BASE SCHEDULES COLUMN SCHEDULE

Base Length x Width x Depth Reinforcement (Bottom-N / Top-T)


PF1 1000 x1000 x 300mm Y12-200c/c-B1 & B2 COLUMN TYPE DIMENSION
PF2 1500 x1500 x 300mm Y12-200c/c-B1 & B2 C1 200x200 - C1
PF3 2000 x1500 x 300mm Y12-200c/c-B1 & B2 C2 200x500 - C2
PF4 2000 x2000 x 300mm Y12-200c/c-B1& B2 Y10-200c/c-T1 & T2 C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
C6 200x750 - C6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 C7 150x650 - C7
C8 500x300x100x300 - C8
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 2765 1905 550 2005
C9 600x450x250x400 - C9
C10 850x600x400x400 - C10
PF2
C2 Strip Footing
600 900 1200x200dp

425
N N
PF2

1025
800

400 800
C2 C8 C5 C8

150
M M
530

700
400

1650
PF2

600
C1 C4 C6 C2 C2 C4 C2
L L

350

400

900
1180
1600
PF2 C2
C3

850
C2 PF1 C2 PF1 C2 PF1 750 750

3000
650
PF1

1820
Strip Footing

1400

100
1200x200dp PF1
C2

650 350
PF1 C2
K K
145

140
440
200

2450
PF3 340 200mm Shear Wall
200mm Shear Wall C4 1000
PF3 PF3
3200

1400
565 935
C4 C4 750 750 475 470
432 PF3 1795 PF4
J PF3 J
C4
1000

980

980
600
C9 PF2

780
750

80
480
H H
120

120
500
750

C2 C7

550
1020

1020
1395 805 295 C4
100
1550

4115
200mm Shear Wall
Strip Footing
1200x200dp

445
4200

G G
Strip Footing
1200x200dp 440

300 1700 2400 2000 300

3500
300
No Description Date
100 P1 Issued for Blup 11/12/2019

1900
PF3
C4 495 545 F
PF2
670

3100

600
C9
100

E PF3
E

800
830

PF3 PF1 C1 PF1


600
600

C4 C4 C2 C2
100

100
D 200mm thk. D

2300
550 950 RC Raft
1400
1400
3200

PF1
1500 Lev. -2650

2400
200mm Shear Wall

2000
PF1 PF1

900
PF1
400 600

C2 C2 C2 C1
C C
150

200

300
PF1
Lift Pit
2000

2105
Shear Wall 200mm RC Wall
3040

1180
PF1

4705
200

C2 C2 C1
B Mr. M O B NICOLAS DUBOIS (SOCIETE
C2 PF1
PF1 PF1
THOTES 3)
C1 C4 C2 C2 Strip Footing

2405
1850 1250 1200x200dp
1650

PF2
APARTMENT AT LA PRENEUSE-BLACK
200
C10 300
A C2
A RIVER
C2 C2 C2 C1
950

700

PF2 300 175 FOUNDATION LAYOUT


625 875

Project number P34


Date 11/12/2019

11/12/2019 10:22:47
1 2 4 6 7 8 9 10 13 Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 100

001
COLUMN SCHEDULE

COLUMN TYPE DIMENSION


C1 200x200 - C1
C2 200x500 - C2
C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
1
1 2 3 4 5 6 7 015 8 9 10 11 12 13 14 15 C6 200x750 - C6
6 C7 150x650 - C7
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 2765016 1905 550 2005 C8 500x300x100x300 - C8
1 8700 8600 8045 C9 600x450x250x400 - C9
014 C10 850x600x400x400 - C10
C2

100
N 250 N

1450
16

1025
100
C5 C8 120
C8
M M

50
C2

1650

1650
630 200 100
C4 C6 C2 C4

100
L L
C2 C2

1180
1 1

1600
011 011
C3
C2 C2 C2
C2

3000
16

250
120

530
C2
C2
K K
145
8245

2450
C4
3200

475 470
100
J C4
J
C9 C7

780
330

H H

120

120
C4 C2
805
570
1 1
012 012

4115
6200
10 10
016 016 125mm thk. RC Slab
MESH A252
4200

G Lev. -1650 G
80 9
6
016 3720
016 6100

3500
1700 2400 2000

3630 2670 7 7
016 016 No Description Date

1205
1900
F C4 F P1 Issued for Blup 11/12/2019
C9

3100
600
E E
350

800
C4 C2 C2 C1

5100
D D
100

2300
900

900
3200

2400

2400
8255

2000
100 145 8 8
C2 016 016

900
C2 C2 C1
C C
150

200

95
2000

1800

2400
9
1 1
3040

016
013 1650 013
200

100
B C2 C2 B
C1 C4 C2
100 145 C2
C1 Mr. M O B NICOLAS DUBOIS (SOCIETE
1850 1250 THOTES 3)

2305
3070

C2 C2 C10 C2 C2 C1 APARTMENT AT LA PRENEUSE-BLACK


50

100
A A
400 RIVER
550

1 1 BASEMENT LAYOUT
014 015

8700 16270
Project number P34
Date 11/12/2019
3 4 5 6 7 8 9 10 11 12 13 14 15

11/12/2019 10:22:49
1 2 Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 100

002
COLUMN SCHEDULE

COLUMN TYPE DIMENSION


C1 200x200 - C1
C2 200x500 - C2
C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
1 C6 200x750 - C6
1 2 3 4 5 6 7 015 8 9 10 11 12 13 14 15
C7 150x650 - C7
6
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 2765 016
1905 550 2005 C8 500x300x100x300 - C8
C9 600x450x250x400 - C9
1
014
350 100 C10 850x600x400x400 - C10
C2

