Column Schedule Base Schedules Base Length X Width X Depth Reinforcement (Bottom-N / Top-T)
Column Schedule Base Schedules Base Length X Width X Depth Reinforcement (Bottom-N / Top-T)
425
N N
PF2
1025
800
400 800
C2 C8 C5 C8
150
M M
530
700
400
1650
PF2
600
C1 C4 C6 C2 C2 C4 C2
L L
350
400
900
1180
1600
PF2 C2
C3
850
C2 PF1 C2 PF1 C2 PF1 750 750
3000
650
PF1
1820
Strip Footing
1400
100
1200x200dp PF1
C2
650 350
PF1 C2
K K
145
140
440
200
2450
PF3 340 200mm Shear Wall
200mm Shear Wall C4 1000
PF3 PF3
3200
1400
565 935
C4 C4 750 750 475 470
432 PF3 1795 PF4
J PF3 J
C4
1000
980
980
600
C9 PF2
780
750
80
480
H H
120
120
500
750
C2 C7
550
1020
1020
1395 805 295 C4
100
1550
4115
200mm Shear Wall
Strip Footing
1200x200dp
445
4200
G G
Strip Footing
1200x200dp 440
3500
300
No Description Date
100 P1 Issued for Blup 11/12/2019
1900
PF3
C4 495 545 F
PF2
670
3100
600
C9
100
E PF3
E
800
830
C4 C4 C2 C2
100
100
D 200mm thk. D
2300
550 950 RC Raft
1400
1400
3200
PF1
1500 Lev. -2650
2400
200mm Shear Wall
2000
PF1 PF1
900
PF1
400 600
C2 C2 C2 C1
C C
150
200
300
PF1
Lift Pit
2000
2105
Shear Wall 200mm RC Wall
3040
1180
PF1
4705
200
C2 C2 C1
B Mr. M O B NICOLAS DUBOIS (SOCIETE
C2 PF1
PF1 PF1
THOTES 3)
C1 C4 C2 C2 Strip Footing
2405
1850 1250 1200x200dp
1650
PF2
APARTMENT AT LA PRENEUSE-BLACK
200
C10 300
A C2
A RIVER
C2 C2 C2 C1
950
700
11/12/2019 10:22:47
1 2 4 6 7 8 9 10 13 Drawn by SR
Checked by DB
001
COLUMN SCHEDULE
100
N 250 N
1450
16
1025
100
C5 C8 120
C8
M M
50
C2
1650
1650
630 200 100
C4 C6 C2 C4
100
L L
C2 C2
1180
1 1
1600
011 011
C3
C2 C2 C2
C2
3000
16
250
120
530
C2
C2
K K
145
8245
2450
C4
3200
475 470
100
J C4
J
C9 C7
780
330
H H
120
120
C4 C2
805
570
1 1
012 012
4115
6200
10 10
016 016 125mm thk. RC Slab
MESH A252
4200
G Lev. -1650 G
80 9
6
016 3720
016 6100
3500
1700 2400 2000
3630 2670 7 7
016 016 No Description Date
1205
1900
F C4 F P1 Issued for Blup 11/12/2019
C9
3100
600
E E
350
800
C4 C2 C2 C1
5100
D D
100
2300
900
900
3200
2400
2400
8255
2000
100 145 8 8
C2 016 016
900
C2 C2 C1
C C
150
200
95
2000
1800
2400
9
1 1
3040
016
013 1650 013
200
100
B C2 C2 B
C1 C4 C2
100 145 C2
C1 Mr. M O B NICOLAS DUBOIS (SOCIETE
1850 1250 THOTES 3)
2305
3070
100
A A
400 RIVER
550
1 1 BASEMENT LAYOUT
014 015
8700 16270
Project number P34
Date 11/12/2019
3 4 5 6 7 8 9 10 11 12 13 14 15
11/12/2019 10:22:49
1 2 Drawn by SR
Checked by DB
002
COLUMN SCHEDULE
1150 100
525
1250
N N
100
1025
100
C2
300
150
C8
M M
C8 C5
1650
630
C1 C4 C6 C2 C2 C4 C1 C2
100
L L
350
1 1
1600
011 C2 011
C3 C2 C2 C2
3000
250
C2
C2
K K
140
400
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping
2450
200mm Shear Wall Lev. +1050
3200
1550 C4 C4
J C7 J
C4 1695
780
