the process "Preparation & Brief" it refers to the
SOW
Scope of Work for the design consultant
1 Introduction
1.1 Purpose TECHNICAL STAGES OF WORK
The purpose of the Abu Dhabi National Housing For ease of understanding across different stakeholder
Guidelines Planning and Design Process is to provide a agencies, the process and stages of work have been
robust mechanism to improve the delivery of integrated standardised and aligned with international best practice.
communities for National housing within the Emirate of Abu The Royal Institute of British Architects (RIBA) Plan of Work
Dhabi. (2013) is used as a model as it clearly aligns the planning
and design process into one framework. This includes five
This report is intended as an internal document for ADHA, stages of work:
the key stakeholders and their appointed consultants. It
includes the process map, supporting descriptions of the 01. Strategic Definition
key stages of work, forms to be completed by relevant 02. Preparation & Brief
stakeholders during key stages of the project, associated
checklists for ADHA to complete and a glossary of terms. 03. Concept Design
Figure 1.2 applies in instances where the master developer Respond to site context through preparation of
pre-concept master plan options
is involved in a ‘land and loan’ or infill project, where there is
no design or delivery of buildings.
Figure 1.3 helps guide individuals, architects and 3 | Concept Design
contractors, involved in the design and delivery of housing
Prepare Concept Master Plan
projects, and design of other buildings (e.g. Mosques,
schools).
4 | Developed Design
5 | Technical Design
Documents/
Reports
Decision
Gateway
Recommendations
CHANGE MANAGEMENT
Within any planning or design process potential changes are
inevitable. Evidence from past ADHA projects indicate that
changes in design have had a significant impact on time and
cost of projects.
While the Planning and Design Process will not prevent the
potential need for change, by following a robust process,
with clear gateways, the impact of changes can be better
understood and managed.
ADHA DPM
Pre concept
2. Preparation Identification of Workshop/
and Brief master plan
preferred option meeting
options
Musanada/
Developer
For detailed
5. Technical infrastructure
Design
design
1 week
1.2 Strategic Brief
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision existing
1. Strategic site?
1 month
Selection
1. Strategic Definition
1.7 ADHA
No Approval
of
Strategic
Brief GSEC Project Budget
Approval
1 week + GSEC period
Yes
Existing Design
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
2. Preparation P2.3 Pre-Concept Master P2.3 Pre-Concept Master Utility Authorities and
Plan Report (Optioning) Plan Report (Optioning) other statutory authorities
& Brief (Pre- (like EAD, ADTCA, DMAT
3 months
etc.)
P2.4 P/D2.4
Concept) Selection Selection No
of of
preferred preferred
option option
Yes
Approval (if
variation required)
Existing
D3.2
1 week
Existing
3.1 Initiate Concept Stage
Design New
(or) New?
Master Plan
P3.2
DPM Master Plan Choice Developer / Consultant Master Plan
of Master
# Planner
P3.3 Concept Master Plan P3.3 Concept Master Plan
3 months
Design
D3.3 Concept Building
Design Report (Optioning)
No
3.4 ADHA
NOC 2
3. Concept Design
2 weeks
Yes
Yes
requirement
If no major changes in
CMP submission
P4.2
DPM Master Plan Choice
Developer / Consultant Master Plan
of Master
# Planner
P4.3 Detailed Master Plan P4.3 Detailed Master Plan
Report Report
2 months
4. Developed
D4.2 Schematic Building
Design Design Report
No
4.4 ADHA
NOC 3
1 week
4. Developed Design
Yes
Yes
Approval/NOC Yes
5. Technical
P5.2 Concept
Design Infrastructure Planning
Submission No
Yes
P5.3 Preliminary P5.5 Stage review and
Infrastructure Design No approval/NOC from
Submission Municipalities and
5. Technical Design
P5.4 Detailed
Infrastructure Design No
Submission
Yes
5.7 ADHA
Submission 5.6 Preparation of Tender
to GSEC Documents
2 months
approval GSEC
Construction
PLANNING AND DESIGN IMPLEMENTATION PROCESS
Budget
Approval
LEGEND Note:
Introduction
Process Documents (reports) Decision Gateway Recommednations # - ADHA NOC and formal approvals will be replaced with collaborative
5
1
1 week
Introduction
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision existing
site? 1 month
Engage Municipalities,
1. Strategic 1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
Definition 1.6 Site Validation and
2 weeks
Selection
1. Strategic Definition
1.7 ADHA
No Approval
of
Strategic
Brief GSEC Project Budget
Approval
1 week + GSEC period
Yes
Existing Design
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
P2.3 Pre-Concept Master P2.3 Pre-Concept Master Plan Utility Authorities and
Plan Report (Optioning) Report (Optioning) other statutory authorities
2. Preparation (like EAD, ADTCA, DMAT
3 months
etc.)
P2.4 P/D2.4
& Brief (Pre- Selection Selection No
of of
Concept) preferred preferred
option option
Yes
Approval (if
variation required)
Existing
D3.2
1 week
Existing
3.1 Initiate Concept Stage
Design New
(or) New?
Master Plan
P3.2
DPM Master Plan Developer Master Plan
Choice
of Master
Planner
#
P3.3 Concept Master Plan P3.3 Concept Master Plan
3 months
Report Report
3. Concept
Design D3.3 Concept Building
Design Report (Optioning)
No
3.4 ADHA
NOC 2
3. Concept Design
2 weeks
Yes
Yes
requirement
If no major changes in
CMP submission
4. Developed
Design D4.2 Schematic Building
Design Report
No
4.4 ADHA
NOC 3
1 week
4. Developed Design
Yes
Yes
Approval/NOC Yes
Design
P5.2 Concept
Infrastructure Planning
Submission No
Yes
P5.3 Preliminary P5.5 Stage review and
Infrastructure Design No approval/NOC from
Submission Municipalities and
5. Technical Design
P5.4 Detailed
Infrastructure Design No
Submission
Yes
5.7 ADHA
Submission 5.6 Preparation of Tender
for GSEC Documents
2 months
Approval GSEC
Construction
Budget
Approval
LEGEND Note:
Process Documents (reports) Decision Gateway Recommednations
# - ADHA NOC and formal approvals will be replaced with collaborative
Figure 1.2 Master Planning Process
1 week
1.2 Strategic Brief
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision existing
site?
1 month
Engage Municipalities,
1.5 Site Options Report Utility Authorities and other
1. Strategic statutory authorities (like
EAD, ADTCA, DMAT etc.)
Definition 1.6 Site Validation and
2 weeks
Selection
1. Strategic Definition
1.7 ADHA
No Approval
of
Strategic
Brief GSEC Project Budget
Approval
1 week + GSEC period
Yes
Existing Design
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
P2.3 Pre-Concept Master P2.3 Pre-Concept Master Plan
Utility Authorities and other
Plan Report (Optioning) Report (Optioning)
statutory authorities (like
2. Preparation EAD, ADTCA, DMAT etc.)
3 months
P2.4 P/D2.4
& Brief (Pre- Selection Selection No
of of
preferred preferred
Concept) option option
Yes
Approval (if
variation required)
Existing
D3.2
1 week
Existing
3.1 Initiate Concept Stage
Design New
(or) New?
P3.2
DPM Master Plan Developer Master Plan
Choice
of Master
Planner
P3.3 Concept Master Plan P3.3 Concept Master Plan
Report
3 months
Report
3. Concept
Design D3.3 Concept Building
Design Report (Optioning)
No
3.4 ADHA
NOC 2
3. Concept Design
2 weeks
Yes
No P3.5 DPM No
Development Review
& Approval
2 months
Yes
requirement
If no major changes in
CMP submission
4. Developed
D4.2 Schematic Building
Design Design Report
No
4.4 ADHA
NOC 3
1 week
4. Developed Design
Yes
Yes
Approval/NOC Yes
Design
P5.2 Concept Infrastructure
Planning Submission No
Yes
Providers
Yes
Yes
5.7 ADHA
Submission 5.6 Preparation of Tender
for GSEC Documents
2 months
Approval GSEC
PLANNING AND DESIGN IMPLEMENTATION PROCESS
Construction
Budget
Approval
LEGEND
Introduction
1.1 Establish the project need 1.6 Site validation and selection
The starting point for all projects is the Once DPM have identified sites based on 2030
identification of needs according to the supply vision and prepared 1.5 Site options report, based
and demand analysis undertaken by ADHA. on Attachment A: Site Options Appraisal
Request form, ADHA will complete the CH1 Site
Options Validation checklist and Attachment B:
Site Options Evaluation Matrix to help
1.2 Prepare Strategic Brief
determine the optimal site to take forward for
ADHA shall start preparing D1: Strategic Brief development.
Report to provide the DPM basic information
such as the number of units and site area
required and an initial understanding of ADHA’s
vision, objectives and priorities for the project. 1.7 ADHA approval of Strategic
This will help the DPM in 1.5 Preparation of Site Brief
Options. It is expected that any gaps in This is ADHA’s first gateway approval and involves
completing this form by ADHA at this stage, will ‘sign-off’ of the strategic brief and preparation of a
be addressed by ADHA as part of D2: Initial high-level budget for the project, which can initiate
Project Brief. GSEC approval of the project.
At this stage, ADHA is also required to liaise with
developer to receive a high level cost estimate for
1.3 Is it an existing site? the project that can be taken forward to GSEC
If there is an existing site, ADHA has the option approval.
to immediately move to Stage 2. Alternatively,
where there is no site, ADHA shall initiate
the site selection and validation process in
GSEC budget approval
coordination with DPM.
At the end of Stage 1, ADHA will prepare an initial
project budget based on the site condition and
submit for GSEC approval of the project.
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision existing
site?
1 month
Engage Municipalities,
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
1.6 Site Validation and
2 weeks
Selection
1. Strategic Definition
1.7 ADHA
No Approval
of
Strategic
Brief GSEC Project Budget
Approval
1 week + GSEC period
Yes
Existing Design
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
etc.)
P2.4 P/D2.4
Stage 1: Strategic Definition
Selection Selection No
of of
11
2
preferred preferred
option option
Yes
2.3 Description
Strategic definition is the stage in which the project is identified and strategically defined and appraised before a more detailed brief is
prepared. This stage sets out the core project requirements clearly describing ADHA’s key requirements and aligns these to land
allocations/site identification process.
PROCESS WORKFLOW
12
Stage 1: Strategic Definition 2
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
1 month
(Cont’d....)
