HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)

Unloading of container by Tyre mounted Crane


Base Risk Residual Risk

Acceptable(A)/Non-
1 to 25

1 to 25
Legal concern(Y/N)

Probability 1 to 5
1 to 5

Probability 1 to 5

1 to 5
Proposed Control
Potential Hazard

Acceptable(NA)
Routine®/Non

Consequence
Routine(NR)
Sub-Activity

Remarks
Severity

Severity
Risk

Risk
S.No Present control

Collision, Injury/fatal
1. Uneven surface of due to fall of 1. Surface shall be checke & ensure
ground. equipment & Property properly compected.
damage

2. Toppling of vehicles. Injury /fatal to person 2. Outrigeers shall be fully extend & 1. Engage competent /
Crane Placement working near by area to be properly barricaded. experienced personnel
(60 ton Tyre R Y 4 4 16 for handling /operating 1 4 4 A
mounted) 3. Ensure power cable should not hand tools / power tools
3. Overhead Power cables. Elecrtrocutions came arround swing crane area, during tree cutting.
Valid PTW to be taken

1. All the lifting gears (Slings, D-


shackles) shall be god condition &
1. Valid test certificates for lifting
tools & tackles. 2. Only Trained
riggers/operator & signalman shall
1. Failure of lifting gear. 2. be deployed. 3. Area to be properly 1. Administrative control
Poor rigging. 3. barricaded. 4. Unauthorizes person measures are to be
Unloading of Miscommunication shall be restrected. 5. Mandatory developed for vehicle
1. Injury/Fatal fitness and engagement
Container (40 betwwn operator & & specific PPE shall be use by
accident & Property workmen. 6.. Ladder shall be use. of competent operators &
Feet) signalman. 4. Fall from
R heights. 5. Using mobile damage 2. Peronal 7. Tag line shall be use. 8. HIRA talk N 4 4 16 Engage competent person 1 4 4 A
phone during operation. injury or materiak before start the activity. 9. Close for the unloading
loss. 3. Personal injury supervision by job operation.
supervisor/Engineer. 9. Mobile
phone shall be resttricted during
operation. 10. Valid PTW shall be
taken.

RISK MATRIX
P R O B A B I Là I T Y

Very Likely 5 5 10 15 20 25
-
Likely 4 4 8 12 16 20
-
Possible 3 3 6 9 12 15
-
Unlikely 2 2 4 6 8 10
-
Very Unlikely 1 1 2 3 4 5
-
1 2 3 4 5
Negligible Slight Moderate High Very High
SEVERITY 
Risk Risk Level Action
May be acceptable but review task to see if risk can be reduced
1 to 6 Low Risk
further
Task should only be undertaken with appropriate management
8 to 12 Medium Risk
authorization after consultation with specialist personnel and
Task must not proceed. It should be redefined or further control
15 to 25 High Risk
measures put in place to reduce risk. The controls should be