Bill Of Quantities

Project Name

Construction of Elevated Corridor from Km 135.650 to 136.450 on NH 63, from Km 249.00 to


250.050 on NH4 and from Km 193.800 to 193.350 on NH 218 for Decongestion of Traffic at Rani
Chennamma Circle in Hubli City / Taluk in the State of Karnataka

CLIENT CONCESSIONAIRE DESIGN CONSULTANT

NATIONAL HIGHWAY ZONE ESSVY CONSTRUCTIONS PRIMERAIL INFRALABS PVT.LTD.


BANGALORE INDIA PRIVATE LIMITED BANGALORE

Part 2
Revision No. 1
Issued for: Review
BOQ Abstract for Road works - Part 2

1 Proportion for Different stages of constructions as per items


Sl.no. Descriptions Cost Percentage Weightages
A. Site Clearence and Dismantling and Restoration road Works after the construction ₹ 14,182,931.22 6.33%
B. Eathwrk and Drainage ₹ 68,497,690.00 30.58%
C. GSB and Base Cource ₹ 24,797,950.00 11.07%
D. Bituminous corce pavement ₹ 70,352,650.00 31.41%
E. Traffic signs and other apparatances ₹ 46,134,350.00 20.60%
Subtotal ₹ 223,965,571.22 100.00%

2 Proportion for Different stages of constructions of the road works


Sl.no. Descriptions Cost Percentage Weightages
A. Road Works ₹ 105,502,550.00
a. Earth Work upto top of subgrade ₹ 10,351,950.00
b. Sub-Base Works ₹ 24,797,950.00 47.11%
d. Bituminous Base cource and Wearing Coat for BC Course ₹ 70,352,650.00
B. Other works ₹ 118,463,021.22
a. Dismantling Flexible Pavements ₹ 892,250.00
b. Shifting of Utilities ₹ 966,750.00
c. Road side Drains ₹ 58,145,740.00 52.89%
d. Road Signs, markings, Safety Devices ₹ 46,134,350.00
e. Dismatling of Medians, Kerbs and Medians ₹ 818,000.00
f. Dismantling of Bus Bays ₹ 4,500,000.00
h. Restoration Works after Constructions ₹ 7,005,931.22
Subtotal ₹ 223,965,571.22 100.00%

Notes:
1 The Rates and amont mentioned here are indicative for comparision purpose only.
The Contractor shall do due diligience by carrying out rate analysis before finalizing the
rate
2 Details for Cement Concrete Pavement at the Median required for the calculations purpose
3 Details for Reparing Pot Holes Required for the calculations purpose
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
A. SITE CLEARANCE, DISMANTLING. RESTORATION
1 Clearing and grubbing road land including uprooting rank vegetation, Hct. 0.00 -
grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned, up to a lead of
1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness, complete as per Technical Specifications
Clause 201.
2 Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lifts and up to a lead
of 1000 metres and earth filling in the depression/pit.
i) Girth from 300 mm to 600 mm Each
ii) Girth from 600 mm to 900 mm Each
iii) Girth from 900 mm to 1800 mm Each
iv) Girth above 1800 mm Each
3 Scarifying the existing bituminous road surface to a depth of 50 mm and sqm
disposal of scarified material with in all lifts and lead up to 1000 metres..

4 Dismantling of flexible pavements and disposal of dismantled materials up cum 17,845.00 50 892,250.0
to a lead of 1000 meters, stacking serviceable and unserviceable materials
separately
5 Shifting of Utilities
5.1 Existing sewage water suply line and Sewage line Rmt 4,534.00 125 566,750
5.2 Existing electrical utilities Each 4.00 100,000 400,000
6 Dismantling of Kerbs/Median and disposal of dismantled materials up to a cum 8,180.00 100.00 818,000
lead of 1000 meters, stacking serviceable and unserviceable materials
separately
7 Dismantling of Bus Bays Each 3.00 1,500,000 4,500,000
8 Restoration of Roads after Constructions
8.1 Soil Subgrade cum 3,501.22 400.00 1,400,486
8.2 Granular Sub-Base cum 1,400.49 900.00 1,260,437
8.3 Base cum 1,750.61 1,250.00 2,188,259
8.4 Bituminous concrete cum 280.10 7,700.00 2,156,748
SUBTOTAL 14,182,931
B. EARTHWORK & DRAINAGE
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket cum 20,260.00 180 3,646,800
capacity including cutting and loading in tippers, trimming bottom and side
slopes
2 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum cum
bucket capacity including cutting and loading in tippers
3 Construction of Reinforcement Earth Fill / Embankment with approved cum 20,237.00 150 3,035,550
material obtained from borrow pits with all leads and lifts, transporting to
site, spreading, grading to required slope and compacting, all complete as
per Technical Specifications Clause 305.
4 Construction of Subgrade with approved material obtained from borrow cum 9,174.00 400 3,669,600
pits, satisfying the requirements of minimum soaked CBR value as indicated
in the drawings, including all leads and lifts, transporting to site, spreading,
grading to required slope and compacted, complete as per Technical
Specifications Clause 30
5 Providing PCC M-15 grade below masonry drains, RCC Drains, vertical falls, cum 1,206.00 5,840 7,043,040
outfalls, escape for drainage arrangement as per drawings and Technical
Specifications sections 1500, 1700 and 2500.
6 RCC M25 Drains with Cover Slab : Providing RCC M-25 Grade Drains with cum 4,002.00 6,350 25,412,700
Cover Slab and also for the Pier concrete wall cover with Lifting hooks for
Covered drains as per drawings and Technical Specification
7 Reinforcement for Drains : Providing HYSD Reinforcement as per drawings MT 367.00 70,000 25,690,000
& Technical Specifications Section 1600.
SUBTOTAL 68,497,690
C. GSB & BASE
1 Construction of granular sub-base by providing coarse graded material, cum 13,444.00 900 12,099,600
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with
vibratory roller to achieve the desired density, complete as per clause 401.
Grading –II (Table–400-2)
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
2 Providing, laying, spreading and compacting graded stone aggregate to wet cum 8,946.00 1,250 11,182,500
mix macadam specification including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed Material by tipper to site,
laying in uniform layers with paver in base course on well prepared surface
and compacting with vibratory roller to achieve the desired density,
complete as per clause 406
3 cum 399.00 400 159,600
Filling in median / Island with approved material obtained from borrow pits
with all leads and lifts, transporting to site, spreading, grading, compacting,
etc., complete as per Technical Specifications Clause 407.

4 CC M20 Kerb (For Medians / Footpaths / Separators) Rmt 3,875.00 350 1,356,250
SUBTOTAL 24,797,950
D. BITUMINOUS COURSE PAVEMENT
1 sqm 35,783.00 38 1,359,754
Prime Coat (Over WMM) : Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.60 kg/sqm using mechanical
means, complete as per Technical Specifications Clause 502.

2 Tack Coat (over Prime Coat) : Providing and applying tack coat with sqm 35,783.00 14 500,962
bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg
per sqm on the prepared granular surface treated with primer, complete as
per Technical Specifications Clause 503.
3 Tack Coat (over DBM) : Providing and applying tack coat with bitumen sqm 38,631.00 14 540,834
emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm
on the prepared bituminous surface, complete as per Technical
Specifications Clause 503.
4 cum 3,670.00 7,000 25,690,000
DBM (Grading I - Thickness 50/95 mm) : Providing and laying dense graded
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight
of total mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level
and alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction as per MoRTH specification clause No.
507 complete in all respects.

5 cum 5,193.00 7,700 39,986,100


Bituminous Concrete (BC) (Grading II - Thickness 40 mm) : Providing and
laying bituminous concrete with 100-120 TPH batch type hot mix plant
producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to
5.6 per cent of mix and filler, transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification clause
No. 509 complete in all respects

6 Wearing Coat 25mm over 40MM BC - Mastic Asphalt : The laying of cum 3,250.00 700 2,275,000
Wearing Coat i.e. Mastic Asphalt shall be confirmed to Morth Specifications
section No.500, Clause No.2702.1
SUBTOTAL 70,352,650
E. TRAFFIC SIGNS MARKING AND OTHER APPURTENANCES
1 Providing and fixing of retro- reflectorised cautionary, mandatory and
informatory sign as per IRC :67 made of high intensity grade sheeting vide
clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the
ground by means of properly designed foundation with M15 grade cement
concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing
1.1 Hazard marker (300mm X 900mm) Each 151.00 4,000 604,000
1.2 Object marker (300mm equi. Triangle) Each 63.00 4,000 252,000
1.3 Cautionary sign (900mm equi. Triangle) Each 239.00 4,000 956,000
1.4 Mandatory Sign (900 mm dia. Circular) Each 188.00 4,000 752,000
1.5 Facility Information Sign (600mm X 800mm) Each 12.00 4,000 48,000
1.6 Name Informatory Board (1200mm X 450mm) Each 15.00 4,000 60,000
BOQ (ROAD WORKS) - PART 2
Sl. No. Item Description Unit Quantity Rate Amount
Thermoplastic paint (BERGER / Equivalent Brand) : Road marking with Hot sqm 12,700.00 480 6,096,000
Applied Thermoplastic Compound with Reflectorising Glass Beads on
Bituminous Surfaces (Providing and laying of hot applied thermoplastic
2 compound 2.5 mm thich including reflectorising glass beads @ 250 gms per
sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC: 35. The finished surface to be leve, uniform and frree from streaks
and holes.)
Each 1,260.00 300 378,000
Road Stud with Lens Reflector (Providing and fixing of road stud 100 x 100
mm, die cast in aluminium, resistant to corrosive effect of salt and grit,
3 fitted with lens reflectors, installed in concrete or asphaltic surface by
drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable
bituminous grout or epoxy mortar, all as per BS : 873 (Part 4) 1973)

80 124,000
Median marker Double side : Painting two coats after filling the surface with
4 sqm 1,550.00
synthetic enamel paint in all shades on new plastered concrete surfaces

6 Providing and erecting OVERHEAD SIGNS including gantry using non -


metallic micro prismatic sheet conforming to ASTM D4956-09 Type XI
Specification fixed with epoxy coated 4 mm thick alluminium composite
panels having 0.5 mm thick alluminium on both sides supported by M.S
angle iron frame complete as per drawing, and as directed by the Engineer.