1150 100

525
1250
N N
100

1025
100
C2

300
150
C8
M M
C8 C5

1650
630
C1 C4 C6 C2 C2 C4 C1 C2

100
L L

350
1 1

1600
011 C2 011
C3 C2 C2 C2

3000
250
C2
C2
K K

140
400
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping

2450
200mm Shear Wall Lev. +1050
3200

1550 C4 C4

J C7 J
C4 1695

780
C4
330

C4
H H

120
200520
375 100

500 720
C9 C2

550
530 1320
1 1
012 012
2050 200 1200 1530 475 470

4115
10 10 Void
150 200mm Shear Wall
016 016
450 450
95 300 95

445
7995

6800
G G

200
310

300
100 925 1165 2500 1105 80
6
016 9
300mm thk. hollow block + 115mm RC Topping 016
1700 2400 2000

3500
Lev. +1050
7 7 No Description Date

600
016 016

600 P1 Issued for Blup 11/12/2019


200

F 530 F

3100
600
C9 C4
E 900 E
350

800
C4 C4 C2 C2 C1

900
D 200mm thk. RC Slab D
Lev. +450
3200

600 600

300 600

2400
200mm Shear Wall

2000
601 600
8 8

900
016 016

250 600
C2 C2 C1
C C
200

C2
1150 100 900 600
2000

2400
9
1 1 016
013 013
Lift Shear Wall
C2 C1
200

B B Mr. M O B NICOLAS DUBOIS (SOCIETE


200 100

C2 C2
C1 THOTES 3)
C4 C2 C2

2305
2405

C2 APARTMENT AT LA PRENEUSE-BLACK
A A RIVER
300

C2
C10 C2 C2 C1
100 1050 2500 850 450 400 305
GROUND FLOOR LAYOUT
1 1
014 015
Project number P34
Date 11/12/2019

11/12/2019 10:22:45
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 100

003
COLUMN SCHEDULE

COLUMN TYPE DIMENSION


C1 200x200 - C1
C2 200x500 - C2
C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
1 C6 200x750 - C6
1 2 3 4 5 6 7 015 8 9 10 11 12 13 14 15
C7 150x650 - C7
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 27656 1905 550 2005 545 C8 500x300x100x300 - C8
016
C9 600x450x250x400 - C9
1 500
014
C10 850x600x400x400 - C10
530

1048 200

600
C2

1225
N 100 N

1025
552

600
C2

302
M M

2498
C8 C5 C8

1499

1650
100
C1 C4 200 x 600dp
L C6 L
200 x 600dp C2 C2 C4 C1 C2

1180
1 1
011 011
200 x 600dp

200 x 600dp
600 2500

3000
C2
C2
C2
C3 C2
530 805
1850 600

K C2 K
C2
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping

2450
295
200mm Shear Wall Lev. +4050

900
475 470

570
J J
C4 500

780
C4 C7
C9
H H

120
100

500 718
C4 C2 450

200
1 1
012 012
2155 200 2050 200 1200

4115
200 1250

150 765 435 200mm Shear Wall 2420 150


450 450
440
302
95

97 300

545
6800

100
G G

198
308
95

198
1275 1160 2505 1185
6
016
300mm thk. hollow block + 115mm RC Topping

3500
Lev. +4050

175 375 7 7 No Description Date


016 016
P1 Issued for Blup 11/12/2019
132 465

F 200 F

600
C9 C4
E E
495

800
C4 C4 C2 C2 C1
D D
200 x 500dp

2400
200mm Shear Wall

C2
C2 200 x 500dp C1
C C
C2
600 2500
200 x 600dp

1 1
013 013
Lift Shear Wall
C2 C1
550 Mr. M O B NICOLAS DUBOIS (SOCIETE
C2 200 x 500dp
C1 C4 C2 C2 C2 THOTES 3)
200 x 500dp
100

200 x 600dp
1500

APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp
A C2
A RIVER
600

C2 C10 C2 C2 C1

100 1050 2500 850 450 305


FIRST FLOOR LAYOUT
1 1
014 015
Project number P34
Date 11/12/2019

11/12/2019 10:22:59
3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
1 2
Checked by DB

BUILDING PERMIT 1 : 100

004
COLUMN SCHEDULE

COLUMN TYPE DIMENSION


C1 200x200 - C1
C2 200x500 - C2
C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
1 C6 200x750 - C6
1 2 3 4 5 6 7 015 8 9 10 11 12 13 14 15
C7 150x650 - C7
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 27656 1905 550 2005 C8 500x300x100x300 - C8
016
C9 600x450x250x400 - C9
1 450 1600 8350 230 C10 850x600x400x400 - C10
230 10820 014 450

1050 200
C2

300
1225
N 100 N

1025
C2

300
250

300
M M
C8 C5 C8

1500

1650
100
C1 C4 200 x 600dp
L C6 L
200 x 600dp C2 C2 C4 C1 C2

1180
1 1
011 200 x 600dp 011

200 x 600dp
2500

3000
C2
C2
C2
C3 C2
530 805
1850 285

K C2 K
C2
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping

2450
200mm Shear Wall 295
Lev. +7050
1245 475 470

570
J J
C4 500

780
C7

120
C9 C4
H H

120
C4 C2

550
450

200
1 1
012 012
200 2050 200 1200

4115
200

200mm Shear Wall 2420 150


440

545
6800

100
G G

200

200
1185
6
016
300mm thk. hollow block + 115mm RC Topping

3500
Lev. +7050
7 7 No Description Date
016 016
P1 Issued for Blup 11/12/2019
200
F F

600
C9 C4 495
E E

800
C4 C4 C2 C2 C1
D D
200 x 500dp

2400
200mm Shear Wall

C2
C2 200 x 500dp C1
C C
C2
300 2500
200 x 600dp

2400
1 1
013 013

C2 C1 Lift Shear Wall


B B Mr. M O B NICOLAS DUBOIS (SOCIETE
C2 200 x 500dp
C1 C4 C2 C2 C2 THOTES 3)
200 x 500dp

200 x 600dp

2305
1500

APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp
A C2
A RIVER
C2 C10 C2 C2 C1