PROCESS WORKFLOW
The evaluation will predominantly be a desk top study and will be carried out
based on the information provided by DPM. It may include a site walk-over
visit(s), coordination with the Municipalities over site data and consultation with
the Developer to confirm site conditions and preliminary budget.
The first project gateway is Approval of the Strategic Brief (and associated
high-level budget for the project). The approval decision relates to:
• Project needs and planning parameters
• Site selection
• Preliminary budget
• Project design and procurement strategy, roles and responsibilities (i.e.
master plan by DPM/developer; building design existing/new etc.)
ADHA Approval of • Project timeline
1.7 Gateway
Strategic Brief
Approval of the Strategic Brief and selected site allows the project to proceed
to GSEC for budget approval. On GSEC approval, the Planning and Design
process can progress to Stage 2. Non-approval returns the project back for
re-examination of site options and costs.
All projects (planning and design) must pass through this stage gate
14
Stage 1: Strategic Definition 2
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
2.4 Forms
Stage 1: Strategic Definition, will be supported by following
reports, forms and checklists
• Document D1: Strategic Brief
• Attachment - A: Site Options Appraisal Request Form
• Checklist CH1: Site Options Validation
• Attachement - B Site Options Evaluation Matrix.
Templates for the above forms are presented in the following
pages.
16
Stage 1: Strategic Definition 2
THIS DOCUMENT IS TO BE COMPLETED BY ADHA (as much as possible) & PROVIDED TO DPM TO GUIDE THE SELECTION OF SITE
OPTIONS
The purpose of the Strategic Brief is to provide an initial outline of the project, its needs, vision and objectives to help inform the
site selection and project initiation processes.
1. PROJECT DETAILS
1.1 Project Title
1.2 Project Ref:
1.3 Type of Project:
2.1 Housing area ADHA to fill in below based on its supply & demand model
Mosques (Neighbourhood)
Mosques (Juma)
Community Centres
Nursery
Clinic
Public School
Private School
Police Station
Petrol Station
Sports Centre
Library
Municipal Office
Parks/Opens Spaces
Others
Total land for Community
facilities (ha)
2.3. Infrastructure area ADHA to fill in below based on assumptions
Road ROW area (equal to 20% of the total of 2.1 and 2.2 above) 0
Other services (such as potable water, power, landscape, sewage etc.) - Equal to about
0
10% of the total of 2.1 and 2.2 above
Total land for infrastructure (ha)
Grand Total 0
Note: the information provided above is a high level estimate only. It is the responsibility of the DPM or developer (whichever
is applicable) to test and verify these estimates as part of the master planning process. (Cont’d....)
Performance measures that against which ADHA will assess the pre-
Objectives
concept master plan
{Provide to DPM with Attachment-A Site Options Appraisal Request Form. Attachment A is to be completed by DPMfor each site option identified.
This is required to support the queries of GSEC's technical committee}
18
Stage 1: Strategic Definition 2
OPTIONS REPORT
The purpose of the site options appraisal request form is to provide a template for assessing potential sites to meet the
requirements of GSECs technical committee. Fill separate request forms of each of the selected sites.
(Cont’d....)
2.8 Attach a slope analysis plan showing areas > and < 10% slope.
% of site area (ha)
% of site < 10% slope
% of site > 10% slope
If yes, please describe any constraints requiring mitigation including sabkha, sinkholes, flood plains, high dunes etc. & attach supporting evidence as
needed
(Cont’d....)
20
Stage 1: Strategic Definition 2
2.12 Is there existing or committed utility infrastructure to support the site? (Supported by letter of communication from the utility authorities
confirming the availability of supply for the site as per project phasing)
Utility Yes/No Please provide details on availability and timing
Power
Potable water
Waste water
Telecom/ICT
Irrigation (TSE)
THIS FORM IS FOR ADHA'S INTERNAL USE AS A CHECKLIST TO ENSURE THAT ALL REQUIRED INFORMATION ARE PROVIDED IN THE UPC'S SITE
OPTIONS REPORT
The checklist can be attached to D1. Strategic Brief and provided to the DPM to guide preparation of the site options report.
CH1.1 The Project Description of the Project and the Site Options
CH1.1.1 Project description Confirmation of type of project (e.g. 'land and loan' projects, infill housing projects).
CH1.1.2 Demand profile Table identifying the number of dwellings units / plots required by year.
CH1.1.3 Development statistics Confirmation of the plot size and dimensions & maximum GFA and FAR.
Strategic plan (to scale) showing the location of the site options in relation to surrounding land uses, urban
CH1.1.4 Site options plan
and natural features, and other ADHA projects.
Plans & details for each of the options, which demonstrate they are appropriate (prepared for
CH1.2 Site Details
minimum of 3 sites)
CH1.2.1 Site plan Plans (to scale) which show the dimensions, total site area and access to the sites.
CH1.2.2 Zoning: Plans showing 2030 zoning of the sites.
Explanation and photographic evidence of land use activities, tenants and structures/buildings/
CH1.2.3 Land use & tenure:
infrastructure (utility corridors) on site. Confirmation of any significant land uses constraints.
CH1.3 Site Context Plans & descriptions of the site in its local context (prepared for minimum of 3 sites)
Plans & descriptions of the site conditions, including infrastructure availability (prepared for
CH1.4 Site Conditions
minimum of 3 sites)
CH1.4.1 Environmental condition Plan and narrative of the sites habitats, proximity to protected areas and any environmental constraints.
CH1.5 Development Capacity Estimate of the developable site area and No. dwelling units (prepared for minimum of 3 sites)
CH1.5.1 Developable site area: Estimate of developable area of the site (hectares).
CH1.5.2 Total dwellings: Table of estimated capacity of the site (No. of dwelling units).
CH1.5.3 Total GFA: Table of estimated total GFA for the site.
CH1.6 Development Cost High level initial estimate of development costs (prepared for minimum of 3 sites)
Table and plan showing high level estimate of cut/fill requirements based on CH1.4.3 (slope analysis) and
CH1.6.1 Estimate of cut/fill
CH1.4.4 above (ground conditions).
Estimate of site development
CH1.6.2 Table of estimated site development costs including site preparation, roads and infrastructure.
costs
Estimate of building costs (if Table of estimated building costs based on CH1.1.2 and CH1.1.3 (Demand profile & development
CH1.6.3
applicable) statistics) above.
Note: After using this checklist to review the completeness of the DPM Site Options Report, ADHA shall proceed to use Attachment B - Site Option Evaluation Matrix, to help define
the preferred site option. Attachment B should be attached to this form when both completed.
The site options evaluation matrix is a tool to compare site option score to identify the most appropriate site for the development.
The site options evaluation matrix is a tool to compare site option score to identify the most appropriate site for the development.
Vision and Objective Compliance with ADHA Vision Rating (0 -3) 0-50% >50% >75% 100% 1 2 1 2
Compliance with ADHA Objectives Rating (0 -3) 0-50% >50% >75% 100% 2
0
3
3
Scale 3
0
2
0
Scores
Site Suitability Economic activity, residents or tenants to be resettled and/or compensated Rating (0 -3) High Medium Negligible No
Parameter Evaluation Criteria Metric Weighted
Conflict with surrounding uses and activities Rating (0 -3) High Medium Negligible No 2
0
0
1 2 2
3 Score Average Score 3 Weighting Total
Master Planning
Existing or proposed compatible surrounding uses (such as residential, commercial Rating (0 -3) No Low Medium High 3 0 0 0 Score
63% 27%2 37% 50%
Adjacency to social, religious and commercial facilities Distance - >5km 3-5km <3km 3 0 0 0
Adjacency to open spaces, parks, leisure facilities Distance - >5km 3-5km <3km 1 0 0 1
Infrastructure Network
Conflict with surrounding uses and activities
Existing/ committed key infrastructure (Power, Potable water, Sewage) to site Rating (0 -3) No Poor Adequate Good 1
Rating (0 -3)33% High
0
Medium Negligible 2
No 2 0
Master Planning
Utility
Anticipated capital cost to connect with surrounding infrastructure Rating (0 -3) High Medium Low Marginal 0 33% 1 50% 50% 2 50%50% 2 42%
1.000 25% 0.083 1.500 25% 0.125 1.5 25% 13% 50% 1.250 25% 0.1041667 42%
67% 50% 58%0.58
Existing or proposed compatible surrounding uses (such as residential, commercial
Amount of earthworks required for the development of site Rating (0 -3) High Medium Low Marginal 1
Rating (0 -3) 0.67
No
2
Low Medium0.50 2
High 3 0.50 2
Ease of future phasing- earthwork and utilities. Rating (0 -3) No Limited Adequate Good 2 3 0 1
63%
Transportation network centre)
Existing/ committed road connection to the site Yes / No No - - Yes 2 1 0 0
Access
No. of road accesses to the site Number 0 1 2 <3 2 2.000 25% 0.167
33%
0.67
67%
1 1.000 25% 0.083
33%
0.33 1 1.0 25% 8% 1.900
0.33
33% 2 20%
1.000 25% 0.127
0.0833333 0.33
67% 33% 37%
Net developable land availability less than ADHA's requirements % deviation >10% >5% 3-5%
67%
<3%, meets 3 67%
Other proposed road improvement to the site Rating (0-3) No Studies Planned Committed 2 0.33 1 0.67 2 0.67 1 0.67 63%
Environmental issues Impact of the site development on environmental receptors & biodiversity Rating (0 -3) Severe Significant Moderate Limited 1 1 1 1
1 1 1 or exceeds 1
0.37
Proximity to environmental sensitive and/or protected area Distance - >5km 3-5km <3km
Environment
Are there any significant natural constraints to be mitigated or avoided (e.g Rating (0-3) Severe Significant Moderate Limited 1 1.167 20% 0.078 1 0.500 20% 0.033 17% 1 1.2 20% 8% 3 1.17 20% 0.0777778
39% 39%
Existing Community Facilities Adjacency to health facility
dunes, natural drainage flow path) Distance61%
39%
39%
- >5km 3-5km
83%
17%
<3km 2 39%
61%
61%
39%
Air quality and noise quality impact to the site from surrounding uses
Rating (0-3) Severe Significant Moderate Limited 1 61% 0 83% 0 61% 1 61%
Adjacency Adjacency to education facility Yes / No
Is there any site contamination No - - Yes 2 Distance 0- >5km 3-5km 1 <3km 2 0
Geotechnical and Are there identified geotechnical risks for the site (e.g. cavities, sabkha)
Rating (0 -3) High Medium Negligible No 2 0 0 2
Adjacency to social, religious andRating
commercial High facilities Distance22%78% - >5km 3-5km
33%
<3km 3
Geo
topographical Are there identified water table risks to be mitigated (0 -3) Medium Negligible No 2 2.333 10% 0.078 78% 1 1.000 10% 0.033
67%
33% 2 1.3 10% 4% 56%
44% 44% 1 1.333 10% 0.0444444 56%
44% 44%
Anticipated capital cost required to overcome the risks Rating (1 -3) Highest Lowest 3 2 2 1
WEIGHTED SCORE Adjacency to open spaces, parks, leisure facilities Distance
22%
- >5km 3-5km
67%
<3km 1 56% 56%
0.53 2.80 0.33 1.60 0.40 2.03 0.41 2.08
Infrastructure Network Existing/ committed key infrastructure (Power, Potable water, Sewage) to site Rating (0 -3) No Poor Adequate Good 1
Utility
Anticipated capital cost to connect with surrounding infrastructure Rating (0 -3) 53.22% High Medium Low 33%33% Marginal 0 40% 41% 33%
33%
40%
47%
46.78%53% 67% 60% 60%1.000 25% 0.083 59%41%
67%
Amount of earthworks required for the development of site Rating (0 -3) High Medium Low
67%
Marginal 1 59%
0.67
Ease of future phasing- earthwork and utilities. Rating (0 -3) No Limited Adequate Good 2
Transportation network Existing/ committed road connection to the site Yes / No No - - Yes 2
Access
33%
No. of road accesses to the site Number 0 1 2 <3 2 2.000 25% 0.167 0.67
67%
Other proposed road improvement to the site Rating (0-3) No Studies Planned Committed 2 0.33
Environmental issues Impact of the site development on environmental receptors & biodiversity Rating (0 -3) Severe Significant Moderate Limited 1
Proximity to environmental sensitive and/or protected area Distance - >5km 3-5km <3km 1
Environment
Are there any significant natural constraints to be mitigated or avoided (e.g Rating (0-3) Severe Significant Moderate Limited 1 1.167 20% 0.078
39%
39%
dunes, natural drainage flow path) 61%
Air quality and noise quality impact to the site from surrounding uses Rating (0-3) Severe Significant Moderate Limited 1 61%
Is there any site contamination Yes / No No - - Yes 2
Geotechnical and Are there identified geotechnical risks for the site (e.g. cavities, sabkha) Rating (0 -3) High Medium Negligible No 2
22%
Geo
topographical Are there identified water table risks to be mitigated Rating (0 -3) High Medium Negligible No 2 2.333 10% 0.078 78%
78%
Anticipated capital cost required to overcome the risks Rating (1 -3) Highest Lowest 3 22%
WEIGHTED SCORE 0.53 2.80
53.22%
2 Stage 1: Strategic Definition
2.1 Prepare Initial Project Brief On the basis of this review, ADHA is responsible
for selecting the preferred pre-concept master
ADHA shall start filling in D2: Project Brief
plan and building design option to be take forward
to provide the DPM or the developer the key
for concept development in stage 3.