C4
330
C4
H H
120
200520
375 100
500 720
C9 C2
550
530 1320
1 1
012 012
2050 200 1200 1530 475 470
4115
10 10 Void
150 200mm Shear Wall
016 016
450 450
95 300 95
445
7995
6800
G G
200
310
300
100 925 1165 2500 1105 80
6
016 9
300mm thk. hollow block + 115mm RC Topping 016
1700 2400 2000
3500
Lev. +1050
7 7 No Description Date
600
016 016
F 530 F
3100
600
C9 C4
E 900 E
350
800
C4 C4 C2 C2 C1
900
D 200mm thk. RC Slab D
Lev. +450
3200
600 600
300 600
2400
200mm Shear Wall
2000
601 600
8 8
900
016 016
250 600
C2 C2 C1
C C
200
C2
1150 100 900 600
2000
2400
9
1 1 016
013 013
Lift Shear Wall
C2 C1
200
C2 C2
C1 THOTES 3)
C4 C2 C2
2305
2405
C2 APARTMENT AT LA PRENEUSE-BLACK
A A RIVER
300
C2
C10 C2 C2 C1
100 1050 2500 850 450 400 305
GROUND FLOOR LAYOUT
1 1
014 015
Project number P34
Date 11/12/2019
11/12/2019 10:22:45
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
Checked by DB
003
COLUMN SCHEDULE
1048 200
600
C2
1225
N 100 N
1025
552
600
C2
302
M M
2498
C8 C5 C8
1499
1650
100
C1 C4 200 x 600dp
L C6 L
200 x 600dp C2 C2 C4 C1 C2
1180
1 1
011 011
200 x 600dp
200 x 600dp
600 2500
3000
C2
C2
C2
C3 C2
530 805
1850 600
K C2 K
C2
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping
2450
295
200mm Shear Wall Lev. +4050
900
475 470
570
J J
C4 500
780
C4 C7
C9
H H
120
100
500 718
C4 C2 450
200
1 1
012 012
2155 200 2050 200 1200
4115
200 1250
97 300
545
6800
100
G G
198
308
95
198
1275 1160 2505 1185
6
016
300mm thk. hollow block + 115mm RC Topping
3500
Lev. +4050
F 200 F
600
C9 C4
E E
495
800
C4 C4 C2 C2 C1
D D
200 x 500dp
2400
200mm Shear Wall
C2
C2 200 x 500dp C1
C C
C2
600 2500
200 x 600dp
1 1
013 013
Lift Shear Wall
C2 C1
550 Mr. M O B NICOLAS DUBOIS (SOCIETE
C2 200 x 500dp
C1 C4 C2 C2 C2 THOTES 3)
200 x 500dp
100
200 x 600dp
1500
APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp
A C2
A RIVER
600
C2 C10 C2 C2 C1
11/12/2019 10:22:59
3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
1 2
Checked by DB
004
COLUMN SCHEDULE
1050 200
C2
300
1225
N 100 N
1025
C2
300
250
300
M M
C8 C5 C8
1500
1650
100
C1 C4 200 x 600dp
L C6 L
200 x 600dp C2 C2 C4 C1 C2
1180
1 1
011 200 x 600dp 011
200 x 600dp
2500
3000
C2
C2
C2
C3 C2
530 805
1850 285
K C2 K
C2
200mm Shear Wall
300mm thk. hollow block + 115mm RC Topping
2450
200mm Shear Wall 295
Lev. +7050
1245 475 470
570
J J
C4 500
780
C7
120
C9 C4
H H
120
C4 C2
550
450
200
1 1
012 012
200 2050 200 1200
4115
200
545
6800
100
G G
200
200
1185
6
016
300mm thk. hollow block + 115mm RC Topping
3500
Lev. +7050
7 7 No Description Date
016 016
P1 Issued for Blup 11/12/2019
200
F F
600
C9 C4 495
E E
800
C4 C4 C2 C2 C1
D D
200 x 500dp
2400
200mm Shear Wall
C2
C2 200 x 500dp C1
C C
C2
300 2500
