KINGDOM OF SAUDI ARABIA Page PG

Saline Water Conversion Corporation


RABIGH – JEDDAH / MAKKAH – AL MOKARRAMAH WTS
Subject: INSPECTION AND TEST PLAN FOR CEMENT MORTAR LINING OF STEEL PIPES, FITTINGS, BENDS Spec. No. M-03 & L-01
AND WELDED JOINTS DIA. 28 INCH AND LARGER
PÖYRY
Revision

First Rev. A Document Number


Index

Issue Date 17.07.18 90-ZG50-N-201


MO3,AASHTO T277,DIN
RSAL Test Report 1048
8.3 Water and Chloride Permeability Monthly P/TC W R W
FM/QC/030 Rev.1 Water Perm. 4mm max.
Chloride Perm. 100-1000
RSAL Test Repot
8.4 Lining Structure Monthly MO3 TC A R A
FM/QC/025 Rev.0

8.5 Water Curing Visual inspection Each Pipe MO3, AWWA C-205 A A A

Complete Release Report


9.0 Final Inspection Release Each Pipe / Weekly MO3, AWWA C-205 W A/W R W
Recommendation for Release
Video Inspection and Visual
10.0 Pipeline Section Inspection for 60 Inch and Larger Each Pipeline Section M03, A/W A R A
Release Documentation and Lining
Reports
Test Certificates,
Relevant Specification and
11.0 Documentation Laboratory Test Reports Weekly / Monthly H H H H
Standards
Lining and Inspection Reports

LEGEND: P: PERFORM, A: ACTUAL INSPECTION, W: WITNESS INSPECTION, R: REVIEW DOCUMENTATION, TC: TEST REPORT/CERTIFICATE REQUIRED,
H: HOLD

Engineering Subcontractor Contractor Subcontractor

MAPA CONSTRUCTION & TRADE Co. Inc. RAYMOND INTERNATIONAL Co. Ltd. Branch (K.S.A.)