requirements that need to be addressed as part
of the pre-concept design preparation. ADHA
may not be able to complete all information
that is required in the form at this stage. 2.5 Update Initial Project Brief
Notwithstanding, ADHA will provide as much If the pre-concept master plan is not prepared by
information as possible, to provide a basis for the developer, ADHA will work with DPM to
preparation of 2.5 Update initial project brief by update and complete the master planning part of
the developer. the 2.1 Prepare Initial Project Brief. This will be
issued to the developer for incorporation and the
preparation of the cost estimate, which the
developer will include in 2.7 Final Project Brief.
2.2 MP required and Choice of
master planner? The final project brief will become the basis
This decision point provides the option for for design and will include a change control
the pre-concept master plan document to be procedure implemented. Changes or deviations to
prepared by either the DPM or the developer. the final project brief shall only be made with the
This step also initiates Pre-Concept Building agreement of the stakeholders that are potentially
Design if applicable. impacted by the proposed changes.
Impact of the changes on the project timeline and
budget should be evaluated for the project, based
2.4 Selection of preferred option on the design stage of its occurance to estimate
ADHA shall provide a blank copy of CH2: the delay in the overall process.
Pre-concept Design Review checklist to the
developer prior to them preparing the pre-
concept options. This checklist will clearly 2.8 ADHA NOC No. 1
document the criteria against which ADHA NOC 1 is the first elevated authority stage gate
will assess pre-concept design options. For that requires ADHA’s Director General signature.
the master plans prepared by DPM planners, After approval of the Final Project Brief the
collaborative meetings will be organised to project will commence to the concept design
capture ADHA’s requirements in the master plan. stage. Information within the Project Brief shall be
ADHA will use CH2: Pre-concept Design Review used for presentation to GSEC and also as part of
checklist to carry out the assessment of each the community consultation process.
of the pre-concept options prepared by the
developer.
If the developer is also preparing building designs,
GSEC budget approval
ADHA shall use CH7: Building Design Review At the end of Stage 2, a cost estimate that is
Deliverables and Attachment C: Building Space more closely aligned with the project master plan
Design Parameter. to ensure three valid options and building design will be prepared. ADHA may
are prepared. choose to approach GSEC for a revised project
budget approval if found appropriate at this stage.
1 month
Engage Municipalities,
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
1.6 Site Validation and
2 weeks
Selection
1. Strategic Definition
3.2 Process Diagram (Master Planning)
1.7 ADHA
No Approval
of
Strategic
Brief GSEC Project Budget MUNICIPALITIES / UTILITIES / Potential
DPM ADHA DEVELOPER / CONSULTANT
Approval OTHERS Timeline
1 week + GSEC period
Establish
1.12.1 Initial Project Need
ProjectBrief
Existing Design
2 weeks1 week
1.2 Strategic
P2.2 MP Brief
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision DPM Master Plan Yes
existing Developer Master Plan
site?
1 month
Definition
Engage Municipalities,
P2.3 Pre-Concept Master P2.3 Pre-Concept Master Plan Engage Municipalities,
Utility Authorities and
Plan Report
1.5 Site (Optioning)
Options Report Report (Optioning) Utility
otherAuthorities and other
statutory authorities
(Pre-Concept)
statutory authorities
(like EAD, ADTCA, DMAT (like
EAD, ADTCA, DMAT etc.)
etc.)
P2.41.6 Site Validation and P/D2.4
Strategic
Selection Selection No
3 months2 weeks
Selection
of of
1. Brief
preferred preferred
option option
2. Preparation &
Yes
Consultation with DPM
Development Review/ 2.8 ADHA 2.7 Final Project Brief
Urban Development 2.1 Initial
NOC Project
1 Brief Consultation with the
2 weeks
Existing Design
Approval (if
variation required)
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Note:
Design Report (Optioning)
(or) New
of Master
Design Existing
Planner?
# - ADHA NOC and formal approvals will be replaced with collaborative
D3.2 meetings if DPM planners prepare the master plan inhouse. This
1 week
Choice etc.)
Stage 2: Preparation and Brief
27
3
preferred preferred
3 months
Report Report
option option
Design
Yes
D3.3 Concept Building
Design Report (Optioning)
paration
ncept
P2.5 Update Initial Project
3 Stage 2: Preparation and Brief
PROCESS WORKFLOW
The initial project brief articulates the project vision and translates them into
tangible KPI’s that can be used to evaluate the design outcome. The initial
project brief will combine the outcome of the site validation/ selection
process with the Strategic Brief and forms the key document upon which
the design and its approach will be based.
The step will be undertaken by Developer and the pre-concept options will
be submitted to ADHA for review and section of the preferred option. For
master plan prepared by DPM planners, collaborative meetings will be
organised between DPM and ADHA to capture ADHA’s requirements in the
master plan.
28
Stage 2: Preparation and Brief 3
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
(Cont’d....)
PROCESS WORKFLOW
The project brief shall be frozen at the end of this stage and change control
procedures should be introduced to prevent further changes without
appropriate justifications and authorisation.
NOC 1 is the first elevated authority stage gate that requires ADHA
Executive Director signature. This is the first stage at which project
definition is of sufficient detail for a more robust cost estimate to be
prepared; it is also the end of the stage before the consulting costs on the
project start to increase. The budget approved at this stage should replace
that already highlighted to GSEC and will inform the basis on which the
project goes forward.
After approval of the Project Brief the project will commence to the concept
development stage. Non-approval returns project back to re-examination of
pre-concept options and costs. All projects (planning and design) must pass
through this stage gate.
30
Stage 2: Preparation and Brief 3
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
CH2: Pre-Concept
ADHA 2 weeks ADHA Developer
Design Review
(Cont’d....)
PROCESS WORKFLOW
32
Stage 2: Preparation and Brief 3
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
34
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision existing
site?
1 month
Engage Municipalities,
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
1.6 Site Validation and
2 weeks
Selection
1. Strategic Definition
3.4 Process Diagram (Building Design)
1.7 ADHA
No Approval
of
Strategic MUNICIPALITIES / UTILITIES / Potential
DPM Brief ADHA GSEC Project Budget DEVELOPER / CONSULTANT
Approval OTHERS Timeline
1 week + GSEC period
Master Planning Building Design
Yes
Existing Design
1 week
1.2 Strategic
P2.2 MP
Brief
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
1.3
No Yes
1.4 Identify sites based on Is it an
2030 vision DPM Master Plan Yes
existing Developer Master Plan
site?
1 month
Definition
Engage Municipalities,
Engage Municipalities,
P2.3 Pre-Concept Master P2.3 Pre-Concept Master Plan
Site Options Report Utility
UtilityAuthorities
Authorities and other
and other
Plan
1.5 Report (Optioning) Report (Optioning)
(Pre-Concept)
statutory
statutory authorities (like
authorities (like
EAD, ADTCA, DMAT
EAD, ADTCA, DMAT etc.) etc.)
3 months
Strategic
Selection Selection
2 weeks
Selection No
of
1.Brief
of
preferred preferred
option option
2. Preparation &
Yes
Approval (if
variation required)
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design Existing
Planner?