200 x 600dp
2400
1 1
013 013
200 x 600dp
2305
1500
APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp
A C2
A RIVER
C2 C10 C2 C2 C1
450 305
SECOND FLOOR LAYOUT
1 1
014 015
Project number P34
Date 11/12/2019
11/12/2019 10:23:10
3 4 5 6 7 8 9 10 11 12 13 14 15 Drawn by SR
1 2
Checked by DB
005
COLUMN SCHEDULE
200
450
525
525
530 550
N N
250475
1050
450 450
550
250
M M
200
1400
1000
1400
1935
L L
390
400
1 1
620
011 011
2430 2250
980
20 mm Joint
820 980
K K
450 1450 200 1000 200 5720 400 300mm thk. hollow block + 115mm RC Topping
Lev. +10050
805 200 900 200 445
J J
520
H H
120
445
200
1 1
1135
012 012
2335
2575
800
1395 1180
24000
6795
G G
200
200 750 200 1275 6325 1100
C1 C2 C2 C1
D D
200 x 500dp
200 x 500dp
C C2
C
C2 C1
820 980
1 1
980
013 013
B 20
B THOTES 3)
200 x 500dp
450 450200 1000 200
200
200 x 500dp
1400
APARTMENT AT LA PRENEUSE-BLACK
200 x 500dp RIVER
200
A A
250
550
300
C2 C2 C1
250
11/12/2019 10:23:21
Drawn by SR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Checked by DB
006
7 10
3
008 5800
200 x 1400dp
D D
200 x 500dp
2600
2700 1850 1250
200 x 500dp
200 x 1400dp
200 x 1400dp
2000
7205
7205
1 1
013 013
200 x 500dp
2605
A A
100
200 x 1400dp
3
008
7 10
11/12/2019 10:27:24
Project number P34
Date 11/12/2019
BUILDING PERMIT
APARTMENT AT LA PRENEUSE-BLACK
Drawn by SR
RIVER 007
Checked by DB 1 : 75
7 10
Y10-150-B1
Y10-150-B1
Y10-150-B1
Y10-200-B1
Y10-200-T1
Y08-200-T2
Y8-150-UB
7 2900 8 3100 10
5800 2Y12
1A
BEAM 1 008
D D 2Y12
Y8-200-UB 2Y12 4x2Y12
900
900
900 2Y12
Y10-200-B2 2Y12
1000 1000 2xY8-200c/c-Links
2Y12
900 900
BEAM 2
BEAM 2
Y10-150-B1 2Y16
7205
2Y16 2Y16
UR-R-BEAM 1 UR-BM 1A
Scale 1 : 50 Scale 1 : 25
Y10-200-B2
Y8-200-UB
900
900
Y10-200-B2
A A
100
BEAM 1
7 10
2Y16
2Y12
Y8-200c/c-Links
2Y12
2Y16 + 1Y12
2A Y8-200c/c-Links
008 2Y16 +
1Y12
UR-R-BEAM 2
All top reinforcement where not shown to be Y8-200c/c Scale 1 : 50 UR-BM 2A
Scale 1 : 25
11/12/2019 10:27:25
Project number P34
Date 11/12/2019
BUILDING PERMIT
APARTMENT AT LA PRENEUSE-BLACK
Drawn by SR
RIVER 008
Checked by DB As indicated
15
1 2 3 4 6 7 9 12 14
10 mm Rubber Spacer
1300
530
950
500
200
350
615 300
550
LEV:+10.05 m
115
615
R-ROOF
415
200
300
1A
2585
011
300 2500
LEV:+7.05 m
50
115
56
500
500
02-SECOND FLOOR
415
240
240
300
2585
600 2500
LEV:+4.05 m
56
300 115
50
500
500
01-FIRST FLOOR
415
240
240
2585
LEV:+1.05 m
415
115
00-GROUND FLOOR
415
300
No Description Date
785
P1 Issued for Blup 11/12/2019
2285
1500
1500
LEV:-1.65 m
125
-01-BASEMENT
LEV:-2.65 m
F-FOUNDATION
Section 1
Scale 1 : 75
APARTMENT AT LA PRENEUSE-BLACK
1 2
RIVER
02-SECOND FLOOR
Date 11/12/2019
500
300
240
11/12/2019 10:23:23
Drawn by SR
Checked by DB
As