6.1 2-Legged Over-head Gantry sign Boards Each 4.00 500,000 2,000,000
6.2 Cantiliver Single Post Gantry Sign Boards Each 9.00 525,000 4,725,000
7 Pedestrian Guard Rail :Providing, fitting and fixing mild steel railing Rmt 4,000 8,000,000
2,000.00
complete as per drawing and Technical Specification
8 Providing and erecting a high mast pole lighting with 30 m high hot dip Each 16.00 750,000 12,000,000
galvanized mast designed to withstand forces exerted with wind speeds of
180 km per hour with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted
with a base flange, door at the base of mast with heavy duty internal lock,
lantern carriage, suitable winching arrangement for safe working load of
750 kg and high powered electrically driven power tools for raising and
lowering of lantern carriage, flexible 8 core electric cable, lightening
conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on
top of the mast, all complete as per approved design and drawings

9 Street Lighting Single Pole - Double side Overhanging Each 165.00 7,500 1,237,500
10 Street Lighting Single Pole - Single side Overhanging Each 183.00 5,000 915,000
11 Close circuit CCTV as per schedule C ; Supply Of 4 MP Standard Resolution Each 1.00 245,000 245,000
IP Bullet CCTV Camera HD Metal Body. 25/30fps 3.6 -12mm Lens with IR
LED's, 5MP IP, Supply Of 1080P NVR 200mbps Up To 8MP Support
Recording 2 SATA Port Supports Up To 8TB Mobile View HDMI, VGA Out. ,
16 Ch NVR, Supply and Installation 4TB Sata Surveillance HDD For NVR
Recording., Supply and Installation Of 35” HD LED TV With Remote, Supply
8 Port POE Network Switch, Supply 4 Port POE Network Switch
Supply Of 4U Rack with Locking, Power and Fan, Front Glass Door Tray,
Supply Of 2U Rack with Locking, Power and Fan, Front Glass Door Tray,
Supply of On-Line UPS Suitable For 1ph AC Input And 1ph

12 LED Light Under Deck @ 25m C/C Nos. 212.00 500 106,000
13 Providing and Laying SS Railing around Rani Chennamma statue Rmt 70.00 5,000 350,000
14 Providing and Laying M20 concrete Traffic Islands at the Ranichennamma cum 435.00 6,350 2,762,250
circle including Major and Minor Junctions
15 Landscaping for medians, under the viaducts, traffic islands Sqm 8,412.00 300 2,523,600
16 Landscaping for Rani Chennamma Circle including MS Panel Logo and Each 1.00 2,000,000 2,000,000
Name, Brick work and Plantation
17 Provision of Paver Blocks at the Drain Foundation Sqm 3,990.00
18 Kilometer Stones No. 12.00
19 Hectometer Stones No. 40.00
20 Rain Water Harvesting No. 5.00
21 Rumble Strips No. 33.00

SUBTOTAL 46,134,350
223,965,571
DETAILS OF QUANTITIES
Site Clearance
Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit

1.00 Clearing and Grubbing

Clearing and grubbing road land including uprooting rank


vegetation, grass, bushes, shrubs, saplings and trees girth up
to 300 mm, removal of stumps of trees cut earlier and disposal
of unserviceable materials and stacking of serviceable material
to be used or auctioned, up to a lead of 1000 meters including
removal and disposal of top organic soil not exceeding 150
mm in thickness, complete as per Technical Specifications
Clause 201.

Main Carriageway 0.00 sqm


Service road 0.00 sqm
Village Road 0.00 sqm
Total 0.00 sqm
convert sqm to hectare (sqm / 10,000) 0.00 Hct.
Say 0.00 Hct.
4.00 Dismantling of Flexible Pavements

Dismantling of flexible pavements and disposal of dismantled


materials up to a lead of 1000 meters, stacking serviceable and
unserviceable materials separately

Main carriageway - Approaches


Arm E1 - TCS 2 1.00 151.00 17.00 1.110 2,849.37 cum
Arm E2 - TCS 2 1.00 260.00 13.00 1.110 3,751.80 cum
Arm C - TCS 1A 1.00 160.00 8.50 1.110 1,509.60 cum
Arm G - TCS 7 1.00 127.00 6.50 1.110 916.31 cum
Arm Airport Up Ramp 1.00 66.00 6.50 1.110 476.19 cum

At Pier Locations of Each ARMS Area Hieght


ARM C 517.72 1.110 574.67 cum
ARM E 4,864.60 1.110 5,399.71 cum
ARM G 1,458.28 1.110 1,618.69 cum
Airport Up Ramp 674.33 1.110 748.51 cum
0.00 cum
Carriage Way Total 17,844.84 cum
Say 17,845.00 cum

5.10 Shifting of Utilities


a Shifting of Water supply Pipe Line 2,012.00 2,012.00 RM
b Shifting of Sewage Line Shifting 2,522.00 2,522.00 RM
Say 4534.00 RM
c shifting of electrical utilities 4.00
4.00 Nos
Say 4.00 Nos
6.00 Dismantling of Kerbs/Median

Dismantling of Kerbs/Median and disposal of dismantled


materials up to a lead of 1000 meters, stacking serviceable and
unserviceable materials separately

From Rani Chennamma Circle to Vijayapura Road (ARM C) 2.00 250.000 500.00 Rm
From Rani Chennamma Circle to Airport Road (ARM G) 2.00 690.000 1,380.00 Rm
From Airport Road to Left Ramp and Right Ramp 1.00 300.000 300.00 Rm
ARM-E 3.00 1,950.000 5,850.00 Rm
Airport UP Ramp 1.00 150.000 150.00 Rm
Say 8180.00 Rm

5.00 Dismantling of Bus Bays 3.00 - 3.00 No.s

6.00 Restoration Works for road after constructions


ARM C Area Hight
Soil Subgarde 467.72 0.500 233.86 cum
Granular Sub-Base 467.72 0.200 93.54 cum
Base 467.72 0.250 116.93 cum
Bituminous concrete 467.72 0.040 18.71 cum
ARM E
Soil Subgarde 4,564.60 0.500 2,282.30 cum
Granular Sub-Base 4,564.60 0.200 912.92 cum
Base 4,564.60 0.250 1,141.15 cum
Bituminous concrete 4,564.60 0.040 182.58 cum
ARM G
Soil Subgarde 1,352.03 0.500 676.02 cum
Granular Sub-Base 1,352.03 0.200 270.41 cum
Base 1,352.03 0.250 338.01 cum
Bituminous concrete 1,352.03 0.040 54.08 cum
Airport Upramp
Soil Subgarde 618.08 0.500 309.04 cum
Granular Sub-Base 618.08 0.200 123.62 cum
Base 618.08 0.250 154.52 cum
Bituminous concrete 618.08 0.040 24.72 cum
DETAILS OF QUANTITIES
Earthwork & Drainages

Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remark

1.00 EARTHWORK

>> Excavation and Carting away


Earthwork in excavation necessary for construction of roadway
and drainage in all types of soil / rock including carting away
with all leads and lifts, complete as per Technical
Specifications Clause 301.