450 305
SECOND FLOOR LAYOUT
1 1
014 015
Project number P34
Date 11/12/2019

11/12/2019 10:23:10
3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
1 2
Checked by DB

BUILDING PERMIT 1 : 100

005
COLUMN SCHEDULE

COLUMN TYPE DIMENSION


C1 200x200 - C1
C2 200x500 - C2
C3 200x700 - C3
C4 200x1000 - C4
C5 200x1500 - C5
C6 200x750 - C6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 C7 150x650 - C7
2670 2400 4250 1400 650 4300 2900 1400 1700 1125 2765 1905 550 2005 C8 500x300x100x300 - C8
1 1 6 C9 600x450x250x400 - C9
014 015 016 C10 850x600x400x400 - C10
250 545

200
450
525

525
530 550
N N

250475

1050
450 450
550

250
M M

200

1400
1000

1400
1935
L L

390
400
1 1

620
011 011
2430 2250

980
20 mm Joint

820 980

K K

450 1450 200 1000 200 5720 400 300mm thk. hollow block + 115mm RC Topping
Lev. +10050
805 200 900 200 445

J J

520
H H

120
445

200
1 1
1135

012 012
2335

3550 200 2050 200

2575
800

1395 1180
24000

6795
G G

200
200 750 200 1275 6325 1100

300mm thk. hollow block + 115mm RC Topping


6
016
No Description Date
7 7
016 016 P1 Issued for Blup 11/12/2019
200mm RC Slab
Lev. +9835
200
F Lev. +9835 F
E E
500

C1 C2 C2 C1
D D
200 x 500dp

200 x 500dp
C C2
C
C2 C1
820 980

1 1
980

013 013

C2 C2 C1 Mr. M O B NICOLAS DUBOIS (SOCIETE


620

B 20
B THOTES 3)
200 x 500dp
450 450200 1000 200

200

200 x 500dp
1400

APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp RIVER
200

A A
250
550

300

C2 C2 C1
250

530 545 4505 450 5450 100 ROOF LAYOUT


1 1
014 015 Project number P34
Date 11/12/2019

11/12/2019 10:23:21
Drawn by SR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Checked by DB

BUILDING PERMIT 1 : 100

006
7 10

3
008 5800

200 x 1400dp
D D

200 x 500dp

2600
2700 1850 1250
200 x 500dp

200 x 1400dp

200 x 1400dp

2000
7205

7205
1 1
013 013

200mm thk RC Slab 200 x 500dp


Lev. +13050

200 x 500dp

2605
A A
100

200 x 1400dp

3
008

7 10

No. Description Date


P1 Issued for Blup 11/12/2019
Mr. M O B NICOLAS DUBOIS (SOCIETE UPPER ROOF LAYOUT
THOTES 3)

11/12/2019 10:27:24
Project number P34
Date 11/12/2019
BUILDING PERMIT
APARTMENT AT LA PRENEUSE-BLACK
Drawn by SR
RIVER 007
Checked by DB 1 : 75
7 10

Y10-150-B1
Y10-150-B1

Y10-150-B1
Y10-200-B1
Y10-200-T1

Y08-200-T2

Y8-150-UB
7 2900 8 3100 10

5800 2Y12
1A
BEAM 1 008

D D 2Y12
Y8-200-UB 2Y12 4x2Y12

900
900
900 2Y12

Y10-200-B2 2Y12
1000 1000 2xY8-200c/c-Links

2Y12

900 900
BEAM 2

BEAM 2
Y10-150-B1 2Y16
7205

2Y16 2Y16

2xY8-150c/c-Links 2xY8-150c/c-Links 2xY8-150c/c-Links


Y08-200-T1
2Y16
1A
008
900

UR-R-BEAM 1 UR-BM 1A
Scale 1 : 50 Scale 1 : 25

Y10-200-B2
Y8-200-UB
900

900

Y10-200-B2
A A
100

BEAM 1

7 10
2Y16

UPPER ROOF SLAB REINFORCEMENT


Scale 1 : 75
2A
2Y12
008
2Y16 4x2Y12 D
2Y12

2Y12
Y8-200c/c-Links

2Y12

2Y16 + 1Y12
2A Y8-200c/c-Links
008 2Y16 +
1Y12
UR-R-BEAM 2
All top reinforcement where not shown to be Y8-200c/c Scale 1 : 50 UR-BM 2A
Scale 1 : 25

No. Description Date


P1 Issued for Blup 11/12/2019
Mr. M O B NICOLAS DUBOIS (SOCIETE UPPER ROOF SLAB REINFORCEMENT
THOTES 3)

11/12/2019 10:27:25
Project number P34
Date 11/12/2019
BUILDING PERMIT
APARTMENT AT LA PRENEUSE-BLACK
Drawn by SR
RIVER 008
Checked by DB As indicated
15
1 2 3 4 6 7 9 12 14
10 mm Rubber Spacer