D3.2
1 week
35
3
preferred preferred
Report
3 months
Design
Yes
D3.3 Concept Building
paration
Design Report (Optioning)
ncept
P2.5 Update Initial Project
3 Stage 2: Preparation and Brief
PROCESS WORKFLOW
The initial project brief articulates the project vision and translates them into
tangible KPI’s that can be used to evaluate the design outcome. The initial
project brief will combine the outcome of the site validation/ selection process
with the Strategic Brief and forms the key document upon which the design
and its approach will be based.
For projects that are identified to go through the pre-concept building design, a
pre-concept design report covering options for building spatial allocation and
preliminary layout (minimum three), building massing and elevation character,
privacy considerations (hierarchy/separation of spaces (public/private/
semi-private), overlooking views, orientation etc.), three-dimension illustration/
Pre-Concept
D2.3 Report model, (No Suggestions) intent, regulatory compliance will be prepared. The
Building Design
report will clearly demonstrate how the requirements of the initial project brief
document has been addressed in the master plan.
The pre-concept report will be submitted to ADHA for review and selection of
the preferred option.
36
Stage 2: Preparation and Brief 3
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
(Cont’d....)
PROCESS WORKFLOW
The project brief shall be frozen at the end of this stage and change control
procedures should be introduced to prevent further changes without
appropriate justifications and authorisation.
NOC 1 is the first elevated authority stage gate that requires ADHA Executive
Director signature. This is the first stage at which project definition is of
sufficient detail for a more robust cost estimate to be prepared; it is also the
end of the stage before the consulting costs on the project start to increase.
The budget approved at this stage should replace that already highlighted to
GSEC and will inform the basis on which the project goes forward.
After approval of the Project Brief the project will commence to the concept
development stage. Non-approval returns project back to re-examination of
pre-concept options and costs. All projects (planning and design) must pass
through this stage gate.
38
Stage 2: Preparation and Brief 3
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
3.6 Forms
Stage 2: Preparation and Brief, will be supported by
following reports, forms and checklists
• Document D2: Project Brief
• Checklist CH2: Pre-Concept Design Review
• Letter: No Objection Certificate
Templates for the above forms are presented in the following
pages.
40
Stage 2: Preparation and Brief 3
THIS DOCUMENT IS TO BE COMPLETED BY ADHA (AS MUCH AS POSSIBLE) & PROVIDED TO DPM (or) DEVELOPER (as applicable) FOR UPDATE FOR FINAL ADHA APPROVAL
The Project Brief is a more detailed statement for the project that is developed throughout Stage 2. It provides sufficient detail to enable the pre-concept
design stage to progress.
The diagram below explains the process of developing the Project Brief document, and key responsibilities as per the tasks within the planning and design process.
2.1 PREPARE INITIAL 2.5 UPDATE INITIAL 2.9 PROJECT BRIEF 2.10 ADHA NOC No.1
PROJECT BRIEF PROJECT BRIEF The developer updates all ADHA provides final
ADHA initially prepares If DPM prepares the pre- sections of the project approval of project
the project brief & concept master plan, brief below. brief document &
provides this to the DPM ADHA works with the initiates Stage 3.
or developer (as DPM to update section
applicable) as a key 2.0- 5.0 below.
data input for the pre-
concept design
1. PROJECT DETAILS
1.1 Project Title
1.2 Project Ref:
1.3 Type of Project:
2.1 Housing area ADHA or developer to update information based on the selected pre-concept master plan option
2.3. Infrastructure area ADHA or developer to update information based on the selected pre-concept master plan option
Road ROW
Utilities
Buffers
Total land for
Infrastructure
Grand Total 0
Note: the information provided above is to be verified and updated as part of Stage 3: Concept Design
(Cont’d....)
PLANNING AND DESIGN IMPLEMENTATION PROCESS 41
3 Stage 2: Preparation and Brief
Performance measures that against which ADHA will assess the pre-concept master
Objectives
plan
4.6 Potential geotechnical, topographical and other physical considerations and risks to be addressed
Explain how opportunities and constraints of the site conditions are addressed in the design (e.g flood risk, sand dune mitigation)
(Cont’d....)
42
Stage 2: Preparation and Brief 3
5.2 Public realm, open space and community facilities location, design and provision considerations
Demonstrate the approach for providing an integrated public realm with accessible community facilities
5.6 Provide best practice examples which demonstrate the design intent
(Cont’d....)
6.6 Provide best practice examples which demonstrate the design intent and aspirations for the project
Document all the key risks and their mitigation actions clearly establishing the timeframe for the risk action and the owner of the risk
Owner and Probability Consequence Mitigation
Risk Timeframe for Action Notes/Comments
responsibilities (low/med/hig (L/M/H) Actions
(Cont’d....)
44
Stage 2: Preparation and Brief 3
10. INDICATIVE PROJECT BUDGET (TO BE UPDATED IN THE FINAL PROJECT BRIEF)
THIS FORM IS FOR ADHA'S INTERNAL USE AND IS A CHECKLIST TO ENSURE THAT ALL REQUIRED INFORMATION ARE PROVIDED IN THE DPM/
DEVELOPER PRE-CONCEPT DESIGN REPORT
The form can also be attached with the D2 Project Brief (initial) document to DPM/Developer to guide the pre-concept design report preparation
The purpose of Stage 2 (Preparation and brief) of the Planning & Design Process is to prepare the pre-concept master plan. The pre-concept master plan
illustrates how the sites physical opportunities, constraints and risks have been addressed, articulates the project vision and reflects the values of ADNHG.
CH2.1 Site Details Plans & details for the site, which demonstrate responsiveness to the site context & conditions
Plan & narrative explaining how the site will be developed in relation to surrounding features, land uses and
CH2.1.1 Context plan:
infrastructure (existing and proposed).
Plan & narrative to illustrate how the sites opportunities, constraints & risks will be addressed / or mitigated,
CH2.1.2 Site plan:
including timing of infrastructure availability.
CH2.2 Development Concepts Plans and illustrations of master plan - a minimum of 3 options
Narrative explaining how ADHA's project vision, objectives and design approach such as incorporating
CH2.2.1 Development intent (1 page):
sustainability, privacy, cultural identity, tradition and sense of place are addressed in the master plan.
Initial master plan options (to scale) & supporting 3D illustrations/ sketches which articulate the project vision,
Pre-concept master plan objectives and master planning technical considerations such as neighbourhood block structure, public realm, open
CH2.2.2
options space, community facilities location, privacy, climatic and orientation considerations, responsiveness to site
conditions and cultural needs; as defined by ADNHG.
CH2.2.3 Land use plan: Plan showing all land uses across the site that relates directly to the development statistics. (CH2.2.4)
Table which distinguishes between total site area and developable area; and provides land use types, total GFA and
CH2.2.4 Development statistics:
FAR based on the estimated No. dwelling units. Also provides an estimate of population and population density.
CH2.3 Transportation & Utilities Plans and illustrations of transport & utilities - a minimum of 3 options
Site circulation and access Plan showing site access, key internal road network, vehicular/non-vehicular connection between community
CH2.3.1
plan: facilities and dwellings, access to public transport/school bus etc.
Table showing high level utility demand (power, potable water, waste water & TSE) and narrative to explain the
CH2.3.2 Utility demand calculations:
approach towards sustainability, water and energy conservation.
Pre-Concept Building
CH2.4 Plans and illustrations of typical building typologies - a minimum of three options
Design (if applicable)
A narrative, diagrams and/or sketches describing the project vision and design philosophy for the architectural,
CH2.4.1 Design philosophy
structural, MEP and other service design of the buildings. Demonstrate how ADNHG requirements are incorporated.
Building character and Conceptual illustrations demonstrating the design philosophy and their compliance with the project vision and
CH2.4.2
national identity ADNHG guidelines for national identity, materials and colour palettes.
CH2.4.3 Building statistics summary Plans (to scale) and tables which show GFA, site coverage, FAR and setbacks.
Note:
1. Refer to CH7: Architectural Deliverables for list of drawings to be completed to support the review of Pre-Concept Building Design
2. Refer to Attachment-C for building design parameters to be completed by the developer
46
Stage 2: Preparation and Brief 3
<ADDRESSEE>
ADDRESS LINE1
ADDRESS LINE2
ADDRESS LINE3
Abu Dhabi
UAE
No Objection Certificate
<Date>
Project Name:
Reference: No Objection Certificate For [1: Pre-Concept / 2: Concept / 3. Technical] Design Stage
Dear Sirs,
Further to submission of [document reference], this letter is to confirm ADHA has reviewed the details of the
submission and has no objections under the following conditions.
Development Parameters
{Insert key development parameters}
Gross Floor Area (sqm):
FAR:
No. of Dwellings (units):
Population Density (pers/ha):
SD/-
Director General
Abu Dhabi Housing Authority
48
4
Stage 3: Concept
Design
4 Stage 3: Concept Design
3 months
etc.)
P2.4 P/D2.4
Selection Selection No
of of
preferred preferred
option option
Yes
D3.2
1 week
Existing
1.2 Strategic
3.1 Initiate ConceptBrief
Stage
Design New
(or) New?
Master Plan
1.3
No Yes
1.4 Identify sites basedDPM
on Master Plan IsP3.2
it an Developer Master Plan
Choice
2030 vision existing
of Master
site?
1 month
Planner
Definition
#
P3.3 Concept Master Plan P3.3 Concept Master Plan
3 months
Design
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
1.6 Site Validation and D3.3 Concept Building
Design Report (Optioning)
2 weeks
Selection
1. Strategic
No
3.4 ADHA
NOC 2
3. Concept
2 weeks
1.7 ADHA
No Approval
of Yes
Strategic
Brief GSEC Project Budget
Approval
1 week + GSEC period
Existing Design
requirement
If no major changes
ofinMaster
Design meetings if DPM planners prepare the master plan inhouse. This exemption does
CMP submission Planner?
not apply to Consultants appointed by the DPM.
Master P4.2
UPC UPC Master
Plan Plan Yes Developer Master Plan
Choice Developer / Consultant Master Plan
of Master
Planner
#
P4.3 Detailed Master Plan P4.3 Detailed Master Plan Engage Municipalities,
(Pre-Concept)
2 months
etc.)
Stage 3: Concept Design
& BriefDesign
51
4
preferred No preferred
option 4.4 ADHA option
NOC 3
1 week
Yes
4. Developed
paration
P2.5 Update Yes
Initial Project
4 Stage 3: Concept Design
PROCESS WORKFLOW
The concept design stage of the project will be initiated once NOC1 is received
Initiate Concept from ADHA by the Developer (subject to step P3.2 below). The concept stage is
3.1 Process
Stage initiated through the issuing of a Project Request Form to proceed to the next
stage.