BUILDING PERMIT indicated
DETAIL 1A
Scale 1 : 25
011
1 2 5 6 7 13 15
1510
200 2050 200
550
950
350
560
LEV:+10.05 m
200
915
615
R-ROOF
415
200 2050 200
2585
645 200
645 200
1045
200 1249 2420 150
LEV:+7.05 m
615
615
500
500
02-SECOND FLOOR
415
200 2050 200
2585
645 200
200 1250 1350 1045 2420 150
LEV:+4.05 m
615
500
500
01-FIRST FLOOR No Description Date
415
P1 Issued for Blup 11/12/2019
2585
645 200
1045
00-GROUND FLOOR
415
785
2285
1500
LEV:-1.65 m
Mr. M O B NICOLAS DUBOIS (SOCIETE
-01-BASEMENT
THOTES 3)
LEV:-2.65 m
F-FOUNDATION
APARTMENT AT LA PRENEUSE-BLACK
RIVER
SECTION 2
11/12/2019 10:23:24
Drawn by SR
Checked by DB
BUILDING PERMIT 1 : 75
012
1 2 3 4 5 6 7 8 9 10
200 2500 200 1650 200 1050 200
Lev. +14450
1600
1600
1200
1400
LEV:+13.05 m
200
UR-UPPER ROOF
10 mm Rubber Joint
1450 200 1000 200 620 200 4900 400
2800
1300
1510
450
500
LEV:+10.05 m
560
415
615
R-ROOF
2585
300 2500
LEV:+7.05 m
415
500
02-SECOND FLOOR
385
No Description Date
2585
2200
600 2500 P1 Issued for Blup 11/12/2019
415
LEV:+4.05 m
415
500
01-FIRST FLOOR
185
2585
2400
415 LEV:+1.05 m
00-GROUND FLOOR
785
2285
1500
LEV:-1.65 m
1000
LEV:-2.65 m THOTES 3)
F-FOUNDATION
APARTMENT AT LA PRENEUSE-BLACK
RIVER
SECTION 3
11/12/2019 10:23:25
Drawn by SR
Checked by DB
013
A B E G H L
300
10 mm Rubber Joint
450 450 200 1000 400 M
400 1000 200
1300
1300
200
200
350
350
550
LEV:+10.05 m
615
615
R-ROOF
415
2100 755
3000
2585
500
02-SECOND FLOOR
415
3000
2585
500
01-FIRST FLOOR
415
No Description Date
P1 Issued for Blup 11/12/2019
3000
2585
LEV:+1.05 m
00-GROUND FLOOR
415
2700
2285
LEV:-1.65 m
-01-BASEMENT
Mr. M O B NICOLAS DUBOIS (SOCIETE
LEV:-2.65 m THOTES 3)
F-FOUNDATION
APARTMENT AT LA PRENEUSE-BLACK
RIVER
SECTION 4
11/12/2019 10:23:27
Drawn by SR
Checked by DB
BUILDING PERMIT 1 : 75
014
A B C F K L M
200 450
200
950
950
615 300
LEV:+10.05 m
624
615
R-ROOF
415
1540
3000
2585
645 200
645 200
200 225
LEV:+7.05 m
615
615
02-SECOND FLOOR
415
1540
3000
2585
645 200
645 200
225 LEV:+4.05 m
615
615
01-FIRST FLOOR
415
415
1540
3000
2585
No Description Date
645 200
645 200
P1 Issued for Blup 11/12/2019
225
LEV:+1.05 m
415
615
615
00-GROUND FLOOR
415
415
785
2700
2285
2285
2285
1500
1500
LEV:-1.65 m
-01-BASEMENT
LEV:-2.65 m
F-FOUNDATION
Mr. M O B NICOLAS DUBOIS (SOCIETE
THOTES 3)
APARTMENT AT LA PRENEUSE-BLACK
RIVER
SECTION 5
11/12/2019 10:23:29
Drawn by SR
Checked by DB
BUILDING PERMIT 1 : 75
015
G H L N
300
200
9
2400
2800
200
950
950
1165
615 300
LEV:+10.05 m
500
115
624
615
500
R-ROOF
415
415
415
200
300
400
C E
5300
250 600 451 600 600 199
2585
2585
2585
Lev. +450
645 200
200
100 2500 300
LEV:+7.05 m
415
56
615
500
02-SECOND FLOOR
415
415
415
200 700 200 2100 200 1700 200