200 1600 200 3920 400


20 mm Joint
1980 200

1300
530

950
500
200

350

615 300
550

LEV:+10.05 m

115
615

R-ROOF

415
200
300

1A

2585
011

300 2500
LEV:+7.05 m
50

115

56
500

500
02-SECOND FLOOR

415

240
240

300

2585
600 2500
LEV:+4.05 m

56
300 115
50
500

500
01-FIRST FLOOR

415

240
240

2585
LEV:+1.05 m

415
115

00-GROUND FLOOR
415

300

No Description Date

785
P1 Issued for Blup 11/12/2019

2285
1500

1500
LEV:-1.65 m
125

-01-BASEMENT

LEV:-2.65 m

F-FOUNDATION

Section 1
Scale 1 : 75

Mr. M O B NICOLAS DUBOIS (SOCIETE


THOTES 3)

APARTMENT AT LA PRENEUSE-BLACK
1 2
RIVER

Lev. +7135 SECTION 1


300 150
LEV:+7.05 m
115
50

Project number P34


185
25

02-SECOND FLOOR
Date 11/12/2019
500

300
240

11/12/2019 10:23:23
Drawn by SR
Checked by DB
As
BUILDING PERMIT indicated
DETAIL 1A
Scale 1 : 25
011
1 2 5 6 7 13 15

4325 400 2375 200


600 1300 200 1000 200
200 900 200
1300

1510
200 2050 200
550

950
350
560

LEV:+10.05 m
200

915
615

R-ROOF

415
200 2050 200

2585
645 200

645 200
1045
200 1249 2420 150
LEV:+7.05 m

615

615
500

500
02-SECOND FLOOR

415
200 2050 200

2585
645 200
200 1250 1350 1045 2420 150
LEV:+4.05 m

615
500

500
01-FIRST FLOOR No Description Date

415
P1 Issued for Blup 11/12/2019

200 2050 200

2585
645 200
1045

1350 375 LEV:+1.05 m


615

00-GROUND FLOOR

415
785

2285
1500

LEV:-1.65 m
Mr. M O B NICOLAS DUBOIS (SOCIETE
-01-BASEMENT
THOTES 3)
LEV:-2.65 m

F-FOUNDATION
APARTMENT AT LA PRENEUSE-BLACK
RIVER

SECTION 2

Project number P34


Date 11/12/2019

11/12/2019 10:23:24
Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 75

012
1 2 3 4 5 6 7 8 9 10
200 2500 200 1650 200 1050 200
Lev. +14450

1600

1600
1200

1400
LEV:+13.05 m

200
UR-UPPER ROOF

10 mm Rubber Joint
1450 200 1000 200 620 200 4900 400

2800
1300

1510
450
500

LEV:+10.05 m
560

415
615

R-ROOF

2585
300 2500
LEV:+7.05 m

415
500

02-SECOND FLOOR

385
No Description Date

2585

2200
600 2500 P1 Issued for Blup 11/12/2019
415

LEV:+4.05 m

415
500

01-FIRST FLOOR
185

2585
2400

415 LEV:+1.05 m

00-GROUND FLOOR
785

2285
1500

LEV:-1.65 m

-01-BASEMENT Mr. M O B NICOLAS DUBOIS (SOCIETE

1000
LEV:-2.65 m THOTES 3)
F-FOUNDATION

APARTMENT AT LA PRENEUSE-BLACK
RIVER

SECTION 3

Project number P34


Date 11/12/2019

11/12/2019 10:23:25
Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 100

013
A B E G H L
300

10 mm Rubber Joint
450 450 200 1000 400 M
400 1000 200
1300

1300
200

200
350

350

550
LEV:+10.05 m
615

615
R-ROOF

415
2100 755

3000
2585

300 1500 755


1500 300
LEV:+7.05 m
500

500
02-SECOND FLOOR
415

3000
2585

600 1500 755 1500 600


LEV:+4.05 m
500

500
01-FIRST FLOOR
415

No Description Date
P1 Issued for Blup 11/12/2019
3000
2585

LEV:+1.05 m

00-GROUND FLOOR
415

2700
2285

LEV:-1.65 m

-01-BASEMENT
Mr. M O B NICOLAS DUBOIS (SOCIETE
LEV:-2.65 m THOTES 3)
F-FOUNDATION

APARTMENT AT LA PRENEUSE-BLACK
RIVER

SECTION 4

Project number P34


Date 11/12/2019

11/12/2019 10:23:27
Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 75

014
A B C F K L M

200 450
200
950

950

615 300
LEV:+10.05 m

624
615

R-ROOF
415

1540

3000
2585

645 200

645 200
200 225
LEV:+7.05 m

615

615
02-SECOND FLOOR
415

1540

3000
2585

645 200

645 200
225 LEV:+4.05 m
615

615
01-FIRST FLOOR
415

415

1540

3000
2585

No Description Date
645 200

645 200
P1 Issued for Blup 11/12/2019
225
LEV:+1.05 m

415
615

615
00-GROUND FLOOR
415

415

785
2700
2285

2285

2285
1500

1500
LEV:-1.65 m

-01-BASEMENT

LEV:-2.65 m

F-FOUNDATION
Mr. M O B NICOLAS DUBOIS (SOCIETE
THOTES 3)