Though the decision to use the service of either DPM or the developer for
preparation of the master plan is agreed during “Stage-2: Preparation & Brief”
Choice of Master there might be a requirement to change the earlier decision due to changing
P3.2 Decision
Planner priorities such as sudden need to make the project fast track, or change in
procurement strategy or executive directives. This step is introduced in the
process to allow for these changes and provide flexibility.
A concept master plan report will be prepared at this stage. The report will be
organised as per DPM requirement (DPM Concept Development Review
application requirement), however it will highlight how the design addresses the
requirements of ADHA design guidelines for the National Housing such as
community structure, transport and movement, public realm and community
Concept Master
P3.3 Report facilities.
Plan Report
All statutory requirements related to DPM concept master plan submission such
as consultation with DMAT on the transport study, EAD on EIA study,
consultation with utility authorities shall be completed before submission for
ADHA’s review.
NOC 2 is the second elevated authority stage gate that requires ADHA Project
Directors signature. This is the stage at which the design for the project is
clearly defined and strategies towards construction and implementation start
to emerge. Upon the NOC the master plan will proceed for submission to
3.4 ADHA NOC 2 Gateway
DPM development review. The building design stream will proceed towards the
schematic design stage.
Upon receipt of NOC2, the developer will submit the concept Master Plan report
for DPM development review. In cases where the Concept MP is prepared by
UPC Development
P3.5 Process DPM, colloborative meetings between DPM and ADHA will decide if the project
Review & Approval
needs to be submitted to the DPM development review team before
proceeding to the developed/detailed MP stage
52
Stage 3: Concept Design 4
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
DPM approval
DPM 2 months DPM Developer
letter issued
54
Stage 3: Concept Design 4
The purpose of Stage 3 (Concept Design) of the Planning & Design process is to prepare and get approval for the concept master plan. This checklist is
designed to support the preparation and review of the Concept Master Plan to ensure that ADHA requirements for the planning of integrated and liveable
National Housing communities are met, and focuses on the important criteria for ADHA (albeit mindful of DPM & DMAT requirements)
CH3.1 Site Details Plan & illustrations indicating the development within the context of the surrounding area
CH3.1.1 Affection plan Correct affection plan with accurate geo-referenced coordinates included, consistent with the pre-concept master plan.
CH3.1.2 Context plan Project context and site plans are aligned with ADHA's approved pre-concept master plan and (if applicable) approved concept
CH3.1.3 Site plan building design.
Plans & illustrations that demonstrate the intent, form and design for the master plan and compliance with regulatory
CH3.2 Development Concepts
controls
CH3.2.1 Development intent Development intent reflects ADHA's approved vision and objectives of the master plan agreed to at pre-concept stage.
CH3.2.5 Perspectives
CH3.2.6 Land use plan Plan showing all land uses across the site that relates directly to the development statistics (CH3.2.7).
Demonstrate ADHA requirements have been met as per the agreed pre-concept master plan, by providing total site area; land use,
CH3.2.7 Development statistics
GFA and FAR by type; building heights; % site coverage; % landscaped area; and population.
CH3.3 Development Delivery Indicates the phasing of the development and development management
Phasing plan and phasing summary accurately cross-referenced which specifically meets ADHA phasing requirements by clearly
CH3.3.1 Phasing plan
specifying the timing of delivery of the public realm and community facilities based on forecast population growth.
CH3.3.3 Development M'gmt Development management table aligns with ADHA's approved approach to development delivery, management and maintenance.
CH3.4 Public Realm Describes and illustrates the public realm vision for the development.
CH3.4.1 Plan
Public realm summary, plan, perspectives and sections that meet ADNHG requirements. For instance, sizing of open spaces to
Plan to demonstrate privacy
CH3.4.2 support cultural events (e.g. weddings & Ramadan); demonstrating passive surveillance and consideration of privacy; and providing
considerations
traditional connections and linkages within the master plan (e.g. Meyadeen, Barahaat and Sikkak).
CH3.4.2 Perspectives and sections
CH3.5 Community Facilities Describe how community facilities will be affected and/or required by the development
Narrative and plan of community facilities which demonstrates adherence to ADNHG requirements including provision and design of
CH3.5.1 Summary & plan facilities to meet the specific needs of Nationals (e.g. Neighbourhood Mosques, Juma Mosques, Eid prayer areas, community majilis,
gender separation) and traditional forms of access to the facilities at the neighbourhood level (e.g. sikkah, barahaat etc).
CH3.6 Transportation & Utilities Describe the transportation aspects and infrastructure demands of the development
Site circulation and access Road network and hierarchy plan, integration of land use and transportation network, non vehicular movement systems (such as
CH3.6.1
plan bicycle, pedestrian) highlighting safe and secure connections to community facilities/ key nodes and road crossings.
Cross sections to illustrate public realm and location of non vehicular movement systems, access to emergency vehicles, public
CH3.6.2 RoW cross-sections
transport, special vehicles such as school bus, refuse trucks to all part of the master plan, and public parking locations.
Methodology Report for the Transportation Impact Study (TIS), which gives due consideration to the impact of larger private
vehicles on the ROW design; and additional parking allowances within plots and the public realm, to reflect higher rates of car
ownership and special cultural events (e.g. Ramadan) as per ADNHG requirements.
Plans and calculations which demonstrate the approach towards sustainability, water and energy conservation; setbacks and
CH3.6.3 Utility demand calculations
screening of utility infrastructure from adjoining properties.
CH3.6.4 Utility plans Provide evidence of initial utility authorities approval of demand forecast and supply options, clearly specifying the required
commitment and timing of delivery of infrastructure based on the community's forecast growth and development phasing.
CH3.6.5 Utility corridor plans
CH3.7.1 Concept level cost estimate Cost estimate for the site development and master plan/infrastructure development.
<ADDRESSEE>
ADDRESS LINE1
ADDRESS LINE2
ADDRESS LINE3
Abu Dhabi
UAE
No Objection Certificate
<Date>
Project Name:
Reference: No Objection Certificate For [1: Pre-Concept / 2: Concept / 3. Technical] Design Stage
Dear Sirs,
Further to submission of [document reference], this letter is to confirm ADHA has reviewed the details of the
submission and has no objections under the following conditions.
Development Parameters
{Insert key development parameters}
Gross Floor Area (sqm):
FAR:
No. of Dwellings (units):
Population Density (pers/ha):
SD/-
Director General
Abu Dhabi Housing Authority
56
Engage Municipalities,
P2.3 Pre-Concept Master P2.3 Pre-Concept Master Plan
Utility Authorities and other
Plan Report (Optioning) Report (Optioning)
statutory authorities (like
EAD, ADTCA, DMAT etc.)
3 months
P2.4 P/D2.4
Selection Selection No
of of
preferred preferred
option option
Yes
4 weeks
DPM ADHA DEVELOPER / CONSULTANT
Approval (if OTHERS Timeline
variation required)
Master Planning Building Design
D3.2
1 week
Existing
3.1 Initiate Concept
1.2 Strategic Stage
Brief Design New
(or) New?
1.3
P3.2
No Yes
Developer Master Plan
1.4 Identify sites basedDPM
on Master Plan Is it an
Choice
2030 vision ofexisting
Master
site?
Planner
1 month
Definition
P3.3 Concept Master Plan P3.3 Concept Master Plan
Report
3 months
Report
Engage Municipalities,
Design
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
EAD, ADTCA, DMAT etc.)
D3.3 Concept Building
1.6 Site Validation and Design Report (Optioning)
2 weeks
Selection
No
1. Strategic
3.4 ADHA
NOC 2
3. Concept
1.7 ADHA
No Approval
of Yes
Strategic
Brief GSEC Project Budget
Approval
No P3.5 DPM No
2 weeks1 week + GSEC period
Development Review
& Approval Yes
Yes
2.1 Initial Project Brief
2 months 2 weeks
Existing Design
(Pre-Concept)
(like EAD, ADTCA, DMAT
3 months
etc.)
D4.2 Schematic Building
Stage 3: Concept Design
P2.4 P/D2.4
Selection Selection No Design Report
of of
& BriefDesign
57
4
preferred No preferred
4.4 ADHA
option NOC 3 option
1 week
Yes
4. Developed
Yes
paration
P2.5 Update Initial Project
4 Stage 3: Concept Design
PROCESS WORKFLOW
The concept design stage of the project will be initiated once NOC1 is received
Initiate Concept
3.1 Process from ADHA. The concept stage is initiated through the issuing of a Project
Stage
Request Form to proceed to the next stage.
Though the decision to use either an existing building typology or develop new
building typology is agreed during the “Stage-2: Preparation & Brief” there
might be a requirement to change the earlier decision due to changing priorities
such as sudden need to make the project fast track, or change in procurement
Existing Design (or)
D3.2 Decision strategy or executive directives. This step is introduced in the process to allow
New
for these changes and provide flexibility.
For projects where existing building typology is used it will proceed directly to
Step:3.6
For projects that will be continued in the path of developing new building
typologies, a concept architecture report will be prepared at this stage. The
concept architecture report will include a minimum of three options for the
building design. The report will primarily address the requirement of the ADHA
Design Guidelines and will demonstrate how the requirements of the guidelines
are met in the design.
Concept Building
D3.3 Report
Design Report
The report will also include outline proposals for structural design, building
services systems, outline specifications. During this stage a number of initial
strategies that complement the design are prepared. These strategies consider
post-occupancy and operational issues along with the consideration of
buildability such as construction strategy, O&M strategy, sustainability
strategy. Third party consultations are also essential.
NOC 2 is the second elevated authority stage gate that requires ADHA Project
Directors signature. This is the stage at which the design for the project is
clearly defined and strategies towards construction and implementation start
to emerge. Upon the NOC the master plan will proceed for submission to
3.4 ADHA NOC 2 Gateway
DPM development review. The building design stream will proceed towards the
schematic design stage.
58
Stage 3: Concept Design 4
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
60
Stage 3: Concept Design 4
+
CH.4 CONCEPT BUILDING DESIGN REVIEW
THIS FORM IS FOR ADHA'S INTERNAL USE AS A CHECKLIST TO ENSURE THAT ALL REQUIRED INFORMATION ARE PROVIDED IN THE DEVELOPER's CONCEPT
BUILDING DESIGN REPORT
The form can also be issued to the developer to guide the concept building design report preparation
Building Placement and Site analysis plan showing building orientation, sun and wind direction, and the relationship between the
CH4.1
Context Analysis building and plot in the design.