185
1540
2900
2585
2585
2400
645 200
100 2500 600
LEV:+4.05 m
115
415
56
615
500
01-FIRST FLOOR
415
415
415
240
200 200
Lev. -2650
300
185
1540
2585
2585
2400
645 200
LEV:+1.05 m
Section 9
415
Scale 1 : 50
300115
615
00-GROUND FLOOR
415
415
785
2285
2285
2285
1500
LEV:-1.65 m
-01-BASEMENT
Section 6
Scale 1 : 75
1 2
14 15
LEV:+1.05 m
00-GROUND FLOOR
900 600 600 800
Lev. +450
200
785
THOTES 3)
1500
400 200 RIVER
1200
2900
Metal Grating
LEV:-1.65 m
SECTIONS
-01-BASEMENT
300
Project number P34
150
200
LEV:-2.65 m
LEV:-2.65 m
F-FOUNDATION
Date 11/12/2019
F-FOUNDATION
11/12/2019 10:23:31
Drawn by SR
75mm Blinding Layer Checked by DB
Section 8 As
Scale 1 : 50 Section 10 BUILDING PERMIT
Scale 1 : 50 indicated
016
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 2xY8-200c/c-Links 2xY8-150c/c-Links
5Y20 4Y16 4Y16 8Y16 10Y25
N N
SB 1
M M
SB 5Y20 4Y16 4Y16 8Y20 10Y25
SB 3
L 2 L
SS 19
SS 25
GF-SS1 GF-SS2 GF-SS3 GF-SS4 GF-SS5
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
SS 28
SS 30
SS 24
SS 26
SB
SS 12
K K
SS 15
SS 18
4
SS 20
2xY8-200c/c-Links Y8-200c/c-Links 2xY8-150c/c-Links 2xY8-200c/c-Links
8Y16 6Y16 10Y25 8Y16
J J
H SB 5 H
SS 27
SS 29
8Y20 6Y16 10Y25 8Y20
SS 21
SS 22
SB
SS 13
SB SB
SS 15
SS 16
SS 17
SS 24
SS 14
SS 19
G 6 G GF-SS6 GF-SS7 GF-SS8 GF-SS9
7 7 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
SS 18
C SB C
SS 12
SS 20
SS 23
4Y16 3Y16 10Y25
9 4Y16
SS 19
B B GF-SS11
SB GF-SS10 Scale 1 : 25 GF-SS12 GF-SS13
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
10
A SB 11 A
Y8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links
4Y20 7Y16 7Y16 5Y20
1 2 3 4 56 7 8 9 10 11 12 1314 15
No Description Date
Y8-200c/c-Links 2Y16 2Y16 P1 Issued for Blup 11/12/2019
2xY8-200c/c-Links Y8-200c/c-Links
4Y20 6Y16 4Y20 3Y20 4Y20
2xY8-200c/c-Links 2xY8-200c/c-Links
115
2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
415
3Y20 8Y16 4Y20 5Y20
300
Y8-200c/c-Links Mr. M O B NICOLAS DUBOIS (SOCIETE
THOTES 3)
2Y12 R6-150c/c 2Y12
150 450 150
3Y20 8Y20 4Y20 5Y20
APARTMENT AT LA PRENEUSE-BLACK
RIVER
GF-SS23 GF-SS24 GF-SS25 GF-SS26
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Y8-200c/c-B2 Y10-150c/c-B1
2Y10 2Y10 GROUND FLOOR SOLID STRIP
REINFORCEMENT DETAILS
115
355
Y8-200c/c-Links
Y8-200c/c-Links Project number P34
240
5Y20 3Y20 4Y16 5Y16
2Y10 R6-150c/c 2Y10 Date 11/12/2019
Y8-200c/c-Links
Y8-200c/c-Links 150 450 150
11/12/2019 10:24:50
Drawn by SR
5Y20 3Y20 4Y16 5Y20 RIB & TOPPING REIN'T DETAIL Checked by DB
Scale 1 : 25
As
GF-SS27 GF-SS28 GF-SS29 GF-SS30 BUILDING PERMIT indicated
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
101
3xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 5Y20 7Y16 6Y16 8Y16