APARTMENT AT LA PRENEUSE-BLACK
RIVER

SECTION 5

Project number P34


Date 11/12/2019

11/12/2019 10:23:29
Drawn by SR
Checked by DB

BUILDING PERMIT 1 : 75

015
G H L N
300
200

9
2400

2800

200 1050 200 450

200

950

950

1165
615 300
LEV:+10.05 m

500
115

624
615

500
R-ROOF
415

415

415

200
300
400
C E
5300
250 600 451 600 600 199
2585

2585

2585
Lev. +450

645 200

200
100 2500 300
LEV:+7.05 m

415

56

615
500
02-SECOND FLOOR
415

415

415
200 700 200 2100 200 1700 200

185

1540

2900
2585

2585
2400

645 200
100 2500 600
LEV:+4.05 m

115
415

56

615
500
01-FIRST FLOOR
415

415

415
240
200 200
Lev. -2650

300
185

1540
2585

2585
2400

75mm Blinding Layer

645 200
LEV:+1.05 m
Section 9
415

Scale 1 : 50

300115
615
00-GROUND FLOOR
415

415
785
2285

2285

2285
1500

LEV:-1.65 m

-01-BASEMENT

LEV:-2.65 m No Description Date


F-FOUNDATION P1 Issued for Blup 11/12/2019
Section 7
Scale 1 : 75

Section 6
Scale 1 : 75
1 2

14 15
LEV:+1.05 m

00-GROUND FLOOR
900 600 600 800
Lev. +450
200

Mr. M O B NICOLAS DUBOIS (SOCIETE

785
THOTES 3)

200 1500 200 2200 200 1800 200 125


APARTMENT AT LA PRENEUSE-BLACK

1500
400 200 RIVER
1200
2900

Metal Grating
LEV:-1.65 m
SECTIONS
-01-BASEMENT

300
Project number P34

150
200

LEV:-2.65 m
LEV:-2.65 m
F-FOUNDATION
Date 11/12/2019
F-FOUNDATION

11/12/2019 10:23:31
Drawn by SR
75mm Blinding Layer Checked by DB
Section 8 As
Scale 1 : 50 Section 10 BUILDING PERMIT
Scale 1 : 50 indicated

016
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 2xY8-200c/c-Links 2xY8-150c/c-Links
5Y20 4Y16 4Y16 8Y16 10Y25

N N
SB 1
M M
SB 5Y20 4Y16 4Y16 8Y20 10Y25
SB 3
L 2 L

SS 19

SS 25
GF-SS1 GF-SS2 GF-SS3 GF-SS4 GF-SS5
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

SS 28

SS 30
SS 24

SS 26
SB
SS 12

K K

SS 15

SS 18
4

SS 20
2xY8-200c/c-Links Y8-200c/c-Links 2xY8-150c/c-Links 2xY8-200c/c-Links
8Y16 6Y16 10Y25 8Y16

J J
H SB 5 H

SS 27

SS 29
8Y20 6Y16 10Y25 8Y20

SS 21
SS 22
SB
SS 13

SB SB
SS 15
SS 16
SS 17

SS 24
SS 14

SS 19
G 6 G GF-SS6 GF-SS7 GF-SS8 GF-SS9
7 7 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

Y8-200c/c-Links Y8-200c/c-Links 2xY8-150c/c-Links


F SB F 4Y16 3Y16 Y8-200c/c-Links 10Y25
E E 4Y16
D 8 D
SS 15

SS 18

C SB C
SS 12

SS 20

SS 23
4Y16 3Y16 10Y25
9 4Y16
SS 19

B B GF-SS11
SB GF-SS10 Scale 1 : 25 GF-SS12 GF-SS13
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
10
A SB 11 A
Y8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links
4Y20 7Y16 7Y16 5Y20

1 2 3 4 56 7 8 9 10 11 12 1314 15

4Y20 7Y20 7Y20 5Y20


00-GROUND FLOOR STRIP BEAM KEYPLAN
Scale 1 : 200

GF-SS14 GF-SS15 GF-SS16 GF-SS17


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

No Description Date
Y8-200c/c-Links 2Y16 2Y16 P1 Issued for Blup 11/12/2019
2xY8-200c/c-Links Y8-200c/c-Links
4Y20 6Y16 4Y20 3Y20 4Y20

2xY8-200c/c-Links 2xY8-200c/c-Links

4Y20 6Y20 4Y20 3Y20 4Y20

GF-SS18 GF-SS19 GF-SS20 GF-SS21 GF-SS22


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
Y8-200c/c-B2 Y10-150c/c-B1
2Y10 2Y10

115
2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links

415
3Y20 8Y16 4Y20 5Y20

300
Y8-200c/c-Links Mr. M O B NICOLAS DUBOIS (SOCIETE
THOTES 3)
2Y12 R6-150c/c 2Y12
150 450 150
3Y20 8Y20 4Y20 5Y20
APARTMENT AT LA PRENEUSE-BLACK
RIVER
GF-SS23 GF-SS24 GF-SS25 GF-SS26
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Y8-200c/c-B2 Y10-150c/c-B1
2Y10 2Y10 GROUND FLOOR SOLID STRIP
REINFORCEMENT DETAILS

115
355
Y8-200c/c-Links
Y8-200c/c-Links Project number P34

240
5Y20 3Y20 4Y16 5Y16
2Y10 R6-150c/c 2Y10 Date 11/12/2019
Y8-200c/c-Links
Y8-200c/c-Links 150 450 150

11/12/2019 10:24:50
Drawn by SR
5Y20 3Y20 4Y16 5Y20 RIB & TOPPING REIN'T DETAIL Checked by DB
Scale 1 : 25

As
GF-SS27 GF-SS28 GF-SS29 GF-SS30 BUILDING PERMIT indicated
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

101
3xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 5Y20 7Y16 6Y16 8Y16

SB 31 Y8-200c/c-Links
N SB 32 SB N
M 1 M
5Y20 7Y20 5Y20 8Y20
SB 33 SB
L SB L
SB 34 3
2Y12 2Y16
2

SS 19

SS 25
FF-SS1 FF-SS2 FF-SS3 FF-SS4
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

SS 28

SS 30
SS 24
SB
SS 12

K K

SS 15
SS 36

SS 18
4

SS 20
2xY8-150c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links 2xY8-150c/c-Links
10Y25 8Y16 6Y16 10Y25
J J
H SB 5 H

