BOQ Abstract for Road works - Part 2
Notes:
1 The Rates and amont mentioned here are indicative for comparision purpose only.
The Contractor shall do due diligience by carrying out rate analysis before finalizing the
rate
2 Details for Cement Concrete Pavement at the Median required for the calculations purpose
3 Details for Reparing Pot Holes Required for the calculations purpose
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
A. SITE CLEARANCE, DISMANTLING. RESTORATION
1 Clearing and grubbing road land including uprooting rank vegetation, Hct. 0.00 -
grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned, up to a lead of
1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness, complete as per Technical Specifications
Clause 201.
2 Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lifts and up to a lead
of 1000 metres and earth filling in the depression/pit.
i) Girth from 300 mm to 600 mm Each
ii) Girth from 600 mm to 900 mm Each
iii) Girth from 900 mm to 1800 mm Each
iv) Girth above 1800 mm Each
3 Scarifying the existing bituminous road surface to a depth of 50 mm and sqm
disposal of scarified material with in all lifts and lead up to 1000 metres..
4 Dismantling of flexible pavements and disposal of dismantled materials up cum 17,845.00 50 892,250.0
to a lead of 1000 meters, stacking serviceable and unserviceable materials
separately
5 Shifting of Utilities
5.1 Existing sewage water suply line and Sewage line Rmt 4,534.00 125 566,750
5.2 Existing electrical utilities Each 4.00 100,000 400,000
6 Dismantling of Kerbs/Median and disposal of dismantled materials up to a cum 8,180.00 100.00 818,000
lead of 1000 meters, stacking serviceable and unserviceable materials
separately
7 Dismantling of Bus Bays Each 3.00 1,500,000 4,500,000
8 Restoration of Roads after Constructions
8.1 Soil Subgrade cum 3,501.22 400.00 1,400,486
8.2 Granular Sub-Base cum 1,400.49 900.00 1,260,437
8.3 Base cum 1,750.61 1,250.00 2,188,259
8.4 Bituminous concrete cum 280.10 7,700.00 2,156,748
SUBTOTAL 14,182,931
B. EARTHWORK & DRAINAGE
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket cum 20,260.00 180 3,646,800
capacity including cutting and loading in tippers, trimming bottom and side
slopes
2 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum cum
bucket capacity including cutting and loading in tippers
3 Construction of Reinforcement Earth Fill / Embankment with approved cum 20,237.00 150 3,035,550
material obtained from borrow pits with all leads and lifts, transporting to
site, spreading, grading to required slope and compacting, all complete as
per Technical Specifications Clause 305.
4 Construction of Subgrade with approved material obtained from borrow cum 9,174.00 400 3,669,600
pits, satisfying the requirements of minimum soaked CBR value as indicated
in the drawings, including all leads and lifts, transporting to site, spreading,
grading to required slope and compacted, complete as per Technical
Specifications Clause 30
5 Providing PCC M-15 grade below masonry drains, RCC Drains, vertical falls, cum 1,206.00 5,840 7,043,040
outfalls, escape for drainage arrangement as per drawings and Technical
Specifications sections 1500, 1700 and 2500.
6 RCC M25 Drains with Cover Slab : Providing RCC M-25 Grade Drains with cum 4,002.00 6,350 25,412,700
Cover Slab and also for the Pier concrete wall cover with Lifting hooks for
Covered drains as per drawings and Technical Specification
7 Reinforcement for Drains : Providing HYSD Reinforcement as per drawings MT 367.00 70,000 25,690,000
& Technical Specifications Section 1600.
SUBTOTAL 68,497,690
C. GSB & BASE
1 Construction of granular sub-base by providing coarse graded material, cum 13,444.00 900 12,099,600
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with
vibratory roller to achieve the desired density, complete as per clause 401.
Grading –II (Table–400-2)
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
2 Providing, laying, spreading and compacting graded stone aggregate to wet cum 8,946.00 1,250 11,182,500
mix macadam specification including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed Material by tipper to site,
laying in uniform layers with paver in base course on well prepared surface
and compacting with vibratory roller to achieve the desired density,
complete as per clause 406
3 cum 399.00 400 159,600
Filling in median / Island with approved material obtained from borrow pits
with all leads and lifts, transporting to site, spreading, grading, compacting,
etc., complete as per Technical Specifications Clause 407.