Earthwork from excavation for main carriageway and service


road( 40mm+95mm+250mm+200mm+500)
Widening of Road Constructions
TCS 1A 1.00 160.000 4.000 1.085 694.40
TCS 1B 1.00 55.000 4.500 1.085 268.54
TCS 2D 2.00 50.000 6.250 1.085 678.13
TCS 2 2.00 150.000 8.250 1.085 2,685.38
TCS 5 1.00 130.000 13.300 1.085 1,875.97
TCS 4E 1.00 50.000 16.150 1.085 876.14
TCS 7 1.00 100.000 4.750 1.085 515.38
TCS 7A 1.00 50.000 4.400 1.085 238.70
TCS 8 2.00 66.000 18.200 1.085 2,606.60
@ Rani Chennamman cricle 3,142.39 1.085 3,409.49
13,848.71 cum

RCC Lined / Covered Drains 0.00 0.000 0.000 0.000 0.00


TCS1 2.00 285.000 1.000 1.500 855.00
TCS1A 1.00 160.000 1.000 1.500 240.00 HOSUR ROAD
TCS1A 1.00 160.000 1.500 1.500 360.00 TO AIRPORT ROAD 1,698.75
TCS1B 1.00 65.000 1.000 1.500 97.50 (ARM C)
TCS1B 1.00 65.000 1.500 1.500 146.25
TCS 2D 0.00 0.000 0.000 0.000 0.00
TCS 2 0.00 0.000 0.000 0.000 0.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 2.00 60.000 1.000 1.500 180.00
TCS2F(1) 2.00 100.000 1.000 1.500 300.00
TCS2F(2) 2.00 100.000 1.500 1.500 450.00 GADAG TO 2,676.00
DHARWAD ROAD
TCS -4/4B(1) 2.00 100.000 1.000 1.500 300.00 (ARM E)
TCS -4/4A 1.00 264.000 1.000 1.500 396.00
TCS -4D 1.00 100.000 1.000 1.500 150.00
TCS -4/4B(3) 1.00 100.000 1.000 1.500 150.00
TCS-4C 1.00 110.000 1.000 1.500 165.00
TCS-5 2.00 130.000 1.000 1.500 390.00
TCS-4E 1.00 50.000 1.100 1.500 82.50
TCS-4E 1.00 50.000 1.500 1.500 112.50
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 100.000 1.500 1.500 225.00 AIRPORT ROAD 337.50
TCS-7A 1.00 50.000 1.500 1.500 112.50 (ARM G)
TCS-8 2.00 66.000 1.500 1.500 297.00 AIRPORT RAMP
TOWARDS CIRCLE 1,698.92
TCS-8A 2.00 311.537 1.500 1.500 1,401.92 (ARM E)
6,411.17 cum
Total 20,259.88 cum
Say 20,260.00 cum

3.00 Construction of Reinforcement Earthfill from Borrow pits

Construction of Reinforcement Earth Fill with approved


material obtained from borrow pits with all leads and lifts,
transporting to site, spreading, grading to required slope and
compacting, all complete as per Technical Specifications
Clause 305.

For Main Carriage way


ARM C 5,169.67 5,169.67
ARM G 2,018.54 2,018.54
AIRPORT UP RAMP 652.39 652.39
ARM E 7,832.17
RIGHT RAMP OF ARM E 2,822.34 12,396.25
LEFT RAMP OF ARM E 1,741.74

20,236.85 cum
Total 20,236.85 cum
Say 20,237.00 cum
4.00 Construction of Subgrade

Construction of Subgrade with approved material obtained


from borrow pits, satisfying the requirements of minimum
soaked CBR value as indicated in the drawings, including all
leads and lifts, transporting to site, spreading, grading to
required slope and compacted, complete as per Technical
Specifications Clause 305.

Sub-Grade

TCS1 0.00 0.000 0.000 0.000 0.00


TCS1A 1.00 160.000 12.500 0.500 1,000.00 HOSUR ROAD
TO AIRPORT ROAD 1,546.25
TCS1B 1.00 55.000 8.500 0.500 233.75 (ARM C)
TCS 2D 2.00 50.000 6.250 0.500 312.50
TCS 2 2.00 150.000 17.000 0.500 2,550.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(1) 0.00 0.000 0.000 0.000 0.00 GADAG TO
DHARWAD ROAD 3,818.25
TCS -4/4B(2) 0.00 0.000 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00
TCS-4C 0.00 130.000 6.500 0.500 0.00
TCS-5 1.00 130.000 13.300 0.500 864.50
TCS-4E 1.00 50.000 16.150 0.500 403.75
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 100.000 8.250 0.500 412.50 AIRPORT ROAD 452.50
TCS-7A 1.00 50.000 1.600 0.500 40.00 (ARM G)
TCS-8 1.00 66.000 6.500 0.500 214.50 AIRPORT RAMP
TOWARDS CIRCLE 214.50
TCS-8A 0.00 0.000 0.000 0.000 0.00 (ARM E)
Rani Chennamma Circle 1.00 3,142.500 3,142.50
Main Carriageway 9,174.00 cum
Service road 0.00 cum

MCW and SR 9,174.00


Total 9,174.00 cum
Say 9,174.00 cum

B. DRAINS

5.00 PCC M15 Below Drains


Providing cement concrete M-15 grade below masonry drains,
RCC Drains, vertical falls, outfalls, escape for drainage
arrangement as per drawings and Technical Specifications
sections 1500, 1700 and 2500.

(100mm Below RCC Drain+75mm Projection on either side)

TCS1 2.00 285.000 1.000 0.250 142.50


TCS1A 1.00 160.000 1.000 0.250 40.00 HOSUR ROAD
TO AIRPORT ROAD 258.75
TCS1A 1.00 160.000 1.500 0.250 60.00 (ARM C)
TCS1B 1.00 65.000 1.000 0.250 16.25
TCS1B 1.00 65.000 1.500 0.250 24.38
TCS 2D 0.00 0.000 0.000 0.000 0.000
TCS 2 0.00 0.000 0.000 0.000 0.000
TCS 2A 0.00 0.000 0.000 0.000 0.000
TCS 2B(1) 0.00 0.000 0.000 0.000 0.000
TCS 2B(2) 2.00 90.000 1.000 0.250 45.00
TCS 2C 2.00 60.000 1.000 0.250 30.00
TCS2F(1) 2.00 100.000 1.500 0.250 75.00 GADAG TO
TCS2F(2) 2.00 100.000 1.500 0.250 75.00 DHARWAD ROAD 536.88
TCS -4/4B(1) 2.00 100.000 1.000 0.250 50.00 (ARM E)
TCS -4/4B(2) 2.00 100.000 1.000 0.250 50.00
TCS -4D 1.00 100.000 1.000 0.250 25.00
TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00
TCS-4C 1.00 110.000 1.500 0.250 41.25
TCS-5 2.00 130.000 1.000 0.250 65.00
TCS-4E 1.00 90.000 1.000 0.250 22.50
TCS-4E 1.00 90.000 1.500 0.250 33.75
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 100.000 1.500 0.250 37.50 AIRPORT ROAD 56.25
TCS-7A 1.00 50.000 1.500 0.250 18.75 (ARM G)
TCS-8 2.00 80.000 1.500 0.250 60.00 AIRPORT RAMP
TOWARDS CIRCLE 353.65
TCS-8A 2.00 391.537 1.500 0.250 293.65 (ARM E)
Drains 1,205.53 cum
Total 1,205.53 cum

Say 1,206.00 cum

6.00 RCC M20 Drains


Providing Reinforced Cement Concrete Grade as per drawing
and Technical Specification.

TCS1 6.00 285.000 1.000 0.250 427.50


TCS1A 3.00 160.000 1.000 0.250 120.00 HOSUR ROAD
TCS1A 3.50 160.000 1.000 0.250 140.00 TO AIRPORT ROAD 793.13
TCS1B 3.00 65.000 1.000 0.250 48.75 (ARM C)
TCS1B 3.50 65.000 1.000 0.250 56.88
TCS 2D 0.00 0.000 0.000 0.000 0.00
TCS 2 0.00 0.000 0.000 0.000 0.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 6.00 60.000 1.000 0.250 90.00
TCS2F(1) 3.00 100.000 1.000 0.250 75.00
TCS2F(2) 3.50 100.000 1.000 0.250 87.50 GADAG TO
DHARWAD ROAD 1,110.50
TCS -4/4B(1) 6.00 100.000 1.000 0.250 150.00 (ARM E)
TCS -4/4A 3.00 264.000 1.000 0.250 198.00
TCS -4D 3.00 100.000 1.000 0.250 75.00
TCS -4/4B(3) 3.00 100.000 1.000 0.250 75.00
TCS-4C 3.00 110.000 1.000 0.250 82.50
TCS-5 6.00 130.000 1.000 0.250 195.00
TCS-4E 3.10 50.000 1.000 0.250 38.75
TCS-4E 3.50 50.000 1.000 0.250 43.75
TCS-6 0.00 0.000 0.000 0.000 0.00 0.00 HOSUR TO
TCS-7 3.50 100.000 1.000 0.250 87.50 AIRPORT ROAD 131.25
TCS-7A 3.50 50.000 1.000 0.250 43.75 (ARM G)
TCS-8 7.00 80.000 1.000 0.250 140.00 AIRPORT RAMP
TOWARDS CIRCLE 685.19
TCS-8A 7.00 311.537 1.000 0.250 545.19 (ARM E)

For Both Bottom and Walls


ARM C (TCS 1) 8.00 5.000 1.670 0.250 16.70 cum Pier Thickness
38.00 5.000 1.670 0.250 79.33 cum =
ARM E (2A+2C+4/4B++4A+4C+4D) 5( 2.5*2)
ARM G 14.00 5.000 1.670 0.250 29.23 cum
Airport Up Ramp 9.00 5.000 1.670 0.250 18.79 cum

Total 2,864.10 cum


Say 2,865.00 cum
6.00 RCC M25 Drain Cover Slab

Providing RCC M-25 Grade Cover Slab with Lifting hooks for
Covered drains as per drawings and Technical Specifications