Plan to demonstrate the following:
Villas are oriented to capture prevailing winds (typically from the north/ northwest) to pass between individual
developments and promote cross ventilation.
Facades are oriented towards the south, east and west should reduce the amount of glazing exposed to direct sun
radiation through smaller openings or increased shading.
CH4.1.1 Site analysis plan Shaded connection between indoor and outdoor spaces is provided to take advantage
of natural available light and ventilation.
Villas fronting public streets have a primary entrance and main windows facing the
street.
Visual privacy between adjacent plots is maintained and overlooking into habitable rooms or outdoor spaces of
neighbouring dwellings is avoided.
Site plan and floor plans detailing the outdoor and indoor spaces and their interlinkages. Future extensions
CH4.2 Site design
should be considered and indicated on the plans.
Plans to demonstrate the following:
CH4.2.1
Maximum plot coverage and integration of indoor and outdoor spaces is compliant with ADNHG requirements.
Minimum setbacks on plot comply with ADNHG requirements; and front setbacks are consistent along street
CH4.2.2
Site plan frontages, or in clusters of villas, if possible.
CH4.2.3 Any outbuilding or ancillary structure maintains a minimum setback from the main villa as per ADNHG requirements.
Any extension or expansion to the original building is built only within the permitted building zone and does not
CH4.2.4
exceed the permissible GFA or prescribed plot coverage.
CH4.2.5 Elevations Elevation plans to show the maximum allowable building height, as per ADNHG requirements.
Spaces and rooms Site plan and floor plans, FAR, GFA and plot coverage that demonstrate consideration of connectivity between
CH4.3
adjacencies relevant spaces and privacy; the separation of spaces for private, semi-private, semi-public and public use
CH4.3.1 Floors plans and calculation tables (use Attachment C as the template) to show area breakdown and GFA calculations.
CH4.3.2 Diagrammatic layout of the Floors plans that comply with the universal accessibility code as per ADNHG requirements.
hierarchy of spaces; floor
CH4.3.4 Elevations which show that roofs are a functional part of the design and location for mechanical equipment.
plans and GFA calculation
Diagrams to demonstrate dwellings are designed around four hierarchies of space: Public, Semi-public, Semi-private
table
and Private.
CH4.3.5
Diagrams to demonstrate that rooms are organized to provide privacy between public and private areas, and between
male and female users.
CH4.3.6 Plans to demonstrate room adjacencies as per the ADNHG.
Note:
1. Refer to CH7: Architectural Deliverables for list of drawings to be submitted to support the review of Concept Building Design
2. Refer to Attachment-C for building design parameters to be filled by the developer
<ADDRESSEE>
ADDRESS LINE1
ADDRESS LINE2
ADDRESS LINE3
Abu Dhabi
UAE
No Objection Certificate
<Date>
Project Name:
Reference: No Objection Certificate For [1: Pre-Concept / 2: Concept / 3. Technical] Design Stage
Dear Sirs,
Further to submission of [document reference], this letter is to confirm ADHA has reviewed the details of the
submission and has no objections under the following conditions.
Development Parameters
{Insert key development parameters}
Gross Floor Area (sqm):
FAR:
No. of Dwellings (units):
Population Density (pers/ha):
SD/-
Director General
Abu Dhabi Housing Authority
62
5
Stage 4:
Developed
Design
5 Stage 4: Developed Design
3 months
Report Report
3. Concept Design
2 weeks
5.2 Process Diagram (Master Planning)
Yes
2 months
DPM ADHA DEVELOPER / CONSULTANT
OTHERS Timeline
Yes
Master Planning Building Design
requirement
If no major changes in
1.2 Strategic Brief
CMP submission
Definition
D4.2 Schematic Building Engage Municipalities,
1.5 Site Options Report Design Report Utility Authorities and other
statutory authorities (like
No EAD, ADTCA, DMAT etc.)
4.4 ADHA
1.6 Site Validation
NOC 3 and
12week
weeks
Selection
1. Strategic Design
4. Developed
Yes
1.7 ADHA
1 week
Yes
(Pre-Concept)
(like EAD, ADTCA, DMAT
P5.2 Concept
3 months
etc.)
Infrastructure Planning
Stage 4: Developed Design
P2.4 P/D2.4
Submission No
Selection Selection No
of of Yes
65
5
preferred preferred
option option P5.3 Preliminary P5.5 Stage review and
Infrastructure Design No approval/NOC from
Yes Submission Municipalities and
5. Technical
Yes Utility Providers
paration
P2.5 Update Initial Project P5.4 Detailed
5 Stage 4: Developed Design
PROCESS WORKFLOW
The developed design stage will be initiated once NOC is received from DPM for
the concept master plan.
Initiate Developed If the comments received from DPM on the concept master plan impact on the
4.1 Process
Stage ADHA’s key requirements for the design, ADHA will facilitate further discussion
with DPM so that the comments can be resolved without impacting on the
ADHA’s requirements for master planning. Upon successful completion of this
process the developed design stage will be initiated.
Choice of master planner is considered at this stage because there might be an
option that DPM will develop the master plan only till the concept design and it
Choice of Master
P4.2 Decision will be transferred to the developer for further development. The reason for
Planner
this would be due consideration for infrastructure detailing in the master plan
beyond this stage.
A detailed master plan report will be prepared at this stage for submission to
DPM. The report will be organised as per DPM requirement (DPM Detailed
Development Review application requirement), and will also highlight how the
design addresses the requirements of ADHA design guidelines for the National
Detailed Master Housing such as community structure, transport and movement, public realm
P4.3 Report
Plan Report and community facilities.
All statutory requirements related to DPM detailed master plan submission such
as TIS approval from DMAT, EIA approval from EAD, utility authorities approval
shall be completed before submission for ADHA’s review.
The stage gateway is approval of the detailed master plan report. This is the
stage at which the design and strategies towards construction and
implementation is clearly understood. Upon receipt of the NOC, the master
4.4 ADHA NOC 3 Gateway
plan will proceed for submission to DPM development review.
Upon ADHA approval the developer will submit the detailed master plan report
for DPM development review. In cases where the Detailed MP is prepared by
UPC Development
P4.5 Process DPM, colloborative meetings between DPM and ADHA will decide if the project
Review & Approval
needs to be submitted to the DPM development review team before proceeding
to the next stage.
66
Stage 4: Developed Design 5
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
DPM/
ADHA n/a none ADHA
Developer
68
Stage 4: Developed Design 5
The purpose of Stage 4 (Developed Design) of the Planning & Design process is to prepare and get approval for the detailed master plan. This
checklist is designed to support the preparation and review of the detailed master plan to ensure that ADNHG requirements for the planning of
integrated and liveable National Housing communities are met.
CH5.1 Site Details Plan and illustrations which indicate the development within the context of the surrounding area
CH5.1.1 Affection plan Correct affection plan with accurate geo-referenced coordinates included in the concept review application.
CH5.1.2 Context plan Project context and site plans aligned with ADHA's approved concept master plan and (if applicable) ADHA's approved
CH5.1.3 Site plan schematic architecture design.
Plans and supporting Illustrations that demonstrate the detailed design for the development, land use and
CH5.2 Development Design
development statistics
Detailed statement on development intent that continues to reflect ADHA's approved vision and objectives of the
CH5.2.1 Development intent
master plan as agreed at the pre-concept stage.
CH5.2.2 Street level plan
CH5.2.3 Massing plan
All project plans and illustrations align with ADHA's approved concept master plan.
CH5.2.4 Building and site sections
CH5.2.5 Perspectives
Plot specific land use plan showing all land uses across the site that relates directly to the development statistics
CH5.2.6 Land use plan
(CH5.2.7).
Demonstrate ADHA's requirements have been met as per the approved concept master plan, including total site area;
CH5.2.7 Development statistics
land use, GFA and FAR by type; building heights; % site coverage and landscaped area; and population.
CH5.3 Development Delivery Indicate in detail the phasing of the development across the site
The phasing plan and phasing summary are accurately cross-referenced and meet ADHA phasing requirements with
CH5.3.1 Phasing plan respect to the timely delivery of the public realm and provision of community facilities to meet expected growth of the
community.
Development management table and supporting narrative, include detailed breakdown of rates for any service fees
CH5.3.2 Development M'gmt anticipated and land use regulations and community rules to be implemented. Demonstrate alignment with ADHA's
approved approach to development delivery, management and maintenance.
CH5.4 Development Control Master Plan Level Design Regulations & Guidelines
Master plan/precinct design regulations and guidelines compliant with ADNHG requirements for landscaping,
CH5.4.1 Regulations and guidelines
materials, shading, lighting, universal access and signage and wayfinding.
CH5.4.2 Building typology plan Building Typology Plan aligns with ADHA's approved Schematic Architecture Design
CH5.4.3 Plot control regulations Plot context to be developed in line with ADHA approved Concept Master Plan.
CH5.5 Public Realm Describe and illustrate in detail how the public realm concept will be delivered.
CH5.5.1 Plan Public realm summary and all plans to reflect ADHA's approved vision and objectives for public realm agreed to at the
CH5.5.2 Perspectives and sections concept stage.
Describe and illustrate in detail how community facilities will be affected and/or required by the
CH5.6 Community Facilities
development.
Narrative and plan of community facilities which demonstrates adherence to ADHA's requirements as agreed at the
CH5.6.1 Plan
concept stage.
CH5.7.1 Site circulation and access plan Detailed road network plan, cross sections, non-vehicular movement (cyclists and pedestrians), access to emergency
and special vehicles (e.g. refuse trucks, school buses) and movement plans based on the agreed networks as per of
the concept stage. Demonstrate safety and security of the non-vehicular users.
CH5.7.2 RoW & cross-Sections:
CH5.7.3 Utility demand calculations Detailed plans and calculations demonstrating the approach to sustainability; utility conservation and consumption
efficiency; and safety setbacks from utility infrastructure.
CH5.7.4 Utility plans
PLANNING
Proof of commitment from utility providers that the AND DESIGN
community's IMPLEMENTATION
forecast PROCESS
growth and utility demand is aligned with 69
CH5.7.5 Utility corridor plans committed supply and development phasing.
CH5.4.2 Building typology plan Building Typology Plan aligns with ADHA's approved Schematic Architecture Design
CH5.4.3 Plot control regulations Plot context to be developed in line with ADHA approved Concept Master Plan.