SS 26

SS 27

SS 29
10Y25 8Y20 6Y16 10Y25

SS 21
SS 22
SB SB SB
SS 15
SS 16
SS 17

SS 24
SS 13

SS 14

SS 19
G 6 G
7 7 FF-SS5 FF-SS6 FF-SS7 FF-SS8
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

F SB F
E E
D 8 D 2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
8Y16 7Y16 5Y16 8Y16 7Y20
SS 36

SS 15

SS 18

C SB C
SS 12

SS 20

SS 23

9
SS 19

8Y20 7Y20 5Y16 6Y16 7Y20


B SB B
10 2Y16

A
SB 35 SB 11 A FF-SS9 FF-SS10 FF-SS11 FF-SS12 FF-SS13
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

Y8-200c/c-Links Y8-200c/c-Links
2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 4Y20 7Y16 7Y16 4Y20 4Y20

01-FIRST FLOOR SOLID STRIP KEYPLAN


Scale 1 : 200
4Y20 7Y20 7Y20 4Y20 4Y20

FF-SS14 FF-SS15 FF-SS16 FF-SS17 FF-SS18


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

No Description Date
2Y16 2Y16
2xY8-200c/c-Links Y8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links P1 Issued for Blup 11/12/2019
6Y16 6Y20 3Y20 4Y20 3Y20 10Y20 4Y16 7Y16
2xY8-200c/c-Links Y8-200c/c-Links
2xY8-200c/c-Links

6Y20 6Y20 3Y20 4Y20 3Y20 8Y20 4Y20 7Y16

FF-SS19 FF-SS24 FF-SS25 FF-SS26


Scale 1 : 25 FF-SS20 FF-SS21 FF-SS22 FF-SS23 Scale 1 : 25
Scale 1 : 25
Scale 1 : 25
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

Y8-200c/c-B2 Y10-150c/c-B1
2Y10 2Y10

115
Y8-200c/c-Links 3xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links
4Y16 7Y16 8Y16 6Y16 6Y16
Mr. M O B NICOLAS DUBOIS (SOCIETE

415
300
THOTES 3)
3Y16 2Y16

2Y12 R6-150c/c 2Y12


4Y20 7Y16 7Y16
7Y16 7Y16
150 450 150 APARTMENT AT LA PRENEUSE-BLACK
2Y12 RIVER
FF-SS27
Scale 1 : 25
FF-SS28 FF-SS29 FF-SS30 FF-SS31 1ST & 2ND FLOOR SOLID STRIP REINF'T
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Y8-200c/c-B2 Y10-150c/c-B1
DETAILS
2Y10 2Y10

115
Project number P34
2xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links

355
6Y16 6Y16 6Y16

240
Y8-200c/c-Links
2xY8-200c/c-Links Date 11/12/2019
3Y20 7Y20
2Y10 R6-150c/c 2Y10

11/12/2019 10:25:02
4Y16 4Y16 3Y16 Drawn by SR
150 450 150
Checked by DB
8Y16 3Y20 7Y20 8Y16 7Y16 RIB & TOPPING REIN'T DETAIL
Scale 1 : 25 As
BUILDING PERMIT indicated
FF-SS32 FF-SS33 FF-SS34 FF-SS35 FF-SS36
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 102
2Y16

1 2 3 4 56 7 8 9 10 11 12 1314 15
2xY8-200c/c-Links
5Y16
SB 31 Y8-200c/c-Links Y8-200c/c-Links
N SB 32 N 7Y16 6Y16
SB 1 2xY8-200c/c-Links
M M 10Y16
SB 33
L SB 34 SB 3 L
SB 2

SS 19

SS 25
5Y20 7Y20 6Y20

SS 28

SS 30
SS 24
10Y20
SS 12

K SB 4 K

SS 15
R-SS1 R-SS2 R-SS3 R-SS4
SS 36

SS 18

SS 20
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

J J
H SB 5 H 5Y16
2xY8-200c/c-
Y8-200c/c-Links Links Y8-200c/c-Links 2xY8-200c/c-Links

SS 26

SS 27

SS 29
8Y16 10Y16 6Y16 10Y16

SS 21
SS 22
SB
SS 15
SS 16
SS 17

SS 24
SS 13

SS 14

SB 6
SS 19
G SB 7 G
7
8Y20 10Y20 6Y20 10Y20

F F R-SS5 R-SS6 R-SS7 R-SS8


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
E SB 8 E
D D
2Y16
SS 36

SS 15

SS 18

C C
SS 12

SB 9
SS 20

SS 23
2xY8-200c/c-Links
5Y16
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
SS 19

B B 8Y16 7Y16 6Y16


SB 10
A SB 11 A
SB 35
8Y20 7Y20 5Y20 6Y20

1 2 3 4 56 7 8 9 10 11 12 1314 15 R-SS9 R-SS10 R-SS11 R-SS12


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

R-ROOF STRIP KEYPLAN


Scale 1 : 200

Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links


7Y16 4Y16 7Y16 7Y20 4Y16 4Y16 6Y16 6Y16

7Y20 4Y20 7Y20 7Y20 4Y20 4Y20 6Y20 6Y20 No Description Date
R-SS13 R-SS14 R-SS15 R-SS16 R-SS17 R-SS18 R-SS19 R-SS20 P1 Issued for Blup 11/12/2019
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
2Y16
2Y16

2xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links


4Y16 5Y16 3Y20 10Y20 4Y16 7Y16 4Y16
Y8-200c/c-Links

4Y20 5Y20 3Y20 8Y20 4Y20 7Y16 4Y20

R-SS22 R-SS23 R-SS24 R-SS25 R-SS26 R-SS27


R-SS21 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
Scale 1 : 25 2Y16 2Y16

