Project Summary
Organization
Toyo Pioneers STAAD Advanced Concrete Design
Toyo Engineering
Solution
to Deliver Its Largest Ethylene Plant Project
Manufacturing Bentley’s Integrated STAAD Technology Reduced Engineering Time
Location
Malaysia
by 30 Percent and Set New Concrete Standards
Project Objectives
• Deliver a large-scale, steam Malaysia’s Massive Petrochemical Initiative Using Bentley’s integrated structural design applications
cracker complex in Malaysia. accelerated the entire workflow by 30 percent while ensuring
Having constructed more than 40 greenfield ethylene plants
• Complete conceptual and detail worldwide, Toyo Engineering (Toyo), a global leader in standardization of processes and uniformity of deliverables
design within an 18-month engineering and construction for industrial facilities, across multiple locations. The innovative solution enhanced
timeframe. consistency and quality of the designs, drawings, and reports.
was awarded a contract to deliver a large scale steam
• Design concrete plant structures cracker complex in Malaysia. The plant is an integrated Stated Ajay Marathe, lead engineer, civil and structural,
in compliance with European Toyo Engineering, “Iterative and complex design checks were
refinery and petrochemicals project. It is the largest
codes with Malaysian annexures. possible with a single run. This synchronized the delivery of
liquid-based greenfield downstream in Malaysia, and a
Products Used drawings, which resulted in a 30 percent reduction in resource
petrochemical complex capable of producing ethylene used
STAAD.Pro®, STAAD® Advanced hours.” The integrated workflow also facilitated design
Concrete Design to manufacture polymers that are found in many industrial
optioneering for optimal selection of construction material
and consumer markets.
and enabled parallel work on site to save 10 percent in
Toyo was responsible for the detailed engineering, construction time.
Fast Facts procurement of equipment and materials, construction, and
• Toyo implemented integrated commissioning of the facility on a turnkey basis. To design Automation Optimizes Accuracy and Efficiency
engineering and analysis the complex required detailed engineering across multiple Bentley’s structural design and analysis applications not
processes to deliver its largest
ethylene plant project located disciplines that were globally dispersed. To meet quality only provided a collaborative work environment, but also
in Malaysia. requirements in compliance with strict local and European automated otherwise manual tasks. The team needed to
• Bentley software’s seamless design codes, optimize engineering analysis, and ensure perform checks related to sizing, design, crack width, stress
integration optimized engineering design accuracy on a tight timeline, Toyo required integrated levels, and buoyancy, among others, using more than 700
and design of RCC structures, and automated workflows and processes to deliver its largest different load combinations simultaneously to determine the
ensuring process standardization ethylene plant project. overall behavior in each of these combinations. Using STAAD
and uniformity of deliverables. Advanced Concrete Design the team generated on-demand
• Toyo applied advanced Integrated Technology Streamlines Workflows reports at various levels of detail to efficiently understand the
engineering design codes using concrete behavior subject to the varying loads. This cutting-
Bentley technology to comply Given the sheer size of the project, the ethylene plant
with new European standard required complex engineering analysis for various structural edge technology enabled Toyo to quickly define the load
codes consistent with local elements ranging from pipe racks and buildings, to equipment combinations, iteratively check the design, and automatically
design regulations. and associated infrastructure facilities. Different design adjust the sizing of the foundation in accordance with each of
disciplines needed to collaborate in real time across the load criteria.
ROI
multiple locations in a coordinated environment to ensure Like many industrial structures, the ethylene plant contained
• Bentley’s technology enabled
standardization in the quality and formats of the deliverables. columns with transverse and longitudinal beams at different
the team to complete the project
within 18 months. The seamless integration of Bentley’s STAAD.Pro and STAAD levels, requiring engineers to take specific precautions and
• Performing iterative and complex Advanced Concrete Design 3D structural analysis and design perform tedious calculations to ensure design accuracy of the
design checks and synchronizing applications enabled the multidiscipline project team to columns. STAAD Advanced Concrete Design’s “Merge Levels”
drawings saved 30 percent in simultaneously share synchronized model data and update command managed these variations automatically, saving
engineering hours. designs and drawings in one integrated set of applications. significant time for engineers and minimizing potential error
• The integrated workflow The solution allowed for iterative, multidiscipline design resulting from an otherwise manual calculation. Similarly,
facilitated design optioneering checks among the team, enhancing design productivity and the team was able to perform design checks on the concrete
and enabled parallel work on
streamlining workflows to reduce duplication of effort and to prescribed crack width limits at the click of a button while
site to save 10 percent in
construction time. eliminate errors. ensuring the highest level of accuracy in the computations.
“Seamless Using STAAD Advanced Concrete Design to design and codes, which also mandated different material safety factors
detail the beams for bi-axial and axial force allowed Toyo to for different types of load combinations. The team was also
integration of introduce top and bottom reinforcement across the length confronted with having no applications available that catered
of the beam. The software checked the bi-axial behavior to the Malaysian Annexure.
STAAD.Pro and and automatically generated 3D interaction charts for the
Working collaboratively with Bentley’s development team,
STAAD Advanced suggested reinforcement profile. The ability for Toyo to Toyo developed and applied the new European standard
automate engineering calculations, drawing production, codes consistent with local Malaysian regulations. This
Concrete Design has and report generation optimized design accuracy and enabled the engineers to deliver the project within the
efficiency that helped the team complete the conceptual tight timeframe, consistent with Toyo’s high standards.
completely turned design and detailed engineering within 18 months, STAAD Advanced Concrete Design’s built-in feature for
around the detailed and obtain early approval by the client. designing foundations within varying safe bearing capacities
enumerated in the European standard codes accelerated
engineering of RCC Setting New Country Standards for design and eliminated potential noncompliance. Using STAAD
Concrete Design Advanced Concrete Design facilitated concrete design in
structures, delivering One of the unique challenges facing Toyo was designing compliance with the European standard codes as per the
the ethylene complex to meet new European standards Malaysian Annexure. The team developed new European
automation, accuracy
in combination with current local Malaysian codes, the standard codes for Malaysia, delivering the first project that
and consistency.” Malaysian Annexure. Given that European standards were applied advanced engineering design codes in the country
new in Malaysia, there was no precedent for applying these and setting new country standards for concrete design.
– Ajay Marathe, Lead Engineer
– Civil & Structural,
Toyo Engineering

Find out about Bentley


at: www.bentley.com
Contact Bentley
1-800-BENTLEY (1-800-236-8539)
Outside the US +1 610-458-5000
Global Office Listings
www.bentley.com/contact

Effective utilization of STAAD Advance Concrete Design creates a one-stop solution for RCC Design.

© 2018 Bentley Systems, Incorporated. Bentley, STAAD.Pro, and STAAD are either registered or unregistered trademarks or service marks of Bentley Systems,
Incorporated or one of its direct or indirect wholly owned subsidiaries. Other brands and product names are trademarks of their respective owners. 17896 03/18

You might also like