SB 31 Y8-200c/c-Links
N SB 32 SB N
M 1 M
5Y20 7Y20 5Y20 8Y20
SB 33 SB
L SB L
SB 34 3
2Y12 2Y16
2
SS 19
SS 25
FF-SS1 FF-SS2 FF-SS3 FF-SS4
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
SS 28
SS 30
SS 24
SB
SS 12
K K
SS 15
SS 36
SS 18
4
SS 20
2xY8-150c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links 2xY8-150c/c-Links
10Y25 8Y16 6Y16 10Y25
J J
H SB 5 H
SS 26
SS 27
SS 29
10Y25 8Y20 6Y16 10Y25
SS 21
SS 22
SB SB SB
SS 15
SS 16
SS 17
SS 24
SS 13
SS 14
SS 19
G 6 G
7 7 FF-SS5 FF-SS6 FF-SS7 FF-SS8
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
F SB F
E E
D 8 D 2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
8Y16 7Y16 5Y16 8Y16 7Y20
SS 36
SS 15
SS 18
C SB C
SS 12
SS 20
SS 23
9
SS 19
A
SB 35 SB 11 A FF-SS9 FF-SS10 FF-SS11 FF-SS12 FF-SS13
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
Y8-200c/c-Links Y8-200c/c-Links
2xY8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links
1 2 3 4 56 7 8 9 10 11 12 1314 15 4Y20 7Y16 7Y16 4Y20 4Y20
No Description Date
2Y16 2Y16
2xY8-200c/c-Links Y8-200c/c-Links 2xY8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links P1 Issued for Blup 11/12/2019
6Y16 6Y20 3Y20 4Y20 3Y20 10Y20 4Y16 7Y16
2xY8-200c/c-Links Y8-200c/c-Links
2xY8-200c/c-Links
Y8-200c/c-B2 Y10-150c/c-B1
2Y10 2Y10
115
Y8-200c/c-Links 3xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links
4Y16 7Y16 8Y16 6Y16 6Y16
Mr. M O B NICOLAS DUBOIS (SOCIETE
415
300
THOTES 3)
3Y16 2Y16
115
Project number P34
2xY8-200c/c-Links 2xY8-200c/c-Links 2xY8-200c/c-Links
355
6Y16 6Y16 6Y16
240
Y8-200c/c-Links
2xY8-200c/c-Links Date 11/12/2019
3Y20 7Y20
2Y10 R6-150c/c 2Y10
11/12/2019 10:25:02
4Y16 4Y16 3Y16 Drawn by SR
150 450 150
Checked by DB
8Y16 3Y20 7Y20 8Y16 7Y16 RIB & TOPPING REIN'T DETAIL
Scale 1 : 25 As
BUILDING PERMIT indicated
FF-SS32 FF-SS33 FF-SS34 FF-SS35 FF-SS36
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 102
2Y16
1 2 3 4 56 7 8 9 10 11 12 1314 15
2xY8-200c/c-Links
5Y16
SB 31 Y8-200c/c-Links Y8-200c/c-Links
N SB 32 N 7Y16 6Y16
SB 1 2xY8-200c/c-Links
M M 10Y16
SB 33
L SB 34 SB 3 L
SB 2
SS 19
SS 25
5Y20 7Y20 6Y20
SS 28
SS 30
SS 24
10Y20
SS 12
K SB 4 K
SS 15
R-SS1 R-SS2 R-SS3 R-SS4
SS 36
SS 18
SS 20
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
J J
H SB 5 H 5Y16
2xY8-200c/c-
Y8-200c/c-Links Links Y8-200c/c-Links 2xY8-200c/c-Links
SS 26
SS 27
SS 29
8Y16 10Y16 6Y16 10Y16
SS 21
SS 22
SB
SS 15
SS 16
SS 17
SS 24
SS 13
SS 14
SB 6
SS 19
G SB 7 G
7
8Y20 10Y20 6Y20 10Y20
SS 15
SS 18
C C
SS 12
SB 9
SS 20
SS 23
2xY8-200c/c-Links
5Y16
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links
SS 19
7Y20 4Y20 7Y20 7Y20 4Y20 4Y20 6Y20 6Y20 No Description Date
