The document lists 27 recovery boiler shutdowns that occurred between January and December 2019. It includes the date of each shutdown, the reason for the shutdown (such as boiling in the ring header or fan repairs), and the duration of the shutdown in hours. The total shutdown time for all 27 events was 145.5 hours. The most common reasons for shutdowns were boiling or knocking down in the ring header and issues with the ID and SA fans that required boiling in the ring header.
The document lists 27 recovery boiler shutdowns that occurred between January and December 2019. It includes the date of each shutdown, the reason for the shutdown (such as boiling in the ring header or fan repairs), and the duration of the shutdown in hours. The total shutdown time for all 27 events was 145.5 hours. The most common reasons for shutdowns were boiling or knocking down in the ring header and issues with the ID and SA fans that required boiling in the ring header.
The document lists 27 recovery boiler shutdowns that occurred between January and December 2019. It includes the date of each shutdown, the reason for the shutdown (such as boiling in the ring header or fan repairs), and the duration of the shutdown in hours. The total shutdown time for all 27 events was 145.5 hours. The most common reasons for shutdowns were boiling or knocking down in the ring header and issues with the ID and SA fans that required boiling in the ring header.
The document lists 27 recovery boiler shutdowns that occurred between January and December 2019. It includes the date of each shutdown, the reason for the shutdown (such as boiling in the ring header or fan repairs), and the duration of the shutdown in hours. The total shutdown time for all 27 events was 145.5 hours. The most common reasons for shutdowns were boiling or knocking down in the ring header and issues with the ID and SA fans that required boiling in the ring header.