THE PROJECT FOR IMPROVEMENT OF FISHING PORT IN LOME

TOA CORPORATION DATE :


Ref. No. TOA-BLD-FIR-AD-001

FIELD INSPECTION REPORT


SUBJECT : LOCATION :
Administration Building : Inspection of Form Works and Reinforced Rebar Administration Building
prior to Concrete Casting

Concrete Strength/ Class : Particular Structure : Grade Beam Line X-1 to X-5,
Estimated Volume :
METHOD OF INSPECTION :
Visual / Measurement/ Laboratory Test / Survey CHECKED BY: CHECKED BY:
Mr. A. YAMAMOTO Mr. INKI Remarks
TOA CORPORATION FECL CONSULTANT
INSPECTION ITEMS ACC REJ ACC REJ
DATE:
A. PRELIMNARY INSPECTIONS
TIME:
1 Setting out points (Grade and Line)
2 Dimension (Length/ Width/ Thickness)
3 Soil compaction / Backfilling
4 Lean Concrete Level
5 Others
DATE:
B. REINFORCEMENT BAR INSPECTIONS
TIME:
1 Diameter of main bars/ secondary bars
2 Number of main bars/ secondary bars
3 Spacing of main bars/ secondary bars
4 Links: Diameter/ Spacing/ Numbers
5 Lapping length of main/ secondary bars
6 Anchorage length of main/ secondary bars
7 Trimmer bars for openings / Diameter/ Spacing/ Numbers
8 Rebar cleanliness
9 Constructon joint roughness & cleanliness
10 Others
DATE:
C. FORMWORKS INSPECTIONS
TIME:
1 Dimension (Length/ Width/ Thickness)
2 Alignment/ Verticality
3 Level of Formworks (Base/ Soffit)
4 Sealing of Gaps/ Openings
5 M&E openings/ Block outs
6 Concrete covers/ Spacers
7 Temporary support system
8 Chamfer
9 Cleanliness
10 Others
DATE:
D. EMBEDDED ITEMS
TIME:
1 Alignment/ Verticality
2 Installation Fixing
PREPARED BY: VERIFIED BY: APPROVED BY:

Signed: Signed: Signed:

Name: Mr. PHILIPPE EDEM Name: Mr. A. YAMAMOTO Name: Mr. INKI
TOA Site Engineer TOA CORPORATION FECL CONSULTANT

Date: Date: Date:

COMMENTS / REMARKS
Attachment : Drawings, Quantity (Theoritical Computation), & Site Photo

ACC : Accept REJ : Reject NA : Not Applicable PA : Per Attachment


Legend:
Common CM
Earth Works EW
Admin AD
Criee CR
Electical Building EB
Well WL
Public Toilet PT
Guard Post/ Ticket Office GT
Washing Area WA
Water Tank WT
External Road ER
THE PROJECT FOR IMPROVEMENT OF FISHING PORT IN LOME
TOA CORPORATION DATE :
Ref. No. TOA-BLD-FIRPC-AD-001

FIELD INSPECTION REPORT - POST CONCRETE


SUBJECT : LOCATION :
Administration Building : Post Inspection of Concrete Administration Building

Gridline/ Zone : Structural Member/s : Grade Beam Line X-1 to X-5,


Level :
METHOD OF INSPECTION :
Visual Measurement Survey CHECKED BY: CHECKED BY:
Mr. A. YAMAMOTO Mr. INKI Remarks
TOA CORPORATION FECL CONSULTANT
INSPECTION ITEMS OK NOT OK OK NOT OK
DATE:
A. AFTER FORM STRIPPING
TIME:
1 Striking of Formworks

2 Visibility of Cracks

3 Honey Comb

4 Concrete Bulging

5 Accuracy of Dimension (Length/ Width/ Thickness)

6 Alignment/ Verticality / Plumbness of Structure Members

7 Level of Concrete (Base/ Soffit)

8 Concrete Surfaces Appearance (Smooth Finish/ Trowel)

9 Others : Concrete Surface Defect

10

CONCLUSION :

1.0 Non - Conformances: 3.0 Re-Inspection:


Reason : Reason :

2.0 Disposition : 4.0 Comments:


Reason : Reason :

CHECKED BY: VERIFIED BY: APPROVED BY:

Signed: Signed: Signed:

Name: Mr. PHILIPPE EDEM Name: Mr. A. YAMAMOTO Name: Mr. INKI
TOA Site Engineer TOA CORPORATION FECL CONSULTANT

Date: Date: Date:

COMMENTS / REMARKS
Attachment : Site Inspection Photo
HECK FOR SHUTTERING WORKS
1.4Check for Shuttering material Suitability1.5Check for Shuttering Size as per ref. drawing1.6Check for Shuttering Line, Level & P
CHECK FOR REINFORCEMENT WORKS
1.14Check for Cleanliness of Rebar (Free from Rust, Oil,Grease, Oil & Dirt)1.15Check for Bar Dia, Spacing & , Bar Shape & Spacing1.
CHECK FOR INSERTS IF ANY
1.17Check for Size, Spacing of Inserts / Structural Steel
CHECK FOR RESOURCES (MATERIAL, PLANT & MACHINERY)
1.18Check for Concrete Qty. availability from RMCCheck for availability of Concrete Pumps, Chutes, Vibrators
CHECK FOR SAFETY
1.19Check for Working Area / Area Lighting / PlatformavailabilityDate :
Checking StatusRemarks.T.O.
For During Concrete Pour Check & Rectification Compliance Statu
Ok RectificationRequiredOk

 RectificationRequiredOk

 RectificationRequiredOkRectificationRequiredOk RectificationRequiredOk

 RectificationRequiredOk

RectificationRequiredOk

RectificationRequiredOk RectificationRequiredOk

RectificationRequiredOk

RectificationRequiredOk

RectificationRequiredOk RectificationRequiredOkRectificationRequiredOkRectificationRequiredOk RectificationRequiredOk R
Footing
/ Raft
-
Pedestal
-
Plinth Beam
/
-
RCC Wall Lift-Other
B0__
-----
2014
-- , , ,
Legend:
Common CM
Earth Works EW
Admin AD
Criee CR
Electical Building EB
Well WL
Public Toilet PT
Guard Post/ Ticket Office GT

Washing Area WA

Water Tank WT

External Road ER
ttering Line, Level & Plumb1.7Check for Shuttering Supports system1.8Check for Provision of Pockets and its sizes1.9Check for Formwork Tightness1.10C

ar Shape & Spacing1.16Check for Provision of Chairs / Supports

cationRequiredOk RectificationRequiredOkRectificationRequiredOkRectificationRequired
rk Tightness1.10Check for Concrete Top Level1.11Check for Shuttering Release oil Application1.12Check for Concrete Cover as specified in the ref. draw
ecified in the ref. drawing1.13Check for marking of Concrete Top Level