4 CC M20 Kerb (For Medians / Footpaths / Separators) Rmt 3,875.00 350 1,356,250
SUBTOTAL 24,797,950
D. BITUMINOUS COURSE PAVEMENT
1 sqm 35,783.00 38 1,359,754
Prime Coat (Over WMM) : Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.60 kg/sqm using mechanical
means, complete as per Technical Specifications Clause 502.
2 Tack Coat (over Prime Coat) : Providing and applying tack coat with sqm 35,783.00 14 500,962
bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg
per sqm on the prepared granular surface treated with primer, complete as
per Technical Specifications Clause 503.
3 Tack Coat (over DBM) : Providing and applying tack coat with bitumen sqm 38,631.00 14 540,834
emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm
on the prepared bituminous surface, complete as per Technical
Specifications Clause 503.
4 cum 3,670.00 7,000 25,690,000
DBM (Grading I - Thickness 50/95 mm) : Providing and laying dense graded
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight
of total mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level
and alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction as per MoRTH specification clause No.
507 complete in all respects.
6 Wearing Coat 25mm over 40MM BC - Mastic Asphalt : The laying of cum 3,250.00 700 2,275,000
Wearing Coat i.e. Mastic Asphalt shall be confirmed to Morth Specifications
section No.500, Clause No.2702.1
SUBTOTAL 70,352,650
E. TRAFFIC SIGNS MARKING AND OTHER APPURTENANCES
1 Providing and fixing of retro- reflectorised cautionary, mandatory and
informatory sign as per IRC :67 made of high intensity grade sheeting vide
clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the
ground by means of properly designed foundation with M15 grade cement
concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing
1.1 Hazard marker (300mm X 900mm) Each 151.00 4,000 604,000
1.2 Object marker (300mm equi. Triangle) Each 63.00 4,000 252,000
1.3 Cautionary sign (900mm equi. Triangle) Each 239.00 4,000 956,000
1.4 Mandatory Sign (900 mm dia. Circular) Each 188.00 4,000 752,000
1.5 Facility Information Sign (600mm X 800mm) Each 12.00 4,000 48,000
1.6 Name Informatory Board (1200mm X 450mm) Each 15.00 4,000 60,000
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
Thermoplastic paint (BERGER / Equivalent Brand) : Road marking with Hot sqm 12,700.00 480 6,096,000
Applied Thermoplastic Compound with Reflectorising Glass Beads on
Bituminous Surfaces (Providing and laying of hot applied thermoplastic
2 compound 2.5 mm thich including reflectorising glass beads @ 250 gms per
sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC: 35. The finished surface to be leve, uniform and frree from streaks
and holes.)