TCS1 2.00 285.000 1.000 0.250 142.50


TCS1A 1.00 160.000 1.000 0.250 40.00 HOSUR ROAD
TCS1A 1.00 160.000 1.500 0.250 60.00 TO AIRPORT ROAD 283.13
TCS1B 1.00 65.000 1.000 0.250 16.25 (ARM C)
TCS1B 1.00 65.000 1.500 0.250 24.38
TCS 2D 0.00 0.000 0.000 0.000 0.00
TCS 2 0.00 0.000 0.000 0.000 0.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 2.00 60.000 1.000 0.250 30.00
TCS2F(1) 2.00 100.000 1.000 0.250 50.00 GADAG TO
TCS2F(2) 2.00 100.000 1.500 0.250 75.00 DHARWAD ROAD 427.25
TCS -4/4B(1) 2.00 100.000 1.000 0.250 50.00 (ARM E)
TCS -4/4A 1.00 264.000 1.000 0.250 66.00
TCS -4D 1.00 100.000 1.000 0.250 25.00
TCS -4/4B(3) 1.00 100.000 1.000 0.250 25.00
TCS-4C 1.00 110.000 1.000 0.250 27.50
TCS-5 2.00 130.000 1.000 0.250 65.00
TCS-4E 1.00 50.000 1.100 0.250 13.75
TCS-4E 1.00 50.000 1.500 0.250 18.75
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
AIRPORT ROAD 75.00
TCS-7 1.00 100.000 1.500 0.250 37.50 (ARM G)
TCS-7A 1.00 50.000 1.500 0.250 18.75
TCS-8 2.00 80.000 1.500 0.250 60.00 AIRPORT RAMP
TOWARDS CIRCLE 293.65
TCS-8A 2.00 311.537 1.500 0.250 233.65 (ARM E)

ARM C (TCS 1) 8.00 5.000 1.670 0.100 6.68 cum Pier Thickness
38.00 5.000 1.670 0.100 31.73 cum =
ARM E (2A+2C+4/4B++4A+4C+4D) 5( 2.5*2)
Pier Thickness
=
5( 2.5*2)
ARM G 14.00 5.000 1.670 0.100 11.69 cum
Airport Up Ramp 9.00 5.000 1.670 0.100 7.52 cum
Total 1,136.64 cum
Say 1,137.00 cum

7.00 Reinforcement for Drains


Providing HYSD Reinforcement as per drawings & Technical
Specifications Section 1600.

RCC M20 Drains 2,720.065 2,720.06 cum


RCC M25 Drain Cover Slab 1,137.000 1,137.00 cum
Total 3,857.06 cum

Qty. of steel at the rate of 95.00 kg/cum 366,421.15 Kg


convert Kg to Tonnes (kg / 1,000) Total 366.42 Tonnes
Say 367.00 Tonnes

Drainage for Flyover

Providing the HDPE Pipe of 200dia for Drainage at the


locations of Flyover as per Tender Drawing

Total Length of 4
Providing the HDPE Pipe of 200dia Along the Length of Flyover Lane Flyover 1,420.00 RM
Inside the Crash Barrier
Total Length of 2
Lane Flyover 1,276.00 RM

Priovision of HDPE pipe for Drainage spout 1,675.20 RM

Total Length of 4
Provision of HDPE Pipe for Soffit under Piers Lane Flyover 540.00 RM
Total Length of 2
Lane Flyover 121.00 RM

@4 lane fly over


Providing the HDPE Pipe of 200dia for Drainage at the 72.000 7.300 525.60 RM
locations of Piers
@2 lane fly over
44.000 5.900 259.60 RM

Total 6,165.40 RM
Say 6,166.00 RM
DETAILS OF QUANTITIES
GSB & Base

Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remarks

1.00 Granular Sub-Base (GSB) with Coarse Graded Material

Construction of granular sub-base by providing coarse graded


material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with vibratory roller to
achieve the desired density, complete as per clause 401.
Grading –II (Table–400-2)
HOSUR ROAD
TCS1 0.00 0.000 0.000 0.000 0.00 TO AIRPORT
TCS1A 1.00 160.000 16.000 0.200 512.00 693.50
TCS1B 1.00 55.000 16.500 0.200 181.50 ROAD
(ARM C)
TCS 2D 2.00 50.000 14.750 0.200 295.00
TCS 2 2.00 150.000 15.250 0.200 915.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.000 0.00 GADAG TO
DHARWAD
TCS -4/4B(1) 0.00 0.000 0.000 0.000 0.00 2,355.60
ROAD
TCS -4/4B(2) 0.00 0.000 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00
TCS-4C 0.00 0.000 0.000 0.000 0.00
TCS-5 1.00 130.000 31.600 0.200 821.60
TCS-4E 1.00 50.000 32.400 0.200 324.00
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 130.000 23.250 0.200 604.50 AIRPORT 840.50
ROAD
TCS-7A 1.00 50.000 23.600 0.200 236.00 (ARM G)
AIRPORT
TCS-8 2.00 66.000 6.000 0.200 158.40 RAMP
TOWARDS 158.40
TCS-8A 0.00 0.000 0.000 0.000 0.00 CIRCLE
(ARM E)

Junctions
X - Junction 3.00 100.000 11.000 0.200 660.00
X - Junction 1.00 100.000 11.000 0.200 220.00
X - Junction 1.00 100.000 11.000 0.200 220.00
5-Legged 2.00 100.000 11.000 0.200 440.00
Rani Chennamma circle 1.00 7,856.000 7,856.00
Main Carriageway Total 13,444.00 cum
Say 13,444.00 cum

2.00 Wet Mix Macadam (WMM)

Providing, laying, spreading and compacting graded stone


aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in
uniform layers with paver in base course on well prepared
surface and compacting with vibratory roller to achieve the
desired density, complete as per clause 406
HOSUR ROAD
TCS1 0.00 0.000 0.000 0.000 0.00 TO AIRPORT
TCS1A 1.00 160.000 7.500 0.250 300.00 520.00
TCS1B 1.00 55.000 16.000 0.250 220.00 ROAD
(ARM C)
TCS 2D 2.00 50.000 16.000 0.250 400.00
TCS 2 2.00 150.000 13.000 0.250 975.00
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.000 0.00 GADAG TO
DHARWAD
TCS -4/4B(1) 0.00 0.000 0.000 0.000 0.00 2,738.25
ROAD
TCS -4/4B(2) 0.00 0.000 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.000 0.00
GADAG TO
DHARWAD 2,738.25
ROAD
(ARM E)

TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00


TCS-4C 0.00 0.000 0.000 0.000 0.00
TCS-5 1.00 130.000 31.600 0.250 1,027.00
TCS-4E 1.00 50.000 26.900 0.250 336.25
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 130.000 22.250 0.250 723.13 AIRPORT 1,011.88
ROAD
TCS-7A 1.00 50.000 23.100 0.250 288.75 (ARM G)
AIRPORT
TCS-8 2.00 66.000 5.500 0.250 181.50 RAMP
TOWARDS 181.50
TCS-8A 0.00 0.000 0.000 0.000 0.00 CIRCLE
(ARM E)

Additional WMM for Footpath to be reconstruction @ Left


Side
TCS 4C 1.00 110.000 2.000 0.250 55.00 cum
Major Munctions
Y- Junction 3.00 100.000 11.000 0.250 825.00 cum
X- Junction 2.00 100.000 11.000 0.250 550.00 cum
T-Junction 2.00 100.000 11.000 0.250 550.00 cum
5- Legged - Junction 2.00 100.000 11.000 0.250 550.00 cum
Rani Chennamma Circle 1.00 7,856.000 0.250 1,964.00 cum

Total 8,945.63 cum


Main Carriageway Say 8,946.00 cum

3.00 Filling in Medians with Borrow Material


Filling in median / Island with approved material obtained
from borrow pits with all leads and lifts, transporting to site,
spreading, grading, compacting, etc., complete as per
Technical Specifications Clause 407.

a TCS1 0.00 0.000 0.000 0.000 0.00 HOSUR ROAD


TCS1A 0.00 0.000 0.000 0.000 0.00 TO AIRPORT 0.00
TCS1B 0.00 0.000 0.000 0.000 0.00 ROAD (ARM C)
TCS 2 1.00 150.000 1.500 0.375 84.38
TCS 2D 1.00 50.000 1.500 0.375 28.13
TCS 2A(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2A(2) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(1) 0.00 0.000 0.000 0.000 0.00
GADAG TO
TCS -4A(1) 0.00 0.000 0.000 0.000 0.00 DHARWAD
112.50
TCS -4A(2) 0.00 0.000 0.000 0.000 0.00 ROAD
(ARM E)
TCS -4D(1) 0.00 0.000 0.000 0.000 0.00
TCS -4D(2) 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00
TCS-4C(1) 0.00 0.000 0.000 0.000 0.00
TCS-4C(2) 0.00 0.000 0.000 0.000 0.00
TCS-5 0.00 0.000 0.000 0.000 0.00
TCS-4E(1) 0.00 0.000 0.000 0.000 0.00
TCS-4E(2) 0.00 0.000 0.000 0.000 0.00
TCS-6 0.00 0.000 0.000 0.000 0.00
TCS-7 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 0.00 0.000 0.000 0.000 0.00 AIRPORT 0.00
ROAD
TCS-7A(1) 0.00 0.000 0.000 0.000 0.00 (ARM G)
TCS-7A(2) 0.00 0.000 0.000 0.000 0.00
AIRPORT
TCS-8 0.00 0.000 0.000 0.000 0.00 RAMP
TOWARDS 0.00
TCS-8A 0.00 0.000 0.000 0.000 0.00 CIRCLE
(ARM E)
Total 112.50 cum

b At the Traffic Islands in the Intersections of Rani Chennamma


Circle
At - Garde Intersection 1.00 681.200 0.300 0.300 61.31
Grade Seperated Intersection 1.00 316.480 0.500 0.500 79.12
cum
c Major Junctions 7.00 0.300 0.300 0.63
d Minor Junctions 11.00 0.300 0.300 0.99

