DATE : 1/11/2020
TIME : 12.00 PM
ID/OD
(INCH)/L THK
NO. JOB NO./DRAWING NO. LINE NO. / ITEM NO. JOINT NO. MATERIAL
ENGTH (MM)
(MM)
1 JS19026 2V-1442 CW-02R1 300 37 SS
2 JS19026 1V-1442 HCW-01 1900 36/50 SS
3 JS19026 2V-1442 HCW-01 1900 36/50 SS
4 JS19026 2V-2012 N20J1RS 400 12.7 SS
5 JS19026 2V-1444 N1-J3R1 1219.2 19 SS
6 JS19026 2V-1444 HLW-02R1 300 30/70 SS
7 JS19026 2V-1444 N1LW-03(J7)RS 300 20 SS
8 JS19026 1V-1442 CW-03 3800 37 SS
9 JS19026 2V-1442 CW-03 3800 37 SS
10 JS19026 2V-1451 CW-03R1 300 40 SS
11 JS19026 1V-1441 WA2 1150 40/48 SS
12 JS19026 2V-1451 WA1 1150 40/48 SS
13 JS19026 2V-1451 WA2 1150 40/48 SS
14 JS19026 2V-1441 WA2 1150 48/40 SS