Request For Inspection Report
Request For Inspection Report
Request For Inspection Report
Concrete Strength/ Class : Particular Structure : Grade Beam Line X-1 to X-5,
Estimated Volume :
METHOD OF INSPECTION :
Visual / Measurement/ Laboratory Test / Survey CHECKED BY: CHECKED BY:
Mr. A. YAMAMOTO Mr. INKI Remarks
TOA CORPORATION FECL CONSULTANT
INSPECTION ITEMS ACC REJ ACC REJ
DATE:
A. PRELIMNARY INSPECTIONS
TIME:
1 Setting out points (Grade and Line)
2 Dimension (Length/ Width/ Thickness)
3 Soil compaction / Backfilling
4 Lean Concrete Level
5 Others
DATE:
B. REINFORCEMENT BAR INSPECTIONS
TIME:
1 Diameter of main bars/ secondary bars
2 Number of main bars/ secondary bars
3 Spacing of main bars/ secondary bars
4 Links: Diameter/ Spacing/ Numbers
5 Lapping length of main/ secondary bars
6 Anchorage length of main/ secondary bars
7 Trimmer bars for openings / Diameter/ Spacing/ Numbers
8 Rebar cleanliness
9 Constructon joint roughness & cleanliness
10 Others
DATE:
C. FORMWORKS INSPECTIONS
TIME:
1 Dimension (Length/ Width/ Thickness)
2 Alignment/ Verticality
3 Level of Formworks (Base/ Soffit)
4 Sealing of Gaps/ Openings
5 M&E openings/ Block outs
6 Concrete covers/ Spacers
7 Temporary support system
8 Chamfer
9 Cleanliness
10 Others
DATE:
D. EMBEDDED ITEMS
TIME:
1 Alignment/ Verticality
2 Installation Fixing
PREPARED BY: VERIFIED BY: APPROVED BY:
Name: Mr. PHILIPPE EDEM Name: Mr. A. YAMAMOTO Name: Mr. INKI
TOA Site Engineer TOA CORPORATION FECL CONSULTANT
COMMENTS / REMARKS
Attachment : Drawings, Quantity (Theoritical Computation), & Site Photo
2 Visibility of Cracks
3 Honey Comb
4 Concrete Bulging
10
CONCLUSION :
Name: Mr. PHILIPPE EDEM Name: Mr. A. YAMAMOTO Name: Mr. INKI
TOA Site Engineer TOA CORPORATION FECL CONSULTANT
COMMENTS / REMARKS
Attachment : Site Inspection Photo
HECK FOR SHUTTERING WORKS
1.4Check for Shuttering material Suitability1.5Check for Shuttering Size as per ref. drawing1.6Check for Shuttering Line, Level & P
CHECK FOR REINFORCEMENT WORKS
1.14Check for Cleanliness of Rebar (Free from Rust, Oil,Grease, Oil & Dirt)1.15Check for Bar Dia, Spacing & , Bar Shape & Spacing1.
CHECK FOR INSERTS IF ANY
1.17Check for Size, Spacing of Inserts / Structural Steel
CHECK FOR RESOURCES (MATERIAL, PLANT & MACHINERY)
1.18Check for Concrete Qty. availability from RMCCheck for availability of Concrete Pumps, Chutes, Vibrators
CHECK FOR SAFETY
1.19Check for Working Area / Area Lighting / PlatformavailabilityDate :
Checking StatusRemarks.T.O.
For During Concrete Pour Check & Rectification Compliance Statu
Ok RectificationRequiredOk
RectificationRequiredOk
RectificationRequiredOkRectificationRequiredOk RectificationRequiredOk
RectificationRequiredOk
RectificationRequiredOk
RectificationRequiredOk RectificationRequiredOk
RectificationRequiredOk
RectificationRequiredOk
RectificationRequiredOk RectificationRequiredOkRectificationRequiredOkRectificationRequiredOk RectificationRequiredOk R
Footing
/ Raft
-
Pedestal
-
Plinth Beam
/
-
RCC Wall Lift-Other
B0__
-----
2014
-- , , ,
Legend:
Common CM
Earth Works EW
Admin AD
Criee CR
Electical Building EB
Well WL
Public Toilet PT
Guard Post/ Ticket Office GT
Washing Area WA
Water Tank WT
External Road ER
ttering Line, Level & Plumb1.7Check for Shuttering Supports system1.8Check for Provision of Pockets and its sizes1.9Check for Formwork Tightness1.10C
cationRequiredOk RectificationRequiredOkRectificationRequiredOkRectificationRequired
rk Tightness1.10Check for Concrete Top Level1.11Check for Shuttering Release oil Application1.12Check for Concrete Cover as specified in the ref. draw
ecified in the ref. drawing1.13Check for marking of Concrete Top Level