Download as pdf
Download as pdf
You are on page 1of 2
‘Mom held between M/s Hindalco Industries Lt. and M/s Maxflow Fans Manufacturing Pvt. Ltd at ‘ud Smelter Plant on 11° FEb 2020. ‘Members present: M/sHIL M/s MFMPL. Mr. Om Prakash Nayak Mr. Parba Maity ‘Mr. Swagat Sourav Patel Mr. Narayan Sahu Mr. P Maity, representative of Maxflow Fans has reached the site on 10" Feb 2020 for supervision pre- erection readiness of FTP-2 ID fan2(cap-180000m3/hr) During his stay time following job executed and discussed about the ID fans. 1. Cross-checked NDE side civil foundation & matched with GA .Found the pockets 40 mm differed {It was being adjusted as per pockets without changing the center-line dimension 2. Existing final grouting was removed at DE side in presence of M/s MFMPL representative. 3. Fixing of DE Pedestal was done as per GA & cross-checking of levels, center-line, water-level, height from FFL was done in presence of M/s MFMPL representative. Found OK. 4. Half-grouting at DE side was done in presence of M/s MFMPL representative 5. NDE side pedestal fixing was done in presence of M/s MFMPL representative. Cross-checking of levels, center-line, water-level, height from FFL was done in presence of M/s MEMPL representative. Found OK as per GA 6. Found some mismatch between old GA & existing structure, which had not been identified during earlier visits. It was also been replicated into the new GA. Rectification in the existing structure was advised by of M/s MEMPL design dept. Mr. Parba Maity is leaving the site on 11" February 2020 Signature ote Ov M/sHIL f M/s MEMPL MY ‘Mom held between M/s Hindalco Industries Lt. and M/s Maxflow Fans Manufacturing Pvt. Ltd at Hirakud Smelter Plant on 17" Feb. 2020. Members prese M/sHIL M/s MFMPL Mr. Om Prakash Nayak Mr. Parba Maity Mr. Swagat Sourav Patel Mr. Narayan Sahu Mr. P Maity, representative of Maxflow Fans has reached the site on 17" Feb 2020 for supervision pre- erection readiness of FTP-2 ID fan2(cap-500000m3/hr) During his stay time following job executed and discussed about the ID fans. 1. Cross-checked the drawing & existing civil foundation, ¢ 2. Found mismatch between drawing & existing civil foundation 3. Solutions to be provided by M/s MFMPL for smooth execution of ID Fans. Mr. Parba Maity is leaving the site on 17" February 2020. =r Oe en \ ww 7} \o2-| pe ms PREGA MATT

You might also like