R-SS13 R-SS14 R-SS15 R-SS16 R-SS17 R-SS18 R-SS19 R-SS20 P1 Issued for Blup 11/12/2019
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
2Y16
2Y16
115
2xY8-200c/c-Links
4Y16 6Y16 9Y16
415
APARTMENT AT LA PRENEUSE-BLACK
300
RIVER
2Y12 R6-150c/c 2Y12
4Y20 6Y20 7Y20 7Y20 9Y20
150 450 150 ROOF SLAB SOLID STRIP REINF'T
11/12/2019 10:25:11
115
4Y20 9Y16 Drawn by SR
355
240
Checked by DB
2Y10 R6-150c/c 2Y10 As
7Y20 8Y20
4Y20 9Y20 150 450 150 BUILDING PERMIT indicated
R-SS34 R-SS36
R-SS33 Scale 1 : 25 R-SS35 Scale 1 : 25 RIB & TOPPING REIN'T DETAIL 103
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
850
200 400 COLUMN SCHEDULE
Roof Level
200
COLUMN TYPE DIMENSION
500
250
C1 200x200 - C1
600
C2 200x500 - C2
450
450
400
50 200
250
C3 200x700 - C3
200
Links
C4 200x1000 - C4
200 300 600 C5 200x1500 - C5
400 450
C6 200x750 - C6
C7 150x650 - C7 Refer to column
C8 500x300x100x300 - C8 reinforcement
C9 600x450x250x400 - C9
C8 C9 C10 C10 850x600x400x400 - C10
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
75 50 x Min bar Ø
2Y16
Typical detail of bar
stopping where column
Y8-200c/c-Links section reduces at higher level
2Y16
Floor Level
2Y12 3Y16 6Y16 8Y16
2Y16
Y8-200c/c-Links 2xY8-200c/c-
R6-150c/c-Links
Links
2Y12 3Y16 2Y16 2xY8-200c/c- 6Y16 8Y16
Links
Links
R-C1 R-C2 R-C5
Scale 1 : 25 Scale 1 : 25 R-C3 R-C4 Scale 1 : 25
Scale 1 : 25 Scale 1 : 25
Refer to column
2Y16 reinforcement
5Y16
2Y16
2Y16
75 50 x Min bar Ø
2xY8-200c/c-Links 4Y16
3Y16 Typical detail of bar
4Y16 2Y16 4Y16 starting where column
Y8-200c/c-Links Y8-200c/c-Links Y8-200c/c-Links 2Y16 section is bigger at higher level
Y8-200c/c-Links 3Y16
4Y16 Floor Level
4Y16 2Y16 2Y12 R6-150c/c-Links
3Y16
R-C6 R-C7 R-C8 R-C9 R-C10
Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25 Scale 1 : 25
Refer to column
1. All bases to be center on columns
reinforcement
unless otherwise shown.
2. All strip footing to be 900mm wide
except otherwise stated.
3. All strip footing to be aligned in center
75 50 x Min bar Ø
of blockwall except otherwise stated.
4. Depth of foundation to be confirmed
on site.
Y10-200c/c-Dist.
Lower Ground Floor Level No Description Date
P1 Issued for Blup 11/12/2019
Y10-150c/c-Vert(NF & FF)
100mm Protective blockwork
B2
B2
T2
T2
T1 T1 Refer to column
reinforcement Column Reinforcement to rest on
Tanking membrane Base/Pile Cap bottom reinforcement
Pile Cap/Base whichever is lower
200mm RC Wall
300 300
COLUMN ELEVATION
500
Scale 1 : 25
500
100mm Mass concrete THOTES 3)
200
11/12/2019 10:22:36
Drawn by SR
75mm thick 15MPa B2 B1 75mm thick 15MPa B2 B1 BASE SCHEDULES
Blinding Layer Blinding Layer
Base Length x Width x Depth Reinforcement (Bottom-N / Top-T) Checked by DB