Describe and illustrate in detail how community facilities will be affected and/or required by the
CH5.6 Community Facilities
development.
Narrative and plan of community facilities which demonstrates adherence to ADHA's requirements as agreed at the
CH5.6.1 Plan
concept stage.
Transportation and
CH5.7 Describe in detail the transportation aspects and infrastructure demands of the development
Infrastructure
CH5.7.1 Site circulation and access plan Detailed road network plan, cross sections, non-vehicular movement (cyclists and pedestrians), access to emergency
and special vehicles (e.g. refuse trucks, school buses) and movement plans based on the agreed networks as per of
the concept stage. Demonstrate safety and security of the non-vehicular users.
CH5.7.2 RoW & cross-Sections:
CH5.7.3 Utility demand calculations Detailed plans and calculations demonstrating the approach to sustainability; utility conservation and consumption
efficiency; and safety setbacks from utility infrastructure.
CH5.7.4 Utility plans
Proof of commitment from utility providers that the community's forecast growth and utility demand is aligned with
CH5.7.5 Utility corridor plans committed supply and development phasing.
CH5.8.1 Developed level cost estimate Cost estimate for the development and master plan/infrastructure development.
70
UPC Master Plan Developer Master Plan
Choice
of Master
Planner
P3.3 Concept Master Plan P3.3 Concept Master Plan
Report
3 months
Report
3. Concept Design
2 weeks
5.5 Process Diagram (Building Design)
Yes
No P3.5 UPC No
Development Review
& Approval MUNICIPALITIES / UTILITIES / Potential
2 months
DPM ADHA DEVELOPER / CONSULTANT
OTHERS Timeline
Yes
Master Planning Building Design
requirement
If no major changes in
CMP submission
1.2 Strategic Brief
Design
D4.2 Schematic Building Engage Municipalities,
Design Report Utility Authorities and other
1.5 Site Options Report
statutory authorities (like
No EAD, ADTCA, DMAT etc.)
4.4 ADHA
NOC 3
1.6 Site Validation and
1 2week
Strategic Definition
weeks
Selection
Developed
4. 1.
Yes
1.7 ADHA
No P4.5 DPM Development No
1 week
No Approval
Review & Approval of
Strategic
2 months
Yes
Approval/NOC
Utility Authorities and Yes
Design
Plan Report (Optioning) Plan Report (Optioning) other statutory authorities
(like EAD, ADTCA, DMAT
3 months
71
5
preferred preferred
option P5.3 Preliminary P5.5 Stage review and
option
Infrastructure Design No approval/NOC from
Submission Municipalities and Utility
Yes
5. Technical
Providers
Yes
paration
P2.5 Update Initial Project P5.4 Detailed Infrastructure
5 Stage 4: Developed Design
PROCESS WORKFLOW
The developed design stage will be initiated once NOC is received from ADHA
for the concept master plan.
Initiate Developed
4.1 Process It will be required that any changes to the concept design during the design
Stage
development process should be communicated to ADHA and resubmited if
required to get the acceptance before proceeding to the next stages of design
development.
The stage gateway is approval of the schematic building design report (and
associated cost estimate) This is the stage at which the design and strategies
towards construction and implementation is clearly understood. Upon receipt
4.4 ADHA NOC 3 Gateway of the NOC,the building design stream will proceed towards the Technical
design stage.
72
Stage 4: Developed Design 5
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
CH6 : Developed
ADHA 1 week ADHA DPM
Building Design Review
Schematic building
design report
74
Stage 4: Developed Design 5
THIS FORM IS FOR ADHA'S INTERNAL USE AS A CHECKLIST TO ENSURE THAT ALL REQUIRED INFORMATION ARE PROVIDED IN THE DEVELOPERS
SCHEMATIC BUILDING DESIGN REPORT
The form can also be issued to the developer to guide the schematic building design report preparation
A key objective of Stage 4 (Developed Design) of the Planning & Design process is to prepare and get approval for the Schematic Architecture
Design. This checklist is designed to support the preparation and review of the Schematic Architectural Plans to ensure that ADNHG
requirements for the planning of integrated and liveable National Housing communities are met.
Site plan and floor plans detailing the outdoor and indoor spaces and their interlinkages. Future
CH6.1 Site Design
extensions should be considered and indicated on the plans.
Floor plans and GFA Floor plans with details of indoor and outdoor spaces demonstrating compliance with approved concept building
CH6.1.1
calculation table design.
The minimum setbacks, plot coverage including coverage of all buildings comply with the approved concept
CH6.1.2
building design as per ADNHG requirements .
CH6.1.3 All outbuilding or ancillary structures maintain a minimum distance as per ADNHG requirements.
CH6.1.4 Outdoor spaces accommodate a range of outdoor activities.
Site plan
Outdoor amenities can be accessible throughout the day or night, aided by shade structures
CH6.1.5
or lighting features.
Planting are used within the setback zone to provide a visual buffer increasing privacy and shading within the plot.
CH6.1.6
The planting palette shall comply with ADNHG requirements.
CH6.1.7 The maximum number of storeys for an outbuilding does not exceed one storey.
Elevations
CH6.1.8 Maximum allowable building height, as per ADNHG.
Spaces and Rooms Site plan and floor plans that demonstrate consideration of connectivity between relevant spaces and
CH6.2
Adjacencies privacy; the separation of spaces for private, semi-private, semi-public and public space spaces.
Calculation tables and floors plans with space area breakdown and GFA calculation that complies with ADNHG
CH6.2.1
Diagrammatic layout of the minimum spacing requirements.
hierarchy of spaces and floor Facilities provided in each room comply with the ADNHG requirements (for example, master bed room provided
CH6.2.2
plans with attached bathroom and walk-in-closet).
CH6.2.3 Dwelling design reflects approved design at concept design stage.
CH6.3 Plot Access Site plan and floor plans highlighting pedestrian access, vehicular access and car parking.
CH6.3.1 Plot entrances for various functions (vehicular and non-vehicular) comply with ADNHG requirements.
CH6.3.2 Entrances for driver accommodation is separate, and faces away from the villa.
CH6.3.3 The width of vehicular and non vehicular access complies with ADNHG requirements.
Site plan
CH6.3.4 and floor plans Required parking (including space for loading/unloading) is provided in compliance with ADNHG requirements.
The minimum number of parking spaces and the dimension of the parking space on plot comply with ADNHG
CH6.3.5
requirements.
CH6.3.6
(Cont’d....)
Building Form and Plans, elevations and sections showing the development of the selected design option.
CH6.4
Appearance Detailed 3D renderings of the building show external and internal finishes.
CH6.4.1 A distinction between a visitor entrance and a private entrance to the villa is created.
CH6.4.2
Site plan
CH6.4.3 and Floor Plans Minimum shading as per ADNHG is provided within the plot.
Parking facilities inside the plot boundary should have appropriate landscaping, screening and
CH6.4.4
shading, and be suitably integrated into the overall building and site design.
Elevations to show:
CH6.4.5 Shading of south façades is provided to all glazed elements through either a horizontal projection with a width
equal to, or exceeding, the glazed unit, and have a minimum projection of half the window height.
CH6.4.6 Elevations Shading of east and west façades is provided through appropriate shading systems.
CH6.4.7 Boundary wall height and design comply with ADNHG requirements.
CH6.4.8 Any ancillary building on the boundary wall has a height complying with ADNHG requirements.
CH6.4.9 The scale, texture and colour of the dwellings should reflect the area’s unique character.
Finishes Schedule The outer surface of the shading elements such as canopies must have a minimum Solar Reflectance Index as
CH6.4.10
required by ADNHG.
CH6.5.1 Structural GA drawings Show location and size of structural elements, and highlight any elements that may protrude from walls or ceilings.
Describe the building services systems, and strategies in place which are aligned with ADNHG 'Structural and MEP
CH6.5.2 MEP design narrative
Systems' section.
CH6.5.3 MEP layouts Show utility lines within the plot, and demonstrate the locations of utility rooms are compliant with ADNHG.
CH6.6.1 Concept level cost estimate Cost estimate for the building, including all services.
Note:
1. Refer to CH7: Architectural Deliverables for list of drawings to be submitted to support the review of Concept Building Design
2. Refer to Attachment-C for Building Design Parameters to be completed by the developer
76
6
Stage 5:
Technical
Design
6 Stage 5: Technical Design
2 months
D4.2 Schematic Building
Design Report
No
4.4 ADHA
NOC 3
1 week
6.2 Process Diagram (Master Planning)
4. Developed Design
Yes
2 months
MUNICIPALITIES / UTILITIES / Potential
DPM ADHA DEVELOPER / CONSULTANT
Yes OTHERS Timeline
Definition
Yes D5.4 Building
4 months
Approval/NOC
Engage Municipalities, Yes
Design
1.5 Site Options Report Utility Authorities and other
P5.2 Concept statutory authorities (like
Infrastructure Planning EAD, ADTCA, DMAT etc.)
1.6 Site Validation and Submission No
2 weeks
Selection Yes
1. Strategic
P5.3 Preliminary P5.5 Stage review and
Infrastructure Design No approval/NOC from
Submission Municipalities and
5. Technical
1.7 ADHA Yes Utility Providers
No Approval
of P5.4 Detailed
Strategic Infrastructure Design No
Brief GSEC Project Budget Submission
Approval
1 week + GSEC period
Yes
Yes
5.7 ADHA
Submission 5.6 Preparation of Tender
for GSEC Documents
2 months
Approval
2.1 Initial Project Brief GSEC
2 weeks
Construction
Budget Existing Design
Approval
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
etc.)
Stage 5: Technical Design
P2.4 P/D2.4
Selection Selection No
of of
79
6
preferred preferred
option option
Yes
PROCESS WORKFLOW
The Technical design stage will be initiated once NOC is received from DPM for
the detailed design.
Initiate Technical
5.1 Process
Stage Consultation between ADHA and DPM is recommended if the changes to the
master plan impact ADHA’s key requirements for the design before the start of
the infrastructure design.
Upon DPM approval for the master plan, the data is transferred to the
municipalities to update into their GIS systems. In a master plan context this
consist of two sets of information. 1) the plots and 2) the ROWs and Service
Corridors. After various iterations within the municipality system the PLOTS are
issued as Affection Plans and proceed into the Building Architecture/design
Concept process. The developer of the master plan then proceeds with the infrastructure
Infrastructure planning submission of the ROW’s and Service Corridors with the Municipality
P5.2 Process
Planning Planning Department. This process will demarcate the various easements within
Submission ROWs, utility plots and NOC from the authorities to obtain infrastructure
planning approval to proceed with the preliminary and detailed design of the
infrastructure facilities.