Total 142.05 cum

ARM C (TCS 1) 8.00 5.000 1.670 0.250 16.70 cum Pier Thickness
38.00 5.000 1.670 0.250 79.33 cum =
ARM E (2A+2C+4/4B++4A+4C+4D) 5( 2.5*2)
ARM G 14.00 5.000 1.670 0.250 29.23 cum
Airport Up Ramp 9.00 5.000 1.670 0.250 18.79 cum
Total 398.59 cum
Say 399.00 cum

4.00
Cast in Situ Cement Concrete M20 Kerb (For Medians /
Footpaths / Separators)

HOSUR ROAD
TCS1 1.00 285.000 285.00 TO AIRPORT
TCS1A 1.00 160.000 160.00 575.00
TCS1B 2.00 65.000 130.00 ROAD
(ARM C)
TCS 2D 6.00 50.000 300.00
TCS 2 2.00 150.000 300.00
TCS 2A 0.00 0.000 0.00
TCS 2B(1) 4.00 50.000 200.00
TCS 2B(2) 4.00 90.000 360.00
TCS 2C 0.00 0.000 0.00 GADAG TO
DHARWAD ROAD 1,520.00
(ARM E)
GADAG TO
TCS -4/4B(1) 0.00 0.000 0.00 DHARWAD ROAD 1,520.00
TCS -4/4B(2) 0.00 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.00
TCS-4C 0.00 0.000 0.00
TCS-5 0.00 0.000 0.00
TCS-4E 4.00 90.000 360.00
HOSUR
TCS-6 2.00 500.000 1,000.00 TO
TCS-7 0.00 0.000 0.00 AIRPORT 1,000.00
TCS-7A 0.00 0.000 0.00 ROAD
(ARM G)
AIRPORT
TCS-8 2.00 80.000 160.00 RAMP
TOWARDS 780.00
TCS-8A 2.00 310.00 620.00 CIRCLE
(ARM E)
Main Carriage way and service road 3,875.00 Rm

Total 3,875.00 Rm
Say 3,875.00 Rm
DETAILS OF QUANTITIES
Bituminous & CC Course

Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit Remarks

4A FLEXIBLE PAVEMENT

1.00 Prime Coat (Over WMM)


Providing and applying primer coat with bitumen emulsion on
prepared surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.60 kg/sqm using
mechanical means, complete as per Technical Specifications
Clause 502.

TCS1 0.00 0.000 0.000 0.00 HOSUR ROAD


TO AIRPORT
TCS1A 1.00 160.000 7.500 1,200.00 2,080.00
ROAD
TCS1B 1.00 55.000 16.000 880.00 (ARM C)
TCS 2D 2.00 50.000 16.000 1,600.00
TCS 2 2.00 150.000 13.000 3,900.00
TCS 2A 0.00 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.00 GADAG TO
TCS -4/4B(1) 0.00 0.000 0.000 0.00 DHARWAD ROAD 10,953.00
TCS -4/4B(2) 0.00 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.00
TCS-4C 0.00 0.000 0.000 0.00
TCS-5 1.00 130.000 31.600 4,108.00
TCS-4E 1.00 50.000 26.900 1,345.00
TCS-6 0.00 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 130.000 22.250 2,892.50 AIRPORT ROAD 4,047.50
TCS-7A 1.00 50.000 23.100 1,155.00 (ARM G)
AIRPORT RAMP
TCS-8 2.00 66.000 5.500 726.00 TOWARDS
726.00
TCS-8A 0.00 0.000 0.000 0.00 CIRCLE
(ARM E)
Main Carriageway 17,806.50

Additional WMM for Footpath to be reconstruction @ Left Side

TCS 4C 1.00 110.000 2.000 220.00


Major Munctions
Y- Junction 3.00 100.000 11.000 3,300.00
X- Junction 2.00 100.000 11.000 2,200.00
T-Junction 2.00 100.000 11.000 2,200.00
5- Legged - Junction 2.00 100.000 11.000 2,200.00
Rani Chennamma Circle 1.00 7,856.000 7,856.00
17,976.00
Total 35,782.50 sqm
Say 35,783.00 sqm

2.00 Tack Coat (over Prime Coat )


Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared granular surface treated with primer, complete
as per Technical Specifications Clause 503.

TCS1 0.00 0.000 0.000 0.00 HOSUR ROAD


TO AIRPORT
TCS1A 1.00 160.000 7.500 1,200.00 2,080.00
ROAD
TCS1B 1.00 55.000 16.000 880.00 (ARM C)
TCS 2D 2.00 50.000 16.000 1,600.00
TCS 2 2.00 150.000 13.000 3,900.00
TCS 2A 0.00 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.00 GADAG TO
TCS -4/4B(1) 0.00 0.000 0.000 0.00 DHARWAD ROAD 10,953.00
TCS -4/4B(2) 0.00 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.00
TCS-4C 0.00 0.000 0.000 0.00
TCS-5 1.00 130.000 31.600 4,108.00
TCS-4E 1.00 50.000 26.900 1,345.00
TCS-6 0.00 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 130.000 22.250 2,892.50 AIRPORT ROAD 4,047.50
TCS-7A 1.00 50.000 23.100 1,155.00 (ARM G)
TCS-8 2.00 66.000 5.500 726.00 AIRPORT RAMP
TOWARDS 726.00
TCS-8A 0.00 0.000 0.000 0.00 CIRCLE
(ARM E)
Main Carriageway sqm

Additional WMM for Footpath to be reconstruction @ Left Side

TCS 4C 1.00 110.000 2.000 220.00


Major Munctions
Y- Junction 3.00 100.000 11.000 3,300.00
X- Junction 2.00 100.000 11.000 2,200.00
T-Junction 2.00 100.000 11.000 2,200.00
5- Legged - Junction 2.00 100.000 11.000 2,200.00
Rani Chennamma Circle 1.00 7,856.000 7,856.00

Total 35,782.50 sqm


Say 35,783.00 sqm

3.00 Tack Coat (over DBM)


Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous surface, complete as per Technical
Specifications Clause 503.

TCS1 0.00 0.000 0.000 0.00 HOSUR ROAD


TO AIRPORT
TCS1A 1.00 160.000 15.000 2,400.00 5,425.00
ROAD
TCS1B 1.00 55.000 55.000 3,025.00 (ARM C)
TCS 2D 2.00 50.000 13.500 1,350.00
TCS 2 2.00 150.000 13.000 3,900.00
TCS 2A 0.00 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.00 GADAG TO
TCS -4/4B(1) 0.00 0.000 0.000 0.00 DHARWAD ROAD 10,599.00
TCS -4/4B(2) 0.00 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.00
TCS-4C 0.00 0.000 0.000 0.00
TCS-5 1.00 130.000 30.800 4,004.00
TCS-4E 1.00 50.000 26.900 1,345.00
TCS-6 0.00 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 100.000 5.500 550.00 AIRPORT ROAD 1,705.00
TCS-7A 1.00 50.000 23.100 1,155.00 (ARM G)
TCS-8 2.00 66.000 5.500 726.00 AIRPORT RAMP
TOWARDS 726.00
TCS-8A 0.00 0.000 0.000 0.00 CIRCLE
(ARM E)
sqm

Major Junction
Y- Junction 3.00 100.000 11.000 3,300.00
X- Junction 1.00 100.000 11.000 1,100.00
T-Junction 1.00 100.000 11.000 1,100.00
5- Legged - Junction 2.00 100.000 11.000 2,200.00
Rani Chennamma Circle 1.00 7,856.000 7,856.00

Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 3,360.00
T-Junction 3.00 60.000 7.000 1,260.00

Total 38,631.00 sqm


Say 38,631.00 sqm

4.00 Dense Graded Bituminous Macadam (DBM)


(Grading II - Thickness 95 mm)
Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of
75 tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5 per
cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MoRTH specification
clause No. 507 complete in all respects.