Each 1,260.00 300 378,000
Road Stud with Lens Reflector (Providing and fixing of road stud 100 x 100
mm, die cast in aluminium, resistant to corrosive effect of salt and grit,
3 fitted with lens reflectors, installed in concrete or asphaltic surface by
drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable
bituminous grout or epoxy mortar, all as per BS : 873 (Part 4) 1973)
80 124,000
Median marker Double side : Painting two coats after filling the surface with
4 sqm 1,550.00
synthetic enamel paint in all shades on new plastered concrete surfaces
6.1 2-Legged Over-head Gantry sign Boards Each 4.00 500,000 2,000,000
6.2 Cantiliver Single Post Gantry Sign Boards Each 9.00 525,000 4,725,000
7 Pedestrian Guard Rail :Providing, fitting and fixing mild steel railing Rmt 4,000 8,000,000
2,000.00
complete as per drawing and Technical Specification
8 Providing and erecting a high mast pole lighting with 30 m high hot dip Each 16.00 750,000 12,000,000
galvanized mast designed to withstand forces exerted with wind speeds of
180 km per hour with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted
with a base flange, door at the base of mast with heavy duty internal lock,
lantern carriage, suitable winching arrangement for safe working load of
750 kg and high powered electrically driven power tools for raising and
lowering of lantern carriage, flexible 8 core electric cable, lightening
conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on
top of the mast, all complete as per approved design and drawings
9 Street Lighting Single Pole - Double side Overhanging Each 165.00 7,500 1,237,500
10 Street Lighting Single Pole - Single side Overhanging Each 183.00 5,000 915,000
11 Close circuit CCTV as per schedule C ; Supply Of 4 MP Standard Resolution Each 1.00 245,000 245,000
IP Bullet CCTV Camera HD Metal Body. 25/30fps 3.6 -12mm Lens with IR
LED's, 5MP IP, Supply Of 1080P NVR 200mbps Up To 8MP Support
Recording 2 SATA Port Supports Up To 8TB Mobile View HDMI, VGA Out. ,
16 Ch NVR, Supply and Installation 4TB Sata Surveillance HDD For NVR
Recording., Supply and Installation Of 35” HD LED TV With Remote, Supply
8 Port POE Network Switch, Supply 4 Port POE Network Switch
Supply Of 4U Rack with Locking, Power and Fan, Front Glass Door Tray,
Supply Of 2U Rack with Locking, Power and Fan, Front Glass Door Tray,
Supply of On-Line UPS Suitable For 1ph AC Input And 1ph
12 LED Light Under Deck @ 25m C/C Nos. 212.00 500 106,000
13 Providing and Laying SS Railing around Rani Chennamma statue Rmt 70.00 5,000 350,000
14 Providing and Laying M20 concrete Traffic Islands at the Ranichennamma cum 435.00 6,350 2,762,250
circle including Major and Minor Junctions
15 Landscaping for medians, under the viaducts, traffic islands Sqm 8,412.00 300 2,523,600
16 Landscaping for Rani Chennamma Circle including MS Panel Logo and Each 1.00 2,000,000 2,000,000
Name, Brick work and Plantation
17 Provision of Paver Blocks at the Drain Foundation Sqm 3,990.00
18 Kilometer Stones No. 12.00
19 Hectometer Stones No. 40.00
20 Rain Water Harvesting No. 5.00
21 Rumble Strips No. 33.00
SUBTOTAL 46,134,350
223,965,571
DETAILS OF QUANTITIES
Site Clearance
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit
From Rani Chennamma Circle to Vijayapura Road (ARM C) 2.00 250.000 500.00 Rm
From Rani Chennamma Circle to Airport Road (ARM G) 2.00 690.000 1,380.00 Rm
From Airport Road to Left Ramp and Right Ramp 1.00 300.000 300.00 Rm
ARM-E 3.00 1,950.000 5,850.00 Rm
Airport UP Ramp 1.00 150.000 150.00 Rm
Say 8180.00 Rm
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remark
1.00 EARTHWORK
20,236.85 cum
Total 20,236.85 cum
Say 20,237.00 cum
4.00 Construction of Subgrade
Sub-Grade
B. DRAINS
Providing RCC M-25 Grade Cover Slab with Lifting hooks for
Covered drains as per drawings and Technical Specifications
ARM C (TCS 1) 8.00 5.000 1.670 0.100 6.68 cum Pier Thickness
38.00 5.000 1.670 0.100 31.73 cum =
ARM E (2A+2C+4/4B++4A+4C+4D) 5( 2.5*2)
Pier Thickness
=
5( 2.5*2)