The developer will follow the applicable standards and codes as required by the
respective statutary authorities in the approval process.
Preliminary As part of the approval from the Municipality Planning Department, the plots
P5.3 Infrastructure Process and utility easements/corridors are transferred to the respective external
Design Submission authorities to undergo their design process. Services that are part of
municipality assets such as roads, street lighting, landscape, storm water and
drainage go through the Infrastructure Design Approval process within the
Detailed municipality system.
P5.4 Infrastructure Process
Design Submission Each authority has slightly different approval stages established within their
design work flow for infrastructure design which will be undertaken by the
developer.
Review and
approval/NOC of
The process involves approval for the detailed design/technical design of the
infrastructure
infrastructure networks and plots. An NOC is provided at the end of this stage
P5.5 design by Process
for the design, however a construction permit will be issued only after a
municipalities and
contractor is on board and available to implement the design
respective
authorities
Preparation of Upon obtaining NOC for the infrastructure design and building design the
5.6 Process
Tender Documents developer will proceed to preparation of the construction tender document.
TThe final design level project gateway is the approval of the tender document
which will then proceed to the construction. The approval decision relates to:
- Detailed design of all infrastructure within the master plan (such as but not
limited to roads, utility networks, site preperation)
- Construction, O&M, H&S, procurement, handover strategies
- Project execution plan, program, updated risk assessment
- Updated project budget
ADHA submission
5.7 Gateway Approval of the Technical Design allows the project to proceed to GSEC
for GSEC Approval
approval for the appointment of the contractor and start of construction. On
GSEC approval, the Planning and Design process can progress to construction.
Non-approval returns the project back for re-examination of the design.
All projects (planning and design) must pass through this stage gate.
80
Stage 5: Technical Design 6
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
Municipality/
Concept Infrastructure
Developer 3 weeks Developer Respective
planning report
authority
Municipality/
Preliminary infrastructure
Developer 1.5 months Developer Respective
design report
authority
Municipality/
Detailed infrastructure
Developer 1.5 months Developer Respective
design report
authority
Municipality/ Municipality/
1 month
Respective NOC letter Respective Developer
(together)
authority authority
82
UPC Master Plan P4.2
Developer Master Plan
Choice
of Master
Planner
P4.3 Detailed Master Plan P4.3 Detailed Master Plan
Report Report
2 months
D4.2 Schematic Building
Design Report
No
4.4 ADHA
NOC 3
1 week
6.4 Process Diagram (Building Design)
4. Developed Design
Yes
2 months
MUNICIPALITIES / UTILITIES / Potential
DPM ADHA DEVELOPER / CONSULTANT
Yes OTHERS Timeline
Definition
Yes D5.4 Building
4 months
Approval/NOC
Engage Municipalities, Yes
Design
1.5 Site Options Report Utility Authorities and other
statutory authorities (like
P5.2 Concept Infrastructure EAD, ADTCA, DMAT etc.)
Planning Submission No
1.6 Site Validation and
2 weeks
Selection Yes
1. Strategic
P5.3 Preliminary P5.5 Stage review and
Infrastructure Design No approval/NOC from
Submission Municipalities and Utility
5. Technical
1.7 ADHA Providers
Yes
No Approval
of
P5.4 Detailed Infrastructure No
Strategic
GSEC Project Budget Design Submission
Brief
Approval
1 week + GSEC period
Yes
Yes
5.7 ADHA
Submission 5.6 Preparation of Tender
for GSEC Documents
2 months
Approval
2.1 Initial Project Brief GSEC
2 weeks
Construction
Budget Existing Design
Approval
P2.2 MP
D2.2
required No New Design D2.3 Pre-Concept Building
Existing
and Choice Design Report (Optioning)
(or) New
of Master
Design
Planner?
Engage Municipalities,
etc.)
Stage 5: Technical Design
P2.4 P/D2.4
Selection Selection No
of of
83
6
preferred preferred
option option
Yes
PROCESS WORKFLOW
Initiate Technical The Technical design stage will be initiated once review of the schematic design
5.1 Process
Stage of the building is completed by ADHA
The architectural, building services and structural engineering designs are
further refined to provide technical definition of the project and the design
work of specialist subcontractors is clearly developed and concluded. A design
responsibility matrix is set out to provide the interface requirements between
Detailed Building
D5.2 Report various design teams. By the end, all aspects of the design will be completed
Design Report
apart from minor queries arising from the site during the construction stage.
The developer will follow the applicable standards and codes in coordination
with the respective municipalities building permit department requriements.
ADHA review will be required only if there are any major changes that are
required in the design based on the detailed design/technical design exercise
ADHA Review (if
D5.3 Decision and on the outcome of the discussion with the municipality building approval
any changes)
section. In such cases ADHA will facilitate meetings between the developer and
municipalities (if required) to resolve the issues and obtain approval.
The process involves approval for the detailed design/technical design of the
Building Approval/ building design including Civil Defense requirements. An NOC is provided at the
D5.4 Process
NOC end of this stage for the design, however a construction permit will be issued
only after a contractor is on board and available to implement the design
Preparation of Upon obtaining NOC for the building design the developer will proceed to
5.6 Process
Tender Documents preparation of the construction tender document.
The final design level project gateway is the approval of the tender document
which will then proceed to the construction. The approval decision relates to:
- Detailed design of buildings (including finishes, external works, sustainability
etc.)
- Construction, O&M, H&S, procurement, handover strategies
- Project execution plan, program, updated risk assessment
- Updated project budget
ADHA submission
5.7 Gateway Approval of the Technical Design allows the project to proceed to GSEC
for GSEC Approval
approval for the appointment of the contractor and start of construction. On
GSEC approval, the Planning and Design process can progress to construction.
Non-approval returns the project back for re-examination of the design.
All projects (planning and design) must pass through this stage gate.
84
Stage 5: Technical Design 6
DOCUMENTS
RESPONSIBILITY TIMESCALE NOTES
TITLE FROM TO
THIS CHECKLIST IS FOR THE DEVELOPER / ARCHITECTS USE ONLY, AND EXPLAINS THE BUILDING DESIGN DRAWING DELIVERABLE REQUIREMENTS
The purpose of the checklist is to provide the list of minimum required drawings by ADHA for the building design at Stages 2, 3 and 4 of the Planning &
Design process, to review and provide approval for the building design.
Stage -2: Preparation and Brief (Pre-concept Building Design - minimum 3 Options)
Deliverables Scale Information Included
Plans should be dimensioned and indicate the building setbacks. The GFA calculation table should also indicate the
resultant FAR.
- Site plan of the project showing location of all buildings, roads, parking and landscape elements.
- Plans of all floors showing the room layout and all other details such as furniture layout, dimensions, openings etc. and
explaining how the privacy requirements both at plot level and with the adjacent plots are achieved.
Conceptual floor plans and GFA
1:100 - Elevation of the building showing all the details such as floor levels and overall dimensions.
calculation table
- 3D renderings portraying the building massing, character and identity.
- Future expansion options/
- Interior 3D views of prominent spaces showing indicative interior finishes.
- Room Sizes, GFA and other key planning details/
- Indicative cost estimate/
1:200 Drawings highlighting the areas considered in the GFA calculation, based on the DPM definition for GFA calculation.
GFA calculation
N/A Tables listing the areas at each floor and the total areas.
Schedule of rooms areas N/A A list of proposed areas for each room in comparison with the minimum requirements of ADNHG.
Schedule of finishes N/A Preliminary finish schedule for typical areas.
(Cont’d....)
PLANNING AND DESIGN IMPLEMENTATION PROCESS 89
Appendix 1
This form compares the areas provided for different rooms and spaces in comparison with ADHA minimum requirements. This form also
documents the estimated utilities loads and car parking spaces.
This form can be used at each stage of the design process.
1. PROJECT DETAILS
1.1 Project Title
1.2 Project Ref:
1.3 Type of Project:
Majlis (Female) 27
Living room 27
Dining Room 25
Toilet - 1 4
Toilet - 2 4
Guest Bedroom 20
Kitchen 25
Kitchenette 12
Store Room 5
Laundry Room 9
Master Bedroom 30
Standard Bedroom - 1 20
Standard Bedroom - 2 20
Standard Bedroom - 3 20
Staff Bedroom - 1 9
Staff Bedroom - 2 9
(Cont’d....)
Residential Spaces
Residential Spaces Standard
Majlis Bathroom - 2
(Male) 4.8
42
Standard
Majlis Bathroom - 3
(Female) 4.8
27
Standard
Living Bathroom - 4
room 4.8
27
Staff Bathroom
Dining Room - 1 3
25
Staff Bathroom
Powder Room - 2 3
3.2
Standard
Toilet - 2 Walk-in Closet - 1 4
Standard
Guest Walk-in Closet - 2
Bedroom 4
20
Balconies
Store Room N/A
5
with depths of 1.5 or more
StaircasesBedroom - 3
Standard N/A
20
Circulation
Corridors
Staff Bedroom - 1 N/A
9
Structure WallsBedroom
Staff and Columns
-2 N/A
9
Building Services
Master Bathroom
Electrical, Mechanical, Telecome Rooms 6.4
N/A
(Excluded from GFA)
Proposed GFA
Standard Bathroom - 1 0 4.8
(Current Phase)
TOTAL GFA 0
Note: the information provided above is to be verified and updated as part of Stage 4: Developed Design
3. SERVICES
3.4 Required Number of Car Parking 3.5 Provided Number of Car Parking
Spaces Spaces
Project Name:
Project Number:
Update Date:
Affected
Change Owner & Instruction Affected studies to be verified Contract value
ID Change to be Actioned Request date Primary Change Secondary Change Cause / Impact Action Owner Due Date Priority Contract clause / Status
Ref. or reviewed impact
scope
Closed: change
Impact 1 : Delay in project Project implemenation plan ADHA High AED 0.00
approved
LY
High AED 0.00
Closed: change
N
detailed building design Consultant rejected
O
LE
Concept & detailed master Musanada /
Impact 3 : Re-design of infrastructure High AED 0.00 Open: under review
P
plan reports Consultant
Musanada /
AM
EX
Impact 4: Authorities consultation na High AED 0.00 Open: under review
Consultant
10
11
12
13
14