PF1 1000 x1000 x 300mm Y12-200c/c-B1 & B2
As
PF2 1500 x1500 x 300mm Y12-200c/c-B1 & B2 BUILDING PERMIT indicated
PF3 2000 x1500 x 300mm Y12-200c/c-B1 & B2
TYPICAL BASE LAYOUT PF4 2000 x2000 x 300mm Y12-200c/c-B1& B2 Y10-200c/c-T1 & T2
Scale 1 : 20
120
8 10 8 10
LEV:+13.05 m LEV:+13.05 m
200
UR-UPPER ROOF UR-UPPER ROOF
2800
3300
7 Step x 300mm= 2100 1200
LEV:+10.05 m LEV:+10.05 m
R-ROOF R-ROOF
150
7 Step x 300mm= 2100 1200
Lev. +8550 Lev. +8550
350 150
2585
8 Riser x 187.5mm= 1500
500
500
200
150
150
7 Step x 300mm= 2100 1200
Lev. +5550 Lev. +5550
350 150
2585
8 Riser x 187.5mm= 1500
500
500
200
150
150
7 Step x 300mm= 2100 1200
2610
8 Riser x 187.5mm= 1500
500
500
200
150
150
7 Step x 300mm= 2100 1200
Lev. -300 Lev. -300 APARTMENT AT LA PRENEUSE-BLACK
RIVER
350 150
8 Riser x 168.8mm= 1350
2285
500
500
200 TYPICAL STAIRCASE LAYOUT
150
LEV:-1.65 m LEV:-1.65 m
Project number P34
-01-BASEMENT -01-BASEMENT
Date 11/12/2019
11/12/2019 10:24:38
Drawn by SR
LEV:-2.65 m LEV:-2.65 m
BUILDING PERMIT 1 : 50
Section thru Staircase Part 1 Section thru Staircase Part 2
Scale 1 : 50 Scale 1 : 50 121
8 9
1 2 3 4 56 7 8 9 1011 12 13
14 15 12 13
500
N N
M Sim M
L 4 L Y10-200-Links
122 3
122 LEV:+13.05 m
K K Y8-200c/c-Links
Y10-150c/c-Vert UR-UPPER ROOF
Y08-200c/c-UB
J J Y10-150c/c-Vert.
Y10-200-Dist.
H H
G
2
122 500 500 Y10-150c/c-Vert. Bars
G G
Y08-200c/c-UB Y10-200c/c-Horz. Bars
F F
E E
D D
00-SHEAR WALL TYPE 2
C C Scale 1 : 30
100 500
B B LEV:+10.05 m
4
122 1 13 14 R-ROOF
A 122 A
1 2 3 4 56 7 8 9 1011 12 13
14 15 K
Y10-150c/c-Vert. Bars
500
Y08-200c/c-UB
100 500
LEV:+7.05 m
02-SECOND FLOOR
Y10-150c/c-Vert. Bars
8 9 8Y12+
Y08-200-Links
Y10-150c/c-Vert. Bars
Y08-200c/c-Horz. Bars
Y10150c/c-Vert
Y10-200c/c-Horz. Bars
C
2
Y8-200c/c-Links No Description Date
500
100 500
Y08-200c/c-UB LEV:+4.05 m
Y10-150c/c-Vert
Y10-150c/c-Vert Y8-200c/c-Links 500 P1 Issued for Blup 11/12/2019
01-FIRST FLOOR
H
8Y12+
1A 1A Y08-200c/c-UB Y08-200c/c-UB Y08-200-Links
122 122 Y10-150c/c-Vert
Y10-150c/c-Vert. Bars
Y08-200c/c-Links
500
Y10-150c/c-Vert
Y10-200c/c-UB
Y10-200c/c-Horz. Bars
Y08-200c/c-Links
Y10-150c/c-Vert Y8-200c/c-Links
00-SHEAR WALL TYPE 3
100 500
Y8-200c/c-Links Scale 1 : 30
Y10-150c/c-Vert. Bars LEV:+1.05 m
B 00-GROUND FLOOR
Mr. M O B NICOLAS DUBOIS (SOCIETE
6Y12+
THOTES 3)
Y10150c/c-Vert
Y08-200-Links Y10-150c/c-Vert. Bars
Y10-200c/c-Horz. Bars
Scale 1 : 30
100 500
LEV:-1.65 m
Project number P34
Y10-200c/c-UB -01-BASEMENT
11/12/2019 10:24:37
Y16-150c/c-T1&T2 Y10-200c/c-Horz. Bars
LEV:-2.65 m
Drawn by SR
F-FOUNDATION Checked by DB
As
Y16-150c/c-B1&B2 BUILDING PERMIT indicated
00-SHEAR WALL TYPE 4 LIFT SHEAR WALL DETAILS
Scale 1 : 30 Scale 1 : 50
122