O MON THERMAL POWER PLANT AND MEKONG DELTA TRANSMISSION NETWORK

PROJECT(I)

MITSUBISHI HEAVY INDUSTRIES.,LTD

TOA CORPORATION DATE :

FORM WORKS INSPECTION FIR No. : OM-TOA-P/RC/FWI/_______/_______


( BEFORE CASTING CONCRETE)
SUBJECT : LOCATION :

Concrete Strenght/ Class : Particular Structure :


Estimated Volume :
METHOD OF INSPECTION : TOA FECL TOA
Visual / Laboratory Test / Survey Name
REF. DRAWING NO. Revision No. Signature

INSPECTION ITEMS ACC REJ ACC REJ ACC


DATE:
A. PRELIMNARY INSPECTIONS
TIME:
1 Setting out points (Grade and Line)
2 Dimension (Length/ Width/ Thickness)
3 Soil compaction / Backfilling
4 Lean Concrete Level
5 Others
DATE:
B. REINFORCEMENT BAR INSPECTIONS
TIME:
1 Latest revision construction drawing
2 Diameter of main bars/ secondary bars
3 Number of main bars/ secondary bars
4 Spacing of main bars/ secondary bars
5 Links: diameter/ Spacing/ Numbers
6 Lapping length of main/ secondary bars
7 Anchorage length of main/ secondary bars
8 Trimmer bars for openings / Diameter/ Spacing/ Numbers
9 Rebar cleanliness
10 Constructon joint roughness & cleanliness
11 Others
DATE:
C. FORMWORKS INSPECTIONS
TIME:
1 Dimention (Length/ Wirth/ Thickness)
2 Alignment/ Verticality
3 Level of formworks (base/ soffit)
4 Sealing of gaps/ Openings
5 M&E openings/ Block outs
6 Concrete covers/ Spacers
7 Temporary support system
8 Cleanliness
9 Others
DATE:
D. EMBEDDED ITEMS
TIME:
1 Alignment
2 Installation
DATE:
D. WATER STOP
TIME:
1 Type
2 Positioning/ Tightness/ Joint

PREPARED BY:

TOA CORPORATION
COMMENTS / REMARKS

ACC : Accept REJ : Reject NA : Not Applicable PA : Per Attachment