Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Saturday ​ 12th​ December (Plan 2)

Filming day 1 running order:

Activity or Scene
Time
Serina Katie Wafa Omar Yasmina
Actor / Dancer Actor / Dancer Crew member Crew member Director / Producer

9-10 am Leave muscat and arrive to Muscat bay

10-12 am ● Rehearse and film Chorus 2 ● Rehearse and film chorus 2 ● Film from another ● Film from another ● Film instrumental introduction whilst they are
angle angle rehearsing the dance
● Rehearse and film Chorus 1 ● Rehearse and film Chorus 1
● Film chorus 2 (Balcony)
● Rehearse and film Solo
section ● Film Chorus 1

12-2 pm ● Rehearse and film Drum ● Rehearse and film Katie’s ● Film from another ● Film from another ● Film Katie’s ending scene
instrumental ending scene angle angle
● Film Drum instrumental
● Rehearse and film Drum
instrumental ● Film Katie’s Solo section

2-3 pm Take Photos for digipak and have a small break

3-4pm ● Section 1 and pre chorus 1 ● Film from another ● Film from another ● Film Section 1 and Pre-chorus 1
angle angle
● Instrumental corridor section ● Film Serina’s Corridor Section

4-5 pm ● Section 2 and Pre-chorus 2 ● Film from another ● Film from another ● Film Serina’s Section 2 and pre-chorus 2
angle angle (Pool Scene)

You might also like