TCS1 0.00 0.000 0.000 0.00 0.00 HOSUR ROAD


TO AIRPORT
TCS1A 1.00 160.000 15.000 0.095 228.00 515.38
ROAD
TCS1B 1.00 55.000 55.000 0.095 287.38 (ARM C)
TCS 2D 2.00 50.000 13.500 0.095 128.25
TCS 2 2.00 150.000 13.000 0.095 370.50
TCS 2A 0.00 0.000 0.000 0.000 0.00
TCS 2B(1) 0.00 0.000 0.000 0.000 0.00
TCS 2B(2) 0.00 0.000 0.000 0.000 0.00
TCS 2C 0.00 0.000 0.000 0.000 0.00 GADAG TO
TCS -4/4B(1) 0.00 0.000 0.000 0.000 0.00 DHARWAD ROAD 1,006.91
TCS -4/4B(2) 0.00 0.000 0.000 0.000 0.00 (ARM E)
TCS -4D 0.00 0.000 0.000 0.000 0.00
TCS -4/4B(3) 0.00 0.000 0.000 0.000 0.00
GADAG TO
DHARWAD ROAD 1,006.91
(ARM E)

TCS-4C 0.00 0.000 0.000 0.000 0.00


TCS-5 1.00 130.000 30.800 0.095 380.38
TCS-4E 1.00 50.000 26.900 0.095 127.78
TCS-6 0.00 0.000 0.000 0.000 0.00 HOSUR TO
TCS-7 1.00 100.000 5.500 0.095 52.25 AIRPORT ROAD 161.98
TCS-7A 1.00 50.000 23.100 0.095 109.73 (ARM G)
TCS-8 2.00 66.000 5.500 0.095 68.97 AIRPORT RAMP
TOWARDS 68.97
TCS-8A 0.00 0.000 0.000 0.000 0.00 CIRCLE
(ARM E)
cum

Major Junction
Y- Junction 3.00 100.000 11.000 0.095 313.50
X- Junction 1.00 100.000 11.000 0.095 104.50
T-Junction 1.00 100.000 11.000 0.095 104.50
5- Legged - Junction 2.00 100.000 11.000 0.095 209.00
Rani Chennamma Circle 1.00 7,856.000 0.095 746.32

Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.095 319.20
T-Junction 3.00 60.000 7.000 0.095 119.70
3,669.95 cum
DBM (Grading II - Thickness 95 mm) Carriage Way Say 3,670.00 cum

5.00 Bituminous Concrete (BC)


(Grading II - Thickness 40 mm)
Providing and laying bituminous concrete with 100-120 TPH
batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.4 to 5.6 per cent of mix
and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired
compaction as per MORTH specification clause No. 509
complete in all respects

TCS1 1.00 285.000 7.500 0.040 85.50 HOSUR ROAD


TCS1A 1.00 160.000 7.500 0.040 48.00 TO AIRPORT 133.50
ROAD
TCS1B 0.00 0.000 0.000 0.000 0.00 (ARM C)
TCS 2D 2.00 50.000 8.000 0.040 32.00
TCS 2 2.00 150.000 8.000 0.040 96.00
TCS 2A 2.00 200.000 8.000 0.040 128.00
TCS 2B(1) 2.00 50.000 7.500 0.040 30.00
TCS 2B(2) 2.00 90.000 7.500 0.040 54.00
TCS 2C 2.00 60.000 7.500 0.040 36.00
TCS 2F(1.1) 1.00 100.000 61.033 0.040 244.13
TCS 2F(1.2) 1.00 100.000 72.800 0.040 291.20 GADAG TO
DHARWAD ROAD 1,538.30
TCS -4A 2.00 100.000 7.500 0.040 60.00 (ARM E)
TCS -4/4B(1) 2.00 100.000 7.500 0.040 60.00
TCS -4/4B(2) 2.00 264.000 7.500 0.040 158.40
TCS -4D 2.00 100.000 7.500 0.040 60.00
TCS -4/4B(3) 2.00 86.000 7.500 0.040 51.60
TCS-4C(1) 2.00 110.000 5.500 0.040 48.40
TCS-4C(2) 1.00 110.000 15.000 0.040 66.00
TCS-5(1) 2.00 130.000 5.500 0.040 57.20
TCS-5(2) 1.00 130.000 8.800 0.040 45.76 HOSUR TO
TCS-4E(1) 1.00 50.000 4.820 0.040 9.64 AIRPORT ROAD 132.00
TCS-4E(2) 1.00 50.000 4.985 0.040 9.97 (ARM G)
TCS-6 1.00 500.000 5.500 0.040 110.00 AIRPORT RAMP
TOWARDS
86.14
TCS-7 1.00 100.000 5.500 0.040 22.00 CIRCLE
(ARM E)
TCS-7A 0.00 0.000 0.000 0.000 0.00 cum
TCS-8 1.00 80.000 5.500 0.040 17.60
TCS-8A 1.00 311.537 5.500 0.040 68.54
Main Carriage Way 1,889.94

TCS1 1.00 285.000 9.000 0.040 102.60 HOSUR ROAD


TCS1A 1.00 160.000 8.500 0.040 54.40 TO AIRPORT 194.40
TCS1B 2.00 55.000 8.500 0.040 37.40 ROAD (ARM C)
TCS 2 2.00 150.000 7.500 0.040 90.00
TCS 2D 2.00 50.000 5.500 0.040 22.00
TCS 2A(1) 2.00 200.000 13.100 0.040 209.60
TCS 2B(1) 2.00 50.000 7.000 0.040 28.00
TCS 2A(2) 2.00 200.000 13.100 0.040 209.60
TCS 2B(2) 2.00 90.000 7.000 0.040 50.40
TCS 2C 2.00 60.000 11.000 0.040 52.80
TCS 2F(1.1) 1.00 100.000 19.495 0.040 77.98
TCS 2F(1.2) 1.00 100.000 22.120 0.040 88.48
TCS 2F(2.1) 1.00 100.000 31.010 0.040 124.04
TCS 2F(2.2) 1.00 100.000 32.926 0.040 131.70
TCS -4/4B(1) 2.00 100.000 7.500 0.040 60.00 GADAG TO
DHARWAD ROAD 1,637.57
(ARM E)
GADAG TO
DHARWAD ROAD 1,637.57
TCS -4A(1) 1.00 100.000 7.800 0.040 31.20 (ARM E)
TCS -4A(2) 1.00 100.000 7.300 0.040 29.20
TCS -4D(1) 1.00 100.000 10.500 0.040 42.00
TCS -4D(2) 1.00 100.000 8.000 0.040 32.00
TCS -4/4B(2) 2.00 264.000 7.500 0.040 158.40
TCS -4/4B(3) 2.00 86.000 7.000 0.040 48.16
TCS-4C(1) 1.00 110.000 7.000 0.040 30.80
TCS-4C(2) 1.00 110.000 5.800 0.040 25.52
TCS-5 2.00 130.000 6.000 0.040 62.40
TCS-4E(1) 1.00 50.000 7.980 0.040 15.96
TCS-4E(2) 1.00 50.000 8.665 0.040 17.33
TCS-6 2.00 500.000 8.000 0.040 320.00
TCS-7 1.00 100.000 10.500 0.040 42.00
TCS-7 1.00 100.000 6.250 0.040 25.00 HOSUR TO
AIRPORT ROAD 433.20
TCS-7A(1) 1.00 50.000 12.600 0.040 25.20 (ARM G)
TCS-7A(2) 1.00 50.000 10.500 0.040 21.00 cum
AIRPORT RAMP
TCS-8 2.00 80.000 5.500 0.040 35.20 cum TOWARDS 230.85
TCS-8A 2.00 311.537 7.850 0.040 195.65 cum CIRCLE
(ARM E)
Service Road 2,496.02

Major Junction
Y- Junction 3.00 100.000 11.000 0.040 132.00
X- Junction 1.00 100.000 11.000 0.040 44.00
T-Junction 1.00 100.000 11.000 0.040 44.00
5- Legged - Junction 2.00 100.000 11.000 0.040 88.00
Rani Chennamma Circle 1.00 7,856.000 0.040 314.24

Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.040 134.40
T-Junction 3.00 60.000 7.000 0.040 50.40
807.04 cum
5,193.00 cum
Say 5,193.00 cum

6.00 Wearing Coarse (Mastic Asphalt)


Thickness 25mm
The laying of Wearing Coat i.e. Mastic Asphalt shall be
confirmed to Morth Specifications section No.500, Clause
No.2702.1

TCS1 1.00 285.000 7.500 0.025 53.44 HOSUR ROAD


TCS1A 1.00 160.000 7.500 0.025 30.00 TO AIRPORT 83.44
ROAD
TCS1B 0.00 0.000 0.000 0.025 0.00 (ARM C)
TCS 2D 2.00 50.000 8.000 0.025 20.00
TCS 2 2.00 150.000 8.000 0.025 60.00
TCS 2A 2.00 200.000 8.000 0.025 80.00
TCS 2B(1) 2.00 50.000 7.500 0.025 18.75
TCS 2B(2) 2.00 90.000 7.500 0.025 33.75
TCS 2C 2.00 60.000 7.500 0.025 22.50
TCS 2F(1.1) 1.00 100.000 61.033 0.025 152.58
TCS 2F(1.2) 1.00 100.000 72.800 0.025 182.00
TCS -4A 2.00 100.000 7.500 0.025 37.50 GADAG TO
TCS -4/4B(1) 2.00 100.000 7.500 0.025 37.50 DHARWAD ROAD 961.44
TCS -4/4B(2) 2.00 264.000 7.500 0.025 99.00 (ARM E)
TCS -4D 2.00 100.000 7.500 0.025 37.50
TCS -4/4B(3) 2.00 86.000 7.500 0.025 32.25
TCS-4C(1) 2.00 110.000 5.500 0.025 30.25
TCS-4C(2) 1.00 110.000 15.000 0.025 41.25
TCS-5(1) 2.00 130.000 5.500 0.025 35.75
TCS-5(2) 1.00 130.000 8.800 0.025 28.60
TCS-4E(1) 1.00 50.000 4.820 0.025 6.03
TCS-4E(2) 1.00 50.000 4.985 0.025 6.23
TCS-6 1.00 500.000 5.500 0.025 68.75 HOSUR TO
TCS-7 1.00 100.000 5.500 0.025 13.75 AIRPORT ROAD 82.50
TCS-7A 0.00 0.000 0.000 0.025 0.00 cum (ARM G)
AIRPORT RAMP
TCS-8 1.00 80.000 5.500 0.025 11.00 TOWARDS 53.84
TCS-8A 1.00 311.537 5.500 0.025 42.84 CIRCLE
(ARM E)
Main Carriage Way 1,181.21