ARM G 14.00 5.000 1.670 0.100 11.69 cum
Airport Up Ramp 9.00 5.000 1.670 0.100 7.52 cum
Total 1,136.64 cum
Say 1,137.00 cum
Total Length of 4
Providing the HDPE Pipe of 200dia Along the Length of Flyover Lane Flyover 1,420.00 RM
Inside the Crash Barrier
Total Length of 2
Lane Flyover 1,276.00 RM
Total Length of 4
Provision of HDPE Pipe for Soffit under Piers Lane Flyover 540.00 RM
Total Length of 2
Lane Flyover 121.00 RM
Total 6,165.40 RM
Say 6,166.00 RM
DETAILS OF QUANTITIES
GSB & Base
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remarks
Junctions
X - Junction 3.00 100.000 11.000 0.200 660.00
X - Junction 1.00 100.000 11.000 0.200 220.00
X - Junction 1.00 100.000 11.000 0.200 220.00
5-Legged 2.00 100.000 11.000 0.200 440.00
Rani Chennamma circle 1.00 7,856.000 7,856.00
Main Carriageway Total 13,444.00 cum
Say 13,444.00 cum
ARM C (TCS 1) 8.00 5.000 1.670 0.250 16.70 cum Pier Thickness
38.00 5.000 1.670 0.250 79.33 cum =
ARM E (2A+2C+4/4B++4A+4C+4D) 5( 2.5*2)
ARM G 14.00 5.000 1.670 0.250 29.23 cum
Airport Up Ramp 9.00 5.000 1.670 0.250 18.79 cum
Total 398.59 cum
Say 399.00 cum
4.00
Cast in Situ Cement Concrete M20 Kerb (For Medians /
Footpaths / Separators)
HOSUR ROAD
TCS1 1.00 285.000 285.00 TO AIRPORT
TCS1A 1.00 160.000 160.00 575.00
TCS1B 2.00 65.000 130.00 ROAD
(ARM C)
TCS 2D 6.00 50.000 300.00
TCS 2 2.00 150.000 300.00
TCS 2A 0.00 0.000 0.00
TCS 2B(1) 4.00 50.000 200.00
TCS 2B(2) 4.00 90.000 360.00
TCS 2C 0.00 0.000 0.00 GADAG TO
DHARWAD ROAD 1,520.00
(ARM E)
GADAG TO
TCS -4/4B(1) 0.00 0.000 0.00 DHARWAD ROAD 1,520.00
TCS -4/4B(2) 0.00 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.00
TCS-4C 0.00 0.000 0.00
TCS-5 0.00 0.000 0.00
TCS-4E 4.00 90.000 360.00
HOSUR
TCS-6 2.00 500.000 1,000.00 TO
TCS-7 0.00 0.000 0.00 AIRPORT 1,000.00
TCS-7A 0.00 0.000 0.00 ROAD
(ARM G)
AIRPORT
TCS-8 2.00 80.000 160.00 RAMP
TOWARDS 780.00
TCS-8A 2.00 310.00 620.00 CIRCLE
(ARM E)
Main Carriage way and service road 3,875.00 Rm
Total 3,875.00 Rm
Say 3,875.00 Rm
DETAILS OF QUANTITIES
Bituminous & CC Course
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remarks
4A FLEXIBLE PAVEMENT
Major Junction
Y- Junction 3.00 100.000 11.000 3,300.00
X- Junction 1.00 100.000 11.000 1,100.00
T-Junction 1.00 100.000 11.000 1,100.00
5- Legged - Junction 2.00 100.000 11.000 2,200.00
Rani Chennamma Circle 1.00 7,856.000 7,856.00
Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 3,360.00
T-Junction 3.00 60.000 7.000 1,260.00
Major Junction
Y- Junction 3.00 100.000 11.000 0.095 313.50
X- Junction 1.00 100.000 11.000 0.095 104.50
T-Junction 1.00 100.000 11.000 0.095 104.50
5- Legged - Junction 2.00 100.000 11.000 0.095 209.00
Rani Chennamma Circle 1.00 7,856.000 0.095 746.32
Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.095 319.20
T-Junction 3.00 60.000 7.000 0.095 119.70
3,669.95 cum
DBM (Grading II - Thickness 95 mm) Carriage Way Say 3,670.00 cum
Major Junction
Y- Junction 3.00 100.000 11.000 0.040 132.00
X- Junction 1.00 100.000 11.000 0.040 44.00
T-Junction 1.00 100.000 11.000 0.040 44.00
5- Legged - Junction 2.00 100.000 11.000 0.040 88.00
Rani Chennamma Circle 1.00 7,856.000 0.040 314.24
Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.040 134.40
T-Junction 3.00 60.000 7.000 0.040 50.40
807.04 cum
5,193.00 cum
Say 5,193.00 cum
Major Junction
Y- Junction 3.00 100.000 11.000 0.025 82.50
X- Junction 1.00 100.000 11.000 0.025 27.50
T-Junction 1.00 100.000 11.000 0.025 27.50
5- Legged - Junction 2.00 100.000 11.000 0.025 55.00
Rani Chennamma Circle 1.00 7,856.000 0.025 196.40
Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.025 84.00
T-Junction 3.00 60.000 7.000 0.025 31.50
504.40
TOTAL 3,249.87
Say 3,250.00 cum
DETAILS OF QUANTITIES
Traffic Signs, Markings & Other Appurtenances
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit
For Major Junctions and Minor Junctions 11,526.450 10.00% Total 1,152.65 sqm
Sub Total 12,679.10 sqm
Say 12,700.00 sqm
RPM (Twin moulded Shanks)
Main CarriageWay
center line 1.00 420.000 420.00 No.