Y8-200c/c-B2 Y10-150c/c-B1 Mr. M O B NICOLAS DUBOIS (SOCIETE


2xY8-200c/c-Links 2xY8-200c/c-Links
7Y16 7Y16 5Y16 2Y10 2Y10 THOTES 3)
Y8-200c/c-Links Y8-200c/c-Links

115
2xY8-200c/c-Links
4Y16 6Y16 9Y16

415
APARTMENT AT LA PRENEUSE-BLACK

300
RIVER
2Y12 R6-150c/c 2Y12
4Y20 6Y20 7Y20 7Y20 9Y20
150 450 150 ROOF SLAB SOLID STRIP REINF'T

R-SS28 R-SS29 R-SS30 R-SS31 R-SS32 Project number P34


Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
5Y16 Y8-200c/c-B2 Y10-150c/c-B1
5Y16
2Y10 2Y10
Date 11/12/2019
2xY8-200c/c-Links 2xY8-200c/c-Links
Y8-200c/c-Links 7Y20 2xY8-200c/c-Links 8Y16

11/12/2019 10:25:11
115
4Y20 9Y16 Drawn by SR

355
240
Checked by DB
2Y10 R6-150c/c 2Y10 As
7Y20 8Y20
4Y20 9Y20 150 450 150 BUILDING PERMIT indicated
R-SS34 R-SS36
R-SS33 Scale 1 : 25 R-SS35 Scale 1 : 25 RIB & TOPPING REIN'T DETAIL 103
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
850
200 400 COLUMN SCHEDULE
Roof Level

200
COLUMN TYPE DIMENSION
500

250
C1 200x200 - C1

600
C2 200x500 - C2

450

450

400
50 200
250
C3 200x700 - C3

200
Links
C4 200x1000 - C4
200 300 600 C5 200x1500 - C5
400 450
C6 200x750 - C6
C7 150x650 - C7 Refer to column
C8 500x300x100x300 - C8 reinforcement
C9 600x450x250x400 - C9
C8 C9 C10 C10 850x600x400x400 - C10
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

75 50 x Min bar Ø
2Y16
Typical detail of bar
stopping where column
Y8-200c/c-Links section reduces at higher level
2Y16
Floor Level
2Y12 3Y16 6Y16 8Y16
2Y16
Y8-200c/c-Links 2xY8-200c/c-
R6-150c/c-Links
Links
2Y12 3Y16 2Y16 2xY8-200c/c- 6Y16 8Y16
Links
Links
R-C1 R-C2 R-C5
Scale 1 : 25 Scale 1 : 25 R-C3 R-C4 Scale 1 : 25
Scale 1 : 25 Scale 1 : 25
Refer to column
2Y16 reinforcement
5Y16
2Y16
2Y16

75 50 x Min bar Ø
2xY8-200c/c-Links 4Y16
3Y16 Typical detail of bar
4Y16 2Y16 4Y16 starting where column
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links 2Y16 section is bigger at higher level
Y8-200c/c-Links 3Y16
4Y16 Floor Level
4Y16 2Y16 2Y12 R6-150c/c-Links
3Y16
R-C6 R-C7 R-C8 R-C9 R-C10
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25

Starter bar to rest properly on slab


or beam bottom reinforcement
Links whichever is lower

Refer to column
1. All bases to be center on columns
reinforcement
unless otherwise shown.
2. All strip footing to be 900mm wide
except otherwise stated.
3. All strip footing to be aligned in center

75 50 x Min bar Ø
of blockwall except otherwise stated.
4. Depth of foundation to be confirmed
on site.

Y10-200c/c-Dist.
Lower Ground Floor Level No Description Date
P1 Issued for Blup 11/12/2019
Y10-150c/c-Vert(NF & FF)
100mm Protective blockwork
B2

B2
T2

T2

T1 T1 Refer to column
reinforcement Column Reinforcement to rest on
Tanking membrane Base/Pile Cap bottom reinforcement
Pile Cap/Base whichever is lower

200mm RC Wall

300 300

COLUMN ELEVATION

500
Scale 1 : 25

B1 300x300 French drain


B1
Y10-150c/c-
Vert(UB) 110mm Dia. perforated pipe Mr. M O B NICOLAS DUBOIS (SOCIETE
500

500
100mm Mass concrete THOTES 3)
200

R.C Column R.c Column


APARTMENT AT LA PRENEUSE-BLACK
RIVER
EQ EQ 100mm Crusher
Y10-200c/c-B1&B2 75mm Blinding
Run
T2 T1 T2 T1 Y10-200c/c-T1&T2 layer
BASES & COLUMNS REINFORCEMENTS
TYPICAL RETAINING WALL DETAIL
Scale 1 : 25
Project number P34
Date 11/12/2019

11/12/2019 10:22:36
Drawn by SR
75mm thick 15MPa B2 B1 75mm thick 15MPa B2 B1 BASE SCHEDULES
Blinding Layer Blinding Layer
Base Length x Width x Depth Reinforcement (Bottom-N / Top-T) Checked by DB
PF1 1000 x1000 x 300mm Y12-200c/c-B1 & B2
As
PF2 1500 x1500 x 300mm Y12-200c/c-B1 & B2 BUILDING PERMIT indicated
PF3 2000 x1500 x 300mm Y12-200c/c-B1 & B2
TYPICAL BASE LAYOUT PF4 2000 x2000 x 300mm Y12-200c/c-B1& B2 Y10-200c/c-T1 & T2
Scale 1 : 20
120
8 10 8 10