TCS1 1.00 285.000 9.000 0.025 64.13 HOSUR ROAD


TCS1A 1.00 160.000 8.500 0.025 34.00 TO AIRPORT 125.75
TCS1B 2.00 65.000 8.500 0.025 27.63 ROAD (ARM C)
TCS 2 2.00 150.000 7.500 0.025 56.25
TCS 2D 2.00 50.000 5.500 0.025 13.75
TCS 2A(1) 2.00 200.000 13.100 0.025 131.00
TCS 2B(1) 2.00 50.000 7.000 0.025 17.50
TCS 2A(2) 2.00 200.000 13.100 0.025 131.00
TCS 2B(2) 2.00 90.000 7.000 0.025 31.50
TCS 2C 2.00 60.000 11.000 0.025 33.00
TCS 2F(1.1) 1.00 100.000 19.495 0.025 48.74
TCS 2F(1.2) 1.00 100.000 22.120 0.025 55.30
TCS 2F(2.1) 1.00 100.000 31.010 0.025 77.53
TCS 2F(2.2) 1.00 100.000 32.926 0.025 82.32 GADAG TO
DHARWAD ROAD 1,023.48
(ARM E)
GADAG TO
TCS -4/4B(1) 2.00 100.000 7.500 0.025 37.50 DHARWAD ROAD 1,023.48
TCS -4A(1) 1.00 100.000 7.800 0.025 19.50 (ARM E)
TCS -4A(2) 1.00 100.000 7.300 0.025 18.25
TCS -4D(1) 1.00 100.000 10.500 0.025 26.25
TCS -4D(2) 1.00 100.000 8.000 0.025 20.00
TCS -4/4B(2) 2.00 264.000 7.500 0.025 99.00
TCS -4/4B(3) 2.00 86.000 7.000 0.025 30.10
TCS-4C(1) 1.00 110.000 7.000 0.025 19.25
TCS-4C(2) 1.00 110.000 5.800 0.025 15.95
TCS-5 2.00 130.000 6.000 0.025 39.00
TCS-4E(1) 1.00 50.000 7.980 0.025 9.98
TCS-4E(2) 1.00 50.000 8.665 0.025 10.83
TCS-6 2.00 500.000 8.000 0.025 200.00
TCS-7 1.00 100.000 10.500 0.025 26.25 HOSUR TO
TCS-7 1.00 100.000 6.250 0.025 15.63 AIRPORT ROAD 270.75
TCS-7A(1) 1.00 50.000 12.600 0.025 15.75 (ARM G)
TCS-7A(2) 1.00 50.000 10.500 0.025 13.13 cum
AIRPORT RAMP
TCS-8 2.00 80.000 5.500 0.025 22.00 cum TOWARDS 144.28
TCS-8A 2.00 311.537 7.850 0.025 122.28 cum CIRCLE
(ARM E)
Service Road 1,564.26

Major Junction
Y- Junction 3.00 100.000 11.000 0.025 82.50
X- Junction 1.00 100.000 11.000 0.025 27.50
T-Junction 1.00 100.000 11.000 0.025 27.50
5- Legged - Junction 2.00 100.000 11.000 0.025 55.00
Rani Chennamma Circle 1.00 7,856.000 0.025 196.40

Minor Junction
Y- Junction 0.00
X- Junction 8.00 60.000 7.000 0.025 84.00
T-Junction 3.00 60.000 7.000 0.025 31.50
504.40
TOTAL 3,249.87
Say 3,250.00 cum
DETAILS OF QUANTITIES
Traffic Signs, Markings & Other Appurtenances

Item No. Description No. Length (m) Breadth (m) Height (m) Quantity Unit

1.00 SIGNS & MARKINGS

Hazard marker (300mm X 900mm) 151.00 151.00 Each


On Medians from 2 to 4 lanes 51.00

ARM - E( Including Left and Right Ramp) 31.00


ARM - G 8.00
ARM - C 6.00
RAMP UP TO AIRPORT ROAD 6.00

On Medians on junctions 28.00


Major Junction 28.00
Minor Junction 44.00

Object marker (300mm equi. Triangle) 63.00 63.00 Each

Cautionary sign (900mm equi. Triangle)


Left / Right Curve 20.00
Intersection sign 77.00
Merging Traffic Sign 4
Single Chevron 112
U-Turn Ahead 13
Rotary Interchange Ahead 13
Total 239 239.00 Each

Mandatory Sign (900 mm dia. Circular)


Give way (Triangle) 78.00
Stop sign (Octagonal) 78.00

Speed Limit 32.00


Total 188.00 188.00 Each

Facility Information Sign (600mm X 800mm) 12.00 12.00 Each


Name Informatory Board (1200mm X 450mm) 15.00 15.00 Each

Thermoplastic paint (BERGER / Equivalent Brand)


Main Carriage way
Edge Marking 2.00 1,261.000 0.150 378.30 sqm
Center Line 1.00 1,261.000 0.150 189.15 sqm

Directional Arrows, lettering etc. 13.00 562.000 1.500 10,959.00 sqm


Total 11,526.45 sqm

For Major Junctions and Minor Junctions 11,526.450 10.00% Total 1,152.65 sqm
Sub Total 12,679.10 sqm
Say 12,700.00 sqm
RPM (Twin moulded Shanks)
Main CarriageWay
center line 1.00 420.000 420.00 No.
Edge Line 2.00 420.000 840.00 No.
Total 1,260.00 No.
Say 1,260.00 No.

Median marker Double side 2 3,875.000 260.00 Each

6.00 Overhead Signs


Providing and erecting overhead signs with a corrosion resistant
2mm thick aluminum alloy sheet reflectorized with high intensity
retro-reflective sheeting of encapsulated lenses type with vertical
and lateral clearance given in clause 802.2 and 802.3 and installed as
per clause 802.7 over a designed support system of aluminum alloy
or galvanized steel trestles and trusses of sections and type as per
structural design requirements and approved plans, complete as per
clause 802
6.10 2 - Legged overhead Gantry sign Boards
4.00 4.00 Each
Total 4.00 Each
Say 4.00 Each

6.20 Caniliver single post Gantry Sign Boards


9.00 9.00 Each
Total 9.00 Each
Say 9.00 Each
7.00 Pedestrian Guard Rail
TCS1 0.00 0.00 0.00 0.00 0.00
TCS1A 1.00 160.000 - - 160.00
TCS1B 0.00 0.00 0.00 0.00 -
TCS 2 2.00 150.000 - - 300.00
TCS 2D 0.00 0.00 0.00 0.00 -
TCS 2A(1) 0.00 0.00 0.00 0.00 -
TCS 2B(1) 0.00 0.00 0.00 0.00 -
TCS 2A(2) 0.00 0.00 0.00 0.00 -
TCS 2B(2) 0.00 0.00 0.00 0.00 0.00
TCS 2C 0.00 0.00 0.00 0.00 0.00
TCS -4/4B(1) 0.00 0.00 0.00 0.00 0.00
TCS -4A(1) 0.00 0.00 0.00 0.00 0.00
TCS -4A(2) 0.00 0.00 0.00 0.00 0.00
TCS -4D(1) 0.00 0.00 0.00 0.00 0.00
TCS -4D(2) 0.00 0.00 0.00 0.00 0.00
TCS -4/4B(3) 0.00 0.00 0.00 0.00 0.00
TCS-4C(1) 0.00 0.00 0.00 0.00 0.00
TCS-4C(2) 0.00 0.00 0.00 0.00 0.00
TCS-5 2.00 130.000 - - 260.00
TCS-4E(1) 0.00 0.00 0.00 0.00 0.00
TCS-4E(2) 0.00 0.00 0.00 0.00 0.00
TCS-6 - - - - -
TCS-7 2.00 100.000 - - 200.00
TCS-7A - - - - -
TCS-8 2.00 80.000 - - 160.00

TCS-8A - - - - -

Total 1,080.00 LM
Say 1,080.00 LM
As per Schedule 2,000.00 LM
AMENITIES
8.00 High Mast Lighting
Providing and erecting a high mast pole lighting with 30 m high hot
dip galvanized mast designed to withstand forces exerted with wind
speeds of 180 km per hour with 3 seconds gust, as per IS:875 (Part 3)
- 1978, fitted with a base flange, door at the base of mast with heavy
duty internal lock, lantern carriage, suitable winching arrangement
for safe working load of 750 kg and high powered electrically driven
power tools for raising and lowering of lantern carriage, flexible 8
core electric cable, lightening conductor, earthing terminal, and
fixing 2 nos aviation obstruction lights on top of the mast, all
complete as per approved design and drawings

16.00 16.00 No.


