Professional Documents
Culture Documents
BR25 A1 Side Existing Cut-Off
BR25 A1 Side Existing Cut-Off
BR25 A1 Side Existing Cut-Off
SUMITOMO MITSUI CONSTRUCTION CO., LTD Rev DESCRIPTION DATE PROJECT : National Road No. 5 Improvement Project SCALE :
KINGDOM OF CAMBODIA & 1 FOR APPROVAL DEC/2/2020
(Prek Kdam - Thlea Ma'am Section), CONTRACT PACKAGE 2
WORLD KAIHATSU KOGYO CO., LTD. AS SHOWN
MINISTRY OF PUBLIC WORKS AND TRANSPORT JICA LOAN No. : JICA Loan No. CP-P19
JOINT VENTURE CONTRACT No. : MPWT/SS/CW-P2
KATAHIRA & ENGINEERS INTERNATIONAL DRAWING TITLE : DRAWING No. :
ENGINEER In Joint Venture with
SUBMITTED BY : YASUTOMO AKASAKA
ORIENTAL CONSULTANTS COMPANY LIMITED
In Association with BRIDGE 25 CP2-S-SD-B25-30
KHMER CONSULTANT ENGINEERING CORPORATION LTD LOCATION OF EXISTING FOUNDATION
and TANCONS. (CAMBODIA) CO., LTD. DATE PREPARED : DECEMBER 2, 2020