LEV:+13.05 m LEV:+13.05 m

200
UR-UPPER ROOF UR-UPPER ROOF

2800
3300
7 Step x 300mm= 2100 1200
LEV:+10.05 m LEV:+10.05 m

R-ROOF R-ROOF

350 150 8 Riser x 187.5mm= 1500


415

150
7 Step x 300mm= 2100 1200
Lev. +8550 Lev. +8550

350 150

2585
8 Riser x 187.5mm= 1500

500

500
200
150

7 Step x 300mm= 2100 1200


LEV:+7.05 m LEV:+7.05 m

02-SECOND FLOOR 02-SECOND FLOOR

350 150 8 Riser x 187.5mm= 1500


415

150
7 Step x 300mm= 2100 1200
Lev. +5550 Lev. +5550
350 150

2585
8 Riser x 187.5mm= 1500

500

500
200
150

7 Step x 300mm= 2100 1200


No Description Date
LEV:+4.05 m LEV:+4.05 m
P1 Issued for Blup 11/12/2019
01-FIRST FLOOR 01-FIRST FLOOR

350 150 8 Riser x 187.5mm= 1500


390

150
7 Step x 300mm= 2100 1200

Lev. +2550 Lev. +2550


350 150

2610
8 Riser x 187.5mm= 1500

500

500
200
150

7 Step x 300mm= 2100 1200


LEV:+1.05 m LEV:+1.05 m

350 1508 Riser x 168.8mm= 1350


00-GROUND FLOOR 00-GROUND FLOOR
415 Mr. M O B NICOLAS DUBOIS (SOCIETE
THOTES 3)

150
7 Step x 300mm= 2100 1200
Lev. -300 Lev. -300 APARTMENT AT LA PRENEUSE-BLACK
RIVER
350 150
8 Riser x 168.8mm= 1350

2285
500

500
200 TYPICAL STAIRCASE LAYOUT
150

LEV:-1.65 m LEV:-1.65 m
Project number P34
-01-BASEMENT -01-BASEMENT
Date 11/12/2019

11/12/2019 10:24:38
Drawn by SR
LEV:-2.65 m LEV:-2.65 m

F-FOUNDATION F-FOUNDATION Checked by DB

BUILDING PERMIT 1 : 50
Section thru Staircase Part 1 Section thru Staircase Part 2
Scale 1 : 50 Scale 1 : 50 121
8 9

1 2 3 4 56 7 8 9 1011 12 13
14 15 12 13

500
N N
M Sim M
L 4 L Y10-200-Links
122 3
122 LEV:+13.05 m
K K Y8-200c/c-Links
Y10-150c/c-Vert UR-UPPER ROOF
Y08-200c/c-UB
J J Y10-150c/c-Vert.
Y10-200-Dist.
H H
G
2
122 500 500 Y10-150c/c-Vert. Bars
G G
Y08-200c/c-UB Y10-200c/c-Horz. Bars

F F
E E
D D
00-SHEAR WALL TYPE 2
C C Scale 1 : 30

100 500
B B LEV:+10.05 m
4
122 1 13 14 R-ROOF
A 122 A

1 2 3 4 56 7 8 9 1011 12 13
14 15 K
Y10-150c/c-Vert. Bars

00-SHEAR WALL KEY PLAN


Scale 1 : 300 Y10-200c/c-Horz. Bars

500
Y08-200c/c-UB

100 500
LEV:+7.05 m

02-SECOND FLOOR
Y10-150c/c-Vert. Bars

8 9 8Y12+
Y08-200-Links

Y10-150c/c-Vert. Bars
Y08-200c/c-Horz. Bars

Y10150c/c-Vert
Y10-200c/c-Horz. Bars

C
2
Y8-200c/c-Links No Description Date

500

100 500
Y08-200c/c-UB LEV:+4.05 m
Y10-150c/c-Vert
Y10-150c/c-Vert Y8-200c/c-Links 500 P1 Issued for Blup 11/12/2019
01-FIRST FLOOR
H
8Y12+
1A 1A Y08-200c/c-UB Y08-200c/c-UB Y08-200-Links
122 122 Y10-150c/c-Vert
Y10-150c/c-Vert. Bars
Y08-200c/c-Links
500

Y10-150c/c-Vert
Y10-200c/c-UB
Y10-200c/c-Horz. Bars

Y08-200c/c-Links
Y10-150c/c-Vert Y8-200c/c-Links
00-SHEAR WALL TYPE 3

100 500
Y8-200c/c-Links Scale 1 : 30
Y10-150c/c-Vert. Bars LEV:+1.05 m

B 00-GROUND FLOOR
Mr. M O B NICOLAS DUBOIS (SOCIETE
6Y12+
THOTES 3)
Y10150c/c-Vert
Y08-200-Links Y10-150c/c-Vert. Bars
Y10-200c/c-Horz. Bars

Y10-200c/c-Horz. Bars APARTMENT AT LA PRENEUSE-BLACK


RIVER

00-SHEAR WALL TYPE 1 LIFT & SHEAR WALL DETAILS


500

Scale 1 : 30

100 500
LEV:-1.65 m
Project number P34
Y10-200c/c-UB -01-BASEMENT

Y10-150c/c-Vert. Bars Y10-150c/c-Vert. Bars


Date 11/12/2019
Y10-200c/c-Horz. Bars

11/12/2019 10:24:37
Y16-150c/c-T1&T2 Y10-200c/c-Horz. Bars
LEV:-2.65 m
Drawn by SR
F-FOUNDATION Checked by DB
As
Y16-150c/c-B1&B2 BUILDING PERMIT indicated
00-SHEAR WALL TYPE 4 LIFT SHEAR WALL DETAILS
Scale 1 : 30 Scale 1 : 50
122