Total 16.00 No.
Say 16.00 No.

Street Lighting
9.00 Street Lighting Single Pole - Double side overhanging
TCS1 0.00 0.000 0.000 0.000 0.00
TCS1A 0.00 0.000 0.000 0.000 0.00
TCS1B 0.00 0.000 0.000 0.000 0.00
TCS 2 1.00 6.000 - - 6.00
TCS 2D 1.00 2.000 - - 2.00
TCS 2A 1.00 17.280 - - 17.28
TCS 2B(1) 1.00 2.000 - - 2.00
TCS 2B(2) 1.00 3.600 - - 3.60
TCS 2C 1.00 2.400 - - 2.40
TCS -4/4B(1) 1.00 4.000 - - 4.00
TCS -4A(1) 1.00 4.000 - - 4.00
TCS -4D(1) 1.00 4.000 - - 4.00
TCS -4/4B(2) 1.00 3.440 - - 3.44
TCS -4A(3) 11.00 10.560 - - 116.16
TCS-4C(1) 0.00 0.000 0.000 0.000 0.00
TCS-5 0.00 0.000 0.000 0.000 0.00
TCS-4E(1) 0.00 0.000 0.000 0.000 0.00
TCS-6 0.00 0.000 0.000 0.000 0.00
TCS-7 0.00 0.000 0.000 0.000 0.00
TCS-7A
TCS-8 0.00 0.000 0.000 0.000 0.00

TCS-8A 0.00 0.000 0.000 0.000 0.00

Total 164.88 No.


Say 165.00 No.
10.00 Street Lighting Single Pole - single side overhanging

TCS1 1.00 11.400 - - 11.40


TCS1A 2.00 12.800 - - 25.60
TCS1B 1.00 2.000 - - 2.00
TCS 2 1.00 6.000 - - 6.00
TCS 2D 1.00 2.000 - - 2.00
TCS 2A(1) 1.00 8.000 - - 8.00
TCS 2B(1) 1.00 2.000 - - 2.00
TCS 2A(2) 1.00 9.280 - - 9.28
TCS 2B(2) 1.00 3.600 - - 3.60
TCS 2C 1.00 2.400 - - 2.40
TCS -4/4B(1) 1.00 4.000 - - 4.00
TCS -4/4B(2) 1.00 3.440 - - 3.44
TCS -4A(1) 1.00 4.000 - - 4.00
TCS -4D 1.00 4.000 - - 4.00
TCS -4/4B(3) 1.00 10.560 - - 10.56
TCS-4C 2.00 4.400 - - 8.80
TCS-4E 1.00 3.600 - - 3.60
TCS-5 2.00 5.200 - - 10.40
TCS-6 1.00 20.000 - - 20.00
TCS-7 2.00 4.000 - - 8.00
TCS-7A 1.00 2.000 - - 2.00
TCS-8 2.00 3.200 - - 6.40

TCS-8A 2.00 12.460 - - 24.92

Total 182.40 No.


Say 183.00 No.

11.00 Close circuit Camera CCTV Camera

Supply Of 4 MP Standard Resolution IP Bullet CCTV Camera HD


Metal Body. 25/30fps 3.6 -12mm Lens with IR LED's, 5MP IP 82.00 82.00

Supply Of 1080P NVR 200mbps Up To 8MP Support Recording 2


SATA Port Supports Up To 8TB Mobile View HDMI, VGA Out. , 16 1.00 1.00
Ch NVR
Supply and Installation 4TB Sata Surveillance HDD For NVR
Recording. 4.00 4.00

Supply and Installation Of 35” HD LED TV With Remote 2.00 2.00


Supply 8 Port POE Network Switch 2.00 2.00
Supply 4 Port POE Network Switch 4.00 4.00
Supply Of 4U Rack with Locking, Power and Fan, Front Glass Door
Tray. 2.00 2.00

Supply Of 2U Rack with Locking, Power and Fan, Front Glass Door
Tray 4.00 4.00

Supply of On-Line UPS Suitable For 1ph AC Input And 1ph 2.00 2.00
Total 103.00 NO.
Say 103.00 No.

12.00 LED Light Under Deck @ 25m C/C


Providing LED Light Undaer Deck @25m C/C
TCS -1 2.00 285.000 - - 22.80 NO.
TCS -2B 2.00 90.000 - - 7.20 NO.
TCS -2A 2.00 432.000 - - 34.56 NO.
TCS -2B 2.00 50.000 - - 4.00 NO.
TCS - 2C 2.00 60.000 - - 4.80 NO.
TCS -4/4B 2.00 814.000 - - 65.12 NO.
TCS -4D 2.00 100.000 - - 8.00 NO.
TCS -6 2.00 500.000 - - 40.00 NO.
TCS -8A 2.00 311.537 - - 24.92 NO.
Total 211.40 No.
Say 212.00 No.

13.00 Providing AND Laying SS Raililng around the Rani Chennamma


Circle
1.00 69.370 69.37 LM
Say 70.00 LM

14.00 Providing and Laying M20 Grade Concrete Traffic Islands


at rani Chennamma Circle
a At Garde Intersection 1.00 681.200 0.300 0.300 61.31 Cum
b Garde seperated intersection 1.00 316.480 0.500 0.500 79.12 Cum

c Major Junctions 7.00 200.000 0.300 0.300 126.00 Cum


d Minor Junctions 11.00 170.000 0.300 0.300 168.30 Cum
434.73 Cum
Total 434.73 cum
Say 435.00 Cum

15.00 Landscping
a At Garde Intersection 1.00 340.600 6.000 2,103.60 Sqm
b Garde seperated intersection 1.00 158.240 6.000 949.44 Sqm
c Medians 1.00 1,937.500 1.500 2,906.25 Sqm
d Major Junctions 7.00 100.000 1.500 1,050.00 Sqm
e Minor Junctions 11.00 85.000 1.500 1,402.50 Sqm
Total 8,411.79 sqm
Say 8,412.00 sqm

16.00 Anti Glare Devices 2.00 154.218 Total 308.44


Say 309.00 No.

Aminities required for the statue of Rani Chennamma Circle


(As per the Final Architectural Drawing)
Alternate MS designed Panel Logo and Name 7.00 7.00 No.

230mm Brick wall


a) 69m Length Brick wall
PCC Below Brick wall 1.00 69.000 0.100 0.100 0.69 Cum
Brick work 24.15 Sqm
Mortor 1.00 69.000 0.600 1.23 Cum
b)60m Length Brick wll
PCC Below Brick wall 1.00 60.000 0.100 0.100 0.60 Cum
Brick work 21.00 Sqm
Mortor 1.00 60.000 0.600 1.07 Cum
c)47m Brick wall
PCC Below Brick wall 1.00 47.000 0.100 0.100 0.47 Cum
Brick work 16.45 Sqm
Mortor 1.00 47.000 0.600 0.84 Cum

Total PCC Required for Brick wall 1.76 Cum


Total Brick work Required 61.60 Sqm
Total Mortor 3.14 Cum

MS Railing Around the Rani Chennamma statue


MS Section Panel 1.00 69.000 69.00 RM
MS Rod 30mm dia fro the Railing 3.00 69.000 207.00 RM

Landscaping at Statue 1.00 60.000 60.00 RM


Plantation for Statue( AT EVERY 3m) 1.00 15.667 15.67 No.
say 16.00 No.

17.00 Paver Blocks at the PCC Foundation for Drain


Providing and Laying 80MM Paver Blocks Including Foundations for
PCC concrete
TCS1 2.00 285.000 1.000 570.00 Sqm
TCS1A(1) 1.00 160.000 1.500 240.00 Sqm
TCS1A(2) 1.00 160.000 1.000 160.00 Sqm
TCS1B(1) 1.00 55.000 1.500 82.50 Sqm
TCS1B(2) 1.00 55.000 1.000 55.00 Sqm
TCS 2C 2.00 60.000 1.000 120.00 Sqm
TCS -4A(1) 1.00 100.000 1.000 100.00 Sqm
TCS -4A(2) 1.00 100.000 2.500 250.00 Sqm
TCS -4D 1.00 100.000 1.500 150.00 Sqm
TCS -4B 1.00 250.000 1.000 250.00 Sqm
TCS -4C 1.00 110.000 2.100 231.00 Sqm
TCS-5 2.00 130.000 1.100 286.00 Sqm
TCS-4E(1) 1.00 50.000 1.400 70.00 Sqm
TCS-4E(2) 1.00 50.000 1.500 75.00 Sqm
TCS-7 1.00 100.000 1.500 150.00 Sqm
TCS-7A 1.00 50.000 1.500 75.00 Sqm
TCS-8A 2.00 312.000 1.500 936.00 Sqm
TCS-8 2.00 66.000 1.500 198.00 Sqm
Total 3,998.50 Sqm
Say 3,990.00 Sqm

18.00 Kilometer Stones 2.00 6.000 12.00 No.


19.00 Hectometer Stones 2.00 20.000 40.00 No.

20.00 Rain Water Harvesting 5.00 5.00 No.


21.00 Rumble Strips 33.00 33.00 No.