‘Mom held between M/s Hindalco Industries Lt. and M/s Maxflow Fans Manufacturing Pvt. Ltd at
‘ud Smelter Plant on 11° FEb 2020.
‘Members present:
M/sHIL M/s MFMPL.
Mr. Om Prakash Nayak Mr. Parba Maity
‘Mr. Swagat Sourav Patel
Mr. Narayan Sahu
Mr. P Maity, representative of Maxflow Fans has reached the site on 10" Feb 2020 for supervision pre-
erection readiness of FTP-2 ID fan2(cap-180000m3/hr)
During his stay time following job executed and discussed about the ID fans.
1. Cross-checked NDE side civil foundation & matched with GA .Found the pockets 40 mm differed
{It was being adjusted as per pockets without changing the center-line dimension
2. Existing final grouting was removed at DE side in presence of M/s MFMPL representative.
3. Fixing of DE Pedestal was done as per GA & cross-checking of levels, center-line, water-level,
height from FFL was done in presence of M/s MFMPL representative. Found OK.
4. Half-grouting at DE side was done in presence of M/s MFMPL representative
5. NDE side pedestal fixing was done in presence of M/s MFMPL representative. Cross-checking of
levels, center-line, water-level, height from FFL was done in presence of M/s MEMPL
representative. Found OK as per GA
6. Found some mismatch between old GA & existing structure, which had not been identified
during earlier visits. It was also been replicated into the new GA. Rectification in the existing
structure was advised by of M/s MEMPL design dept.
Mr. Parba Maity is leaving the site on 11" February 2020
Signature ote
Ov
M/sHIL f M/s MEMPL
MY‘Mom held between M/s Hindalco Industries Lt. and M/s Maxflow Fans Manufacturing Pvt. Ltd at
Hirakud Smelter Plant on 17" Feb. 2020.
Members prese
M/sHIL M/s MFMPL
Mr. Om Prakash Nayak Mr. Parba Maity
Mr. Swagat Sourav Patel
Mr. Narayan Sahu
Mr. P Maity, representative of Maxflow Fans has reached the site on 17" Feb 2020 for supervision pre-
erection readiness of FTP-2 ID fan2(cap-500000m3/hr)
During his stay time following job executed and discussed about the ID fans.
1. Cross-checked the drawing & existing civil foundation,
¢ 2. Found mismatch between drawing & existing civil foundation
3. Solutions to be provided by M/s MFMPL for smooth execution of ID Fans.
Mr. Parba Maity is leaving the site on 17" February 2020.
=r Oe en
\ ww 7} \o2-|
pe ms PREGA MATT