Name Of Project:-Naubise Jyamire Sadak Starronati


Location:-Rainas-3

AOC
S.N. Items of Work Quantity Unit Rate Amount

1 E/W in excavation 1970 m3 71.19 140244.3

2 Landslide Clearance Work 2336.22 m3 47.46 110877.0012

3 Drain 71.04 m3 71.19 5057.3376

4 E/w in Exavation For Gabion 16 m3 406.85 6509.6

5 Gabion Box 250 m2 282.5 70625

6 Filling Of Gabion Box 45 m3 2955.21 132984.66375

Total 466298

Note:
Name of Agency Contribution
Municipality 400,000.00
Contengency 12,000.00
Municipality without
contengency 388,000.00
UC(Work) 78,298.00
Total 466,298.00
Date:-

Remarks
as per district
rate
as per district
rate
as per district
rate
as per district
rate
as per district
rate
as per district
rate
Rainas Municipality
Office Of Municipal Excecutive
Tinpiple, Lamjung
Gandaki Province, Nepal

Name Of Project:-Naubise Jyamire Sadak Starronati


Location:-Rainas-3

S.N. Item of work No Length Breadth Height Quantity


1 E/W in excavation 1970
New Track 1 20 5.5 3 330
grade down 1 60 5.5 3 990
New Track 1 30 5 3 450
widening 1 20 2 5 200
New Track 1 20 5 2.5 250

2 Landslide Clearance 2336.22


Work
1 25 2 2 100
1 7 2.5 1.2 21
1 19.3 2.5 4 193
1 15 2 1.5 45
1 14 2.5 2.5 87.5
1 13 1.5 1.5 29.25
1 3 1.3 1.3 5.07
1 9 2 1.8 32.4
1 48 3 6 864
1 25 4 3 300
1 20 3 3 180
Pairo Mathi 1 15 4 1.5 90
1 8 2 1.5 24
1 4 13 2.5 130
1 15 4 2 120
1 10 2 2 40
1 12 2.5 2.5 75

3 Drain 71.04
1 48 0.8 0.6 23.04
1 25 0.8 0.6 12
1 30 0.8 0.6 14.4
1 20 0.8 0.6 9.6
1 25 0.8 0.6 12
1 20 0.8 0.6 9.6

4 E/w in Exavation For 16


Gabion
1 5 0.5 2 5
1 5 0.8 2 8
1 4 0.5 1.5 3

5 Gabion Box 250


12 2*1*1 96

14 1.5*1*1 154

6 Filling Of Gabion Box 45


12 2 1 1 24
14 1.5 1 1 21
Date:-

Unit Remarks
m3
m3
m3
m3
m3
m3

m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3

m2
m2 1 box of
1.5*1*1=8 m2
m2 1 box of
2*1*1=11 m2

m3
m3
m3
Norms no 2-1.2.2,2-1.8
materials andand
as required 2-1.9
also the disposal of Norms Unit
unsuitable 1.00
cut materials Cu.m
in specified
Items Description : manner. This further covers trimming and finishing of the road way. For,
a)   Ordinary soil
Description Quantity Unit Rate Amount
Skilled
Labour
Unskilled 0.50 md 790.00 395.00
Tools and plants
@ 3 % of labour 11.85
cost
Total 406.85
Rate per un 406.85

Norms no 44.1(17-1.4,17.5
position & 17.6)stretching, binding
including Norms
them Unit Box size
together and2x1x1
tying
Items Description : down lids.
i.     Binding wire - 12 SWG
Quantity Unit Rate Amount
Skilled 0.00 md 1090.00 0.00
Labour
Unskilled 0.09 md 790.00 71.10
12 gauge wire 0.95 kg 109.61 104.13
Materials 0.00
0.00
Total 175.23
Rate per m3 87.61

Norms no 45.1(17-1.4,17.5 & 17.6) Norms Unit 2.00 m3


Items Description : Packing and filling of gabion crates with rubble stones

Quantity Unit Rate Amount


Skilled 0.60 md 1090.00 654.00
Labour
Unskilled 1.50 md 790.00 1185.00
Stone 2.20 m3 1771.00 3896.20
Materials 0.00
0.00
Total 5735.20
Rate per m32867.60
position including stretching, binding them together and tying down
lids. Rate per m3 2955.21
Packing and filling of gabion crates with rubble stones