"Unit Cost" - This column should have the estimated $ amount listed. (Not in $K)
"Craft Code" - By entering the craft code of the correct labor type required for a task (found on the "FY07 Craft Rates" worksheet
column B "Code". This sheet will be updated by the ALS Planning Office as needed.) the appropriate "Labor Rate $/Hr" column will
be filled in for you.
"Overhead Total" - The overhead will be calculated automatically based on the current rates on the "Overhead" worksheet. These
rates will be updated as needed by the ALS Planning Office.
"Contng %" - The contingency percentage should be filled in for each item. The cells are already formatted as a percentage. The
total project contingency percentage will self-calculate.