Edge Line 2.00 420.000 840.00 No.
Total 1,260.00 No.
Say 1,260.00 No.
TCS-8A - - - - -
Total 1,080.00 LM
Say 1,080.00 LM
As per Schedule 2,000.00 LM
AMENITIES
8.00 High Mast Lighting
Providing and erecting a high mast pole lighting with 30 m high hot
dip galvanized mast designed to withstand forces exerted with wind
speeds of 180 km per hour with 3 seconds gust, as per IS:875 (Part 3)
- 1978, fitted with a base flange, door at the base of mast with heavy
duty internal lock, lantern carriage, suitable winching arrangement
for safe working load of 750 kg and high powered electrically driven
power tools for raising and lowering of lantern carriage, flexible 8
core electric cable, lightening conductor, earthing terminal, and
fixing 2 nos aviation obstruction lights on top of the mast, all
complete as per approved design and drawings
Street Lighting
9.00 Street Lighting Single Pole - Double side overhanging
TCS1 0.00 0.000 0.000 0.000 0.00
TCS1A 0.00 0.000 0.000 0.000 0.00
TCS1B 0.00 0.000 0.000 0.000 0.00
TCS 2 1.00 6.000 - - 6.00
TCS 2D 1.00 2.000 - - 2.00
TCS 2A 1.00 17.280 - - 17.28
TCS 2B(1) 1.00 2.000 - - 2.00
TCS 2B(2) 1.00 3.600 - - 3.60
TCS 2C 1.00 2.400 - - 2.40
TCS -4/4B(1) 1.00 4.000 - - 4.00
TCS -4A(1) 1.00 4.000 - - 4.00
TCS -4D(1) 1.00 4.000 - - 4.00
TCS -4/4B(2) 1.00 3.440 - - 3.44
TCS -4A(3) 11.00 10.560 - - 116.16
TCS-4C(1) 0.00 0.000 0.000 0.000 0.00
TCS-5 0.00 0.000 0.000 0.000 0.00
TCS-4E(1) 0.00 0.000 0.000 0.000 0.00
TCS-6 0.00 0.000 0.000 0.000 0.00
TCS-7 0.00 0.000 0.000 0.000 0.00
TCS-7A
TCS-8 0.00 0.000 0.000 0.000 0.00
Supply Of 2U Rack with Locking, Power and Fan, Front Glass Door
Tray 4.00 4.00
Supply of On-Line UPS Suitable For 1ph AC Input And 1ph 2.00 2.00
Total 103.00 NO.
Say 103.00 No.
15.00 Landscping
a At Garde Intersection 1.00 340.600 6.000 2,103.60 Sqm
b Garde seperated intersection 1.00 158.240 6.000 949.44 Sqm
c Medians 1.00 1,937.500 1.500 2,906.25 Sqm
d Major Junctions 7.00 100.000 1.500 1,050.00 Sqm
e Minor Junctions 11.00 85.000 1.500 1,402.50 Sqm
Total 8,411.79 sqm